    Piping & InstrumentationDiagram (PID)

    What is PID?The Usage ofPID

    PIDs ElementsHow to CreatePID

  • 8/9/2019 Training P&ID

    3/45

    Whats PID?

    Diagram shows

    ! E"uipments s#stem

    ! Piping s#stem

    !Instrumentation$%ontrol

    s#stem

  • 8/9/2019 Training P&ID

    4/45

    E'i*ent S"!te*!:

    - The path/flow of equipments (equipments

    arrangements)

    - Equipments types (tanks, rotating

    equipments, pumps, blowers,mixers, heat

    exchanger,etc)- Equipments !etails (specification, !imension,

    stan!ar!s, connections, utility !ata, etc)

  • 8/9/2019 Training P&ID

    5/45

  • 8/9/2019 Training P&ID

    6/45

    In!tr*entation+%ontro,!"!te*

    - instrumentation system (local/remote

    instrumentation)

    - control system (", *%, control

    +al+es,etc)

    - safety system ("%)

  • 8/9/2019 Training P&ID

    7/45

    The Usage of PID

    "&* is implementation of process system conceptual

    "&* is a more complete-"* with control system .specification/!etails !ata

    "&* is input (upstream !ocument) for otherengineering/procurement/construction !isciplines(material take off equipment, piping,instruments,scope of supply checking,construction

    stages,commissioning/start up sequences)

    "&* is the !ata source for analysis of ha0ar!ousoperation (1#23"), risk mitigation of operation

  • 8/9/2019 Training P&ID

    8/45

    Pro%e!! Con%etI*,e*entation

    4esearch/!e+elopmentprocess flow

    !iagram,material/heat balance,utility

    consumption,chemical reactionspiping .instrumentation !iagram

  • 8/9/2019 Training P&ID

    9/45

    PID i! *ore %o*,ete P-D

    "* 5 equipment si0ing5instrumentation/control

    system5!etails information 6 "&*

  • 8/9/2019 Training P&ID

    10/45

    PID i! int (!trea* #o%*ent) or ot/erenineerin+ro%re*ent+%on!tr%tion #i!%i,ine!

    "&*isometric piping (an!/or "*%) for

    material take off piping (manual

    +al+es,pipes,fittings,re!ucers,gaskets,etc)

    hook up !rawing,wiring schematic,instrument

    layout, control system for material take off for

    instrument (bulk material an!/or in!i+i!ual

    instruments)

  • 8/9/2019 Training P&ID

    11/45

    "&*equipment list/specification, utility

    consumption, connection rating

    equipment supply"3 (purchase

    or!er)

    test package construction/pre-start up,performance/start up proce!ure

  • 8/9/2019 Training P&ID

    12/45

    PID i! #ata !or%e or ana,"!i! o0a1ar#o! Oeration & Ri!2

    Mitiation o Oeration 1a0ar!ous 3peration with/without

    integration with existing

    4isk mitigation of operation processsafety with/without integration with

    existing

  • 8/9/2019 Training P&ID

    13/45

    PID3! E,e*ent!

    "&* consists of:

    Equipments symbol (complete with internal

    an! ma7or parts

    &nstrumentation symbol

    "iping symbols (line,re!ucer,etc)

    egen!s to explain the symbols

    8attery imit location (Tie-ins with existing an!/or

    +en!or9s scope of supply,other party9s scope)

    $otice of re+isions

  • 8/9/2019 Training P&ID

    14/45

    Title block to show title, pro7ect name,

    person incharge, re+ision number, an!

    priority/important things

  • 8/9/2019 Training P&ID

    15/45

    How to Create P&ID

    %oftware use!: #T3 #*,%mart "lant, ;icro

    station, "*%,etc

    hoose "* that woul! like to be !e+elope! as

    "&*

    *i+i!e "* becoming some ma7or equipments

    3ne or < ma7or equipments becomes = sheet of

    "&*

  • 8/9/2019 Training P&ID

    16/45

    Ma4or e'i*ent!: Tower, urnace, *rum,

    4eactor, olumns, Tankage

    Non$*a4or e'i*ent!: "umps,

    exchanger, reboilers, con!enser

  • 8/9/2019 Training P&ID

    17/45

    ;a7or equipments shoul! be !rawn in "&* refer

    to:

    oa! sheets

    essel sketch

    exchanger setting plans

  • 8/9/2019 Training P&ID

    18/45

    ;a7or/non-ma7or equipments shoul! be name!

    as per name in >Equipment ist?

    Equipments shoul! be complete! with

    necessary an! (also) important information from

    +en!or/fabricator

  • 8/9/2019 Training P&ID

    19/45

    1ow to !raw the process lines

    process stream flow is !rawn from left to

    right

    ine output from @before "&*9 shoul! be in

    the same location with line input from @after"&*9

    ;ain process line shoul! be in @bol! line9

  • 8/9/2019 Training P&ID

    20/45

    ent line going up an! !rain line going !own

    ine to tube si!e of exchanger shoul! befrom abo+e si!e of shell

    %team/con!ensate shoul! lea+e theexchanger from bottom si!e

    ine shoul! represent the actual con!ition of

    no00les of equipments

    ontrol +al+e shoul! be !rawn in hori0ontal line

    &f hori0ontal an! +ertical line is meet in the one

    point, +ertical line shoul! be cut

  • 8/9/2019 Training P&ID

    21/45

    *estiny or source point of lines shoul!

    be !rawn in "&*

  • 8/9/2019 Training P&ID

    22/45

    Mana, 5a,5e!6

    Aate +al+e, plug +al+e, ball +al+e:

    usually use! for blocking the line, fully

    open/fully close

    Alobe +al+e: usually use! for throttling,

    because of high range of pressure !rop

    8utterfly +al+e: usually use! for cooling water,

    because of low pressure !rop an! rating

    heck +al+e (swing . lift): usually use! to

    anticipate the back flow

  • 8/9/2019 Training P&ID

    23/45

    Mana, 5a,5e !e,e%tion:

    "ro7ect specification from client

    Ao+ernment regulation

    "rocess requirement

    "iping specification

  • 8/9/2019 Training P&ID

    24/45

    7,o%2 5a,5e: not use! for inlet/outlet of

    process si!e of exchanger, except there isexchanger9s spare/maintenance/process

    requirement, an! not use! for o+erhea!

    con!ensing ser+ice, except for systemcontrolling

  • 8/9/2019 Training P&ID

    25/45

    Drain+5ent ,ine:

    3n the pipeline or equipment that

    flammable, use !ouble block +al+e Theupstream +al+e is gate +al+e an! !ownstream

    +al+e is globe +al+e

  • 8/9/2019 Training P&ID

    26/45

    C/e%2 5a,5e: using !ouble +al+e with the

    arrangement:

    Aate +al+e (upstream)Bcheck +al+e globe +al+e(!ownstream)

    Contro, 5a,5e: using !ouble +al+e with type gate

    +al+e an! globe +al+e for the by pass line

    Re,ie 5a,5e (PS8):to relief o+er pressure in the

    pressuri0e! system, on the +essel/tower-"% is installe!

    on the o+erhea! circuit system

  • 8/9/2019 Training P&ID

    27/45

    0o9 to i5e ine N*;er+ine In#e

  • 8/9/2019 Training P&ID

    28/45

    In!tr*entation on PID

    meaning controlling system, pressure in!icator,

    temperature in!icator, le+el in!icator an! flow

    in!icatorcontrolling . alarm&nstrumentation symbols on "&* as per &nstrument %ocietyof #merica (%tan!ar! an! "ractices for &nstrumentation)

    ;ore !etail information about instrumentation will be

    informe! by &nstrumentation *epartment to "rocess*epartment to be shown on "&*

  • 8/9/2019 Training P&ID

    29/45

    inimum information on E"uipmentsin PID

    Heater: heater type, ra!iation coil,con+ection coil,pipingsystem an! the !imension,manifol! of inlet . outlet for thecase of multi pass heaters,l buil! in-instrumentationsystem,steam connection, sample gas connection,openingaccess,information summary for equipments (such as type,!imension, !esign temperature an! pressure, an!material)

  • 8/9/2019 Training P&ID

    30/45

    Tower$'essel$Tan$ilter$*ea%torEquipment shape, tray, packing, catalyst, an! fillingmaterial,mesh blanket (if any), +ortex breaker (if any),!emister (if any), piping system an! !imension,built-ininstrumentation system,opening access,skirt height (if anyprocess requirement), +ent an! !rain +al+es (if any),steam tracing (if any), information summary for

    equipments (such as type, !imension, !esign temperaturean! pressure, an! material),access for loa!ing an!unloa!ing packing,catalyst an! filling material

  • 8/9/2019 Training P&ID

    31/45

    Heat E+%hangerExchanger shape, no00leposition,slope (if process require!),back flushing (if process

    require!),tracing an! insulation (if any), piping system an!

    !imension,built-in instrumentation system,opening access, +ent

    an! !rain +al+es (if any), information summary for equipments

    (such as type, !imension, !esign temperature an! pressure,

    insulation type an! material),spool in inlet an! outlet of

    exchanger (espfor plate 1E) for maintenance purposes, strainerfor inlet flui! flow that !irty or corrosi+e (espfor plate 1E)

  • 8/9/2019 Training P&ID

    32/45

    Pump$%ompressor$,lower"ump/compressor/blower9s type, !ri+er9s type,connection

    si0e/rating for suction/!ischarge line (if require!),all connection

    si0e/rating for process line (usually shown in +en!or9s

    !ocuments), all connection si0e/rating for utility line (not shown in

    +en!or9s !oc), all controlling an! monitoring system to the main

    process line,summary information (such as hea!,type,capacity,

    insulation type an! material), recycle lines,tracing an!insulation,inter stage coolers (if any),C/3 !rum,+ent . !rain

    +al+es,accumulator,strainer, filter an! silencer

  • 8/9/2019 Training P&ID

    33/45

    -team Tur,ine Turbine Type, Turbine *ri+er,ump/compressor/blower9s type, !ri+er9s type,connection

    si0e/rating for suction/!ischarge line (if require!),allconnection si0e/rating for process line (usually shown in

    +en!or9s !ocuments), all connection si0e/rating for utility

    line (not shown in +en!or9s !oc), all controlling an!

    monitoring system to the main process line,summaryinformation (such as hea!,type,capacity, insulation type

    an! material),+ent . !rain +al+es

  • 8/9/2019 Training P&ID

    34/45

    inimum Information of Instrumentation inPID..

    1eat tracing/7acket steam for instruments (if require!),failure positionof control +al+e,limit switches,han! wheel for c/+ (if any),instrumentation

    no00le (exc,for orifice tapping),tight shut off requirement (if

    require!),control +al+e si0ing,set pressure of relief +al+e/rupture

    !isc,interlock number,scope of work/supply i!entification

    (contractor,+en!or or client),safe location !escription (+enting line-ha0ar!ous flui!s)

    /ote Drain valve for instruments system not necessary to be shown,except if dispose to sewer.

  • 8/9/2019 Training P&ID

    35/45

    1ow to !raw instrumentation

    The figure of piping instrumentation ("A,"&

    ("),A,&(),analy0ers,etc) will be simplifie!after @the first block +al+e9

    The !etails of piping instrumentation will be

    shown in @hook up !rawing9

  • 8/9/2019 Training P&ID

    36/45

    The 0riefs of

    Instrumentations&nstrumentation *e+ices

    *iaphragm type is use! to measure le+el

    an! pressure of flui! with high soli!ity

    or the purposes of checking plant eficiency

    an! checking fee! supply from other party,flow meter shoul! be pro+i!e! with totali0er

  • 8/9/2019 Training P&ID

    37/45

    -,o9 *eter !e,e%tion:press!rop,+elocity,!isplacement

    "ressure !rop:orifice plate (cheapest . simplest)

    +enturi tubes (low press!rop,a+ailable for !irty . slurryflui!s),target meter (expensi+e,soli! an! +iscousflui!),rotameter (low flow rate . local)

    elocity:magnetic flow meter (not a+ailable for 1),+ortexmeter (liqui! +ortex meter-4eD=,,+ortex precision meter-gas,more accurate but expensi+e,+ortex she!!ing-cheaper,1)

    *isplacement:Turbine meter (clean flui!,not corrosi+e)

  • 8/9/2019 Training P&ID

    38/45

    Inter,o%2 Sina,!+S/t Do9nS"!te*

    low instrument:T to interlock shoul! be !ifferent with T forcontrolling . in!ication, e+en using the same E

    e+el instrument:&n the %/* &nterlock %ystem,E for signal trip shoul! be

    !ifferent with E for control . in!ication E for interlock common using

    e+el switch

    "ressure instrument:&n the %/* &nterlock %ystem, "E (*uplex Type) foracti+ation signal trip (pressure switch or transmitter) shoul! be !ifferent

    with "E for control . in!ication"%:+acuum-

  • 8/9/2019 Training P&ID

    39/45

    Temperature instrument:&n the %/* &nterlock %ystem,TE

    (*uplex Type) shoul! be !ifferent with TE for control .

    in!icationTE for in!ication " shoul! be place! inseparate! well from this TE

    uel gas to burner:shoul! be complete! with !ouble

    block an! blee! +al+e to %/* system if there is fuel

    failure

  • 8/9/2019 Training P&ID

    40/45

    "re-#larm: Farning before Trip/%*

    ontrol +al+e: #ll shoul! be controlle! in 4

    urnace: &nstrumentation shoul! be pro+i!e! to

    furnace system to guarantee the ignition can

    perform well

    &nstrument connection:see the table for

    examples

  • 8/9/2019 Training P&ID

    41/45

    The 0riefs of Piping

    -#stem;anual +al+es: by type,by function

    8y Type: Aate +al+e,globe +al+e,nee!le +al+e,

    check +al+e,butterfly +al+e,ball +al+e, angle+al+e

    8y function:8lock +al+e . 8y pass +al+e

  • 8/9/2019 Training P&ID

    42/45

    7,o%2 5a,5e & 7" Pa!! 8a,5e

    8lock +al+e at the battery limit of plant

    8lock +al+e . by pass +al+e for control +al+e 8lock +al+e for safety +al+e/rupture !iscno

    nee! to install block +al+e for safety +al+e

    8lock +al+e for water coole! exchangers 8lock +al+e for pump, turbine an! compressor

    8lock +al+e for branch of utility hea!er

  • 8/9/2019 Training P&ID

    43/45

    8lock +al+e for piping auxiliary

    8y pass +al+e for turbine meter

    8y pass +al+e for gate +al+es

  • 8/9/2019 Training P&ID

    44/45

    Strainer!: permanent, temporary"ermanent:pump suction (exccooling water pump-usetemporary strainer),moti+e steam line for steam 7et e7ectoran! steam turbines,burner-main line of fuel supply,hy!raulicactuate! equipment (hy!raulic oil pump),pneumaticactuate! equipment (air supply),43 for gas/air/ser+iceair/mixe! air

    Temporary:pump suction !uring start up$ote:except that there is instrument air filter

  • 8/9/2019 Training P&ID

    45/45

    7,in#!+!a%er!: maintenance,inspection or changing ofoperation mo!e

    8ent! & Drain!: to !ispose ha0ar!ous/non ha0ar!ous

    agent +ent/!rain for tower/!rum

    +ent/!rain for heat exchanger

    +ent/!rain for pump

    !rain +al+e for steam trap

    !rain +al+e for

    +ent opening for atmospheric tank