nSQP Status
June 28, 20101
Pixel nSQPUpdate ER Bundle transmission
qualification tests
Presented by
David [email protected]
David Nelson
nSQP Status
June 28, 2010
nSQP Bundle Test
2
David Nelson
nSQP Status
June 28, 2010
nSQP Bundle Test
3
PP0 Board
HSIO
TERMINATION
BOARD
INTERFACE BOARD
ER CABLE
PIGTAILS
David Nelson
nSQP Status
June 28, 2010
Single Bundle Test
4
DT07-SHIELDDT07-NO SHIELD
CK7-NO SHIELD
DCI7-NO SHIELD DCI7- SHIELD
CK7- SHIELD
David Nelson
nSQP Status
June 28, 2010
Bundle test statusHSIO Bundle test board fabricated and partially loaded.
Need to load 10 each 16 channel LVDS driver chips
Need to wire bond more VDCs
Need to load DORIC and VDC chips
E-board termination fabricated and loaded
PP0 board is loaded
Pigtail cables are available
Need one E-board from CERN
Need five ER wire bundles from CERN
Need firmware for test.Martin Kocian will modify existing firmware used on the IBL wire bundle tests.
UCF file is ready