7/27/2019 Pavement (SI)
1/11
Aspahltic Wearing Cou
Tack Coat
Asphaltic Base Course(Prime Coat
Water Bound Macadam
Base Course(20cm)
Sub Base Course(30cm
Subgrade(By Three Met
NSL
Cross-section of Flexible Pavement/Highway
Asphaltic Wea
Tack Coat
Prime Coat
Base Course +
Sub Base Cou
Subgrade
NSL
Reinforced Concrete Slab (25cm) with Expansion J
Cross-section of Rigid Pavement/Highway
7/27/2019 Pavement (SI)
2/11
Plan of Pavement/Highway - Flexible
Fence
Kerb
MedianRoad Marking Road Lighting
SH
OULDER
S
SH
OULDER
S
L
ANE-2
LANE-3
LANE-1
LANE-3
L
ANE-2
LANE-1
7/27/2019 Pavement (SI)
3/11
Plan of Pavement/Highway - Rigid
Fence
Kerb
MedianRoad Marking Expension Joi
Road Lighting
SH
OULDER
S
SH
OULDER
S
L
ANE-2
LANE-3
LANE-1
LANE-3
L
ANE-2
LANE-1
7/27/2019 Pavement (SI)
4/11
Tripple Surface Treatment(TST)
Prime Coat
Base Course (9")
Sub Base Course(12")
Subgrade (By Three Me
NSL
Cross Section of Shoulder - Flexible/Rigid Pavement
7/27/2019 Pavement (SI)
5/11
Dsn Problem 1
(7cm) A flexible pavement is proposed between Lahore-S
The length of the section is 150 Km. The road is 3
m) If the all components of flexible plavement are provthe quantity of works?
cm) Width of Each Lane = 4.5m, Width of Shoulder on
ds) Length Width
Main Road m m
1 AWC
2 Tack Coat
3 ABC
4 Prime Coat
5 WBM
6 Base Course
7 Sub Base Course
8 Fence -
9 Road Lighting Poles - -
10 Median -
11 Kerb Stones -
12 Road Marking - -
Course a B/w Lanes - -
b Along Shoulder and Median -
Shoulders1 TST
nd 2 Prime Coat
3 Base Course
4 Sub Base Course
If pavement is replaced with Rigid Pavement, de1 RCC Slab
ts 2 Expansion Joints - -a Transverse
b Longitudinal
Sr. No. Description Qty
7/27/2019 Pavement (SI)
6/11
Dsn Problem 2
A flexible pavement is proposed between Lahore-S
The length of the section is 300 km. The road is 4
If the all components of flexible plavement is provid
the quantity of works?
Width of Each Lane = 4.5m, Width of Shoulder on
If Pavement is replaced with Rigid Pavement, D
Draw the neat Plans and Cross sections of main road (fle
Road Lighting: 10 Poles in 1Km on both sides of the road
Road Marking: 5mx0.15m @ 5m
Longitudinal Joints: Along the median, Transverse Joints
ne
7/27/2019 Pavement (SI)
7/11
ne
7/27/2019 Pavement (SI)
8/11
ds)
7/27/2019 Pavement (SI)
9/11
hiwal section of GT Road.
ne each side.
ed except subgrade. Estimate
ch Side = 4.0m
QtyHeight
m
m3 6 lanes @ 4.5m
- m2
m3
- m2
m3
m3
m3
- Rm
- No 10 Poles in 1 Km
- Rm
- - Rm
- -
- m2 5m x 0.15m @ 5m
- Rm
- m2
- m2
m3
m3
cribe the quantities of new items.m3 0.5-0.75% Steel
-
No after 20m
Rm Along median
RemarksUnit
7/27/2019 Pavement (SI)
10/11
lkot section of Motorway by National Highway Authority
es each side.
d except subgrade. Estimate
ch Side = 4m.
cribe the Quantities of New Items.
ble and rigid), shoulders and miscellaneous items.
after 20m on both sides
7/27/2019 Pavement (SI)
11/11
Dsn Problem 1
A flexible pavement is proposed between Lahore-Sahiwal section of GT Road.
The length of the section is 150 Km. The road is 3 lane each side.
If the all components of flexible plavement are provided except subgrade. Estimate
the quantity of works?Width of Each Lane = 4.5m, Width of Shoulder on each Side = 4.0m