29
Oxyfuel Combustion Technology Challenges to Demonstration Stanley Santos Stanley Santos IEA Greenhouse Gas R&D Programme Oxyfuel Capacity Building Course Tokyo, Japan 2 nd S t b 2012 2 nd September 2012

Oxyfuel Combustion Technology y gy Challenges to Demonstration

  • Upload
    vutuyen

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Oxyfuel Combustion Technologyy gyChallenges to Demonstration

Stanley SantosStanley SantosIEA Greenhouse Gas R&D Programme

Oxyfuel Capacity Building CourseTokyo, Japan

2nd S t b 20122nd September 2012

Page 2: Oxyfuel Combustion Technology y gy Challenges to Demonstration

KEPCO/KOSEP ‐ Yongdong (PC ‐ 100MWe)FutureGen2 ‐ Illinois (PC ‐ 168MWe)

Endesa/CIUDEN El Bierzo (CFB 300MWe) ???

Alstom Schwarze Pumpe 2008 30MWth LigniteHitachi Babcock Schwarze Pumpe 2010 30MWth LigniteIHI Callide 2011 30MWeAlstom / AL Lacq 2009 30MWth Gas/Oil?

l l h l

Coal

2011 C llidTarget :

Endesa/CIUDEN ‐ El Bierzo (CFB ‐ 300MWe) ‐ ???

China: 3 Oxyfuel Projects – in progressUK: Drax Power Plant Oxyfuel

CIUDEN El Bierzo CFB Facility 2011 30MWth CoalEl Bierzo PC Facility 2011 20MWth CoalCIUDEN

2009 – Lacq –World’s first 30MWt retrofitted O NG

2011 – Callide –World’s first

30MWe retrofitted Oxy-coal power

plant

By 2014-2018

Demonstration of 50– 300MWe full scale power plant

“Commercialised by 2020”

2008

World’s FIRST 30 MWtfull chain demonstration at Schwarze Pumpe Pilot

retrofitted Oxy-NG boiler

2011 – CIUDEN –World’s first 30MWt Oxy-CFB Pilot Plant

scale power plant.

2003 ‐ 2005

2007

B&W CEDF (30MWt) large scale burner testing started

at Schwarze Pumpe Pilot Plant

By the end of 2010/2011, Users (i.e. Power Plant

Operators) will have 6 burner

1990 ‐ 1995

1998 – 2001

CANMETUS DOE Project / B&W / Air Liquide

Vattenfall (ENCAP ++)CS Energy / IHI Callide Project

Operators) will have 6 burner manufacturers fully

demonstrating “Utility Size Large Scale Burners” which should

give a high level of confidence

1980’s

ANL/Battelle/EERC completed the first industrial scale pilot plant

EC Joule Thermie Project ‐ IFRF / Doosan Babcock / Int’l Combustion 

NEDO / IHI / Jcoal Project

First large scale 35MWt B&W CEDF 2008 30MWth Coal

give a high level of confidence toward demonstration

industrial scale pilot plant Oxy‐Coal Burner Retrofit Test done by 

International Combustion

B&W CEDF 2008 30MWth CoalAlstom Alstom CE 2010 15MWth CoalDoosan Babcock DBEL ‐MBTF 2009 40MWth Coal

Updated by S. Santos (20/08/12)

Page 3: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Concluding Remarks –Update to Key Demonstration Projects• Based on the Conclusions from 2nd Oxyfuel Combustion

C f Thi T h l i READY f DEMONSTRATIONConference – This Technology is READY for DEMONSTRATION

• Lost of Janschwalde Project is a setbackLost of Janschwalde Project is a setback…• Success in the commissioning of Callide Project is an important

milestone.

• Three important projects on-going…• FutureGen2 (USA)• FutureGen2 (USA)• Compostilla (Spain)• Yong Dong Project (South Korea)

• Other new projects – currently under development• White Rose Project (UK)• SIEG Project (China)

3

SIEG Project (China)• Datang Project (China)• Huazhong Project (China)

Page 4: Oxyfuel Combustion Technology y gy Challenges to Demonstration

© 2011 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 5: Oxyfuel Combustion Technology y gy Challenges to Demonstration

© 2011 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 6: Oxyfuel Combustion Technology y gy Challenges to Demonstration

ASUASU

Ash SiloGypsum

PileReagent Prep

Coal BunkersPJFF WFGDID Fans

PR FansSR Fans

Boiler CPURecycle Heater

(Airheater)DCCPS

PR Fans

© 2011 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 7: Oxyfuel Combustion Technology y gy Challenges to Demonstration
Page 8: Oxyfuel Combustion Technology y gy Challenges to Demonstration

© 2011 Babcock & Wilcox Power Generation Group, Inc. All rights reserved.

Page 9: Oxyfuel Combustion Technology y gy Challenges to Demonstration
Page 10: Oxyfuel Combustion Technology y gy Challenges to Demonstration

© 2011 Babcock & Wilcox

Page 11: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Scope of WorkScope of Work• Boiler retrofit led by Doosan Heavy Industry y y y

• Conversion of downshot anthracite fired boiler to a wall fired boiler using sub-bituminous coal.

• Deployment of in-furnace DeSOx• Development of the Flue Gas Processing or p g

Environmental Island led by KC Cotrell• Demonstration of both Dry and Wet ESPDemonstration of both Dry and Wet ESP• FG Condenser (FGC) – based on 2 column design –

combined with NaOH/Na2CO3 wash• ASU and CPU based on process design to be

developed by Daesung.

11

developed by Daesung.

Page 12: Oxyfuel Combustion Technology y gy Challenges to Demonstration

OrganizationOrganization Project Outline

Project CoordinatorProject Coordinator

Role : Management/Adjustment/Guide)

Organization : KEPCO RI

P j tP j t 11 P j tP j t 33P j tP j t 22Project Project 11 Project Project 33Project Project 22

RoleRole- Development of Technology of

Process Control & Operation forOxy- PC Power System

- Basic Design of Demo. Plant

Role : Development of Environmental Control System for Oxy-PCPower System

Organization : KIMM

Role : Basic Design of Oxy-PC Boiler

Organization : DHIC

Organization : KEPCO RI

Consortium : KOSEP, DIGC, DHIC,KITECH

g

Consortium : KC-Cottrell, Yonsei Univ.

KAIST

12

Page 13: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Arrangement Plan of Main FacilitiesArrangement Plan of Main Facilities What We Have Done

Coal Yard

ASU & CPU

Ash Pond

FGD

ESP

Boiler Island

TBN & Gen

13

Page 14: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Tentative Demo. Site (Tentative Demo. Site (YoungdongYoungdong TPP)TPP) Project Outline

14

Page 15: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Feasibility Study Result (Boiler)Feasibility Study Result (Boiler) What We Have Done

The Retrofit Case was selected to apply for verified Oxyfuel technology maximizing use of exiting boiler components & layout

15

Page 16: Oxyfuel Combustion Technology y gy Challenges to Demonstration

ASU & CPUASU & CPU What We Have Done

Basic Design Conditions for ASU Remarks

ASU Type Double Column Cryogenic

Basic Design Conditions for CPU Remarks

CPU Type Cryogenic

O2 Purity 95%

Oxy mode GO2 Producing, 20,000 Nm3/hLO2 Back-up, 40,000 Nm3/h

1/3 Vs Full Load

Demand

Air Mode 20 000 Nm3/h LO2

Capacity 10% Vs Full Load Demand

CO2 Phase GCO2, LCO2Depend on Operation

Mode

Air Mode 20,000 Nm3/h LO2

Capacity of LO2 Tank 8,000 m3 For 6days Oxy

mode Operation

Time for LO2production 11 ~ 12 days For During Air

Modep

16

Page 17: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Environment Control SystemEnvironment Control System What We Have Done

< deSOx System >

WetWet--EPEPDryDry--EPEP

FGCFGC

InIn--furnacefurnacedeNOxdeNOx, , deSOxdeSOx

Dust : 22000㎎/N㎥SO₂ : 150ppmSO₃ : 6ppm

Dust : 22㎎/N㎥SO₂ : 150ppmSO₃ : 6ppm

< Dry-EP >

CPU

FGCFGC

FGR-2Dust : 22Dust : 22㎎/N㎥SO₂ : 150ppmSO₃ : 6ppm

Dust : 1.23₂₃

Dust : 1.23㎎/N㎥SO₂ : 6ppmSO₃ : 0.144ppm

FGR-1Dust : 1.23₂₃

Dust : 1.23㎎/N㎥SO₂ : 6ppmSO₃ : 0.144ppm

< Wet-EP >

17

Page 18: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Test Bed Test Bed --Environment Control SystemEnvironment Control System What We Have Done

In-furnaceDry EP

217OC1155Am3/hr

deSOx

FGC

Heat ExchangerWet EP

FGC

18

Page 19: Oxyfuel Combustion Technology y gy Challenges to Demonstration

KOCROKOCRO PlanPlan What We Will Do

Conceptual [2007~2010]

Basic Design

ConceptualDesign

[ ]

[2010~2012][2020~]

Detail Design/ C t ti Development

[2012~2015]

[2020 ]

/ Construction Developmentof Advanced

Oxy-PC PowerPlant

Demo.100MWe Commercialization

500MWe

Plant

[2015~2017][2017~2020][ ]

Page 20: Oxyfuel Combustion Technology y gy Challenges to Demonstration

20

Page 21: Oxyfuel Combustion Technology y gy Challenges to Demonstration

21

Page 22: Oxyfuel Combustion Technology y gy Challenges to Demonstration

22

Page 23: Oxyfuel Combustion Technology y gy Challenges to Demonstration

23

Page 24: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Development of Oxyfuel Combustion in China is now geared toward full scale

demonstration of the technology...

24

de o s a o o e ec o ogyConsequence of shelving of Janschwalde Project means that Europe could lose

grounds in the development of oxyfuel combustion

Page 25: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Oxyfuel CombustionR&D D l t HUSTR&D Development – HUST • Features of the 35MWt Oxyfuel PilotFeatures of the 35MWt Oxyfuel Pilot

Plant• Supported granted under MOST 863

PProgramme• Project led by Huazhong University of

S&T and Others.• Goal:

• To set up a full demonstration plant combiningcarbon capture storage and utilizationcarbon capture, storage and utilization

• Scale:• 35 MWt oxy‐fuel combustion boiler with

100 000 t/a CO2 storage100,000 t/a CO2 storage

• Location: Yingcheng, Hubei Province• Technology:

25

gy• Oxy‐fuel combustion + storage in salt mines

• Status: Expected Start Up - 2014

Page 26: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Datang Oxyfuel Demo Projectg y j• Daqing 350MWe + heat Project • Full size Oxyfuel Combustion

CO2 Capture C f• Cogeneration of Heat and Power based on SC PC Boiler using ligniteusing lignite

• Location: Daqing, Heilongjiang provinceprovince

• EOR and CO2 storage: adjacent to PetroChina’sjDaqing oil field for EOR, near Songliao basin for geological

26

sequestration

Page 27: Oxyfuel Combustion Technology y gy Challenges to Demonstration

SIEG Oxyfuel Demo Project• Shanxi SIEG Project is

based on 350MWe Powerbased on 350MWe Power Plant (To capture ~2 MTPY CO2)• Project Based on Joint US-

China Fossil Energy Protocol• Pre feasibility Study• Pre-feasibility Study

Completed• Partnership with Shanxi

International Energy Group (SIEG)

• Key Technology Partners:Key Technology Partners:o B&W – providing technology for

boiler and environmental islando APCI – providing ASU and CPU

27

o APCI providing ASU and CPUo WVU – providing support for CO2

storage

Page 28: Oxyfuel Combustion Technology y gy Challenges to Demonstration

Concluding Remarks - ChinaConcluding Remarks China• Success to demonstrate oxyfuel

combustion technology in China would require the following:q g• Cost effective CCS technology • Reliable CO2 Storage• Reliable CO2 Storage • Outside funding for project execution • Special power tariff / EOR or other utilisation

schemes • MOST endorsement of CCS capture technology

and storage technology

28

g gy• NDRC approval of project execution

Page 29: Oxyfuel Combustion Technology y gy Challenges to Demonstration

29