PETROSTAR S.A.PETROSTAR S.A.PETROSTAR S.A.

GENERAL CAPABILITY STATEMENT

Page 2: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

Overview

Performance Efficiency Trust Responsibility Open Strength Talent Ability Respect,

a company fully committed to providing you with highest engineering solutions and

services.

P E T R O S T A R is a Romanian specialist oil and gas engineeringcompany that supplies services, project management, design,consultancy and technology training to companies in the oil and gassectors. Our company is committed to offering you a full spectrum ofengineering to our clients from conceptual design to manufacture,installation and ongoing maintenance in the field.

Page 3: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

ContactREGISTERED OFFICES, HUMAN RESOURCES AND STRUCTURING

Calea Bucuresti 37

100520 Ploiesti

Prahova County

R O M A N I A

Phone: +40 244 575 963

Fax: +40 244 575 412

E-mail:[email protected]

www.petrostar.ro

Constantin Iliescu, Managing Director – [email protected]

Daniel Rucareanu, Executive Manager – [email protected]

George Ionescu, Director – [email protected]

Page 4: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

Hardware & Software CapabilityHARDWARE:

A. Personal Computers

• 270 pcs Pentium IV , I3, I5, I7

• 100/1000 GB LAN including 4 Windows 2003

servers, 3 Linux servers

• 2 UNIX storage servers

• 2 FTP servers

• 1 server back-up

• other Network Attached Storage facilities

B. Printers

• 2 plotters HP DJ 430 format A0

• 1 plotter HP T790

• 1 plotter HP color DJ 500 format A0

• 3 network printers HP LaserJet 9000, format A3

• 1 network printer laser A4, HP 3505n

• 1 printer XEROX Phaser 7400, format A3

• 1 high cpacity printer HP 8150 , format A3

• 10 HP LaserJet, format A4 printers

SOFTWARE:

•Windows XP, Vista, 7

•Windows 2003 Server, Linux Server

•Office XP, 2003, 2007,2010, 2012

•AutoCAD 2002, 2004, 2005, 2008, 2009,

•2010,2011,2013

•Adobe Acrobat Professional 7, 8, 11

•Adobe Photoshop CS2

•Microsoft Project 2003, 2007

•PipeData Pro8

•AutoDesk Plant Design Suite - P & ID, 2016

•AutoDesk Plant Design Suite – Plant 3D, 2016

•AutoDesk Plant Design Suite 2016

• PV ELITE 2014

•ETAP 5

SOFTWARE:

• Corel Draw x3

• VISIO 2003 Standard

• VISUAL FOXPRO 2.6

• PROGECAD 2006, 2007, 2008, 2009,

• 2010, 2011,2013

• PIPENET 1.6

• EUROLEX 2013

• Abby Fine Reader 8.0

• VISUAL STUDIO 2005

• ExpertKit Out

• Ulead Photoimpact 11

• MECHANICAL INVENTOR 11

• CAESAR II ver 5.2.0

• ArcINFO 9.3.1, ArcGIS 9.3.1

• ArcReader 9

• Pipephase 9.3

• Pro II 4.17• 10 HP LaserJet, format A4 printers

• 11 multifunctional HP Laserjet 3052/3055

printers

• 10 HP DeskJet, format A4 printers

C. Other :

• 7 scanners HP format A4

• 1 scaner EPSON format A3

• 3 copy machines format A0

• 6 copy machines format A3

• 6 copy machines format A4

• POWERSET SOKKIA 4000 - 2 PCS

• POWERSET SOKKIA 300 - 1 PCS

• POWERSET LEICA TC 703 - 2 PCS

• POWERSET ZEISS 20 SPRINT - 1 PCS

• GPS SYSTEM SCORPIO 6502 SK-MK

• SCORPIO 6502 SK - 1 PCS

• SCORPIO 6502 MK - 2 PCS

• GPS SOKKIA GSS 1A - 3 PCS

• GPS GARMIN - GPSMAP 76 - 3 PCS

• GPS SYSTEM PROMARK-3 RTK-3 PCS

• PROJECTORS TOSHIBA TLP-S10 -2 PCS

• DIGITAL PHOTO CAMERAS – 2 PCS

•PRIMAVERA ENTERPRISE 6.7

•INSTRUCALC 6.0

•CHVAC7

•AUTODESK CIVIL 3D 2007, 2009, 2011

•Advanced Road Design for Civil 3D

•Horizontal Design 3.2

•Total Commander 5

•NOD 32 ver 5, 6, 7

•AXIS VM 11

•PHA-PRO6

•TANK 2011

•TopoLT 10.3

•ProfLT 10.3

•TransLT 2.0

•Mapsys 8

•Toposys 7

•Slope (9)

•Loadcap(13)

•GFAS(4)

• Pro II 4.17

• HYSYS 7.2

• Autopipe

• Column

• Naomi

• WinDoc Deviz, Construct Estimator 2011, 2012

• IntelSoft Deviz Profesional 2013

Page 5: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

•STUDIES

Conceptual and pre-feasibility studies

Feasibility and techno-economic studies

Project strategy optimization

•TENDER EVALUATION AND RISKASSESSMENT

•EPC/EPCC CONTRACTS

•PROCUREMENT AND PROCUREMENT

Product and Services

Project strategy optimization

•VALUE ENGINEERING

•BASIC AND FRONT END ENGINEERINGDESIGN (FEED)

•DETAIL ENGINEERING, COVERING

•PROJECT MANAGEMENT

•TECHNICALAUDITS

•PROJECT CONTROLS

•OWNER’S ENGINEER OR PROJECTMANAGEMENT CONTRACTOR

•PROCUREMENT AND PROCUREMENT

SERVICES

•CONSTRUCTION SUPERVISION

•CORROSION MANAGEMENT

•GEOTECHNICAL ENGINEERING

•SUMMARY OF ENGINEERING SERVICES

•TOPO/CADASTRAL

•WELL ENGINEERING SERVICES

Page 6: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

Our Expertise - Upstream Oil & GasP R O C E S S

•Concept development

•Process simulations•De-bottlenecking•Feasibility studies

•Gas treatment•Gas dehydration/Dew pointing•Gas dehydration/Dew pointing

•Gas compression and gas pipelines•Gathering centers

•Flare simulation and calculation•Oil stabilization

•Oil pipelines•NGL extraction

•Nitrogen removal•CO2/H2S removal

•Fuel gas conditioning•Water treatment•Water injection

Page 7: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

Examples of Recent Projects

(1)Project name:

Gas to Power and Cogeneration

Project in Moinesti Area -3 locations –

Park 1 Ghelinta, Cerdac Tank Farm

and Comanesti Tank Farm

PROJECT DESCRIPTION

• G2P station:• Service facilities for motor- electric

generator container:• Power plants:• Electrical systems for connection to

National Electrical System:and Comanesti Tank Farm

Client:

OMV PETROM S.A.

Start date: 2012

Completion date: 2013

National Electrical System:• Annexes• Constructions

Page 8: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT SCOPE

Providing within the area of Park 1

Ghelinta of a Gas to Power (G2P) station

with power of 2,26 MW for electrical

energy production by burning of

associated gas resulted from crude oil

production process

Page 9: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(2)Project name:

Nabucco Gas Pipeline

Client:

Nabucco Gas Pipeline International GmbH

Start date: 2008

Completion date: 2013

PROJECT DESCRIPTION

The Nabucco Gas pipeline is a proposed 56” natural gas pipeline from Turkey to Austria routed as follows:Austria routed as follows:

Austria 47 kmUngaria 384 kmRomânia 475 kmBulgaria 422 kmTurkey 2000 km

Page 10: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

(for Romanian section only)

• Basic Design review

• Complete Site surveys (topographical, routing, aerial photogrametric including Lidar, environmental etc)

• Complete FEED Design – Pipeline

Romanian Section of Nabucco Gas

Pipeline includes the following major

components:

• 475 km of 56” pipeline

• One compressor station

• 35 block valve stations

• One metering station

• One Off-take station

• Complete FEED Design – Pipeline and stations (all disciplinesL: Pipeline, Process, Piping, Civil, Electrical, Instrumentation, Cathodic Protection)

• EIA/ ESIA

• Permitting activities

• •HAZOP

• Detail Design for permitting

Page 11: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(3)Project name:

Romgaz Compressors Stations

(cumullated capacity 5.000.000 Nm3/day)

Client:

Romgaz- Romania

Start date: 2007

Completion date: 2013

PROJECTS DESCRIPTION

New individual compressors stations were designed, constructed and commisioned as follows:

Filitelnic CS 2.100.000 Nm3/day Cristur CS 800.000 Nm3/day Balda CS 700.000 Nm3/day Grebenis CS 800.000 Nm3/day SanMartin CS 600.000 Nm3/day

Completion date: 2013

Page 12: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

• Basic Design review

• Complete FEED and/ or Detail Design

– (all disciplines: Pipeline, Process,

Piping, Civil, Electrical,

FACILITIES:

• 2 to 6 compression units per station

• All asscociated buildings and

facilities

• Tie-in inexisting pipelines and

existing plants

• One metering station

• One Off-take station

Piping, Civil, Electrical,

Instrumentation, Cathodic

Protection)

• Permitting activities

• Construction Assistance

• As built

Page 13: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(4)Project name:

Romgaz Dehydration Plants

(cumullated capacity 13.800.000 Nm3/day)

Client:

Romgaz- Romania

Start date: 2007

Completion date: 2014

PROJECTS DESCRIPTION

New individual dehydration units with capacities

ranging from 150.000 to 2.700.000 Nm3/day were ranging from 150.000 to 2.700.000 Nm3/day were

specified, purchased, constructed and commisioned

for the following locations: Finta, Piscu Stejari,

Hurezani, Bilciureşti, Bălăceanca, Bibeşti, Urziceni

SCOPE OF SERVICES

• Basic Design review

• Complete FEED and/ or Detail Design for the

facilities

• Tender Specifications and data sheets for

dehydration packages.

• Permitting activities

• Construction Assistance

• As built

Page 14: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(5) Project name:

PREFEASIBILITY STUDY FOR GAS TRANSPORT

AND PROCESSING TO CHEMCHEMAL- ZAHKO-

IRAK

(cumullated capacity 1.500.000 St bbl/day)

Start date: 2007

Completion date: 2014

PROJECT DESCRIPTION

The project scope was to study the recovery

possibilities for free and associated gas

extracted from Kurdistan region from the

fields:Kirkuk (Baba Dome and Adanah Dome),

Khurmala Dome, TaqTaq, Howler, DemirDagh,

Zab Dome, Chia Surkh, Pulkhana, Bai Hassan,

Khabbaz plus the forecast production of other

6 structures with crude oil and associated gas

perspectives (Barda Rash, AinSafra, Bashiqa,

Maqlub, Basakhrah and Khurmala).

Page 15: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT DESCRIPTION

•6” to 28”, 4000 km pipeline rehabilitation

•17 pcs. pumping stations and tank farm rehabilitation

•2 crude oil loading/unloading railway ramps

•2LNG loading/unloading railway ramps

•Custody and fiscal metering system (48 metering skids)

•Combined fiber optic and microwaves

(6)Project name:

Romanian National Crude Oil Transport System Rehabilitation

Client:

CONPET S.A. Ploiesti

Start date: 1994

Completion date: 2004

•Combined fiber optic and microwaves telecommunication system

•Full integrated automation and SCADA system with National Center Dispatcher and local

station microscada dispatchers

•Rehabilitation of all electrical power supply

•Leak detection system

•Rehabilitation of cathodic protection for all pipelines

Page 16: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project management

•Consultancy

•Feed package

•Detail design

•Tender evaluation

•Procurement supervision

•Cost control

•Planning and scheduling

•FAT

(7)Project name:

Butimanu Natural Gas Compression Station and Underground Storage

Facilities

Client:

ROMGAZ S.A. – Ploiesti Branch

Start date: 1998

Completion date: 2006

•Construction supervision

•Commissioning supervision

•Operation and maintenance manuals

•Training

•Project audit

•Corporate development

•Project Value Engineering

•Emergency Response Plan

•Lost Prevention Plan

Page 17: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project Management

•Geological Reservoir Engineering

•Conceptual/Basic/Detailed Design

•Cost Estimating and Project Scheduling

PROJECT DESCRIPRION

•Gas Compressor Station 200,000,000Nm3/year

•Underground Storage Facilities

•utilities

•Cost Estimating and Project Scheduling

•Invitation to Tender (ITT) documentation

and bid analysis

•Procurement, expediting, inspection and

associated services

•Construction Management and turnkey

solutions

•Commissioning support

•Operation and maintenance manual

Page 18: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(8)Project name:

Tolkan-Borankol Kazakhstan’s Fields Gas and Condensate (UKPG) Complex Process Facilities

Client:

PETROM –Member of OMV Group

Start date: 2001

Completion date: 2002

PROJECT DESCRIPTION

•Gas separation

•Condensate Processing

•Gas Compressor Station 200,000 Nm3/day

•Storage Facilities

•Pumping Station

•Utilities

Page 19: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT DESCRIPTION

PFS-U is a offshore platform designed as a gathering facility for fluid production of 8 wells. The processing capacity of PFS-U is:

•300 m3/d of crude oil

•350,000 Sm3/d of gas

•Water cut of 5% to 10% PFS-U consists of the following process

and utility units:

•Wellhead and associated equipment

•Production and Test Inlet Manifolds

•Well Testing Facility•Well Testing Facility

•Pig Launcher

•Pig Launcher/Receiver

•Electric Gas Heater

•Gas Lift Injection Manifold

•Closed Drain and Blowdown System

•Open Drain System

•Instrument Air System

•Firefighting System

•Chemical Injection System

Page 20: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(9)Project name:

IRRI Flowstation – N-LNG Phase 3 Gas Supply Project

Client:

Nigerian Agip Oil Corporation SAIPEM Contracting Nigeria Ltd.

Start date: 2004

Completion date: 2006

•Project management

•MTO and B of Q•Procurement•Commissioning and Start-up Supervision•Operation manual

SCOPE OF SERVICES

•Feasibility study

•Basic Design•Schedule•Flow Diagrams and P & ID’s•Operation on emergency philosophy•Detail Design (Civil, Piping, Mechanical,Instrumentation, Electrical etc.)

Page 21: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT DESCRIPTION

Irri flowstation is a new gathering station, located in the Irri/Isoko area, designed toreceive well-fluids from 3 existing and 2 future dual-completion wells.The Plant is designed to export 120 MMSCFD of gas and 15,700 BPD of oil from 3existing wells, rising to 160 MMSCFD of gas and 23,000 BPD of oil when the futurewells are brought online.The gas is treated to reduce the CO2 content to bellow 2 mol% before it is exportedto Kwale via an 18” pipeline. In the event of an upset at Kwale or there being nodemand for the gas from Irri, the oil production may be continued by venting the gasstream to flare

SCOPE OF SERVICES

•Basic Design review

•Schedule

•Flow Diagrams and P & ID’s

•Operation on emergency philosophy

•HAZOP

•Detail Design (Civil, Piping, Mechanical, Instrumentation, Electrical etc.)

•MTO and B of Q

•Commissioning and Start-up Supervision

•Operation manual

Page 22: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(10)Project name:

EPC Obiafu-Obrikom Plant Works N-LNG Phase 3 Gas Supply Project

Client:

Nigerian Agip Oil Corporation SAIPEM Contracting Nigeria Ltd.

Start date: 2002

Completion date: 2006

PROJECT DESCRIPTION

NAOC Obiafu-Obrikom plant (Ob/Ob) is an oiland gas treating complex located approx. 80km north-west of Port Harcourt Nigeria.The object of N-LNG gas supply project is toupgrade and expand NAOC Ob/Ob gas plantin Nigeria to produce sales gas for delivery toN-LNG at the Bonny LNG plant. N-LNG phase3 project is to increase the sales gas exportcapacity to 440 MMSCFD with the possibilityof achieving 600 MMSCFD for short periodsand reduce flaring. This work forms part ofthe N-LNG gas supply project-phase 3.

Page 23: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

N-LNG Gas Supply Project, Phase 3

includes the following major

components:

•Lopped Rich/Lean HP Gas Header

•TEG Contactor

•TEG Regeneration

•CO2 Regenerator Columns - Trays

replacement

•Fuel Gas Heater Package

SCOPE OF SERVICES

•Basic Design review

•Schedule•Fuel Gas Heater Package

•MP Compressor

•Stabilizer Pre-Flash Drum

•Nitrogen Generation Package

•Multi-Phase Flow Meter

•Lube Oil System

•Schedule

•Flow Diagrams and P & ID’s

•Operation on emergency philosophy

•HAZOP

•Detail Design (Civil, Piping, Mechanical,

Instrumentation, Electrical etc.)

•MTO and B of Q

•Commissioning and Start-up Supervision

•Operation Manual

Page 24: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(11)Project name:

Idu Flowstation Revamping Phase 2 N-LNG Trains 4/5 Gas Supply Project

Client:

Nigerian Agip Oil Corporation ALCON Nigeria Ltd.

Start date: 2004

Completion date: 2008

PROJECT DESCRIPTION

Idu Flowstation F/S is located in Rivers State, in the Niger Delta are of Nigeria, and it is

currently treating the production from Idu field and from Samabri/Biseni field. The gross

liquid (oil and water) is sent to Brass terminal while the separated gas is flared. The

present project “N-LNG, Phases 4/5 Gas Supply Project-Idu Gas Field Development-Idu

Flowstation Revamping, Phase 2” covers, mainly, the installation of process and service

units for oil production and gas delivery to Ob/Ob gas plant as follows:

Page 25: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

•Installation of a new separator (NAGseparator) to treat the production fromthe new Idu NAG wells•Installation of a LP/MP TurboCompressor System, to ensure therequired gas pressure for delivery toOb/Ob Gas Plant•Installation of a Launching Trap for the18”gas pipeline to Ob/Ob, installation ofan 18”Receiving Trap and Slug Catcher inOb/Ob Gas Plant, and interconnectionwith the existing facilities•Installation of Flaring and Blowdown

•Installation of a Water TreatmentSystem to remove the residual oil fromthe produced water•Installation of a Diesel Oil System•Installation of a Water Well System, andPotable Water System•Installation of an Instrument Air System•Installation of a Nitrogen GenerationSystem•Installation of a Chemical InjectionSystem•Upgrade of the Firefighting System•Upgrade of the Diesel PowerGeneration System•Installation of a DCS, ESD/PSD System•Installation of Flaring and Blowdown

systems•Installation of a new Power GenerationSystem, to supply power to Idu F/S,Samabri C2 F/S and its surroundingcommunities via overhead lines•Installation of a Fuel Gas TreatmentSystem, to ensure the required gasquality at the inlet of the new GasTurbines•Installation of a new Gas Boot•Installation of a new Liquid MeteringStation

•Installation of a DCS, ESD/PSD System•Installation of a new Storage Tank

SCOPE OF SERVICES

•Basic Design review•Schedule•Flow Diagrams and P & ID’s•Operation on emergency philosophy•HAZOP•Detail Design (Civil, Piping, Mechanical,Instrumentation, Electrical etc.)•MTO and B of Q•Commissioning and Start-up supervision•Operation manual

Page 26: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

(12)Project name:

Engineering Procurement Construction and Management (EPCM) services for

„Development of Natural Gas Underground Storage in Targu Mures – Romania”

Client:

SC DEPOMUREŞ SA. Targu Mures

Start date: 2013

Completion date: Ongoing

Project description:

The general purpose of Project was to increase the UGS working volume up to 400 million Nm3 in a first phase. A possible future

expansion shall be also considered, to increase the working volume up to 600 million Nm3. Furthermore, the dependency on existing Romgaz facilities shall be eliminated, by building a new Gas Station made of compression, dehydration, and fiscal

metering facilities.

Page 27: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

•Start-up and Operating Manuals.•As-Built documentation•Procurement, Transportation, Inspection and Customs Clearance of all equipment and materials for both temporary and permanent works

Scope of services:

•Basic Design•Quality assurance and Quality Control•HSE Plan•Philosophies•Simulation models and reports•Schedules for works quality control •General estimate•Detail Design.•MTO for both temporary and permanent works

required to complete the WORK.•Supply and installation of compression station•Supply and installation of dehydration station•Supply and installation of a bidirectional fiscal gas metering•Supply and installation of a fuel gas treatment skid•Supply and installation of a gas distribution manifold•Supply and installation of a guard house with necessary fixture and fittings•supply and installation of warehouse

•MTO•Pre-commissioning, Commissioning, Initial Start-up, Performance Test and Hand-over Manuals

Page 28: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project management

•Consultancy

•Feed package

•Detail design

•Tender evaluation

•Planning and scheduling

•Construction supervision

•Commissioning supervision

•Operation and maintenance manuals

(13)Project name:

Sinca Turbo-Compressors Station and Associated Facilities

Client:

SNTGN TRANSGAZ S.A. – Medias

Start date: 2015

Completion date: 2015

•Training

Page 29: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

•The purpose of the EPC project was to

upgrade the existing Compressors Station

by replacing 2 of the existing

Turbocompressors with new machines. A

number of 2 new compressors model

C335EH Solar driven by 2 turbines Solar

PROJECT DESCRIPTION

• Gas Compressor Station upgrade with 2 x 120,000 Nm3/hour new turbocompressors.

•Above ground connection point/ nodeupgrade.

• Utilities

C335EH Solar driven by 2 turbines Solar

Centaur 50 turbines were installed.

•The project was finalized in

approximately 9 months from contract

signature.

•Petrostar was part in the EPC Consortium

performing the entire package of

engineering activities.

Page 30: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project management

•Consultancy

•Feed package

•Detail design

•Tender evaluation

•Planning and scheduling

•Construction supervision

•Commissioning supervision

(14) Project name:

Sarmasel Compressors Station and Associated Facilities

Client:

ROMGAZ S.A. – Ploiesti Branch

Start date: 2013

Completion date: 2016 (est.)

•Operation and maintenance manuals

•Training

Page 31: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT DESCRIPTION

• Upgrade of the existing Undergroundstorage facility up to 9 million Nm3/daycapacity

•Installation of 4 Compressors Units of1.5 million Nm3/day each.

• Installation of 3 Dehydration Units of3 million Nm3/day each.

• Utilities• The purpose of the EPC project was to

upgrade the existing Compressors Station

by installing 4 new reciprocating

compressors with a capacity of 1.5 million

Nm3/day each. A number of 3 new

dehydration units were installed.

•Petrostar was part in the EPC Consortium

and performed the entire package of

engineering activities.

• Utilities

Page 32: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project management

•Consultancy

•Feed package

•Detail design

•Tender evaluation

•Planning and scheduling

•Construction supervision

•Commissioning supervision

•Operation and maintenance manuals

(15) Project name:

Roman Compressors Station

Client:

ROMGAZ S.A. – Medias

Start date: 2014

Completion date: 2015

•Training

Page 33: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

• The purpose of the EPC project was to

develop a new Compressors Station by

PROJECT DESCRIPTION

• New compressors station with a capacity of600,000 Nm3/day.

•Installation of 2 Reciprocating CompressorUnits of 0.3 million Nm3/day each.

•Utilities

installing 2 new reciprocating compressors

with a capacity of 300,000 Nm3/day each

along with the required facilities such as:

fuel gas system, depressurization system,

instrument air sustyem, firefighting,

control systems, fire and gas detection,

power system, HVAC systems, new building

with bridge cranes, ESD system etc.

Page 34: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES

•Project management

•Consultancy

•FEED package

•Detail design (for EPC phase)

•Procurement assistance & technical evaluations

•Construction supervision

•Commissioning assiostance

•Operation and maintenance manuals

•Training

(16) Project name:

Urziceni Compressors Station and Associated Facilities

Client:

ROMGAZ S.A. – Ploiesti Branch

Start date: 2008

Completion date: 2014

•Training

Page 35: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

PROJECT DESCRIPTION

• Upgrade of the existing compressorstation for the underground storagefacility up to an injection capacity of 2.4million Sm3/day at 125 barg

•Installation of 4 Compressors Units of0.6 million Sm3/day each.

• Facilities, Buildings, Utilities

• The purpose of the EPC project was to

upgrade the existing Compressors Station

by installing 4 new reciprocating

compressors with a capacity of 0.6 million

Nm3/day each as an extension to the

existing M1 Compressor station

•Petrostar was part in the EPC Consortium

and performed the entire package of

engineering activities.

Page 36: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

SCOPE OF SERVICES:

• Project management (FEED)

• Complete Multidisciplinary FEED Engineering

• Permitting

• Cost Estimates

• Bid Package Preparation

(14) Project name:

BRUA Pipeline- 3 Compressor Stations FEED

Client:

SNTGN TRANSGAZ S.A. – Medias

Start date: October 2016

Completion date: June 2017

Page 37: PETROSTAR S.A. .pdf · • PIPENET 1.6 • EUROLEX 2013 • Abby Fine Reader 8.0 • VISUAL STUDIO 2005 • ExpertKit Out • Ulead Photoimpact 11 • MECHANICAL INVENTOR11 • CAESARII

•The purpose of the FEED project was to

define the requirements for the

subsequent EPCC Phase for the 3 new

Compressors Stations of the BRUA

Pipeline.

• A number of 1466 deliverables were

PROJECT DESCRIPTION:

• Three New Gas Compressor Stations in 3 different locations with 3 x 300,000 Sm3/hour new turbocompressors each.

• Utilities

• A number of 1466 deliverables were

issued in approximately 9 months from

contract signature.

• The level of detail of the FEED was

high due to special requirements of the

Client.