P&ID

Embed Size (px)

DESCRIPTION

P N I D

Citation preview

  • SludgeSewage

    HEAT REJECTION STAGE (3 stages) HEAT RECOVERY STAGE (21 stages)

    P-101A~G

    P-106A~D

    S-101

    T-101

    P-102A~D

    P-104A~D

    P-105A~D

    P-108A/B

    P-107A/B

    P-103A/B

    P-109A/B

    P-110A/B

    D-101A~DD-102A~D

    E-103A~D

    E-101A~D E-102A~D

    C-101A~D

    CSP-P-02-PID

    C-201A/B

    CSP-P-02-PID

    ST-202

    WST-P-03-PID

    E-301

    WST-P-03-PID

    T-301

    Vent

    Kelompok 10

    No Scale

    Date:Drawn by:

    Note:

    Examined by:

    Department of Chemical EngineeringUniversitas Indonesia

    PLANT-1: MULTI STAGE FLASH DESALINATION PLANTPIPING & INSTRUMENTATION DIAGRAM

    Drawing No.:MSF-P-01-PID

    A3

    Date:1Revision No.:

    T-102

    UC / DRAIN

    UC / DRAIN

    DRAIN

    VENT

    Steam to Deaerator S

    team

    to

    D

    eaer

    ato

    r

    LC101

    LC102

    FC101

    FC102

    AC101

    FC103

    TC101

    TI101

    TI103

    AC102

    TI106

    TI103

    TI102

    LI124

    LI123

    LI122

    LC121

    LI101

    LI102

    PI101

    TI107

    FI101

    FI102

    AC101

    LC124

    TI104

    FC103

    TC102

    LC123

    LC122

    LC106

    LC105

    LC104

    LC103

    Seawater

    E-103Brine

    Heater

    E-101/2Rejection Heat

    Exchanger

    S-101Travelling

    Screen

    D-101Heat Rejection

    Stage MSF

    T-101Basin

    Sedimentation

    T-102NaOCl Storage

    Tank

    C-101Deaerator

    P-101Submersible Pump

    P-102Feed Seawater

    Pump

    P-103Cooling Seawater

    Pump

    P-104NaOCl Injection

    Pump

    P-105Brine Recycle

    Pump

    P-106Brine Blowdown

    Pump

    P-107Brine Reject

    Pump

    D-102Heat Recovery

    Stage MSF

    P-108Distillate Pump

    P-109Steam Condensate

    Pump

    P-110Utility Water

    Pump

  • PSV 202

    PSV201

    PT-201

    Electricity

    C-201A C-202A

    E-201

    E-204

    E-203

    ST-201 ST-202

    P-203A/B

    P-204A/B

    P-202A/B

    T-201

    E-202

    T-202

    MSF-P-01-PID

    E-103A~D

    MSF-P-01-PID

    P-110A/B

    Kelompok 10

    No Scale

    Date:Drawn by:

    Note:

    Examined by:

    Department of Chemical EngineeringUniversitas Indonesia

    PLANT-2: CONCENTRATED SOLAR POWER PLANTPIPING & INSTRUMENTATION DIAGRAM

    Drawing No.:CSP-P-02-PID

    A3

    Date:1Revision No.:

    SolarRadiation

    P-205A/B

    P-201A/B

    P-206A~J

    Backwash Inflow

    Backwash Inflow

    AC201

    Regeneration Inflow

    Regeneration Inflow

    LC202

    AC202

    LC201

    To C-201B To C-202B

    PC201

    TC201

    TC202

    FC201

    LSH201

    LSL201

    LSH202

    LSL202

    FC202

    FC203

    TI201

    TI202

    TI203

    TI204

    PC202

    PI201

    TI205

    PI202

    TI206

    PI203

    TI207

    TI208

    TI209

    TI210

    TI211

    TI212

    FI201

    FC204

    C-201Cation

    Exchanger

    C-202Anion

    Exchanger

    P-201/2Utility Water

    Pump

    E-202Pre-Heater (1st

    Heat Exchanger)

    E-203Evaporator (2nd Heat Exchanger)

    E-204Superheater (3rd Heat Exchanger)

    ST-2011st Steam Turbine

    ST-2022nd Steam Turbine

    E-201Molten Salt Storage

    Heat Exchanger

    P-203Hot Molten Salt

    Screw Pump

    P-204Cold Molten Salt

    Screw Pump

    T-201Hot Molten Salt

    Storage Tank

    T-202Cold Molten Salt

    Storage Tank

    P-205Screw Pump

    P-206Parabolic Through

    Screw Pump

    PT-201Parabolic Through

    Solar Collector

  • WST-P-03-PID

    P-108A/B

    WST-P-03-PID

    P-107A/B

    T-301A/B

    P-301A/B P-303A/BP-302A/B

    T-302 T-303 T-304

    P-304A/B

    T-301

    Ultraviolet Disinfection Basin

    P-301/2/3

    Potable Water Storage Tank Pump

    P-304

    Potable Water Distribution Pump

    T-302/3/4

    Potable Water Storage Tank

    T-305

    Salt Storage TankE-301

    Solar Evaporator (Salt Ponds)

    T-305Water Evaporated

    Salt Harvested

    Kelompok 10

    No Scale

    Date:Drawn by:

    Note:

    Examined by:

    Department of Chemical EngineeringUniversitas Indonesia

    PLANT-3: POTABLE WATER & SALT TREATMENT PLANTPIPING & INSTRUMENTATION DIAGRAM

    Drawing No.:WST-P-03-PID

    A3

    Date:0Revision No.:

    Potable Water

    E-301

    LI301

    LI302

    LI303

    LC301

    AC304

    AC303

    AC302

    AC301

    FC301

    2nd Grade Salt

    Brine WaterBack to Sea

    P&ID.vsdPlant-1Plant-2Plant-3