Pavement (SI)

Embed Size (px)

Citation preview

  • 7/27/2019 Pavement (SI)

    1/11

    Aspahltic Wearing Cou

    Tack Coat

    Asphaltic Base Course(Prime Coat

    Water Bound Macadam

    Base Course(20cm)

    Sub Base Course(30cm

    Subgrade(By Three Met

    NSL

    Cross-section of Flexible Pavement/Highway

    Asphaltic Wea

    Tack Coat

    Prime Coat

    Base Course +

    Sub Base Cou

    Subgrade

    NSL

    Reinforced Concrete Slab (25cm) with Expansion J

    Cross-section of Rigid Pavement/Highway

  • 7/27/2019 Pavement (SI)

    2/11

    Plan of Pavement/Highway - Flexible

    Fence

    Kerb

    MedianRoad Marking Road Lighting

    SH

    OULDER

    S

    SH

    OULDER

    S

    L

    ANE-2

    LANE-3

    LANE-1

    LANE-3

    L

    ANE-2

    LANE-1

  • 7/27/2019 Pavement (SI)

    3/11

    Plan of Pavement/Highway - Rigid

    Fence

    Kerb

    MedianRoad Marking Expension Joi

    Road Lighting

    SH

    OULDER

    S

    SH

    OULDER

    S

    L

    ANE-2

    LANE-3

    LANE-1

    LANE-3

    L

    ANE-2

    LANE-1

  • 7/27/2019 Pavement (SI)

    4/11

    Tripple Surface Treatment(TST)

    Prime Coat

    Base Course (9")

    Sub Base Course(12")

    Subgrade (By Three Me

    NSL

    Cross Section of Shoulder - Flexible/Rigid Pavement

  • 7/27/2019 Pavement (SI)

    5/11

    Dsn Problem 1

    (7cm) A flexible pavement is proposed between Lahore-S

    The length of the section is 150 Km. The road is 3

    m) If the all components of flexible plavement are provthe quantity of works?

    cm) Width of Each Lane = 4.5m, Width of Shoulder on

    ds) Length Width

    Main Road m m

    1 AWC

    2 Tack Coat

    3 ABC

    4 Prime Coat

    5 WBM

    6 Base Course

    7 Sub Base Course

    8 Fence -

    9 Road Lighting Poles - -

    10 Median -

    11 Kerb Stones -

    12 Road Marking - -

    Course a B/w Lanes - -

    b Along Shoulder and Median -

    Shoulders1 TST

    nd 2 Prime Coat

    3 Base Course

    4 Sub Base Course

    If pavement is replaced with Rigid Pavement, de1 RCC Slab

    ts 2 Expansion Joints - -a Transverse

    b Longitudinal

    Sr. No. Description Qty

  • 7/27/2019 Pavement (SI)

    6/11

    Dsn Problem 2

    A flexible pavement is proposed between Lahore-S

    The length of the section is 300 km. The road is 4

    If the all components of flexible plavement is provid

    the quantity of works?

    Width of Each Lane = 4.5m, Width of Shoulder on

    If Pavement is replaced with Rigid Pavement, D

    Draw the neat Plans and Cross sections of main road (fle

    Road Lighting: 10 Poles in 1Km on both sides of the road

    Road Marking: 5mx0.15m @ 5m

    Longitudinal Joints: Along the median, Transverse Joints

    ne

  • 7/27/2019 Pavement (SI)

    7/11

    ne

  • 7/27/2019 Pavement (SI)

    8/11

    ds)

  • 7/27/2019 Pavement (SI)

    9/11

    hiwal section of GT Road.

    ne each side.

    ed except subgrade. Estimate

    ch Side = 4.0m

    QtyHeight

    m

    m3 6 lanes @ 4.5m

    - m2

    m3

    - m2

    m3

    m3

    m3

    - Rm

    - No 10 Poles in 1 Km

    - Rm

    - - Rm

    - -

    - m2 5m x 0.15m @ 5m

    - Rm

    - m2

    - m2

    m3

    m3

    cribe the quantities of new items.m3 0.5-0.75% Steel

    -

    No after 20m

    Rm Along median

    RemarksUnit

  • 7/27/2019 Pavement (SI)

    10/11

    lkot section of Motorway by National Highway Authority

    es each side.

    d except subgrade. Estimate

    ch Side = 4m.

    cribe the Quantities of New Items.

    ble and rigid), shoulders and miscellaneous items.

    after 20m on both sides

  • 7/27/2019 Pavement (SI)

    11/11

    Dsn Problem 1

    A flexible pavement is proposed between Lahore-Sahiwal section of GT Road.

    The length of the section is 150 Km. The road is 3 lane each side.

    If the all components of flexible plavement are provided except subgrade. Estimate

    the quantity of works?Width of Each Lane = 4.5m, Width of Shoulder on each Side = 4.0m