PKP Polish Railway Lines’ investment plans >> Creating a World Class Rail Network
Citation preview
www.plk-sa.pl 1
PKP Polish Railway Lines’ investment plans
>> Creating a World Class Rail Network <<
Warsaw, 16th November 2011Dr. Marek Pawlik Dr. Marek Pawlik
PKP PLK S.A. Vice President
www.plk-sa.pl 2
TSIs for both HS and CR systems:TSI NOI (Noise)TSI SRT (Safety in Rail Tunnels)TSI PRM (Persons with Reduced Mobility)TSI TAP (Telematics, Passenger Services)
TSIs for Conventional rail systemTSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operational)TSI RST + TSI WAG (Rolling Stock)TSI TAF (Telematics, Freight Services)
Structural sub-systems Functional sub-systems
OPE
MAI
TAF/TAP
ENE
CCS
INF
RST
TSIs for High Speed rail systems:TSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operation)TSI RST (Rolling Stock)
.
.
.
www.plk-sa.pl 3
Lines of state importance upgrading for interoperability ~1500 kms of lines
PKP PLK S.A. investments in structural sub-systems
2007 - 2013
Lines of local importance upgrading in accordance with EU regulations ~1000 kms of lines
railway network in Poland 20 547 kms of lines
www.plk-sa.pl 4
4
Main Tasks for Preparing High Speed Line Warszawa – Lodz – Poznan/Wroclaw
Task Realisation
Feasibility study for HSL Warszawa – Lodz – Poznan/Wroclaw
I stage: 2010-2011II stage: 2011-2012
Feasibility studies for rebuilding railway junctions in Warszawa, Poznan, Wroclaw, Lodz (with tunnel)
2010-2013
Preparation of technical standards for HSL 2010-2013
Training of personnel for project, construction and operation of HSL
2010-2020
Promotional and information activities 2010-2020
Construction of HSL and launching the operation 2014-2020
Modernisation of other complementary lines and stations
2010-2020
www.plk-sa.pl 5
5
Planned HS Linesand its extension to neighbour countries
www.plk-sa.pl 6
6
HSL Warszawa – Lodz – Poznan/Wroclaw
Parameters of a new line
Lenght of line ~ 450km
Maximum speed 350km/h
Electrification 2x25kV, 50Hz
Technical standards in accordance with TSI HS
Travel time: Warszawa – Lodz Warszawa – Poznan Warszawa – Wroclaw Poznan – Wroclaw Warszawa - Opole
35 min (currently ~1h 30 min) 1 h 35 min (currently ~3 h) 1 h 40 min (currently ~5 h) 55 min (currently ~2 h 40 min) 2 h 00 min (currently ~4 h 30 min)
www.plk-sa.pl 7
Modernisation and Extensionof CMK line
www.plk-sa.pl 8
8
HSL Warszawa – Katowice/Krakow – South Border
Parameters of a new line
Lenght of line ~ 440km
Maximum speed up to 300km/h
Electrification 2x25kV, 50Hz
Technical standards in accordance with TSI HS
Travel time: Warszawa – Katowice Warszawa – Krakow Lodz – Krakow Poznan – Krakow
1h25min (currently 2h25min) 1h25min (currently 2h35min) 1h25min (currently ~ 3h) 2h30min (currently ~ 6h)
www.plk-sa.pl 9
High speed trains High speed trains on conventional on conventional railway linesrailway lines
- standards for: - HS lines - HS trains
- compatibility with: - 2007-13 Cohesion Fund investments - existing railway infrastructure
2:40
Warszawa -
Gdańsk
1:35około 340 km
Warszawa -
Poznań
0:35około 120 km
Warszawa - Łódź
1:40około 345 km
Warszawa - Wrocław
1:30
Warszawa -Białystok
1:40
Warszawa - Lublin
3:30
Warszawa - Rzeszów
3:1
5
Warszawa -
Szczecin
ok. 3:30
Warszawa -
Berlin
www.plk-sa.pl 10
PKP PLK S.A. investment process
• plans to the Master Plan 2030;
• tenders for feasibility studies;
• gradual change from tenders for design and tenders for construction to tenders for design and construction;
• intensive works on standardised tender documents both in legal and technical dimensions.
www.plk-sa.pl 11
TSIs for both HS and CR systems:TSI NOI (Noise)TSI SRT (Safety in Rail Tunnels)TSI PRM (Persons with Reduced Mobility)TSI TAP (Telematics, Passenger Services)
TSIs for Conventional rail systemTSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operational)TSI RST + TSI WAG (Rolling Stock)TSI TAF (Telematics, Freight Services)
Structural sub-systems Functional sub-systems
OPE
MAI
TAF/TAP
ENE
CCS
INF
RST
TSIs for High Speed rail systems:TSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operation)TSI RST (Rolling Stock)
.
.
.
www.plk-sa.pl 12
PKP PLK S.A. CCS investments
• plans to the ERTMS National DeploymentPlan quoted by MP2030;
• ETCS implementation: - 84 kms - pilot project (l2),- 224 kms - CMK speeding-up (l1)- 8 traction vehicles in the pilot,- 10 HS Locos for IC trains (to be equipped after suply)- 20 HS trainsets to be delivered with ERTMS on-board - European ERTMS Master Plan (~ 300 kms per year in Poland);
• GSM-R implementation:- 84 kms pilot + 2 MSCs in Warsaw and Poznań- 1300 kms of lines with already available preliminary GSM-R planning
www.plk-sa.pl 13
TSIs for both HS and CR systems:TSI NOI (Noise)TSI SRT (Safety in Rail Tunnels)TSI PRM (Persons with Reduced Mobility)TSI TAP (Telematics, Passenger Services)
TSIs for Conventional rail systemTSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operational)TSI RST + TSI WAG (Rolling Stock)TSI TAF (Telematics, Freight Services)
Structural sub-systems Functional sub-systems
OPE
MAI
TAF/TAP
ENE
CCS
INF
RST
TSIs for High Speed rail systems:TSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operation)TSI RST (Rolling Stock)
.
.
.
www.plk-sa.pl 14
• RS certification for networkversus ETCS cert by projects;
• PLK Involvement in RS XA legal works: - 2008/57/EC annex VII,- 2009/131/EC changing annex VII;
• Follow up EU legal works(GIG based on corr. F & C):
- supporting notification of the Polish requirements for RS, - supporting equivalence checking.
key RS questionsThe Railway System
Safety Directive
RUs and IMS
Safety
Management
Systems
Current
TSI
Legacy
National
Rules
Open
Points
Off
TENS
Final TSI
Scope of X Acceptance
www.plk-sa.pl 15
TSIs for both HS and CR systems:TSI NOI (Noise)TSI SRT (Safety in Rail Tunnels)TSI PRM (Persons with Reduced Mobility)TSI TAP (Telematics, Passenger Services)
TSIs for Conventional rail systemTSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operational)TSI RST + TSI WAG (Rolling Stock)TSI TAF (Telematics, Freight Services)
Structural sub-systems Functional sub-systems
OPE
MAI
TAF/TAP
ENE
CCS
INF
RST
TSIs for High Speed rail systems:TSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operation)TSI RST (Rolling Stock)
.
.
.
www.plk-sa.pl 16
PKP PLK S.A. strategy regarding rail telematics
• TAF implementation PLK strategy accepted;
• Involvement in TAF CCG: - PLK is investing in TAF Common Components,- PLK is a test partner for Common Interface;
• Active in TAF + TAP + WIMO discussions;
• Preparing implementation (1st step):
- CE20 east-west on data from SEPE,- CE65 north-south on manualy entered data.
(Wagons & Inter-Modal unitsOperational database)
(Wagons & Inter-Modal unitsOperational database)
www.plk-sa.pl 17
TSIs for both HS and CR systems:TSI NOI (Noise)TSI SRT (Safety in Rail Tunnels)TSI PRM (Persons with Reduced Mobility)TSI TAP (Telematics, Passenger Services)
TSIs for Conventional rail systemTSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operational)TSI RST + TSI WAG (Rolling Stock)TSI TAF (Telematics, Freight Services)
Structural sub-systems Functional sub-systems
OPE
MAI
TAF/TAP
ENE
CCS
INF
RST
TSIs for High Speed rail systems:TSI INF (Infrastructure)TSI ENE (Energy)TSI CCS (Control Command)TSI OPE (Operation)TSI RST (Rolling Stock)
.
.
.
Railway Railway Safety DirectiveSafety Directive
Railway Railway Safety DirectiveSafety Directive
www.plk-sa.pl 18
Prod
uctio
n
Accidents, unsafeincidents
Early warning indicators
Risik Assessmenta) generelb) specific
Other influences
Program, TargetsMeasures
A c c i d e n t I n v e s t i g a t i o n s
Plan, Resources,(incl Financing)
Measuring systemΔ(Target/Actual)
ActionRisk Assessment
Monitoring (aims, projects)
Safety comparisions
Requirements,Politics, Strategies,Standards
Actual
A u d i t s
Prod
uctio
nPr
oduc
tion
Accidents, unsafeincidents
Early warning indicators
Risik Assessmenta) generelb) specific
Other influences
Program, TargetsMeasures
A c c i d e n t I n v e s t i g a t i o n s
Plan, Resources,(incl Financing)
Measuring systemΔ(Target/Actual)
ActionRisk Assessment
Monitoring (aims, projects)
Safety comparisions
Requirements,Politics, Strategies,Standards
Actual
A u d i t sA u d i t s
PLK SMSPLK SMS
(safety management system)(safety management system)
ACCEPTED ACCEPTED by Polish NSAby Polish NSA
PLK SMSPLK SMS
(safety management system)(safety management system)
ACCEPTED ACCEPTED by Polish NSAby Polish NSA
www.plk-sa.pl 19