PETROSTAR S.A.PETROSTAR S.A.PETROSTAR S.A.
GENERAL CAPABILITY STATEMENT
Overview
Performance Efficiency Trust Responsibility Open Strength Talent Ability Respect,
a company fully committed to providing you with highest engineering solutions and
services.
P E T R O S T A R is a Romanian specialist oil and gas engineeringcompany that supplies services, project management, design,consultancy and technology training to companies in the oil and gassectors. Our company is committed to offering you a full spectrum ofengineering to our clients from conceptual design to manufacture,installation and ongoing maintenance in the field.
ContactREGISTERED OFFICES, HUMAN RESOURCES AND STRUCTURING
Calea Bucuresti 37
100520 Ploiesti
Prahova County
R O M A N I A
Phone: +40 244 575 963
Fax: +40 244 575 412
E-mail:[email protected]
www.petrostar.ro
Constantin Iliescu, Managing Director – [email protected]
Daniel Rucareanu, Executive Manager – [email protected]
George Ionescu, Director – [email protected]
Hardware & Software CapabilityHARDWARE:
A. Personal Computers
• 270 pcs Pentium IV , I3, I5, I7
• 100/1000 GB LAN including 4 Windows 2003
servers, 3 Linux servers
• 2 UNIX storage servers
• 2 FTP servers
• 1 server back-up
• other Network Attached Storage facilities
B. Printers
• 2 plotters HP DJ 430 format A0
• 1 plotter HP T790
• 1 plotter HP color DJ 500 format A0
• 3 network printers HP LaserJet 9000, format A3
• 1 network printer laser A4, HP 3505n
• 1 printer XEROX Phaser 7400, format A3
• 1 high cpacity printer HP 8150 , format A3
• 10 HP LaserJet, format A4 printers
SOFTWARE:
•Windows XP, Vista, 7
•Windows 2003 Server, Linux Server
•Office XP, 2003, 2007,2010, 2012
•AutoCAD 2002, 2004, 2005, 2008, 2009,
•2010,2011,2013
•Adobe Acrobat Professional 7, 8, 11
•Adobe Photoshop CS2
•Microsoft Project 2003, 2007
•PipeData Pro8
•AutoDesk Plant Design Suite - P & ID, 2016
•AutoDesk Plant Design Suite – Plant 3D, 2016
•AutoDesk Plant Design Suite 2016
• PV ELITE 2014
•ETAP 5
SOFTWARE:
• Corel Draw x3
• VISIO 2003 Standard
• VISUAL FOXPRO 2.6
• PROGECAD 2006, 2007, 2008, 2009,
• 2010, 2011,2013
• PIPENET 1.6
• EUROLEX 2013
• Abby Fine Reader 8.0
• VISUAL STUDIO 2005
• ExpertKit Out
• Ulead Photoimpact 11
• MECHANICAL INVENTOR 11
• CAESAR II ver 5.2.0
• ArcINFO 9.3.1, ArcGIS 9.3.1
• ArcReader 9
• Pipephase 9.3
• Pro II 4.17• 10 HP LaserJet, format A4 printers
• 11 multifunctional HP Laserjet 3052/3055
printers
• 10 HP DeskJet, format A4 printers
C. Other :
• 7 scanners HP format A4
• 1 scaner EPSON format A3
• 3 copy machines format A0
• 6 copy machines format A3
• 6 copy machines format A4
• POWERSET SOKKIA 4000 - 2 PCS
• POWERSET SOKKIA 300 - 1 PCS
• POWERSET LEICA TC 703 - 2 PCS
• POWERSET ZEISS 20 SPRINT - 1 PCS
• GPS SYSTEM SCORPIO 6502 SK-MK
• SCORPIO 6502 SK - 1 PCS
• SCORPIO 6502 MK - 2 PCS
• GPS SOKKIA GSS 1A - 3 PCS
• GPS GARMIN - GPSMAP 76 - 3 PCS
• GPS SYSTEM PROMARK-3 RTK-3 PCS
• PROJECTORS TOSHIBA TLP-S10 -2 PCS
• DIGITAL PHOTO CAMERAS – 2 PCS
•PRIMAVERA ENTERPRISE 6.7
•INSTRUCALC 6.0
•CHVAC7
•AUTODESK CIVIL 3D 2007, 2009, 2011
•Advanced Road Design for Civil 3D
•Horizontal Design 3.2
•Total Commander 5
•NOD 32 ver 5, 6, 7
•AXIS VM 11
•PHA-PRO6
•TANK 2011
•TopoLT 10.3
•ProfLT 10.3
•TransLT 2.0
•Mapsys 8
•Toposys 7
•Slope (9)
•Loadcap(13)
•GFAS(4)
• Pro II 4.17
• HYSYS 7.2
• Autopipe
• Column
• Naomi
• WinDoc Deviz, Construct Estimator 2011, 2012
• IntelSoft Deviz Profesional 2013
•STUDIES
Conceptual and pre-feasibility studies
Feasibility and techno-economic studies
Project strategy optimization
•TENDER EVALUATION AND RISKASSESSMENT
•EPC/EPCC CONTRACTS
•PROCUREMENT AND PROCUREMENT
Product and Services
Project strategy optimization
•VALUE ENGINEERING
•BASIC AND FRONT END ENGINEERINGDESIGN (FEED)
•DETAIL ENGINEERING, COVERING
•PROJECT MANAGEMENT
•TECHNICALAUDITS
•PROJECT CONTROLS
•OWNER’S ENGINEER OR PROJECTMANAGEMENT CONTRACTOR
•PROCUREMENT AND PROCUREMENT
SERVICES
•CONSTRUCTION SUPERVISION
•CORROSION MANAGEMENT
•GEOTECHNICAL ENGINEERING
•SUMMARY OF ENGINEERING SERVICES
•TOPO/CADASTRAL
•WELL ENGINEERING SERVICES
Our Expertise - Upstream Oil & GasP R O C E S S
•Concept development
•Process simulations•De-bottlenecking•Feasibility studies
•Gas treatment•Gas dehydration/Dew pointing•Gas dehydration/Dew pointing
•Gas compression and gas pipelines•Gathering centers
•Flare simulation and calculation•Oil stabilization
•Oil pipelines•NGL extraction
•Nitrogen removal•CO2/H2S removal
•Fuel gas conditioning•Water treatment•Water injection
Examples of Recent Projects
(1)Project name:
Gas to Power and Cogeneration
Project in Moinesti Area -3 locations –
Park 1 Ghelinta, Cerdac Tank Farm
and Comanesti Tank Farm
PROJECT DESCRIPTION
• G2P station:• Service facilities for motor- electric
generator container:• Power plants:• Electrical systems for connection to
National Electrical System:and Comanesti Tank Farm
Client:
OMV PETROM S.A.
Start date: 2012
Completion date: 2013
National Electrical System:• Annexes• Constructions
PROJECT SCOPE
Providing within the area of Park 1
Ghelinta of a Gas to Power (G2P) station
with power of 2,26 MW for electrical
energy production by burning of
associated gas resulted from crude oil
production process
(2)Project name:
Nabucco Gas Pipeline
Client:
Nabucco Gas Pipeline International GmbH
Start date: 2008
Completion date: 2013
PROJECT DESCRIPTION
The Nabucco Gas pipeline is a proposed 56” natural gas pipeline from Turkey to Austria routed as follows:Austria routed as follows:
Austria 47 kmUngaria 384 kmRomânia 475 kmBulgaria 422 kmTurkey 2000 km
SCOPE OF SERVICES
(for Romanian section only)
• Basic Design review
• Complete Site surveys (topographical, routing, aerial photogrametric including Lidar, environmental etc)
• Complete FEED Design – Pipeline
Romanian Section of Nabucco Gas
Pipeline includes the following major
components:
• 475 km of 56” pipeline
• One compressor station
• 35 block valve stations
• One metering station
• One Off-take station
• Complete FEED Design – Pipeline and stations (all disciplinesL: Pipeline, Process, Piping, Civil, Electrical, Instrumentation, Cathodic Protection)
• EIA/ ESIA
• Permitting activities
• •HAZOP
• Detail Design for permitting
(3)Project name:
Romgaz Compressors Stations
(cumullated capacity 5.000.000 Nm3/day)
Client:
Romgaz- Romania
Start date: 2007
Completion date: 2013
PROJECTS DESCRIPTION
New individual compressors stations were designed, constructed and commisioned as follows:
Filitelnic CS 2.100.000 Nm3/day Cristur CS 800.000 Nm3/day Balda CS 700.000 Nm3/day Grebenis CS 800.000 Nm3/day SanMartin CS 600.000 Nm3/day
Completion date: 2013
SCOPE OF SERVICES
• Basic Design review
• Complete FEED and/ or Detail Design
– (all disciplines: Pipeline, Process,
Piping, Civil, Electrical,
FACILITIES:
• 2 to 6 compression units per station
• All asscociated buildings and
facilities
• Tie-in inexisting pipelines and
existing plants
• One metering station
• One Off-take station
Piping, Civil, Electrical,
Instrumentation, Cathodic
Protection)
• Permitting activities
• Construction Assistance
• As built
(4)Project name:
Romgaz Dehydration Plants
(cumullated capacity 13.800.000 Nm3/day)
Client:
Romgaz- Romania
Start date: 2007
Completion date: 2014
PROJECTS DESCRIPTION
New individual dehydration units with capacities
ranging from 150.000 to 2.700.000 Nm3/day were ranging from 150.000 to 2.700.000 Nm3/day were
specified, purchased, constructed and commisioned
for the following locations: Finta, Piscu Stejari,
Hurezani, Bilciureşti, Bălăceanca, Bibeşti, Urziceni
SCOPE OF SERVICES
• Basic Design review
• Complete FEED and/ or Detail Design for the
facilities
• Tender Specifications and data sheets for
dehydration packages.
• Permitting activities
• Construction Assistance
• As built
(5) Project name:
PREFEASIBILITY STUDY FOR GAS TRANSPORT
AND PROCESSING TO CHEMCHEMAL- ZAHKO-
IRAK
(cumullated capacity 1.500.000 St bbl/day)
Start date: 2007
Completion date: 2014
PROJECT DESCRIPTION
The project scope was to study the recovery
possibilities for free and associated gas
extracted from Kurdistan region from the
fields:Kirkuk (Baba Dome and Adanah Dome),
Khurmala Dome, TaqTaq, Howler, DemirDagh,
Zab Dome, Chia Surkh, Pulkhana, Bai Hassan,
Khabbaz plus the forecast production of other
6 structures with crude oil and associated gas
perspectives (Barda Rash, AinSafra, Bashiqa,
Maqlub, Basakhrah and Khurmala).
PROJECT DESCRIPTION
•6” to 28”, 4000 km pipeline rehabilitation
•17 pcs. pumping stations and tank farm rehabilitation
•2 crude oil loading/unloading railway ramps
•2LNG loading/unloading railway ramps
•Custody and fiscal metering system (48 metering skids)
•Combined fiber optic and microwaves
(6)Project name:
Romanian National Crude Oil Transport System Rehabilitation
Client:
CONPET S.A. Ploiesti
Start date: 1994
Completion date: 2004
•Combined fiber optic and microwaves telecommunication system
•Full integrated automation and SCADA system with National Center Dispatcher and local
station microscada dispatchers
•Rehabilitation of all electrical power supply
•Leak detection system
•Rehabilitation of cathodic protection for all pipelines
SCOPE OF SERVICES
•Project management
•Consultancy
•Feed package
•Detail design
•Tender evaluation
•Procurement supervision
•Cost control
•Planning and scheduling
•FAT
(7)Project name:
Butimanu Natural Gas Compression Station and Underground Storage
Facilities
Client:
ROMGAZ S.A. – Ploiesti Branch
Start date: 1998
Completion date: 2006
•Construction supervision
•Commissioning supervision
•Operation and maintenance manuals
•Training
•Project audit
•Corporate development
•Project Value Engineering
•Emergency Response Plan
•Lost Prevention Plan
SCOPE OF SERVICES
•Project Management
•Geological Reservoir Engineering
•Conceptual/Basic/Detailed Design
•Cost Estimating and Project Scheduling
PROJECT DESCRIPRION
•Gas Compressor Station 200,000,000Nm3/year
•Underground Storage Facilities
•utilities
•Cost Estimating and Project Scheduling
•Invitation to Tender (ITT) documentation
and bid analysis
•Procurement, expediting, inspection and
associated services
•Construction Management and turnkey
solutions
•Commissioning support
•Operation and maintenance manual
(8)Project name:
Tolkan-Borankol Kazakhstan’s Fields Gas and Condensate (UKPG) Complex Process Facilities
Client:
PETROM –Member of OMV Group
Start date: 2001
Completion date: 2002
PROJECT DESCRIPTION
•Gas separation
•Condensate Processing
•Gas Compressor Station 200,000 Nm3/day
•Storage Facilities
•Pumping Station
•Utilities
PROJECT DESCRIPTION
PFS-U is a offshore platform designed as a gathering facility for fluid production of 8 wells. The processing capacity of PFS-U is:
•300 m3/d of crude oil
•350,000 Sm3/d of gas
•Water cut of 5% to 10% PFS-U consists of the following process
and utility units:
•Wellhead and associated equipment
•Production and Test Inlet Manifolds
•Well Testing Facility•Well Testing Facility
•Pig Launcher
•Pig Launcher/Receiver
•Electric Gas Heater
•Gas Lift Injection Manifold
•Closed Drain and Blowdown System
•Open Drain System
•Instrument Air System
•Firefighting System
•Chemical Injection System
(9)Project name:
IRRI Flowstation – N-LNG Phase 3 Gas Supply Project
Client:
Nigerian Agip Oil Corporation SAIPEM Contracting Nigeria Ltd.
Start date: 2004
Completion date: 2006
•Project management
•MTO and B of Q•Procurement•Commissioning and Start-up Supervision•Operation manual
SCOPE OF SERVICES
•Feasibility study
•Basic Design•Schedule•Flow Diagrams and P & ID’s•Operation on emergency philosophy•Detail Design (Civil, Piping, Mechanical,Instrumentation, Electrical etc.)
PROJECT DESCRIPTION
Irri flowstation is a new gathering station, located in the Irri/Isoko area, designed toreceive well-fluids from 3 existing and 2 future dual-completion wells.The Plant is designed to export 120 MMSCFD of gas and 15,700 BPD of oil from 3existing wells, rising to 160 MMSCFD of gas and 23,000 BPD of oil when the futurewells are brought online.The gas is treated to reduce the CO2 content to bellow 2 mol% before it is exportedto Kwale via an 18” pipeline. In the event of an upset at Kwale or there being nodemand for the gas from Irri, the oil production may be continued by venting the gasstream to flare
SCOPE OF SERVICES
•Basic Design review
•Schedule
•Flow Diagrams and P & ID’s
•Operation on emergency philosophy
•HAZOP
•Detail Design (Civil, Piping, Mechanical, Instrumentation, Electrical etc.)
•MTO and B of Q
•Commissioning and Start-up Supervision
•Operation manual
(10)Project name:
EPC Obiafu-Obrikom Plant Works N-LNG Phase 3 Gas Supply Project
Client:
Nigerian Agip Oil Corporation SAIPEM Contracting Nigeria Ltd.
Start date: 2002
Completion date: 2006
PROJECT DESCRIPTION
NAOC Obiafu-Obrikom plant (Ob/Ob) is an oiland gas treating complex located approx. 80km north-west of Port Harcourt Nigeria.The object of N-LNG gas supply project is toupgrade and expand NAOC Ob/Ob gas plantin Nigeria to produce sales gas for delivery toN-LNG at the Bonny LNG plant. N-LNG phase3 project is to increase the sales gas exportcapacity to 440 MMSCFD with the possibilityof achieving 600 MMSCFD for short periodsand reduce flaring. This work forms part ofthe N-LNG gas supply project-phase 3.
N-LNG Gas Supply Project, Phase 3
includes the following major
components:
•Lopped Rich/Lean HP Gas Header
•TEG Contactor
•TEG Regeneration
•CO2 Regenerator Columns - Trays
replacement
•Fuel Gas Heater Package
SCOPE OF SERVICES
•Basic Design review
•Schedule•Fuel Gas Heater Package
•MP Compressor
•Stabilizer Pre-Flash Drum
•Nitrogen Generation Package
•Multi-Phase Flow Meter
•Lube Oil System
•Schedule
•Flow Diagrams and P & ID’s
•Operation on emergency philosophy
•HAZOP
•Detail Design (Civil, Piping, Mechanical,
Instrumentation, Electrical etc.)
•MTO and B of Q
•Commissioning and Start-up Supervision
•Operation Manual
(11)Project name:
Idu Flowstation Revamping Phase 2 N-LNG Trains 4/5 Gas Supply Project
Client:
Nigerian Agip Oil Corporation ALCON Nigeria Ltd.
Start date: 2004
Completion date: 2008
PROJECT DESCRIPTION
Idu Flowstation F/S is located in Rivers State, in the Niger Delta are of Nigeria, and it is
currently treating the production from Idu field and from Samabri/Biseni field. The gross
liquid (oil and water) is sent to Brass terminal while the separated gas is flared. The
present project “N-LNG, Phases 4/5 Gas Supply Project-Idu Gas Field Development-Idu
Flowstation Revamping, Phase 2” covers, mainly, the installation of process and service
units for oil production and gas delivery to Ob/Ob gas plant as follows:
•Installation of a new separator (NAGseparator) to treat the production fromthe new Idu NAG wells•Installation of a LP/MP TurboCompressor System, to ensure therequired gas pressure for delivery toOb/Ob Gas Plant•Installation of a Launching Trap for the18”gas pipeline to Ob/Ob, installation ofan 18”Receiving Trap and Slug Catcher inOb/Ob Gas Plant, and interconnectionwith the existing facilities•Installation of Flaring and Blowdown
•Installation of a Water TreatmentSystem to remove the residual oil fromthe produced water•Installation of a Diesel Oil System•Installation of a Water Well System, andPotable Water System•Installation of an Instrument Air System•Installation of a Nitrogen GenerationSystem•Installation of a Chemical InjectionSystem•Upgrade of the Firefighting System•Upgrade of the Diesel PowerGeneration System•Installation of a DCS, ESD/PSD System•Installation of Flaring and Blowdown
systems•Installation of a new Power GenerationSystem, to supply power to Idu F/S,Samabri C2 F/S and its surroundingcommunities via overhead lines•Installation of a Fuel Gas TreatmentSystem, to ensure the required gasquality at the inlet of the new GasTurbines•Installation of a new Gas Boot•Installation of a new Liquid MeteringStation
•Installation of a DCS, ESD/PSD System•Installation of a new Storage Tank
SCOPE OF SERVICES
•Basic Design review•Schedule•Flow Diagrams and P & ID’s•Operation on emergency philosophy•HAZOP•Detail Design (Civil, Piping, Mechanical,Instrumentation, Electrical etc.)•MTO and B of Q•Commissioning and Start-up supervision•Operation manual
(12)Project name:
Engineering Procurement Construction and Management (EPCM) services for
„Development of Natural Gas Underground Storage in Targu Mures – Romania”
Client:
SC DEPOMUREŞ SA. Targu Mures
Start date: 2013
Completion date: Ongoing
Project description:
The general purpose of Project was to increase the UGS working volume up to 400 million Nm3 in a first phase. A possible future
expansion shall be also considered, to increase the working volume up to 600 million Nm3. Furthermore, the dependency on existing Romgaz facilities shall be eliminated, by building a new Gas Station made of compression, dehydration, and fiscal
metering facilities.
•Start-up and Operating Manuals.•As-Built documentation•Procurement, Transportation, Inspection and Customs Clearance of all equipment and materials for both temporary and permanent works
Scope of services:
•Basic Design•Quality assurance and Quality Control•HSE Plan•Philosophies•Simulation models and reports•Schedules for works quality control •General estimate•Detail Design.•MTO for both temporary and permanent works
required to complete the WORK.•Supply and installation of compression station•Supply and installation of dehydration station•Supply and installation of a bidirectional fiscal gas metering•Supply and installation of a fuel gas treatment skid•Supply and installation of a gas distribution manifold•Supply and installation of a guard house with necessary fixture and fittings•supply and installation of warehouse
•MTO•Pre-commissioning, Commissioning, Initial Start-up, Performance Test and Hand-over Manuals
SCOPE OF SERVICES
•Project management
•Consultancy
•Feed package
•Detail design
•Tender evaluation
•Planning and scheduling
•Construction supervision
•Commissioning supervision
•Operation and maintenance manuals
(13)Project name:
Sinca Turbo-Compressors Station and Associated Facilities
Client:
SNTGN TRANSGAZ S.A. – Medias
Start date: 2015
Completion date: 2015
•Training
•The purpose of the EPC project was to
upgrade the existing Compressors Station
by replacing 2 of the existing
Turbocompressors with new machines. A
number of 2 new compressors model
C335EH Solar driven by 2 turbines Solar
PROJECT DESCRIPTION
• Gas Compressor Station upgrade with 2 x 120,000 Nm3/hour new turbocompressors.
•Above ground connection point/ nodeupgrade.
• Utilities
C335EH Solar driven by 2 turbines Solar
Centaur 50 turbines were installed.
•The project was finalized in
approximately 9 months from contract
signature.
•Petrostar was part in the EPC Consortium
performing the entire package of
engineering activities.
SCOPE OF SERVICES
•Project management
•Consultancy
•Feed package
•Detail design
•Tender evaluation
•Planning and scheduling
•Construction supervision
•Commissioning supervision
(14) Project name:
Sarmasel Compressors Station and Associated Facilities
Client:
ROMGAZ S.A. – Ploiesti Branch
Start date: 2013
Completion date: 2016 (est.)
•Operation and maintenance manuals
•Training
PROJECT DESCRIPTION
• Upgrade of the existing Undergroundstorage facility up to 9 million Nm3/daycapacity
•Installation of 4 Compressors Units of1.5 million Nm3/day each.
• Installation of 3 Dehydration Units of3 million Nm3/day each.
• Utilities• The purpose of the EPC project was to
upgrade the existing Compressors Station
by installing 4 new reciprocating
compressors with a capacity of 1.5 million
Nm3/day each. A number of 3 new
dehydration units were installed.
•Petrostar was part in the EPC Consortium
and performed the entire package of
engineering activities.
• Utilities
SCOPE OF SERVICES
•Project management
•Consultancy
•Feed package
•Detail design
•Tender evaluation
•Planning and scheduling
•Construction supervision
•Commissioning supervision
•Operation and maintenance manuals
(15) Project name:
Roman Compressors Station
Client:
ROMGAZ S.A. – Medias
Start date: 2014
Completion date: 2015
•Training
• The purpose of the EPC project was to
develop a new Compressors Station by
PROJECT DESCRIPTION
• New compressors station with a capacity of600,000 Nm3/day.
•Installation of 2 Reciprocating CompressorUnits of 0.3 million Nm3/day each.
•Utilities
installing 2 new reciprocating compressors
with a capacity of 300,000 Nm3/day each
along with the required facilities such as:
fuel gas system, depressurization system,
instrument air sustyem, firefighting,
control systems, fire and gas detection,
power system, HVAC systems, new building
with bridge cranes, ESD system etc.
SCOPE OF SERVICES
•Project management
•Consultancy
•FEED package
•Detail design (for EPC phase)
•Procurement assistance & technical evaluations
•Construction supervision
•Commissioning assiostance
•Operation and maintenance manuals
•Training
(16) Project name:
Urziceni Compressors Station and Associated Facilities
Client:
ROMGAZ S.A. – Ploiesti Branch
Start date: 2008
Completion date: 2014
•Training
PROJECT DESCRIPTION
• Upgrade of the existing compressorstation for the underground storagefacility up to an injection capacity of 2.4million Sm3/day at 125 barg
•Installation of 4 Compressors Units of0.6 million Sm3/day each.
• Facilities, Buildings, Utilities
• The purpose of the EPC project was to
upgrade the existing Compressors Station
by installing 4 new reciprocating
compressors with a capacity of 0.6 million
Nm3/day each as an extension to the
existing M1 Compressor station
•Petrostar was part in the EPC Consortium
and performed the entire package of
engineering activities.
SCOPE OF SERVICES:
• Project management (FEED)
• Complete Multidisciplinary FEED Engineering
• Permitting
• Cost Estimates
• Bid Package Preparation
(14) Project name:
BRUA Pipeline- 3 Compressor Stations FEED
Client:
SNTGN TRANSGAZ S.A. – Medias
Start date: October 2016
Completion date: June 2017
•The purpose of the FEED project was to
define the requirements for the
subsequent EPCC Phase for the 3 new
Compressors Stations of the BRUA
Pipeline.
• A number of 1466 deliverables were
PROJECT DESCRIPTION:
• Three New Gas Compressor Stations in 3 different locations with 3 x 300,000 Sm3/hour new turbocompressors each.
• Utilities
• A number of 1466 deliverables were
issued in approximately 9 months from
contract signature.
• The level of detail of the FEED was
high due to special requirements of the
Client.