20
CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2 nd Oxyfuel Combustion Conference 12 – 16 September 2011 Capricorn Resort Yeppoon – Australia Presenter:Leonardo F. de Mello Petrobras - Brazil

CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Embed Size (px)

Citation preview

Page 1: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

12 – 16 September 2011

Capricorn Resort Yeppoon – Australia

Presenter:Leonardo F. de Mello Petrobras - Brazil

Page 2: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

The CO2 Capture Project (CCP) The CO2 Capture Project (CCP) is an award-winning partnership of seven major energy companies working to advance the technologies that will underpin the deployment of industrial-scale CO2 capture and storage (CCS)

CO2 Capture Project

• Phase 1 – 2001-2004 – completed Technology Screening/Proof of Concept • Phase 2 – 2004-2009 – completed Intensive Development • Phase 3 – 2009-2013 – On going Demonstration Funded by a number of methods, including: • Full or Associate membership of the partnership • Government grants • In-kind contributions

Current members: BP (Program Operator), Chevron, ConocoPhillips, Eni, Petrobras, Shell & Suncor and associate member EPRI

Page 3: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

CCP program objectives

In order to help make CCS a practical reality and utilised in many different industries and applications around the world, the CCP aims to accomplish the following goals:

Increase technical and cost knowledge associated with CO2 capture technologies and confirm that geological storage of CO2 is a secure and viable means of reducing greenhouse gas emissions

Reduce CO2 capture costs by 20-30% by supporting the development of improved technologies

Quantify remaining assurance issues surrounding geological storage of CO2 through site assessments, field surveys and numerical approaches; and rapid dissemination of results to stakeholder groups

Validate cost-effectiveness of monitoring developments with design and testing of emerging and integrated systems

Cooperate with interested parties to share information about both capture and storage demonstrations

Page 4: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

4

Oxy-combustion in Once-Through Steam Generator - OTSG

Three Phase Project: •Phase I (completed): Develop design basis and cost estimates for test and commercial scale OTSG

•Phase II (2011-13): Demo oxy-fuel combustion on 50 MMBTU/hr test boiler •Phase III (proposed): Demo oxy-fuel combustion, compression and purification on test boiler

Overall Objective: To demonstrate that oxy-fuel combustion is a safe, reliable and cost-effective technology for CO2 capture from once-through steam generators

Funding Partners: Cenovus Energy (host site), CO2 Capture Project, Devon, Praxair, Statoil, Meg Energy Technology Providers: Praxair – industrial gas & combustion technology TIW Western – boiler technology Image courtesy of Cenovus

Page 5: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

The Oil Refinery Scenario

CO2 Emission Sources at a Typical Refinery Complex

Page 6: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

RISER

Products - Gasoline - LPG - Propane

Typical Feeds - Vacuum Gasoil - Atmospheric Resid Steam

Air

REGENERATOR

Flue gas

10 – 20 % CO2

Overview of FCC converter

Page 7: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

RISER

Products

Feed

Steam

REGENERATOR

O2 + CO2

O2

ASU

H2O

85 % CO2

Air

Oxy-combustion in FCC

CO2

Points of attention

• Enhanced heat removal from the catalyst bed • Catalyst fluidization and entrainment rates • Enhanced catalyst deactivation – O2 partial pressure • Combustion rates

Possible impacts in the process may come from different gas properties: Cp CO2 > Cp N2

ρ CO2 > ρ N2

Page 8: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Test Program

1) Same heat removal

Air

O2 N2

H

Oxy

O2 CO2

H

2) Same volume flow rate

Air

O2 N2

H

Oxy

O2 CO2

H

3) Same cyclones solids loading

Air

O2 N2

H

Oxy

O2 CO2

H

- Each condition will be tested with two types of feed - Two long term tests will be made to evaluate catalyst loss and deactivation - The flexibility obtained in condition 2 will be used to test an additional condition with increased feed rate

Page 9: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

FCC Large Scale Pilot Unit

Capacity: cat. Inventory = 300 kg; feed flow rate = 200 kg/h (30 bpd) VGO; 1t/d CO2 emission

FCC Testing Unit

Catalyst inventory

Feed flow rate

x 150 x 280 to 2000

x 200 x 580 to 2000

Typical pilot plant

Test unit Full

scale unit

Page 10: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

FCC Unit Retrofit

FCC Unit

Feed

Products

Air Flue gas

Air - fired operation

FCC Unit

Feed

Products

Flue gas

Oxy - combustion operation

CO 2 Recycle System - SOx scrubber - Compressor - Storage tank

Chemicals

Recycle gas

(CO 2 rich )

O 2 Supply System - Tank - Vaporizer - Control Skid

Liquid Oxygen (Lox)

Oxygen

CO 2 rich Flue gas

Waste water

Water

Page 11: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

FCC Unit Retrofit

Oxygen Supply System

Page 12: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

FCC Unit Retrofit

CO2 Recycle System

• Includes: catalyst fines and SOx removal unit, compressor, chiller, CO2 storage tank and piping;

Page 13: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

FCC Unit Retrofit

Page 14: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Pre-operation

Objective: perform short oxy-combustion trials to evaluate the operability of the entire system, identify possible limitations of the units and anticipate problems so that the test program may be entirely carried-out Learnings: FCC unit oxy-combustion operation: - Air to oxygen transition is very fast and simple. However, there must be a close monitoring of excess O2 in flue gas since it may reach very low levels as recycling occurs Action taken: constant adjustment of O2 flow rate during transition

Page 15: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Excess O2 in Flue Gas

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

5/13/1116:48

5/13/1118:00

5/13/1119:12

5/13/1120:24

5/13/1121:36

5/13/1122:48

Time

wt%

Online O2LAB - O2

Oxidant flow rate

0.0

50.0

100.0

150.0

200.0

250.0

300.0

5/13/1116:48

5/13/1118:00

5/13/1119:12

5/13/1120:24

5/13/1121:36

5/13/1122:48

Time

Kg

/h AirO2+CO2

Flue Gas Composition

0.010.020.030.040.050.060.070.080.090.0

100.0

5/13/1116:48

5/13/1118:00

5/13/1119:12

5/13/1120:24

5/13/1121:36

5/13/1122:48

Time

% v

ol

LAB - CO2LAB N2Online CO2

Oxidant gas composition

-

5.000

10.000

15.000

20.000

25.000

5/13/1116:48

5/13/1118:00

5/13/1119:12

5/13/1120:24

5/13/1121:36

5/13/1122:48

Time

% v

ol

Pre-operation / Air-O2 transition

• Air

• O2+CO2+N2

% v

ol, d

ry

% v

ol, d

ry

% v

ol, d

ry

Page 16: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Pre-operation

Learnings FCC unit oxy-combustion operation: -The starting regenerator temperature is critical for stable operation. As the gas is recycled, this temperature significantly decreases and coke burn rate in the regenerator is affected. Action taken: unit was adjusted to start operation at higher regenerator temperatures and a combustion promoter was used Recycle Compressor - After all oxy-combustion trials, the recycle compressor showed low efficiency and solid deposits were found inside both compression stages which obstructed suction and discharge valves. - The solid deposits were analyzed and the results suggest they are corrosion product from the presence of sulfuric acid. Action taken: adjustments in operation conditions and use of alternative materials improved compressor efficiency

Page 17: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Pre-operation

Page 18: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Preliminary Results

Product Yields, wt%

Base CaseOxyfuel - same inert flow rate

Fuel gas 3.0 3.9LPG 14.9 18.9Gasoline 43.2 41.7LCO 16.8 15.4Bottoms 17.9 15.2Coke 4.2 5.3Total 100.0 100.4Conversion 65.3 69.4

Same inert volumetric flow rate condition

- Air operation: 80,4 Nm3/h of N2

- Oxyfiring operation: 79,5 Nm3/h of N2+CO2

Base CaseOxyfuel - same inert flow rate

CO2 0 69.6O2 21 23.1N2 79 7.3

CO2 14.8 87.9O2 4.7 3.5N2 80.5 8.5

Recycle gas

Flue gas

Component%vol, dry

Page 19: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Final Remarks

The technical viability of oxy-firing an FCC unit has been demonstrated on a large scale pilot test unit

The transition from air to O2 and back was shown to be fast and simple, however care must be taken with the excess oxygen in flue gas

Corrosion inside the recycle compressor was observed as the oxycombustion flue gas has a very strong acidic property. Adequate handling of the gas is critical for long term operation.

The first result, in the same inert volumetric flow rate condition, showed an increase in feed rate conversion and the latest results indicate a CO2 content in flue gas close to 94% (dry basis)

Page 20: CO2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot ... · CO 2 Capture Project Phase 3 – Oxyfuel Large Scale Pilot and Demonstration Projects 2nd Oxyfuel Combustion Conference

Thank you!