POWER DISTRICT RFQ PRE-PROPOSAL PRESENTATION
AGENDA OUTLINE
1. STAFF INTRODUCTIONS
2. PROJECT OVERVIEW
3. RFQ PURPOSE
4. RFQ SCHEDULE
5. RFQ ADDENDA
6. BID PROCESS
7. SELECTION PROCESS
8. AWARD
9. Q & A
POWER DISTRICT RFQ PRE-PROPOSAL PRESENTATION
INTRODUCTIONS
1. ANDREW MEEKER, CRA Project Manager Lead
2. SARAH VIDAL-FINN, Interim CRA Director
3. SUZANNE WYNN, CRA Project Manager Assist
4. KRISTIE WILLIAMS, GRU Land Rights Coordinator
5. DANA GAUTHIER, GRU Purchasing Rep, Senior Buyer
POWER DISTRICT GOALS 1. Attract private investment into the area while maintaining the principles and
community vision of the 2013 Redevelopment Plan and current zoning allowances.
2. Leverage public resources that directly encourage economic development activities.
3. Create a distinctive “sense of place” by creatively celebrating the industrial character of the area by way of architecture, urban design, engineering, and place making.
4. Develop density differently by breaking up single large scale buildings into a series of multiple smaller scale buildings with decentralized parking.
5. Daylight Sweetwater Branch Creek and activate public spaces.
6. Re-connect the urban fabric throughout the Power District by way of integrated pedestrian and vehicular facilities.
POWER DISTRICT GOALS 7. Implement an eclectic and wide range of land uses within the Power District that
provide employment, housing, entertainment, and recreation opportunities.
8. Compliment the adjacent surrounding neighborhood and land uses including the Southeast Historic District and McRorie Community Garden.
9. Adaptively re-use buildings and materials to maintain the history and character of the area.
10. Develop flexible spaces for independent, local, and diverse businesses with a wide range of rental rates and property ownership options.
11. Foster relationships between small, diverse, local developers and larger developers to ensure local participation.
12. Utilize a diversity of temporary programming events to promote and market the Power District.
13. Use innovative environmentally-friendly architecture and site design to promote sustainability.
MILESTONES & DUE DILIGENCE 1. OPENING GRU EASTSIDE OPERATIONS CENTER
2. CATALYST ADAPTIVE REUSE PROJECT
3. 2013 REDEVELOPMENT PLAN + STAKEHOLDER ENGAGEMENT
4. REZONING
5. SWEETWATER DAYLIGHTING FEASIBILITY
6. INFRASTRUCTURE ANALYSIS
7. ENVIRONMENTAL ANALYSIS
8. BUILDING NEEDS ASSESSMENTS
9. AESTHETIC IMPROVEMENTS
10. PROGRAMMING & SPECIAL EVENTS
11. RFQ SOLICITATION
PUBLIC SERVICES
(PS)
URBAN MIXED-USE 2
(UMU-2)
CENTRAL CITY
DISTRICT (CCD)
MULTI-FAMILY MEDIUM DENSITY
RESIDENTIAL (RMF7)
LIMITED INDUSTRIAL
(I1) GENERAL
INDUSTRIAL (I2)
SINGLE-FAMILY
RESIDENTIAL (RSF4)
CONSERVATION (CON)
POWER DISTRICT
BOUNDARY
CENTRAL CITY
DISTRICT (CCD)
URBAN MIXED-USE 2
(UMU-2)
POWER DISTRICT COMPLETED REZONING LIMITS
UMU-2
• ~12 ACRES
• 6 STORIES BY RIGHT
CCD
• ~3 ACRES
• 12 STORIES BY RIGHT
PURPOSE/OBJECTIVE Evaluate the feasibility of daylighting Sweetwater Branch Creek (SE 4th Ave SE 5th Ave)
SCOPE 1. Agency Coordination
2. Data Collection
3. Daylighting Analysis
a. Hydrology & Hydraulics
b. Existing Conditions Research
c. Cost Estimates
d. Benefits/Disadvantages
e. Illustrations
4. Researched-Based Viable Options
Sweetwater Branch Creek Daylighting Concept
POWER DISTRICT SWEETWATER BRANCH CREEK DAYLIGHTING FEASIBILITY STUDY
PURPOSE/OBJECTIVE Evaluate existing infrastructure within the Power District. Outline suggested projects to be evaluated as par t of the recommended strategic redevelopment plan.
SCOPE 1. Utility Providers & Agency Coordination
2. Data Collection
3. Existing Conditions Documentation
4. Redevelopment Infrastructure Demands
5. Implementation Recommendations
(Repor t & Map Series)
a. Summarize Deficiencies
b. Outline Needs, Upgrades (due to age and/or demand) and/or Relocations
c. Develop Priority Projects List
d. Cost Estimates
POWER DISTRICT INFRASTRUCTURE ANALYSIS
POWER DISTRICT ENVIRONMENTAL SITE ASSESSMENTS
PURPOSE/OBJECTIVE Summarize existing environmental repor ts and studies into a single document. Outline next steps, costs, and scope in order to remediate site.
SCOPE 1. Review, Analyze, and Summarize Existing Phase
1 & 2 Assessments For Entire Site
2. Action Plan Recommendations
3. Cost of Work Estimates
RESULTS 1. Typical Findings For Previous Industrial Use
2. Conditions Are Manageable
3. Fixes Can Be Phased When Needed
4. Identified Critical Decision Paths Based On
Redevelopment Activities
POWER DISTRICT BUILDING NEEDS ASSESSMENT
SCOPE SUMMARY
8 Buildings
~75,000 Sq.Ft.
Mixture Of Offices & Warehouses
Building Surveys
Mechanical, Electrical, & Plumbing Analysis
Structural Analysis
Environmental Analysis
Cost Estimates
POWER DISTRICT BUILDING NEEDS ASSESSMENT
Fleet Garage Fleet Building
Fleet Building
Water Waste Water Bldg
Fleet Garage Water Waste Water Ready Room
POWER DISTRICT BUILDING NEEDS ASSESSMENT
Operations Center & Warehouse Carpenters Shop Bldg.
Water Dist. Const. Bldg.
Field Services Bldg
MARKET INTEREST Over the past several years we have received numerous inquires from local and national parties such as developers, companies, businesses, entrepreneurs, retailers, and organizations interested in the Power District
A PRIVATE PUBLIC PARTNERSHIP VIA A RFQ/RFP SOLICITATION WILL IDENTIFY DEVELOPMENT DRIVEN INVESTMENTS SUCH AS… planning, design, engineering building improvements/demo streetscapes & public spaces uti l i ty relocations/upgrades environmental remediation recruitment & economic incentives
THE APPROACH 1. The Solicitation process will include two consecutive stages. The first stage is the
advertisement of an RFQ to determine a shortlist of Respondent(s) that have the qualifications required and are able to demonstrate a general conceptual approach and understanding of the goals and objectives for the Power District.
2. The second stage occurs once a shortlist selection of qualified developers has been made via this RFQ. Based on the feedback received as a result of this RFQ process subsequent RFP(s) will be crafted and advertised that will trigger the initial phases of development and land transfers.
3. The purpose of this RFQ is to advertise the Power District to the development sector.
4. The RFQ will solicit statements of qualifications from developers and/or teams of developers for the acquisition and development of the Power District.
5. Only pre-qualified developers or developer teams selected during this process will be allowed to participate in subsequent RFP solicitations. (this does not apply to independent sub-
developers, contractors, or vendors that will be participating in the implementation process as part of a development team)
WE BELIEVE THIS APPROACH WILL…
1. DEFINE MARKET INTEREST, PHASING, & DEVELOPMENT DRIVEN INVESTMENTS 2. BALANCE “HIGHEST AND BEST USE” WITH.. 3. HONORING THE 2013 REDEVELOPMENT PLAN
THAT INCLUDES OPPORTUNITIES FOR LOCAL, DIVERSE, AND INDEPENDENT BUSINESSES AND ENTREPRENEURS
P O W E R D I S T R I C T
POWER DISTRICT RFQ PRE-PROPOSAL PRESENTATION
PURPOSE OF THE RFQ
To solicit statements of
qualifications from developers
for the redevelopment of
approximately seventeen acres
of proper ty known as the Power
District. A shor t list of
prequalified developers from the
RFQ process will then be invited
to respond to a subsequent
Request for Proposal for the
eventual sale/disposition of the
Site.
SCHEDULE RFQ Advertisement April 18, 2016
Voluntary Pre-Proposal Conference May 18, 2016
Deadline For Receipt of Questions May 23, 2016
Addendum With Answers To Questions May 27, 2016
Deadline For Receipt Of Proposals June 9, 2016 @ 2P EST (NOTE: Late Proposals will not be considered or opened)
Evaluation/Selection Process Week of June 13, 2016
Oral Presentations, If Conducted Week of June 27, 2016
Selection Of Qualified Developers Week of June 27, 2016
Presentation Of Qualified Developers To CRA Board July 18, 2016
Advertisement Of Phase 1 RFP August 2016
ADDENDA Questions or requests for interpretations must be in writing:
C/O Dana Gauthier/Senior Buyer Phone: (352) 393-1250 Fax: (352) 334-2989 e-mail: [email protected]
Only questions answered by formal addenda will be binding, oral or other interpretations will be without legal effect.
There will not be any notices sent out. All addenda will be posted on the GRU website. It is the responsibility of interested developers to check the website for addendums and notices pertaining to this RFQ.
BID PROCESS Response Due Date – June 9, 2016 @ 2:00 PM local time
Bid Possession. Bids must be in the possession of Utilities Purchasing prior to bid call. Possession is defined as being physically received in Utility Purchasing on the 3rd floor of GRU Administration Building, 301 SE 4th Avenue, Gainesville, FL 32601. The time clock located in Utilities Purchasing is the official time to call bids.
Late Bids. Bids received late will not be considered and deemed non-responsive.
No Bids Via E-mail or Fax. Bids received via e-mail or fax will be deemed non-responsive and will not be considered.
BID PROCESS…con’t Responses must be submitted in a non-transparent sealed envelope and marked with:
Power District Development RFQ No. 2016-072 Respondent’s Name: ___________________ Respondents Address: __________________
Response Submittals. One (1) marked original and eight (8) double-sided copies and one electronic PDF file.
The original must be submitted in loose leaf form on 8.5” X 11” white paper and reproducible without color copying.
Instructions for the Response Format are given in Section 3.5 of the RFQ.
SELECTION PROCESS Evaluation Criteria/Points
1. Relevant Experience and Personnel – 40 Points Max
2. Financial Capacity – 20 Points Max
3. Strength of references – 10 Points Max
4. Conceptual Approach & Quality of the Written Narrative – 30 Points Max
Oral Presentations
Only if needed. The projected timeframe is in the week of June 27th. GRU reserves the right to change the timing of Presentations.
Purchasing will contact those invited to give instructions and coordinate the logistics.
Instructions and coordination will be done by Purchasing.
AWARD
1. Finalized Ranking will be posted and respondents will be notified.
2. The final ranking will be presented to the CRA Board on July 18, 2016 for approval.
3. The top ranked prequalified Respondents will be invited to respond to a subsequent RFP.