CALL BEFORE YOU DIGPENNSYLVANIA ONE CALL SYSTEM, INC.
1-800-242-1776
1-800
-242-
1776
PA ACT 287 (1974) REQUIRES THREE WORKINGDAYS NOTICE TO UTILITIES BEFORE YOU
EXCAVATE, DRILL OR BLAST
PLUMBING GENERAL NOTES
COORDINATION NOTE:X
DESCRIPTIONSYMBOL
PLUMBING SYMBOLS - GENERAL
NEW CONNECTION
C.O.CLEAN-OUT (EXPOSED)
GPITCH DOWN - IN DIRECTION OF ARROW
T.W.FLOW IN DIRECTION OF ARROW
H.W.R.RISE OUT OF TEE
H.W.DROP OUT OF TEE
C.W.RISER UP (ELBOW)
I.D.RISER DOWN (ELBOW)
V.P.CONNECTION OUT OF SIDE
R.W.C.CONNECTION OUT OF BOTTOM
S.W.CONNECTION OUT OF TOP
SAN.DROP OR RISEHIGH LOW
C.O.
C.O. CLEAN-OUT (IN FLOOR) C.O.
RUNNING TRAP R.T.
PIPE ANCHOR
PIPE QUIDE
EXPANSION JOINT
EXPANSION LOOP
SHOCK ABSORBER-(A) INDICATES SIZE S.A.SA(A)
"P" TRAP
AP ACCESS PANEL A.P.
WALL HYDRANT NON-FREEZE W.H.
FLOOR DRAIN F.D.
ROOF DRAIN R.D.
ABBREVIATION
DESCRIPTIONSYMBOL ABBREVIATION
SOIL OR WASTE PIPE - SANITARY SAN.
STORMWATER DRAIN PIPE S.W.
RAIN WATER CONDUCTOR AT CEILING R.W.C.
VENT PIPE V.P.
INDIRECT WASTE I.D.
COLD WATER C.W.
HOT WATER H.W.
HOT WATER RETURN H.W.R.
TEMPERED WATER T.W.
GAS G
AIR A
SW
RWC
ID
TW
G
A
PLUMBING SYMBOLS PIPING
DESCRIPTIONSYMBOL ABBREVIATION
GATE VALVE G.V.
GLOBE VALVE G.B.
SWING CHECK VALVE S.C.V.
NON-SLAM CHECK VALVE N.C.V.
PRESSURE REDUCING VALVE P.R.V.
PRESSURE RELIEF VALVE R.V.
VALVE ON RISER
GAS COCK G.C.
STRAINER STR.
THERMOMETER WELL TH.W.
BACKWATER VALVE B.W.V.
PLUMBING SYMBOLS VALVES
BE APPLICABLE TO THIS PROJECT.ALL SYMBOLS SHOWN ABOVE MAY NOT
NOTE:
1. PERFORM ALL WORK IN ACCORDANCE WITH THE PENNSYLVANIA UNIFORM CONSTRUCTION CODE, THEOWNERS INSURANCE UNDERWRITERS, THE INTERNATIONAL PLUMBING CODE, THE PENNSYLVANIADEPARTMENT OF LABOR & INDUSTRY CODES, LOCAL CODES, THE NFPA CODE, PENN STATE STANDARDS,AND ANY OTHER AUTHORITIES HAVING JURISDICTION. PROVIDE OWNER WITH CERTIFICATES OF INSPECTION.
2. ALL SANITARY STACKS SHALL BE PROVIDED WITH CLEANOUTS AT THE BASE.
3. ALL 4" AND LARGER SANITARY PIPING SHALL PITCH AT A MINIMUM OF 1/8" PER FOOT. ALL SANITARY PIPINGSMALLER THAN 4" SHALL PITCH AT A MINIMUM OF 1/4".
4. ALL NATURAL GAS DROPS SHALL BE EQUIPPED WITH A DRIP LEG WITH A CAPPED END FOR DIRT & MOISTURECOLLECTION.
5. ALL PLUMBING PIPING SHALL BE RUN TIGHT TO STEEL TRUSSES AND RACKED ALONG STEEL AND WALLS WITH ASTANDARD PIPE HANGING / RACKING SYSTEM. PIPING SHALL BE RUN CLEAR OF ALL DOORS AND WINDOWS.
6. THESE DRAWINGS ARE A SCHEMATIC PIPING DIAGRAM; ALL PIPING RUNS SHOWN MUST BE CAREFULLYDETERMINED BY THIS CONTRACTOR. THE CEILING CONSTRUCTION IS VERY CONGESTED. THIS CONTRACTORSHALL VIEW THE DRAWINGS OF ALL TRADES & PROVIDE ALL OFFSETS NECESSARY TO FACILITATE PIPING RUNSTO ALL FIXTURES AND EQUIPMENT. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHERCONTRACTORS TO FACILITATE THE INSTALLATION OF ALL PIPING, HANGERS, ETC.
7. THE P.C. IS RESPONSIBLE, AT HIS OWN EXPENSE, TO REPAIR ANY SERVICES OR DAMAGES CAUSED BY HISWORK.
8. THESE NOTES SHALL APPLY TO ALL PLUMBING DRAWINGS.
ABBREVIATIONSTHE HVAC, PLUMBING AND ELECTRICAL CONTRACTORS SHALL BE AWARE THAT THE CEILING HEIGHTS, SOFFITS ANDSPACE CONDITIONS ON THIS PROJECT ARE CRITICAL AND SPACE ALLOCATION MUST BE COORDINATED BETWEENALL TRADES AND MAINTAINED. EACH CTR. OR TRADE SHALL REFER TO THE STRUCTURAL AND ARCHITECTURALDRAWINGS IN ADDITION TO THE HVAC, PLUMBING AND ELECTRICAL DRAWINGS TO DETERMINE ACCEPTABLELAYERING OF ALL EQUIPMENT.
SAN
ACMPR AIR COMPRESSORADR AIR DRYERBFP-DC BACK FLOW PREVENTER, OF THE DOUBLE
CHECK VALVE ASSEMBLY TYPECMPR- COMPRESSOR (SUFFIXES: LA-LABORATORY AIR,
HA-HEATHCARE AIR, DA-DENTAL AIR)DHWRP DOMESTIC HOT WATER RECIRCULATION PUMPDIU DEIONIZED WATER UNITDIWP DEIONIZED WATER PUMPDSWU DISTILLED WATER UNITSDWBP DOMESTIC WATER BOOSTER PUMP
DWH-E,G,S DOMESTIC WATER HEATER (ELECTRIC, GAS, ORSTEAM)
DWST DOMESTIC WATER STORAGE TANKGT GREASE TRAPIDWH-E,G,S INSTANTANEOUS WATER HEATER (ELECTRIC,
GAS, OR STEAM)ROS REVERSE OSMOSIS SYSTEMSMP SUMP PUMPSWGP SEWAGE PUMPTNK TANKVACP VACUUM PUMPWSFR WATER SOFTENER
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:19
:22 P
M P0.01
Plumbing Legend Notes &Abbreviations
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
No. Description Date
DN
DN
DN
DN
DN
DN
74
321
E
F
G
H
J
5 6 8
9
3.40 0.2
10
E.3
3.3
5.2
K
1.6
STAIR 2Z102
BUILDINGMECHANICAL
ROOMM108
MEN'S ROOMR106
WOMEN'S ROOMR105
JANITORJ107
TELE/DATAT106
ELEVATORV101
BUILDINGELECTRICAL
ROOMP108
MAIN JANITOR/STORAGE
J115
CORRIDORQ102
??
MACHINE ROOMM106
A
D
A1
A A A
AA1
AB B
C C C
E1
SAN
SAN
SAN
SAN
SAN
C C C
RW
C
4"ø3"
ø
6"ø 6"ø
4"ø
6"ø8"ø
RW
C
RWCRWC
V
V
SAN
SAN SAN
4"ø 4"ø
8"ø
2"ø
4"ø
2 1/2"ø
2"ø
4"ø
4"ø
5"ø
6"ø
4"ø
2"ø
6"ø
3"ø
4"ø
4"ø
4"ø
2 1/
2"ø
2 1/2"ø
2"ø
2"ø
2"ø2"ø
1"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:21
:15 P
M P2.01
Plumbing Plan Level 1 North- Sanitary
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Plan Level 1 Sanitary North
6" SANITARY SEWER LINE TO5'-0" OUTSIDE OF BUILDINGBY PLUMBING CONTRACTOR.
FOR CONTINUATION OF 6"SANITARY SEWER LINE SEECIVIL DRAWINGS.
MINIMUM 4'-6" OVER INVERTOF PIPE.
C.O.
C.O.
C.O.
C.O.
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
4" FLOOR DRAIN 'B'
4" FLOORDRAIN 'B' 3" FLOOR DRAIN 'A'
4" SANITARY DOWNFROM PENTHOUSE.
4" SANITARY DOWN FROMLEVEL 2 RESTROOMS.
4" FLOOR DRAIN 'B'
SEE DRAWING P2.02 FORCONTINUATION OF 4"SANITARY LINE AND 4"RAINWATER CONDUCTOR.
SEE DRAWING P2.02 FORCONTINUATION OF 4"SANITARY LINE.
SEE DRAWING P2.02 FORCONTINUATION OF 3"SANITARY LINE.
8" STORM WATER LINE TO 5'-0"OUTSIDE OF BUILDING BYPLUMBING CONTRACTOR.MINIMUM OF 3'-6" OVER INVERT OFPIPE.
FOR CONTINUATION OF 8" STORMWATER LINE, SEE CIVILDRAWINGS.
6" RAINWATER DOWN FROMLEVEL 2 ROOF.
8" STORM WATER LINE TO 5'-0"OUTSIDE OF BUILDING BYPLUMBING CONTRACTOR.MINIMUM OF 3'-6" OVER INVERT OFPIPE.
FOR CONTINUATION OF 8" STORMWATER LINE, SEE CIVILDRAWINGS.
3" VENT STACK UP4 " VENT THRU ROOF
C.O.
RAINWATER PIPING RUNABOVE CEILING
4" RWC DOWN FROM FLOORABOVE. SEE DRAWING P-2.05 FOR CONTINUATION.
C.O.
4" RWC DOWN FROM FLOORABOVE. SEE DRAWING P-2.05 FOR CONTINUATION.
SEE DRAWING P2.02 FORCONTINUATION OF 8"RAINWATER CONDUCTOR.
SEE DRAWING P2.02 FORCONTINUATION OF 6"RAINWATER CONDUCTOR.
SEE DRAWING P2.02 FORCONTINUATION OF 4"FOUNDATION DRAIN.
4" PERFORATED HDPEUNDERDRAIN PIPING, PLACEDAROUND EDGE OFCONVENTIONAL FOOTING
4" PERFORATED HDPEUNDERDRAIN PIPING, PLACEDAROUND EDGE OFCONVENTIONAL FOOTING
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
HIGHEST POINT OF FOUNDATION DRAIN
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
SEE DRAWING P2.02 FORCONTINUATION OF 4"FOUNDATION DRAIN.
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOUNDATION DRAIN MIN.
PITCH OF 1/8" PER 1'-0"
4" SANITARY MIN.
PITCH OF 1/8" PER 1'-0"
6" SANITARY MIN.
PITCH OF 1/8" PER 1'-0"
SANITARY PIPING RUNBELOW GROUND
SANITARY PIPING RUNBELOW GROUND
LOOP VENT RUNABOVE CEILING
6" RAINWATER CONDUCTOR DROPSDOWN IN CORNER OF CLOSET
6" RAINWATER CONDUCTOR DROPSDOWN IN CORNER OF CLOSET
4" SANITARY MIN.
PITCH OF 1/8" PER 1'-0"
6" RAINWATER CONDUCTOR
MIN. PITCH OF 1/4" PER 1'-0"
FOUNDATION DRAIN MIN.
PITCH OF 1/8" PER 1'-0"
FOUNDATION DRAIN MIN.
PITCH OF 1/8" PER 1'-0"
6" R
AIN
WAT
ER C
ON
DU
CTO
R
MIN
. PIT
CH
OF
1/4"
PER
1'-0
"
4" R
AIN
WAT
ER C
ON
DU
CTO
R
MIN
. PIT
CH
OF
1/4"
PER
1'-0
"
SUMP PUMP IN PIT
1-1/2" FORCED MAIN RUN ABOVECEILING TIE INTO 4" SANITARYLINE BELOW GROUND
2" OVERFLOW DRAIN- PIPETO NEAREST FLOOR DRAIN
6" RWC INTO RAINWATERSTORAGE TANK
C.O.
BRAE RAINWATER HARVESTINGTANK SYSTEM - SERIES 225P ASMANUFACTURED BY BRAE
C.O.
C.O.
C.O.
No. Description Date
321
A
C
D
5 6 8 9
B
0 0.2 10
5.2
0.5A
0.7A
AA
BB
B.5
8.8 9.18.2
1.6
SMALLCLASSROOM
110
ELECT: POWERLAB114
CIVIL: SURVEY111
CIVIL: GEO(SOILS) TEACHING
LAB112
CIVIL: STUDENTPROJECT LAB
113
CIVIL: CONCRETEPREP116
CIVIL: CONC/ASPHALT LAB
117
CIVIL:STRUCTURES LAB
118
STRENGTH OFMATERIALS LAB
119
CONNECTORQ104
??
LOBBYF102
MAIN JANITOR/STORAGE
J115
LOADING BAY115
STAIR 3Z103
CORRIDORQ103
SOUTHVESTIBULE
F103
SAN
SAN
SAN
V
V
STAIR 1Z101
SANSA
N
SAN
SAN
SAN
RWC
SAN SAN
SAN
SAN
SAN
V
VV
V
V
V
VVV
VV
V
4"ø 4"ø
8"ø
4"ø
4"ø
4"ø
4"ø
2"ø2"ø
1 1/
2"ø
1 1/
2"ø
2"ø
2"ø
2 1/2"ø
2"ø
2"ø
2"ø
2"ø
2"ø
4"ø
1 1/
2"ø
1 1/
2"ø
2"ø
4"ø
4"ø
2"ø 1 1/2"ø
4"ø
4"ø
2"ø
4"ø
2"ø
1 1/2"ø2"ø
2"ø
2"ø
4"ø
4"ø
4"ø
6"ø
4"ø
6"ø
6"ø
1 1/2"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:21
:42 P
M P2.02
Plumbing Plan Level 1South - Sanitary
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
C.O.
4" FLOOR DRAIN 'B'
C.O.
C.O.
C.O.
C.O.
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
SEE DRAWING P2.01 FORCONTINUATION OF 4"SANITARY LINE.
SANITARY LINE FORSAND FILTER
SEE DRAWING P2.01 FORCONTINUATION OF 8" STORMLINE.
C.O.
C.O.
6" RWC DOWN FROM FLOORABOVE. SEE DRAWING P-2.06FOR CONTINUATION.
C.O.
C.O.
C.O.2-1/2" VENT STACK UP3" VENT THRU ROOF
3" VENT STACK UP4" VENT THRU ROOF
TRENCH DRAIN 'C' -SEE SPECIFICATION
SAND INTERCEPTOR-SEE SPECIFICATION
RAINWATER PIPING RUNABOVE CEILING
DROP DOWN ALONG WALLTO UNDER FLOOR
C.O.
C.O.
3" FLOOR DRAIN 'A'
2" SANITARY DOWN INWALL FROM SINK ABOVE
C.O.
C.O.
C.O.
C.O.
C.O.C.O.6" RWC DOWN FROM FLOORABOVE. SEE DRAWING P-2.06FOR CONTINUATION.
C.O.
6" RWC DOWN FROM FLOORABOVE. SEE DRAWING P-2.06FOR CONTINUATION.
SEE DRAWING P2.01 FORCONTINUATION OF 6"RAINWATER CONDUCTOR.
SEE DRAWING P2.01 FORCONTINUATION OF 4"RAINWATER CONDUCTOR.
SEE DRAWING P2.01 FORCONTINUATION OF 4"FOUNDATION DRAIN.
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
4" PERFORATED HDPE UNDERDRAINPIPING, PLACED AROUND EDGE OFCONVENTIONAL FOOTING
SEE CIVIL DRAWINGS FORCONTINUATION OF 6" HDPEUNDERDRAIN PIPING.
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
FOU
ND
ATIO
N D
RAI
N M
IN.
PITC
H O
F 1/
8" P
ER 1
'-0"
SEE DRAWING P2.01 FORCONTINUATION OF 4"FOUNDATION DRAIN.
TRENCH DRAIN 'C'-SEE SPECIFICATION
1-1/2" VENT FROM SINKABOVE IN ROOM 214
SANITARY PIPING RUNBELOW GROUND
4" SANITARY MIN.
PITCH OF 1/8" PER 1'-0"
6" R
AIN
WAT
ER C
ON
DU
CTO
R
MIN
. PIT
CH
OF
1/4"
PER
1'-0
"
SANITARY PIPING RUNBELOW GROUNDSANITARY PIPING RUN
BELOW GROUND
6" R
AIN
WAT
ER C
ON
DU
CTO
R
MIN
. PIT
CH
OF
1/4"
PER
1'-0
"
6" RAINWATER CONDUCTOR
MIN. PITCH OF 1/4" PER 1'-0"
FOUNDATION DRAIN MIN.
PITCH OF 1/8" PER 1'-0"
FOUNDATION DRAIN MIN.
PITCH OF 1/8" PER 1'-0"
4" SANITARY MIN.
PITCH OF 1/8" PER 1'-0"
4" S
ANIT
ARY
MIN
.
PITC
H O
F 1/
8" P
ER 1
'-0"
4" S
ANIT
ARY
MIN
.
PITC
H O
F 1/
8" P
ER 1
'-0"
4" S
ANIT
ARY
MIN
.
PITC
H O
F 1/
8" P
ER 1
'-0"
RAINWATER PIPING RUNABOVE CEILING
No. Description Date
DN
DN
DN
DN
DN
DN
24
12
12
74
321
E
F
G
H
J
5 6 8
9
3.40 0.2
10
E.3
3.3
5.2
K
1.6
??
??
STAIR 2Z102
BUILDINGMECHANICAL
ROOMM108
MEN'S ROOMR106
WOMEN'S ROOMR105
JANITORJ107
TELE/DATAT106
ELEVATORV101
BUILDINGELECTRICAL
ROOMP108
CORRIDORQ102
??
MACHINE ROOMM106
CA
G
A
D
A1 A A A
AA1 AB B
C C C
C C C
1/2"ø1 1/4"ø
2"ø
1"ø
1/2"
ø
2"ø
1/2"ø1 1/4"ø
1 1/
4"ø 2"ø
2 1/2"ø
3/4"
ø
3/4"ø
2"ø
E1
1 1/
4"ø
1 1/
4"ø
1 1/
4"ø
1 1/4"ø
3/4"ø
3/4"ø
1/2"ø1/2"ø
2 1/2"ø
1 1/4"ø
1/2"ø
1"ø2"ø2"ø
3/4"
ø
3/4"
ø
3/4"
ø
3/4"
ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:22
:22 P
M P2.03
Plumbing Plan Level 1 North- Water
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
Pl bi Pl L l 1 W t N th
NEW NATURAL GAS METERREGULATOR SET BY UTILITY.
NEW 3,500 CFH NATURAL GAS LINEFROM UTILITY MAIN AT STREET.
SEE CIVIL DRAWINGS FORCONTINUATION OF WATER ANDNATURAL GAS LINES.
2-1/2" WATER LINE FROM METER PIT
MINIMUM 4'-6" COVER OVER INVERTOF PIPE.
NEW 2-1/2" WATER SERVICE-SEE DETAIL ON DRAWING P-3.01.
NEW 65 GALLON ELECTRIC WATERHEATER WH-1 ON FLOOR-SEE DETAIL ON DRAWING P-3.01.
NATURAL GAS AND DOMESTICCOLD WATER LINE UP TOPENTHOUSE
1-1/2" HW & CW1/2" HWRTO WH-1
NEW AIR COMPRESSOR ACMPR-1(SEE SPECIFICATION)
SEE DRAWING P2.04 FORCONTINUATION OF CW, HW, HRW, &COMPRESSED AIR LINES.
CW, HW, & HWR UP IN PIPECHASE TO ABOVE TOPFLOOR CEILING.
BALANCING AND CHECKVALVES
PIPING RUN ABOVE CEILING.
PIPING RUN ABOVE CEILING.
CIRCULATOR PUMP
EXPANSION TANK
3/4" DOWN IN WALL TO NON-FREEZEWALL HYDRANT. COORDINATEEXACT LOCATION WITH ARCHITECTAND OWNER.
ONICON F-5100 SERIES THERMAL MASS FLOWMETER SUPPLIED BY MC. INSTALLED BY PC.WIRED BY CONTROLS CONTRACTOR.
DUAL TURBINE INSERTION FLOW METERSUPPLIED BY MC. INSTALLED BY PC.WIRED BY CONTROLS CONTRACTOR.
PROVIDE AQUA TREATMENT SERVICESINC. MODEL NXT300-3 SIMPLEX-STYLEWATER SOFTENING SYSTEM.
3/4" HARVESTED RAINWATER LINERUN ABOVE CEILING
3/4" INTAKE LINE INTO BRAEWATER HARVESTING PUMP-SEE SPECIFICATION
BRAE RAINWATER HARVESTINGSYSTEM- SERIES 225P ASMANUFACTURED BY BRAE
No. Description Date
321
A
C
D
5 6 8 93.4
B
0 0.2 103.3
5.2
0.5A
0.7A
AA
BB
B.5
8.8 9.18.2
1.6
SMALLCLASSROOM
110
ELECT: POWERLAB114
CIVIL: SURVEY111
CIVIL: GEO(SOILS) TEACHING
LAB112
CIVIL: STUDENTPROJECT LAB
113
CIVIL: CONCRETEPREP116
CIVIL: CONC/ASPHALT LAB
117
CIVIL:STRUCTURES LAB
118
STRENGTH OFMATERIALS LAB
119
CONNECTORQ104
??
LOBBYF102
MAIN JANITOR/STORAGE
J115
LOADING BAY115
STAIR 3Z103
CORRIDORQ103
??
SOUTHVESTIBULE
F103
CA
CA
CA
CA
2"ø
1"ø
1/2"
ø
2"ø
1"ø
1/2"ø2"ø 1"ø
1/2"
ø 1"ø
1 1/
2"ø
3/4"ø
2"ø3/4"ø
1"ø
3/4"ø 3/4"
ø1"
ø
3/4"
ø1"
ø
1"ø 1"ø
1"ø
1"ø
3/4"
ø 3/4"ø
1/2"
ø1/
2"ø
1/2"
ø1"
ø2"
ø
2"ø
3/4"
ø3/
4"ø
1"ø
1"ø
1"ø
3/4"
ø1"
ø1"
ø
2"ø
1"ø 1 1/2"ø 1/2"ø
1"ø
1"ø
1/2"ø
1/2"ø
3/4"
ø
1"ø
3/4"ø
1 1/
4"ø
1/2"ø
H1
3/4"
ø
1/2"
ø
1"ø
3/4"
ø
1/2"ø1 1/2"ø
1"ø
1"ø
1"ø
1"ø
1 1/
4"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:22
:49 P
M P2.04
Plumbing Plan Level 1South - Water
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Plan Level 1 Water South
SEE DRAWING P2.03 FORCONTINUATION OF CW, HW, HWR, &COMPRESSED AIR LINES.
PIPING RUN ABOVE CEILING.
PIPE ANCHORS
1" HW AND 1" CW TO POWERPROCESS CONTROLS ESSERIES THERMOSTATICMIXING VALVE- TYPICAL ALLEMERGENCY EYEWASHSTATIONS.
(x1) INTERIOR 3/4" HOSE BIB FED BYDOMESTIC WATER SYSTEM.(x1) INTERIOR 3/4" HOSE BIB FED BYHARVESTED RAINWATER.(x1) 3/4" AIR DROP
CW, HW, HWR, AND COMPRESSEDAIR RUN ABOVE CEILING
REVERSE OSMOSIS WATERSYSTEM MODEL E1-4L ASMANUFACTURED BY CULLIGANMATRIX SOLUTIONS- 1.6GALLON PER MINUTECAPACITIES
1/2" HWR TIE-IN POINT TO3/4" HW LINE
3/4" HARVESTEDRAINWATER FROMRAINWATER STORAGETANK ABOVE.
PIPING RUN ABOVE CEILING
1/2" HW AND CW UP TOSECOND FLOOR SINK.3/4" AIR UP TO SECONDFLOOR.
1" DOMESTIC COLD WATER WITH RPZBACKFLOW PREVENTION AND 1"COMPRESSED AIR LINE TO HUMIDIFIER.PROVIDE REGULATOR TO DROP AIRPRESSURE TO 70 PSI.
No. Description Date
3/4" DOWN IN WALL TO NON-FREEZEWALL HYDRANT. COORDINATEEXACT LOCATION WITH ARCHITECTAND OWNER.
3/4" DOWN IN WALL TO NON-FREEZEWALL HYDRANT. COORDINATEEXACT LOCATION WITH ARCHITECTAND OWNER.
HUMIDIFIER PROVIDED BY M.C.
74
321
E
F
G
H
J
5 6 8
9
3.40 0.2
10
E.3
3.3
5.2
K
1.6
MULTI-PURPOSEROOM
204
MEN'S RMR203
WOMEN'S RMR201
JANITORJ204
??ELEVATOR
V201
ELECT: LARGEEQUIP STORAGE
207
WOOD/METALSHOP207B
CORRIDORQ202
UPPER CORRIDORQ201
A1
A A C C
A1 B B
CC
C1
A1
D
E2"ø
SAN
V
2"ø
2"ø
2"ø
4"ø
6"ø4"ø
6"ø
4"ø
4"ø
4"ø
5"ø
4"ø
G
4"ø
4"ø
4"ø5"ø
5"ø
4"ø
4"ø
2 1/2"ø 2"ø
4"ø
4"ø
4"ø
1 1/2"ø
1"ø
1"ø
2"ø
4"ø
3"ø
1 1/
2"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:23
:23 P
M P2.05
Plumbing Plan Level 2 North- Sanitary
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Plan Level 2 Sanitary North
4" SANITARY FROM PENTHOUSE TOBELOW GRADE. SEE DRAWING P2.01FOR CONTINUATION.
4" SANITARY FROM SECONDFLOOR RESTROOMS DOWN TOBELOW GRADE. SEE DRAWINGP2.01 FOR CONTINUATION.
3" VENT STACK UP4" VENT THRU ROOF
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
3" FLOOR DRAIN 'A'
C.O.
C.O.
3" FLOOR DRAIN 'A'
C.O.
C.O.
C.O.
4" ROOF DRAIN
C.O.
C.O.
C.O.
C.O.
4" ROOF DRAIN
4" ROOF DRAIN
4" ROOF DRAIN
4" ROOF DRAIN
4" ROOF DRAIN
C.O.
4" ROOF DRAIN
4" ROOF DRAIN
C.O.4" ROOF DRAIN
6" RAINWATER CONDUCTORDOWN TO BELOW FIRST FLOOR -SEE DRAWING P-2.01 FORCONTINUATION.
C.O.
SEE DRAWING P-2.06 FORCONTINUATION OF 4" RWC.
4" ROOF DRAIN
C.O.
C.O.
4" RWC DOWN TO ABOVE FIRSTFLOOR CEILING. SEE DRAWINGP-2.02 FOR CONTINUATION.
6" RAINWATER FROM PENTHOUSEDOWN TO ABOVE FIRST FLOORCEILING. SEE DRAWING P2.01FOR CONTINUATION.
1" CONDENSATE FROM AHU-4TIES INTO 6" RAINWATER ABOVESECOND FLOOR CEILING
4" RAINWATER FROM PENTHOUSEDOWN TO ABOVE FIRST FLOORCEILING. SEE DRAWING P2.01FOR CONTINUATION.
2" CONDENSATE FROMPENTHOUSE AHU'S DROPS DOWNTO ABOVE FIRST FLOOR CEILING.
SEE DRAWING P-2.06 FOR CONTINUATIONOF AHU CONDENSATE LINES.
SEE DRAWING P-2.06 FOR CONTINUATIONOF AHU CONDENSATE LINES.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
5" RAINWATER CONDUCTOR DOWNIN CORNER OF CLOSET. SEEDRAWIN P2.01 FOR CONTINUATION.
5" AND 6" RAINWATER CONDUCTORSDOWN IN CORNER OF CLOSET. SEEDRAWIN P2.01 FOR CONTINUATION.
No. Description Date
321
A
C
D
5 6 8 9
B
0 0.2 10
5.2
0.5A
0.7A
AA
BB
B.5
8.8 9.18.2
1.6
ELECT:COMPUTER LAB
210
ELECT: LARGEEQUIP STORAGE
207
WOOD/METALSHOP207B
ELECT: AUTO/ROBOTICS LAB
211
ELECT: SENIORPROJECT LAB
212ELECT: PHYSICS
LAB214 ELECT: SIGNAL
INTEGRITYCENTER
216
ELECT: RL 5208
GATHERING217
UPPER CORRIDORQ201
GATHERINGQ201A
STAIR 3Z203
CORRIDORQ203
UPPER CORRIDORQ201
ELECT: MICRO/COMM LAB
209
ELECT: GEN. EELAB213
ELECT: RL 1216A
ELECT: RLPHYSICS
214A
ELECT: RL 4206
ELECT: RL 3205
2"ø
1 1/
2"ø
4"ø
4"ø4"
ø
6"ø
4"ø
4"ø
6"ø4"ø
4"ø
4"ø
4"ø
4"ø
4"ø
1"ø
2"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:23
:49 P
M P2.06
Plumbing Plan Level 2South - Sanitary
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Plan Level 2 Sanitary South
3" VENT STACK UP4" VENT THRU ROOF
6" RAIN WATER DOWN TOABOVE FIRST FLOOR CEILING.SEE DRAWING P-2.02 FORCONTINUATION.
C.O.
2" SANITARY DOWN IN WALL TOBELOW FIRST FLOOR SLAB
2-1/2" VENT STACK UP FROMFIRST FLOOR TO ABOVESECOND FLOOR CEILING
1-1/2" VENT RUN ABOVE FIRSTFLOOR CEILING TO THIS POINT.VENT RISES UP IN WALL ANDTIES INTO 3" VENT STACK.
2-1/2" VENT STACK UP3" VENT THRU ROOF
4" ROOF DRAIN
C.O.
4" ROOF DRAIN
C.O.
C.O.
C.O.
C.O.
4" ROOF DRAIN
C.O.C.O. 4" ROOF DRAIN
C.O.
C.O.
C.O.
C.O.
4" ROOF DRAIN
C.O.
4" ROOF DRAIN
C.O.
C.O.C.O.
6" RAIN WATER DOWN TOABOVE FIRST FLOORCEILING. SEE DRAWING P-2.02 FOR CONTINUATION.
6" RAIN WATER DOWN TOABOVE FIRST FLOOR CEILING.SEE DRAWING P-2.02 FORCONTINUATION.
4" ROOF DRAIN
C.O.
SEE DRAWING P-2.05 FORCONTINUATION OF 4" RWC.
No. Description Date
1" CONDENSATE FROM AHU-1THRU 4 DROPS THRU FLOOR.ROUTE CONDENSATE TORAINWATER COLLECTION PIPING.
SEE DRAWING P-2.05 FORCONTINUATION OF 1"CONDENSATE DRAIN.
SEE DRAWING P-2.05 FORCONTINUATION OF 2"CONDENSATE DRAIN.
1" CONDENSATE FROM AHU-1THRU 4 DROPS THRU FLOOR.ROUTE CONDENSATE TORAINWATER COLLECTION PIPING.
74
321
A
C
D
E
F
5 6 8
9
3.4
B
0 0.2
10
E.3
3.3
5.2
B.5
8.8 9.18.2
1.6
MULTI-PURPOSEROOM
204
MEN'S RMR203
WOMEN'S RMR201
JANITORJ204
??ELEVATOR
V201
ELECT:COMPUTER LAB
210
ELECT: LARGEEQUIP STORAGE
207
WOOD/METALSHOP207B
ELECT: AUTO/ROBOTICS LAB
211
ELECT: SENIORPROJECT LAB
212
ELECT: PHYSICSLAB214
ELECT: SIGNALINTEGRITY
CENTER216
ELECT: RL 5208
GATHERING217
UPPER CORRIDORQ201
??
GATHERINGQ201A
STAIR 3Z203
CORRIDORQ203
CORRIDORQ202
UPPER CORRIDORQ201
ELECT: MICRO/COMM LAB
209
ELECT: GEN. EELAB213
ELECT: RL 1216A
ELECT: RLPHYSICS
214A
ELECT: RL 4206
ELECT: RL 3205
A1 A A C C
A1B B
C
C1
A1
D
E1/2"ø 1/2"ø
3/4"ø
3/4"ø
G
C
1 1/4"ø 2"ø
1 1/
4"ø
1/2"
ø
1"ø
3/4"ø
1 1/4"ø
1 1/2"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:24
:18 P
M P2.07
Plumbing Plan Level 2 -Water
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057 1/8" = 1'-0"1 Plumbing Plan Level 2 Water
CW, HW, & HWR UP IN PIPECHASE TO ABOVE CEILIING.
PIPING RUN ABOVE CEILING.
1" CW AND 2" NAT. GASUP TO PENTHOUSE
1/2" CW AND HW3/4" AIRUP FROM ABOVE FIRSTFLOOR CEILING
No. Description Date
74
321
C
D
E
F
5 6 8
9
3.4
B
0 0.2
E.3
3.53.3
5.2
B.5
9.1
1.6
D.8
E.9
SAN
SAN G
SAN
2"ø
4"ø
4"ø 4"ø
0 0.2 1 2 3 3.4 4 5 5.2 6 7 7.5 7.8 8
B.5
C
D
D.8
E
E.3
E.5
F
1.6
Z.9
Z.8
Z.11 Z.12
7.7
3.3 3.5
E.1
4"ø
1"ø
1"ø
2"ø
4"ø
4"ø 4"
ø
2"ø
2"ø
4"ø
2"ø
4"ø
4"ø
4"ø4"ø
6"ø
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:24
:32 P
M P2.08
Plumbing Plan Penthouse
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Plan Penthouse Sanitary
C.O.
4" FLOOR DRAIN 'B'TYPICAL 4
4" SANITARY DOWN TO FLOORS BELOW
2" NATURAL GAS LINE UPIN PIPE CHASE
1" COLD WATER LINE UPIN PIPE CHASE
1" COLD WATER TO NEW BOILER.FINAL CONNECTION BY M.C.
1" RPZ BACKFLOW PREVENTER
3" VENT STACK UP4" VENT THRU ROOF
3" VENT STACK UP4" VENT THRU ROOF
C.O.
2" NATURAL TO BOILER.FINAL CONNECTION BY M.C.
4" ROOF DRAIN
4" ROOF DRAIN
2-1/2" VENT STACK UP3" VENT THRU ROOF
ROUTE CONDENSATE DRAINS FROM AIR HANDLINGUNITS TO RAINWATER COLLECTION PIPING ABOVESECOND FLOOR CEILING (TYPICAL AHU-1 THRU 4)
C.O.
4" ROOF DRAIN C.O.
4" ROOF DRAIN4" ROOF DRAIN
C.O.C.O.
LOOP FLOOR DRAIN VENTABOVE SECOND FLOOR CEILING
C.O.
6" RAINWATER CONDUCTORDOWN TO FLOORS BELOW
2-1/2" VENT UP FROMFLOORS BELOW
No. Description Date
ELECTRIC SOLENOIDSHUTOFF VALVE
REMOTE PUSH BUTTON ANDWIRING FROM SOLENOIDVALVE TO BUTTON BY E.C.
X
X
XX
X
UPUP
DN DN
DN
DNDN
ROOF BELOW
SAN
SANPGCA
CA
CA
3/4"
3/4"3/4"
3/4"
-ACMPR
3SSAH
1SSAH
2SSAH
CD
CD
CD CD
CD
NEW PROPANE TANK-
PNEUMATIC TRAINER
NEW CW, HW, SAN, & VENTLINES FROM EXISTINGNEAR RESTROOM CORE
C.O.
NEW FLOOR DRAIN 'A'
NEW FLOOR DRAIN
EXISTING 2" SANITARY & VENT LINE
NEW 1/2" CW AND 1/2" HW CONNECTIONTO EXISTING ABOVE CEILING
EXISTING 1/2" CW AND 1/2" HW LINE RUNABOVE CEILING
NEW 2" SANITARY CONNECTION TOEXISTING LINENEW 2" VENT CONNECTION TOEXISTING VENT LINE ABOVE CEILING
NEW 1/2" CW AND 1/2" HW CONNECTIONTO EXISTING ABOVE CEILING
EXISTING 1/2" CW AND 1/2" HW LINE RUNABOVE CEILING
NEW 2" SANITARY CONNECTION TOEXISTING LINE
NEW 2" VENT CONNECTION TOEXISTING VENT LINE ABOVE CEILING
C.O.
NEW CW, HW, SAN, & VENTLINES FROM EXISTINGNEAR RESTROOM CORE
EXISTING BUILDING SECOND FLOOR PLUMBING FLOOR PLAN
EXISTING BUILDING FIRST FLOOR PLUMBING FLOOR PLAN
G G
D
PROVIDE 3/4" INSULATED COPPERCONDENSATE DRAIN FROM SSAH TO MOP SINK
PROVIDE 3/4" INSULATED COPPER CONDENSATEDRAIN FROM SSAH TO SPLASH BLOCK ON ROOF
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:24
:40 P
M P2.09
Plumbing Existing BuildingPlan
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
1/8" = 1'-0"1 Plumbing Existing Building
No. Description Date
M
GPMSIZEMODELTAG MANUFACTURER REMARKSHP VOLTS/PHASE
1/20308.03/4"LR-20BFBELL & GOSSETT 115V / 1�
FLANGEFT
HEAD
1/225502"SE-50 SR.STANCOR 115V / 1�
7 1/2------XXXXINGERSOLL RAND 480V / 3�SIMPLEX SHOP AIRCOMPRESSOR SYSTEM WITHDRYER AND RECEIVER.
CIRCULATING PUMP - HWR. ALLBRONZE CONST.
ELEVATOR SUMP PUMP WITHOIL-MINDER CONTROL. TYP. EACHELEVATOR.
1SMP
REFERENCE NOTES
PIPE SUPPORT DETAILS FLOOR DRAIN & PIPE CONNECTION DETAIL
TRENCH BEDDING & BACKFILL REQUIREMENTS
WALL PIPING PENETRATION DETAILNON-FREEZE WALL HYDRANT DETAIL
SCHEMATIC PIPING ARRANGEMENT FOR WATER HEATER SYSTEM ELEVATOR SUMP BASIN DETAIL
DOMESTIC WATER SERVICE DETAIL
GAS FLOW METER INSTALLATION DETAIL HYDRONIC FLOW METER INSTALLATION DETAIL
1
P-3.01 SCALE: NONE 2
P-3.01 SCALE: NONE
8
P-3.01 SCALE: NONE
7
P-3.01 SCALE: NONE
5
P-3.01 SCALE: NONE
9
P-3.01 SCALE: NONE
10
P-3.01 SCALE: NONE
4
P-3.01 SCALE: NONE
3
P-3.01 SCALE: NONE
5
P-3.01 SCALE: NONE
Flow Direction
OPE
NING
DIM
. TO
BE
2 PI
PE S
IZES
LAR
GER
THAN
PIP
E US
ED
OF WALL
CONCRETE
INTERIOR FACEOF WALL.
PIPING SYSTEM
EXTERIOR FACE
SIZES LARGER THAN(HOLE TO BE 2 PIPETHRU BASEMENT WALLCORE DRILLED HOLE
LINK-SEAL
PIPING).
CONCRETE
SELECT GRANULAR MATERIAL (2RC) B) BACKFILL MATERIAL FOR TRENCHES INSIDE PAVEMENT AREAS SHALL BE CLEAN ACCEPTABLE EARTH MATERIAL. A) BACKFILL MATERIAL FOR TRENCHES OUTSIDE PAVEMENT AREA SHALL BE
AND APPROVAL OF THE MATERIAL BY THE ENGINEER. B) CLEAN "SCREENINGS" FROM CRUSHER OPERATIONS UPON INSPECTION
A) AASHTO NO. 57 COURSE AGGREGATE- BEDDING MATERIAL TO MEET OR SHALL COMPLY WITH ANY OF THE FOLLOWING: MATERIALS FOR PIPE BEDDING AND BACKFILL (TO 1'-0" ABOVE THE PIPE)
FINISHED GRADE
2. BACKFILL:
1. BEDDING:NOTES:
BELOWSEE NOTE 1
TRENCHEDGE OF
BELOW
6" MIN.
1' MIN.
VARIESPAY LIMIT
8" 8"
VARIESPIPE SIZE
WHERE APPLICABLE
SEE NOTE 2
PAV'T SUBGRADE
EXCEED ALL REQUIREMENTS OF LOCAL AUTHORITIES HAVING JURISDICTION.
ONICON VORTEX
FLOW METER
OPTIONAL FLOW
CONDITIONER
THREADED
OUTLET
20 DIAMETERS5 DIAMETERS
SINGLE TURBINEFLOW METER
ISOLATION/SERVICE VALVE
THREAD-O-LET
PIPE
ISOLATION/SERVICE VALVE
THREAD-O-LET
SIZING CHART FOR SHOCK ABSORBERS
33 - 60
SYMBOLS
RATING
FIXTUREUNIT
P.D.I.
1 - 11
A
12 - 32
B C
155 - 330114 - 15461 - 113
D E F
NOTE: TO BE USED TO BE USED
NOTE:
NOTE:
INCLUDING 5"
FOR PIPING UP TO AND
TO BE USED
SEE PIPING
SPLIT RING HANGER
INSULATEDDETAILS (FOR
PIPING ONLY)
PROTECTION
INSULATION FILLSADDLE WITH
(AS REQUIRED)
HOT PIPING
INSULATION
OVER 5"HANGER ROD
(AS REQUIRED)INSULATION
SEE PIPING
DETAILPROTECTION
ROD ROLLER HANGER
UP TO AND FOR PIPING
INCLUDING 5"HANGER ROD
INSULATIONSEE PIPINGPROTECTIONDETAIL
CLEVIS HANGER
(AS REQUIRED)
AROUND PIPINGPROVIDE CLEARANCE
COLD PIPING
85% MAGNESIAOR KAYLO PIPEINSULATION
HANGER ROD
AND COLD PIPINGSHIELD FOR HOT360° PROTECTION SHIELD
PROTECTION
HANGER ROD
GANG HANGER
FOR PIPING
2"
4 13
/16"
3 1/8"2 3/4
WALL THICKNESS
WALL THICKNESS(Z-1310-4)
3/4" FEMALE
3/4" HOSE CONNECTION RECOMMENDEDWALL OPENING1-3/16W X 3-7/8L
12"
TYPICAL FLOOR DRAIN(SEE SPECIFICATIONS)
SEDIMENT BUCKETWITH STRAINER
6" MIN. (TOP OF PIPE TO
TO SANITARYSEWER SYSTEM
UNDERSIDE OF DECK)
FINISH FLOOR
PLUMBING FIXTURE SCHEDULEDESCRIPTIONTAG WASTE
DRAINAGE
VENT HWCW
WATERREMARKS
URINALB 3" 2" ---3/4"
WATER CLOSETA-1 4" 2" OPERATED FLUSH VALVE HANDICAPPED---1"
ONE PIECE 24x24 MOLDEDSTONE BASIN W/SERVICE FAUCET& HOSE.
MOP RECEPTORD 3" 1-1/2" 3/4" 3/4"
LAVATORYC 1-1/2" 1-1/2"COUNTERTOP MOUNT ADA COMPLIANT
1/2"1/2"
WALL MOUNT HARD WIRED SENSOR
HARD WIRED SENSOR OPERATED
NOTES:1. FLOOR DRAINS TO BE SUPPLIED WITH PROSET TRAP GUARD TRAP SEAL.
WATER CLOSETA 4" 2" ---1" WALL MOUNT HARD WIRED
DRINKING FOUNTAINE 1-1/2" 1-1/2" ---1/2" DUAL LEVEL ADA COMPLIANT
LAVATORYC-1 1-1/2" 1-1/2"WALL MOUNT ADA COMPLIANT
1/2"1/2"
2" PUMP DISCHARGE
GATE VALVE
CHECK VALVE
FINISHED FLOOR
START FLOATPOWER SUPPLY CABLE
FLOOR GRATE
FINISHED FLOOR
JUNCTION BOX
OIL MINDER PROBE
PLUMBING PUMP SCHEDULE
DHWRP-1
SMP-1
SENSOR OPERATED FLUSH VALVE
HEIGHT
WALL MOUNT HARD WIREDSENSOR OPERATED FLUSH VALVE
FAUCET
HARD WIRED SENSOR OPERATEDFAUCET
MULTI PIN CONNECTORCABLE TO BEMIN. 200' LONG
SUMP PUMP CONTROLPANEL, LOCATED INMECHANICAL ROOM
SUBMERSIBLE SUMPPUMP SEE SCHEDULE
ELEVATOR SHAFTFLOOR
HIGH LEVEL ALARMFLOAT
SUMP PIT, SEEARCH. DWG'S.
NOTE:DISCHARGE PIPING FROM ELEVATOR SUMP PUMP SHALL BE ASTM 53 SCH 40GALVANIZED W/ THREADED FITTINGS. WYE PATTERN TEES AND LONG RADIUS ELBOWS.
ACMPR-1
PIPE SUPPORT REQUIRED
RPZ VALVE BACKFLOWWATTS 909 SERIES
TEE FOR DOMESTIC WATER
WATTS 223 SERIESPRV VALVE.
O.S. & Y. VALVE
PREVENTER.
O.S. & Y. VALVE
STRAINER
O.S. & Y. VALVE
TEST TEE WITH 2" BALLVALVE & CAP
O.S. & Y. VALVE
WATER METER
TEST TEE WITH 2" BALL VALVE & CAP
O.S. & Y. VALVE
COMBINATION 4"NEW INCOMING 4"
2-1/2"
4"
DOMESTIC WATERFIRE SERVICE
2. ALL FLOOR DRAINS IN LAB AREAS TO BE PROVIDED WITH SILT TRAPS.
WATER HEATER SCHEDULE
MANUFACTURER
A.O. SMITHWH-1
TAGINPUT
GAS (CFH)
XXX 6 KW - 480 V
ELECTRIC (KW)REMARKS
65
STORAGECAPACITY(GALLONS)OUTLET
WATER
1 1/4"
COLDWATER INLET
1 1/4"
HOT
AQUASTAT
(9" LONG, 30°-240°F)TEMPERATURE GAUGE
BELL & GOSSETT MODEL LR-20BF
WITH FULL SIZE DISCHARGEPRESS. & TEMP. RELIEF VALVE
UNION6
7
5
4
CHECK VALVE
BALL VALVE
H.W. RECIRC. PUMP
2
3
1
1 1/4" H.W. TO SYSTEM
WATERHEATER
1 1/4" C.W. SUPPLY
THERM-X-TROL MODEL ST-12, NSF APPROVED)
EXPANSION TANK, MOUNTED FROM ROOFTRUSSES WITH PROPER SUPPORT (AMTROL
1 1/
4"
1 1/
4"
7
1
6
143
2
2 1
1/2" H.W.R. FROM SYSTEM
1
5
PROVIDE HEAT TRAP
PROVIDE VACUUM RELIEF VALVEON CW SUPPLIES TO ELEVATEDHW HEATERS (TYP.)
AO SMITH MODEL DSE-6531 GPH RECOVERY @ 80DEGREE RISESINGLE PHASE
HOT WATERSET POINT
110° F.
POWERS PROCESS CONTROLS LM 490MIXING VALVE TO TEMPER WATER TO105 DEGREES F.
EMERGENCY EYE WASHF - - 1"1"PROVIDE POWER PROCESS CONTROLS THERMOSTATICMIXING VALVE ES SERIES TO PROVIDE TEMPEREDWATER.
ALL PLUMBING FIXTURES AND TRIM IN LAB AREAS SHALL BE SUPPLIED BY OTHERS AND CONNECTED AND PIPED BY THE P.C. PROVIDEMIFAB MODEL MI-SOLID-S SUSPENDED TYPE INTERCEPTOR FOR EVERY LAB SINK.
NOTE:
DRINKING FOUNTAINE-1 1-1/2" 1-1/2" ---1/2"DUAL LEVEL ADA COMPLIANT
SINKG 1-1/2" 1-1/2" COUNTERTOP MOUNT ADA COMPLIANT1/2"1/2" STAINLESS STEEL WITH WRIST BLADE HANDLES.
WITH WATER BOTTLE FILL
NOTE:
FLOW METER PROVIDED BY M.C.,INSTALLED BY P.C.
NOTE:
FLOW METER PROVIDED BY M.C.,INSTALLED BY P.C.
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:24
:47 P
M P3.01
Plumbing Details &Schedules
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
No. Description Date
JANITOR CLOSET103
MEN &WOMEN
RESTROOMS106 & 105
CIVIL STUDENTPROJECT LAB
110
CIVIL STRENGTHOF MATERIALS
LAB 109
CIVIL GEOTEACHING LAB
112
CIVILSTRUCTURES
LAB 111CIVIL
SURVEY 114
CIVIL CONCRETE& ASPHAULT LAB
113
ELECTRICALROOM 116
CIVIL PREP &CURING
115 & 115AELECTRICAL POWER LAB 118 MECHANICAL
ROOMSTAIRS
2-1
STAIRS2-2
STAIRS2-3
PENTHOUSEMECHANICAL ROOM
300
JANITOR CLOSET203
MEN & WOMENRESTROOMS
206 & 205REHEARSAL STUDIO 207
MISC. ELECTRICAL WORK LABS(COMPUTER LAB, AUTO/ROBOTICS LAB)
220, 221
WOOD/MACHNIESHOP212C
MISC. ELECTRICALRESEARCH LABS
208, 209A, 210, 211, 214
MISC. ELECTRICAL WORK LABS(SIGNAL LAB, PHYSICS LAB, ELECT. LAB)
209, 215, 217
ELECTRICAL EQUIPSTORAGE
212
MISC. ELECTRICAL WORK LABS(MICRO. COMM. LAB, SENIOR PROJECTS)
218, 219
CORR.260
CORR.161
JANITOR CLOSET103
MEN &WOMEN
RESTROOMS106 & 105
CIVIL STUDENTPROJECT LAB
110
CIVIL STRENGTHOF MATERIALS
LAB 109
CIVIL GEOTEACHING LAB
112
CIVILSTRUCTURES
LAB 111CIVIL
SURVEY 114
CIVIL CONCRETE& ASPHAULT LAB
113
ELECTRICALROOM 116
CIVIL PREP &CURING
115 & 115AELECTRICAL POWER LAB 118 MECHANICAL
ROOMSTAIRS
2-1
STAIRS2-2
STAIRS2-3
PENTHOUSEMECHANICAL ROOM
300
JANITOR CLOSET203
MEN & WOMENRESTROOMS
206 & 205REHEARSAL STUDIO 207
MISC. ELECTRICAL WORK LABS(COMPUTER LAB, AUTO/ROBOTICS LAB)
220, 221
WOOD/MACHNIESHOP212C
MISC. ELECTRICALRESEARCH LABS
208, 209A, 210, 211, 214
MISC. ELECTRICAL WORK LABS(SIGNAL LAB, PHYSICS LAB, ELECT. LAB)
209, 215, 217
ELECTRICAL EQUIPSTORAGE
212
MISC. ELECTRICAL WORK LABS(MICRO. COMM. LAB, SENIOR PROJECTS)
218, 219
CORR.260
CORR.161
JANITOR CLOSET103
MEN &WOMEN
RESTROOMS106 & 105
CIVIL STUDENTPROJECT LAB
110
CIVIL STRENGTHOF MATERIALS
LAB 109
CIVIL GEOTEACHING LAB
112
CIVILSTRUCTURES
LAB 111CIVIL
SURVEY 114
CIVIL CONCRETE& ASPHAULT LAB
113
ELECTRICALROOM 116
CIVIL PREP &CURING
115 & 115AELECTRICAL POWER LAB 118 MECHANICAL
ROOMSTAIRS
2-1
STAIRS2-2
STAIRS2-3
PENTHOUSEMECHANICAL ROOM
300
JANITOR CLOSET203
MEN & WOMENRESTROOMS
206 & 205REHEARSAL STUDIO 207
MISC. ELECTRICAL WORK LABS(COMPUTER LAB, AUTO/ROBOTICS LAB)
220, 221
WOOD/MACHNIESHOP212C
MISC. ELECTRICALRESEARCH LABS
208, 209A, 210, 211, 214
MISC. ELECTRICAL WORK LABS(SIGNAL LAB, PHYSICS LAB, ELECT. LAB)
209, 215, 217
ELECTRICAL EQUIPSTORAGE
212
MISC. ELECTRICAL WORK LABS(MICRO. COMM. LAB, SENIOR PROJECTS)
218, 219
CORR.260
CORR.161
JANITOR CLOSET103
MEN &WOMEN
RESTROOMS106 & 105
CIVIL STUDENTPROJECT LAB
110
CIVIL STRENGTHOF MATERIALS
LAB 109
CIVIL GEOTEACHING LAB
112
CIVILSTRUCTURES
LAB 111CIVIL
SURVEY 114
CIVIL CONCRETE& ASPHAULT LAB
113
ELECTRICALROOM 116
CIVIL PREP &CURING
115 & 115AELECTRICAL POWER LAB 118 MECHANICAL
ROOMSTAIRS
2-1
STAIRS2-2
STAIRS2-3
PENTHOUSEMECHANICAL ROOM
300
JANITOR CLOSET203
MEN & WOMENRESTROOMS
206 & 205REHEARSAL STUDIO 207
MISC. ELECTRICAL WORK LABS(COMPUTER LAB, AUTO/ROBOTICS LAB)
220, 221
WOOD/MACHNIESHOP212C
MISC. ELECTRICALRESEARCH LABS
208, 209A, 210, 211, 214
MISC. ELECTRICAL WORK LABS(SIGNAL LAB, PHYSICS LAB, ELECT. LAB)
209, 215, 217
ELECTRICAL EQUIPSTORAGE
212
MISC. ELECTRICAL WORK LABS(MICRO. COMM. LAB, SENIOR PROJECTS)
218, 219
CORR.260
CORR.161
DOMESTIC WATER RISER DIAGRAM FIRE PROTECTION RISER DIAGRAM
SANITARY & STORM RISER DIAGRAMNATURAL GAS & COMPRESSED AIR RISER DIAGRAM
1
P-5.01 NOT TO SCALE
2
P-5.01 NOT TO SCALE
4
P-5.01 NOT TO SCALE
3
P-5.01 NOT TO SCALE
A A A A
A A A
A
RWC RWCRWC
RWC
RWC RWC
RWC
RWC
RWC
SW SANSAN SAN
SAN
SAN
SAN
SAN
SAN
F
FF
F F F F F
FF
F
F F F FFF
G
G G
G
GG
G
R
F
C.O.
C.O.C.O.
C.O.
6"6"6"
6"
6"
6"
6"
6"
6"
4"
3"4"
3" 4" 4"
3" 2"2"
C.O.
C.O.
C.O.
C.O.6"
3" 3"
2"3"
2"3"
3"4"
2"3"
2"3"
2"3"
2"3"
2"3"
2"3"
3" 3" 3"3"3"
4"
4"
6" 6" 6" 6"
4"
3"4"
3"4"
3"
4"
3" 3"3"3"
3" 3" 3" 3"
4"4"
4"
2"
2"
65 GALLON ELECTRICWATER HEATER (DWH-E1)
HOT WATER RECIRCPUMP (DHWRP-1)
4" FIRE RISER- SEEDIAGRAM 2 (THIS SHEET)
INCOMING 4" COMBINATIONWATER/FIRE PROTECTION LINE- SEECIVIL DRAWINGS FOR CONTINUATION.
3/4" EXT. HOSEBIB HOOKUP
DWH1
ACMPR1
TO SINK, FLOORDRAIN, ETC...
TO SINK, FLOORDRAIN, ETC...
TO SINK, FLOORDRAIN, ETC...
TO SINK, FLOORDRAIN, W.C., ETC...
TO SINK, FLOORDRAIN, W.C., ETC...
TO FLOORDRAIN
3" V.S.U.4" V.T.R.
3" V.S.U.4" V.T.R.
6" RAINWATER CONDUCTOR FROMTHREE 120 SEAT CLASSROOMS(ROOMS 100, 101, 102)
COORDINATE EXACT LOCATION OFROOF DRAIN WITH ARCHITECT.
COORDINATE EXACT LOCATION OFROOF DRAIN WITH ARCHITECT.
COORDINATE EXACT LOCATION OFROOF DRAIN WITH ARCHITECT.
COORDINATE EXACT LOCATION OFROOF DRAIN WITH ARCHITECT.
SEE CIVIL DRAWINGSFOR CONTINUATION OF6" SANITARY LINE.
SEE CIVIL DRAWINGSFOR CONTINUATION OF6" STORM LINE.
4" FIRE RISER
GAS REGULATORAIR COMPRESSOR
SEE CIVIL DRAWINGSFOR CONTINUATION OFNATURAL GAS LINE.
3/4" EXT. HOSEBIB HOOKUP
3/4" EXT. HOSEBIB HOOKUP
3/4" EXT. HOSEBIB HOOKUP
3/4" EXT. HOSEBIB HOOKUP
2-1/2" DOMESTICWATER SERVICE
TO PENTHOUSEMECHANICAL EQUIPMENT
307 Fourth AvenueSuite 1300Pittsburgh, PA 15222v: 412.765.3890 f: 412.765.2209
Scale
Date
BCJ Project Number
Seal
Revisions
© 2012 Bohlin Cywinski Jackson
Not For Construction
Client Project Number
General Notes
Office for Planning and Architecture234 Liberty StreetHarrisburg, PA 17101v: 717-230-9660f: 717-230-9664
Consultant Office Name or LogoAddress 1Address 2v: xxx-xxx-xxxxf: xxx-xxx-xxxx
1/8" = 1'-0"
11/19
/2012
4:24
:54 P
M P5.01
Plumbing Riser Diagrams
NOVEMBER 21, 2012
11209
PENNSYLVANIA STATEUNIVERSITYPSU HARRISBURG - EDUCATIONALACTIVITIES BUILDING
GMP / 90% CONSTRUCTIONDOCUMENTS SET
01-03602.01
777 West Harrisburg PikeMiddletown, PA 17057
No. Description Date