PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
PSI Experience, Dealing with a MW Beam…Pierre A. Schmelzbach
…in Switzerland
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
COCKCROFT-WALTON
INJECTOR 2870 keV TRANSFER LINE
72 MeV TRANSFER LINE
590 MeV CYCLOTRON
TARGET E
TARGET M
SINQ TRANSFER LINE SINQ
OVERVIEW
Protonentherapie (+ 2006) UCN (in construction)
IP
3 mA /1.8 MW
2 mA /1.2 MW
2 mA /1.1 MW
1.4 mA /.8 MW
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Basic Considerations for Design and Operation
Accelerators: Cyclotrons with large turn separation at the extraction
Losses: Extraction from Injector Cyclotron, injection and extractionfrom Ring Cyclotron: < 0.5 A each
Beam lines: < 1nA / m
Local shielding
Remote handling
Repairs in hot cell located in machine / experimental hall
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Beam production on target E
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
year
char
ge
del
iver
ed [
mA
h]
ho
urs
of
pro
du
ctio
n [
h]
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
aver
age
curr
ent
[mA
]
delivered charge on target E hours of production average delivered current
Rebuilding of Target E /
Beam Dump
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
TARGET E
TARGET WHEEL
ABSORBERS
COLLIMATOR K1
COLLIMATORS K2 + K3
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Layout of the beam line between target E and beam dump
TARGET-E INSERT
COLLIMATORS DIAGNOSTIC INSERTS
MOVABLE SLITS
BEAM DUMP
INFLATABLE SEAL ASSEMBLY
WORKING PLATFORM
CONCRETE SHIELDING
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Special tools
• Shielded flasks for transportation to hot cell
• Remote control of main functions (e.g. lifting defective component out of beam line shielding)
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Accelerator & Beam Line Protection
• Range of 590 MeV p in steel is 28 cm = welding torch !
• The Run Permit System has to switch off the beam in less than 5 ms in order to avoid burning a hole in a vacuum chamber
• Transmission
• Halo
• Losses (Ioniz. Chambers)
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
We are not alone !
Swiss Authorities:BAG / OFSP (Swiss Federal Office of Public Health)HSK / DPSIN (Swiss Nuclear Safety Inspectorate)NAGRA (National Cooperative for the Disposal of Nuclear Waste)
Burocracy- before- during- after
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
eventually….
+ some others…
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
1. Gen. description of the facility / use
2. Plan of controlled areas
3. Machine protection systems
4. Regulations RA-protection (site)
5. Regulations RA-protection (Control Room)
6. Operating regulations for personnel RA-protection systems
7. Concept personnel RA-protection systems (access control vaults)
8. Operating regulations accelerator
• Responsabilities
• Operation, emergencies,…
9. Access regulations to site
10. Quartely reports (Doses)
Further authorizations needed for• Release of radioactivity• Hot cell operation• Special user‘s facilities
Basis for the authorizationto operate the PSI proton facility
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
The good old times . . . Things become tougher !
Experience with the high current accelerator
• Start of the project was quite easy, first upgrade (<1.5 mA) also
• Upgrade 1.5 to 2 mA - only short test periods at higher current allowed first- delay >2 years because a long pending condition was not fulfilled ( controlled access to site [RA check of persons, vehicles])
• Enhanced requirements on facilities for selective storage of material (be carefull with vocabulary and definitions)
• History, tracking of RA material (waste), e.g. ISRAM, specifications for waste / waste containers (HSK, NAGRA)
• Also: BAG frequent visits (about once a month), presentation of shutdown planning
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Experience with the installation of our new 250 MeV, 500 nA cyclotron (PROSCAN Project)
BAG want:
• to be involved at a early stage (before you start to build something) submit plans and safety report early • to supervise step by step the commissioning of the systems several requests for “authorization to operate xxxx” + progress reports
Looks also at things that are not their immediate business (e.g. rf-systems)
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
Recommendations:(to solve a 3-dimensional problem: technology, law, psychology)
• Invite BAG to a first, general information on the project (Dr. Nicolas Stritt ?)
• Define the scope of the project (accelerator only, target a.s.o as separate projects).
• Feel what they want to have in the safety report (can be discussed !, they are reasonable people). Problem with “arbitrary” requirements.
• Safety report: present solutions that satisfy their standards ( not too little, but also not too much !).
• Operating regulations: clear information on who is responsible for what. They accept local rules if equivalent to their standards.
• They read safety report and operating regulations very carefully
PAUL SCHERRER INSTITUT
CERN / Oct. 17. 2005 / P.A.Schmelzbach
4 MWGood Luck !