2015 DISTRICT 12 CONSTRUCTION PROGRAM
2016 CONSTRUCTION PROGRAM
SERVING CUYAHOGA, GEAUGA AND LAKE COUNTIES.
OHIO DEPARTMENT OF TRANSPORTATION
DISTRICT 12
JOHN R. KASICH, OHIO GOVERNOR | JERRY WRAY, ODOT DIRECTOR | MYRON S. PAKUSH, DISTRICT DEPUTY DIRECTOR
SERVING CUYAHOGA, GEAUGA AND LAKE COUNTIES.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
OVERVIEW 1
Table of Contents
Overview............................................................................... Page 2
Cuyahoga County………………………………………… Page 5
Geauga County…………………………………………… Page 29
Lake County……………………………............................. Page 35
Regional Projects…………………………………………. Page 41
Local-Let Projects………………………………………… Page 43
2016 DISTRICT 12 CONSTRUCTION PROGRAM
OVERVIEW 2
Taking Care of What We Have
Most people notice when ODOT builds something new. However, we
actually spend 93% of our time and resources taking care of what we have.
We apply that 93% to more than 43,000 miles of roads and 14,000 bridges
in the state.
Unfortunately, repair costs have gone up while funding has not. What cost
$1 to fix in 2006 costs $1.56 today. So with little additional funding on the
horizon, we have to look at how we can stretch our dollars further.
How do we stretch funds, support the economy and maintain safety
while preserving our system?
ODOT has spent the last 10 years moving to a more data-focused approach to managing and improving our
transportation system. With this 2016 construction season, we are implementing new, smarter ways to
improve safety and protect the huge investment Ohioans have in our roads and bridges. Our innovative, three-pronged approach will allow us to
redirect an estimated $300 million toward more preservation over the next six years.
This approach includes state-of-the-art technology for better
decision-making, aggressive preservation treatments and more
collaboration across ODOT’s divisions. We are switching gears
from fixing the “worst first” to a preservation strategy. It makes
good business sense to get out in front of problems before they
occur. That’s why we’ll be cleaning, sweeping, sealing, painting
and resurfacing statewide on an even more aggressive schedule
than ever before. We’re striving for a new level of consistency
across the state, so we can keep repeating best practices and
eliminate practices that aren’t effective in terms of cost, time and
quality. With greater collaboration and more information about
our transportation assets, we can identify and address concerns faster to keep our roads and bridges in better shape.
We spend 93% of our time
and resources taking care
of what we have.
Innovators. Again.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
OVERVIEW 3
Aggressive Preservation Treatments Instead of traditional (and more expensive) treatments for roads and bridges, ODOT districts across the state are including a variety of more frequent
and cost-effective strategies in their annual construction work plans, such as:
Bridge deck sealing
Bridge cleaning and sweeping
Crack sealing
Chip/micro/smooth sealing
Underdrain clean-outs
A big change in our preservation strategies is more chip seal and microsurfacing to extend surface life. Chip seal allows ODOT to maintain roads at a
fourth of the cost of conventional overlays. With chip seal overlays, we extend the time between full-depth replacements. This lowers costs over the
long term, enabling ODOT to resurface more roads and provide a smoother ride for more people.
We won’t chip seal just any road.
We’ll consider several factors,
including average daily traffic (no
chip seal on roads with more than
2,500 or truck traffic of 250) and the
overall condition of the road. We’ll
use treatments when and where they
are appropriate. We’ll do more
inspections on chip seals to improve
quality and guarantee performance.
We’re also more proactively cleaning and sealing bridges to keep the joints, side structure, surfaces and drains in good repair and extend surface life.
If we don’t clean a bridge regularly, the dirt and water sit on the steel, which can make it rust and deteriorate more rapidly. Bridges are very
expensive. Keeping them lasting longer is smart and cost-effective.
Ensuring Quality.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
OVERVIEW 4
The Ohio Department of Transportation, District 12 is responsible for the maintenance and construction
of all interstates, U.S. and State Routes in unincorporated municipalities in Cuyahoga, Geauga and Lake
counties. Every spring, we shift our focus from snow and ice removal to the construction and repair of
our roadways.
The 2016 Construction Guide includes information about major construction projects in the District 12,
tri-county area. Projects to which ODOT has contributed money but are administered by local agencies
are listed at the back of the book. Tentative start and completion dates are included to provide you with
a project timeline.
As with every construction season, we ask motorists to use caution when traveling
through work zones. By obeying posted speed limits and exercising caution,
motorists can do their part to keep both our construction employees and fellow
motorists safe.
For the latest on ODOT’s three major Cleveland Urban Core Projects and to sign-up
to receive project related e-mails, motorists are encouraged to log-on to the
following website:
George V. Voinovich Bridge and the entire downtown Cleveland
“Innerbelt” Corridor: www.Innerbelt.org. For questions or concerns, call the project
hotline at 216.344.0069 (855.803.5280 toll-free) or e-mail the team
Opportunity Corridor: www.OpportunityCorridor.transportaton.ohio.gov
Lakefront West: www.LakefrontWest.transportation.ohio.gov
Questions concerning District 12 construction projects can be directed to the ODOT, District 12
Public Information Office at 216.584.2005.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 5
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 6
PROJECTS WITH MINIMAL IMPACTS TO TRAFFIC
Map # 4 – Interstate 71, Cuyahoga County
PROJECT I.D.: 98965 - BID AMOUNT: $557,529
Culvert repairs on I-71 north of SR 82 (Royalton Road) in the city of Strongsville. Traffic will be maintained. Estimated start: May 2016. Estimated
complete: October 2016.
Map # 5 – Interstate 71 & Interstate 271, Cuyahoga County
PROJECT I.D.: 100865 - ESTIMATED COST: $2,000,000
Noise barrier replacement on I-71 northbound at various locations in Middleburg Heights and on the I-271 southbound ramp to I-480 westbound in the city
of Warrensville Heights and village of North Randall. Shoulder and off-peak lane closures. Estimated start: July 2016. Estimated complete: November
2016.
Map # 14 – State Route 10/Lorain-Carnegie (Hope Memorial) Bridge, Cuyahoga County
PROJECT I.D.: 99756 - BID AMOUNT: $1,623,000
Replace the overhead street lighting and add debris netting to the underside of the Hope Memorial Bridge in the city of Cleveland. Minor impacts to
traffic. Started: January 2015. Estimated complete: May 2016.
Map # 23 – Interstate 77, Cuyahoga County
PROJECT I.D.: 77419 - BID AMOUNT: $27,373,449
Replace the I-77 bridge deck and parapets over the Cuyahoga River, Canal Road, SR 17 and the Ohio Canal in the city of Independence and village of
Cuyahoga Heights. Off-peak lane and shoulder closures. Started: June 2013. Estimated complete: June 2017.
Map # 23 – Interstate 77, Cuyahoga County
PROJECT I.D.: 87855 - ESTIMATED COST: $18,100,000
Bridge painting on I-77 over the Cuyahoga River, Canal Road, State Route 17 and the Ohio Canal in the cities of Independence and Cuyahoga Heights.
Estimated start: May 2016. Estimated complete: October 2017.
Map # 32 – Interstate 90, Cuyahoga County
PROJECT I.D.: 90759 - BID AMOUNT: $2,976,350
Noise barrier replacement on I-90 between East 96th Street and Coit Road in the village of Bratenahl. Off-peak lane closures. Started: September 2015.
Estimated complete: October 2016.
Map # 40 – State Route 87, Cuyahoga County
PROJECT I.D.: 80988 - BID AMOUNT: $671,774
Traffic management system installation including decorative signal poles, traffic signs and traffic controllers on SR 87 between I-271 and Belmont Road
in the village of Woodmere. Traffic will be maintained. Started February 2016. Estimated complete: June 2016.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 7
PROJECTS WITH MINIMAL IMPACTS TO TRAFFIC
Map # 41 – Interstate 271, Cuyahoga County
PROJECT I.D.: 100791 - BID AMOUNT: $835,549
Build a noise barrier on I-271 southbound between Woodland Road and Shaker Boulevard in the city of Beachwood. Off-peak lane closures. Estimated
start: April 2016. Estimated complete: September 2016.
The following projects are in various locations across Cuyahoga County:
Interstate 80, Cuyahoga County
PROJECT I.D.: 98622 - ESTIMATED COST: $3,951,500
Noise barrier installation on I-80 at various locations in the cities of Strongsville, North Royalton and Olmsted Falls and Olmsted Township. Estimated
start: September 2016. Estimated complete: October 2017.
Cleveland Heights Safe Routes to School, Cuyahoga County
PROJECT I.D.: 98324 - ESTIMATED COST: $155,000
Safe Routes to School project to improve pedestrian crossings, signage, speed feedback signs and bike racks at various schools in the city of Cleveland
Heights. Estimated start: July 2016. Estimated complete: September 2016.
East Cleveland Safe Routes to School, Cuyahoga County
PROJECT I.D.: 93609 - BID AMOUNT: $406,400
East Cleveland Safe Routes to School safety upgrades including signage, crosswalks, pedestrian signals and sidewalks in the city of East Cleveland.
Start: September 2015. Estimated complete June 2016.
Lakewood Traffic Signals Upgrades, Cuyahoga County
PROJECT I.D.: 82797 - ESTIMATED COST: $2,649,686
Lakewood traffic signal upgrade in the city of Lakewood. Estimated start: June 2016. Estimated complete: October 2017.
Lyndhurst Safe Routes to School, Cuyahoga County
PROJECT I.D.: 96347 - ESTIMATED COST: $50,000
Safe Routes to School project to improve crosswalks, ADA ramps, school flashers and sidewalks at Sunview Elementary in the city of Lyndhurst.
Estimated start: August 2016. Estimated complete: December 2016.
South Euclid Safe Routes to School, Cuyahoga County
PROJECT I.D.: 96348 - ESTIMATED COST: $273,500
Safe Routes to School project to improve crosswalks, sidewalk and bike paths & drop-off areas at four schools in the city of South Euclid. Estimated
start: September 2016. Estimated complete: February 2017.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 8
PROJECTS WITH MINIMAL IMPACTS TO TRAFFIC
Various Locations, Cuyahoga County
PROJECT I.D.: 100168 - ESTIMATED COST: $490,000
Storm sewer cleaning at various locations in Cuyahoga County. Estimated start: TBD. Estimated complete: September 2016.
Various Locations, Cuyahoga County
PROJECT I.D.: 100013 - BID AMOUNT: $712,747
Bridge approach pavement repairs at various locations on I-90 and I-480 in Cuyahoga County. Start: September 2015. Estimated complete: June
2016.
Various Locations, Cuyahoga County
PROJECT I.D.: 100417 - BID AMOUNT: $595,389
Bridge approach pavement repairs at various locations on I-77, I-90, I-271 and I-480 in Cuyahoga County. Estimated start: April 2016. Estimated
complete: June 2016.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 9
MAP NUMBER 1 MAP NUMBER 2
LOCATION: Interstate 90,
Westlake
ESTIMATED COST: $1,320,000
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: Interstate 71,
Strongsville and Middleburg
Heights
ESTIMATED START DATE:
June 2016
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 22198
ESTIMATED COST: $5,235,000
DESCRIPTION: Resurface I-90 between the Cuyahoga/Lorain county line
and Canterbury Road in the city of Westlake.
IMPACT: Off-peak lane closures.
PROJECT I.D.: 85508
DESCRIPTION: Resurface I-71 between the Cuyahoga/Medina county
line and U.S. 42 (Pearl Road) in the cities of Strongsville and Middleburg
Heights.
IMPACT: Off-peak lane and ramp closures.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 10
MAP NUMBER 3 MAP NUMBER 6
LOCATION: Interstate 71 & State
Route 82, Strongsville
BID AMOUNT: $1,027,719
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: Snow Road, Brook
Park
ESTIMATED COST: $3,202,698
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2017
PROJECT I.D.: 99435
PROJECT I.D.: 100238
DESCRIPTION: Widen the SR 82 (Royalton Road) eastbound entrance
ramp to I-71 northbound to two lanes in the city of Strongsville.
DESCRIPTION: Resurface Snow Road between SR 237 and West 130th
Street in the city of Brook Park.
IMPACT: Traffic will be maintained utilizing flaggers. IMPACT: Traffic will be maintained on all entrance and exit ramps
utilizing traffic shifts.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 11
MAP NUMBER 7 MAP NUMBER 8
LOCATION: State Route 237,
Lakewood
BID AMOUNT: $1,529,867
START DATE: April 2015
ESTIMATED COMPLETION
DATE: June 2016
LOCATION: Warren Road,
Cleveland
ESTIMATED COST: $1,403,000
ESTIMATED START DATE:
May 2016
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 18741
PROJECT I.D.: 100159
DESCRIPTION: Resurface Warren Road between Munn Road and I-90 in
the city of Cleveland.
IMPACT: One lane of traffic will be maintained in each direction.
DESCRIPTION: Replace the SR 237 bridge deck over I-90 in the city of
Lakewood.
IMPACT: Riverside Drive southbound will be closed for approximately 90
days between Indianola Avenue and Hilliard Road. Motorists will be
detoured via Detroit Road to Wooster Road to Hilliard Road. One lane of
northbound traffic will be maintained. Lane closures on I-90 are expected
during off-peak hours.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 12
MAP NUMBER 9 MAP NUMBER 10
LOCATION: West 150th Street,
Cleveland
ESTIMATED START DATE:
May 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: Royalview Drive,
Parma
ESTIMATED START DATE: June 2015
ESTIMATED COMPLETION
DATE: October 20165
ESTIMATED COST: $3,124,000
BID AMOUNT: $639,021
PROJECT I.D.: 100160 PROJECT I.D.: 89063
DESCRIPTION: Resurface West 150th Street between Industrial Parkway
and SR 10 (Lorain Avenue) in the city of Cleveland.
IMPACT: West 150th Street will be closed to southbound traffic between
Puritas Avenue & Industrial Parkway for approximately 60 days. Detours
will be posted. West 150th Street between Puritas Avenue and Lorain
Avenue will be maintained with one lane of traffic in each direction.
DESCRIPTION: Replace the Royalview Drive bridge over Big Creek,
west of Ridge Road, in the city of Parma.
IMPACT: Traffic will be maintained.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 13
MAP NUMBER 11 MAP NUMBER 12
LOCATION: Wetzel Avenue,
Cleveland
BID AMOUNT: $749,000
PROJECT I.D.: 97497
ESTIMATED START DATE:
March 2016
ESTIMATED COMPLETION
DATE: July 2016
LOCATION: Cleveland Memorial
Shoreway, Cleveland
BID AMOUNT: $41,496,959
START DATE: April 2015
ESTIMATED COMPLETION
DATE: June 2018
PROJECT I.D.: 86482
DESCRIPTION: Replace the Wetzel Avenue bridge – west of State Road
– in the city of Cleveland.
IMPACT: Wetzel Avenue will be closed for approximately 45 days.
Motorists will be detoured via State Road, Burger Avenue and West 44th
Street.
DESCRIPTION: Major pavement rehabilitation along the west Shoreway
between Clifton Boulevard and the Main Avenue Bridge as part of the
Cleveland Lakefront West project. This project also includes the permanent
closure of the West 28th Street eastbound entrance ramp to the Shoreway
and the realignment of the westbound exit ramp to West 28th Street.
IMPACT: Lane and ramp closures are expected. Visit
www.lakefrontwest.transportation.ohio.gov for more info.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 14
MAP NUMBER 13 MAP NUMBER 15
LOCATION: U.S. Route 6,
Cleveland
BID AMOUNT: $4,997,376
PROJECT I.D.: 77040
START DATE: March 2014
ESTIMATED COMPLETION
DATE: May 2016
LOCATION: Interstate 90,
Cleveland
START DATE: January 2014
ESTIMATED COMPLETION
DATE: June 2017 BID AMOUNT: $272,986,001
PROJECT I.D.: 82119
DESCRIPTION: As part of the Innerbelt Plan, demolish the old Innerbelt
Bridge (now complete) and construct a new I-90 eastbound bridge over the
Cuyahoga River Valley that will eventually carry five lanes of eastbound
traffic. The eastbound bridge is expected to be open to traffic during the
fall of 2016.
IMPACT: The new westbound bridge is temporarily carrying traffic in
both directions during construction of the second new bridge. Multiple
lanes and ramps along the corridor are closed or restricted as work takes
place. Visit www.Innerbelt.org for more information.
DESCRIPTION: Spot painting and miscellaneous repairs of the Detroit-
Superior (Veterans Memorial) Bridge in the city of Cleveland.
IMPACT: Short-term lane closures are expected.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 15
MAP NUMBER 16 MAP NUMBER 17
LOCATION: North Marginal Road
and South Marginal Road,
Cleveland
START DATE: March 2016
ESTIMATED COMPLETION
DATE: September 2016
LOCATION: St. Clair Avenue,
Cleveland.
ESTIMATED START DATE: May 2016
ESTIMATED COMPLETION
DATE: October 2016
BID AMOUNT: $4,085,374
PROJECT I.D.: 100096
ESTIMATED COST: $4,205,000
PROJECT I.D.: 100158
DESCRIPTION: Resurface North Marginal Road and South Marginal
Road between East 9th Street and East 55th Street in the city of Cleveland.
IMPACT: Temporary closures of North and South Marginal Roads are
expected. Motorists will be detoured onto the adjacent marginal road or SR
2. Details will be forthcoming.
DESCRIPTION: Resurface St. Clair Avenue between (A) Old River Road
and West 9th Street and between (B) East 13th Street and East 55th Street
in the city of Cleveland.
IMPACT: St. Clair Avenue will be closed to westbound traffic between
West 10th Street and West 9th Street for approximately 30 days. Detours
will be posted. St. Clair Avenue between East 13th Street and East 55th
Street will be maintained with one lane in each direction.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 16
MAP NUMBER 18 MAP NUMBER 19
LOCATION: Interstate 90,
Cleveland
ESTIMATED START DATE: April 2016
ESTIMATED COMPLETION
DATE: November 2016
LOCATION: Canal Road,
Cleveland
START DATE: September 2014
ESTIMATED COMPLETION
DATE: TBD ESTIMATED COST: $420,000 BID AMOUNT: $3,711,639
PROJECT I.D.: 100101
PROJECT I.D.: 89064
DESCRIPTION: Upgrade underpass lighting on I-90 between East 22nd
Street and the East Shoreway in the city of Cleveland.
DESCRIPTION: Replace the Canal Road Bridge over the CSX Railroad
and under the Norfolk Southern Railroad in the city of Cleveland.
IMPACT: Canal Road in now operating as a ONE-WAY northbound
roadway between West 3rd Street and the East 9th Street Extension.
Detours are posted.
IMPACT: Off-peak lane closures.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 17
LOCATION: East 22nd Street,
Cleveland
BID AMOUNT: $4,026,582
PROJECT I.D.: 95556
START DATE: June 2015
ESTIMATED COMPLETION
DATE: May 2016
LOCATION: Community College
Avenue, Cleveland
BID AMOUNT: $1,496,923
PROJECT I.D.: 98804
START DATE: June 2015
ESTIMATED COMPLETION
DATE: June 2016
DESCRIPTION: Resurface East 22nd Street between Orange Avenue and
Euclid Avenue in the city of Cleveland.
DESCRIPTION: Pavement repair on Community College Avenue
between East 22nd Street and East 40th Street in the city of Cleveland.
IMPACT: In 2016, Community College Avenue eastbound will be closed
between East 30th Street and East 40th Street. Motorists will detour via East
30th Street to Central Avenue to East 40th Street. Westbound traffic will be
maintained.
IMPACT: Traffic will be maintained.
MAP NUMBER 20 MAP NUMBER 21
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 18
MAP NUMBER 22 MAP NUMBER 24
LOCATION: Pershing Avenue,
Cleveland
START DATE: February 2015
ESTIMATED COMPLETION
DATE: June 2016
LOCATION: Interstate 77 & State
Route 82, Broadview Heights
BID AMOUNT: $3,962,022
PROJECT I.D.: 92528
START DATE: March 2016
ESTIMATED COMPLETION
DATE: October 2016
BID AMOUNT: $6,273,749
PROJECT I.D.: 22891
DESCRIPTION: Replace the Pershing Avenue bridge over I-77 in the city
of Cleveland.
IMPACT: The I-77 northbound exit ramp at Pershing Avenue and the
Pershing Avenue entrance ramp to I-77 southbound are closed thru fall
2016. Detours are posted. Traffic will be maintained on Pershing Avenue.
Off-peak lane closures are expected on I-77.
DESCRIPTION: Intersection improvements at I-77 and SR 82 and
resurfacing of SR 82 between Ken Mar Industrial Parkway and South Hills
Boulevard in the city of Broadview Heights.
IMPACT: Lane closures on SR 82 are expected. Short-term closures of the
I-77 southbound ramp to SR 82 eastbound are expected. Motorists will be
detoured via I-77 southbound to Miller Road to I-77 northbound to SR 82
eastbound. Short-term ramp closure of the SR 82 entrance ramp to I-77
southbound are expected. Motorists will be detoured via SR 21 to I-77
southbound.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 19
MAP NUMBER 25 MAP NUMBER 26
LOCATION: Interstate 77,
Brecksville and Richfield
ESTIMATED START DATE: August 2016
ESTIMATED COMPLETION
DATE: October 2019
LOCATION: East 79th Street,
Cleveland
BID AMOUNT: $5,876,145
PROJECT I.D.: 93460
START DATE: May 2015
ESTIMATED COMPLETION
DATE: May 2017 ESTIMATED COST: $38,800,000
PROJECT I.D.: 79671
DESCRIPTION: Widen I-77 to three lanes in each direction between the
Ohio Turnpike and Oakes Road in the cities of Brecksville and Richfield.
DESCRIPTION: Replace the East 79th Street bridge over the Norfolk
Southern and GCRTA tracks in the city of Cleveland.
IMPACT: The East 79th Street bridge is closed. Motorists are detoured via
East 75th Street. Weekend sidewalk closures are expected.
IMPACT: Traffic will be maintained. Overnight and weekend lane
closures are expected. The I-77 southbound and I-77 northbound entrance
ramps at Miller Road will be maintained at part-width.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 20
MAP NUMBER 27 MAP NUMBER 28
LOCATION: Opportunity Corridor
Section 2, Cleveland
ESTIMATED START DATE: March 2016
ESTIMATED COMPLETION
DATE: August 2018
LOCATION: East 105th Street,
Cleveland
START DATE: February 2015
ESTIMATED COMPLETION
DATE: July 2017
ESTIMATED COST: $34,086,906
BID AMOUNT: $20,969,780
PROJECT I.D.: 98695 PROJECT I.D.: 96832
DESCRIPTION: Build a new roadway (to be known as SR 10) between
Quebec Avenue and East 93rd Street and construct a new East 105th Street
bridge over NS and GCRTA in the city of Cleveland. (Cleveland
Opportunity Corridor, Section 2)
IMPACT: The East 105th Street bridge over NS and GCRTA will be
closed for a maximum of 300 days. The East 105th Street and Quincy
Avenue intersection will be closed for a maximum of 60 days. Details will
be forthcoming. Visit www.opportunitycorridor.transportation.ohio.gov
DESCRIPTION: Major reconstruction and widening of East 105th Street
between Quebec Avenue and U.S. 322 (Chester Avenue) in the city of
Cleveland. (Cleveland Opportunity Corridor, Section 1)
IMPACT: Restrictions on East 105th Street and some side streets are
expected. Visit www.opportunitycorridor.transportation.ohio.gov for more
information.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 21
LOCATION: East 93rd Street,
Cleveland
ESTIMATED COST: $1,705,000
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: September 2016
LOCATION: State Route 87,
Cleveland
BID AMOUNT: $9,166,535
START DATE: July 2013
ESTIMATED COMPLETION
DATE: September 2016
PROJECT I.D.: 100098 PROJECT I.D.: 10787
DESCRIPTION: Replace the SR 87 (Buckeye Road/Shaker Boulevard)
bridge over GCRTA at Woodhill Road in the city of Cleveland. The project
also includes water main replacement.
IMPACT: The intersection of Buckeye Road and Woodhill Road remains
closed until May 2016. Motorists are detoured via Buckeye Road, East
103rd Street and Shaker Boulevard.
DESCRIPTION: Resurface East 93rd Street between Union Avenue and
Kinsman Road in the city of Cleveland.
IMPACT: Traffic will be maintained.
MAP NUMBER 29 MAP NUMBER 30
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 22
MAP NUMBER 31 MAP NUMBER 33
LOCATION: Woodland Avenue,
Cleveland
START DATE: July 2015
BID AMOUNT: $3,958,901
START DATE: July 2015
ESTIMATED COMPLETION
DATE: May 2016
LOCATION: Harvard Avenue,
Cleveland
58,90
ESTIMATED START DATE: May 2016
ESTIMATED COMPLETION
DATE: October 2016
ESTIMATED COST: $3,335,000
PROJECT I.D.: 95555 PROJECT I.D.: 100157
DESCRIPTION: Resurface Harvard Avenue between East 116th Street
and Lee Road in the city of Cleveland.
IMPACT: Harvard Avenue will be closed to eastbound traffic between
East 116th Street and East 131st Street for approximately 60 days.
Eastbound motorist will be detoured via East 116th Street to Miles Avenue
to East 131st Street to Harvard Avenue. Harvard Avenue between East
131st Street and Lee Road will be maintained with one lane of traffic in
each direction.
DESCRIPTION: Resurface Woodland Avenue between East 89th Street
and East 116th Street in the city of Cleveland.
IMPACT: Traffic will be maintained with one lane in each direction.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 23
MAP NUMBER 34 MAP NUMBER 35
LOCATION: State Route 8,
Walton Hills
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: September 2016
LOCATION: State Route 17,
Maple Heights
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: September 2016
ESTIMATED COST: $380,000
PROJECT I.D.: 92611
ESTIMATED COST: $1,408,347
PROJECT I.D.: 84286
DESCRIPTION: Resurface SR 17 (Libby Road) between East 141st Street
and Lee Road in the city of Maple Heights.
IMPACT: Traffic will be maintained utilizing flaggers.
DESCRIPTION: Resurface SR 8 (Northfield Road) between the
Cuyahoga/Summit county line and Forbes Road in the village of Walton
Hills.
IMPACT: Two-way traffic will be maintained.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 24
MAP NUMBER 36 MAP NUMBER 36
LOCATION: State Route 8,
Warrensville Heights and North
Randall
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 8,
Bedford Heights and Maple Heights
ESTIMATED COST: $1,070,000
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2016 ESTIMATED COST: $320,000
PROJECT I.D.: 98825
PROJECT I.D.: 99052
DESCRIPTION: Pavement repairs on SR 8 between just south of Mueti
Drive and north of I-480 in Bedford Heights & Maple Heights.
IMPACT: One lane maintained on SR 8 (Northfield Road) north and two
lanes maintained southbound. The SR 8 entrance ramp to I-480 west will be
closed. The I-480 westbound exit ramp to Northfield Road will be closed
for approximately 21 days. The Mueti Drive entrance ramp to I-480 east
will be closed for approximately 21 days. Detours will be posted.
DESCRIPTION: Resurface SR 8 (Northfield Road) between I-480 and
Miles Road in the city of Warrensville Heights and the village of North
Randall.
IMPACT: Traffic will be maintained.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 25
MAP NUMBER 37 MAP NUMBER 38
LOCATION: Interstate 90,
Cleveland
ESTIMATED START DATE: March 2016
LOCATION: Interstate 271, Bedford,
Bedford Heights, Warrensville Heights
and Oakwood
ESTIMATED START DATE: May 2016
BID AMOUNT: $3,168,720
ESTIMATED COMPLETION
DATE: October 2016
ESTIMATED COST: $117,550,000
ESTIMATED COMPLETION
DATE: June 2020
PROJECT I.D.: 97245
PROJECT I.D.: 80418
DESCRIPTION: Build a new pedestrian bridge over I-90 just west of East
185th Street in the city of Cleveland.
IMPACT: Off-peak lane closures.
DESCRIPTION: Widen I-271 between the Cuyahoga/Summit county line
and Miles Road in the cities of Bedford, Bedford Heights and Warrensville
Heights and Oakwood Village.
IMPACT: Traffic will be maintained with lanes shifted.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 26
MAP NUMBER 39 MAP NUMBER 42
LOCATION: U.S. Route 422, Solon
ESTIMATED COST: $370,000
ESTIMATED START DATE: June 2016
LOCATION: Interstate 271, Lyndhurst
BID AMOUNT: $2,361,010
ESTIMATED START DATE: August 2016
PROJECT I.D.: 97282 ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 97676
ESTIMATED COMPLETION
DATE: October 2017
DESCRIPTION: Slope stabilization on the U.S. 422 bridge between Solon
Road and Liberty Road in the city of Solon.
IMPACT: One lane of traffic will be maintained in each direction.
DESCRIPTION: Widen the I-271 northbound exit ramp to Cedar
Road/Brainard Road and widen Brainard Road at I-271 in the city of
Lyndhurst.
IMPACT: Off-peak lane closures.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 27
LOCATION: Interstate 271,
Highland Heights and Mayfield ESTIMATED START DATE:
August 2016
LOCATION: State Route 91, Hunting
Valley and Pepper Pike
ESTIMATED START DATE: June 2016
ESTIMATED COST: $8,540,000
PROJECT I.D.: 12343
ESTIMATED COMPLETION
DATE: November 2017
ESTIMATED COST: $784,528
PROJECT I.D.: 92023
ESTIMATED COMPLETION
DATE: October 2016
DESCRIPTION: Replace the I-271 north and southbound Local Lanes
bridges over Wilson Mills Road in the cities of Highland Heights and
Mayfield.
IMPACT: I-271 Local Lanes traffic will be shifted to the Express Lanes
during construction. Traffic will be maintained on the I-271 ramps at
Wilson Mills Road; and on Wilson Mills Road.
DESCRIPTION: Bridge repair on SR 91 north of SR 87 in the village of
Hunting Valley and city of Pepper Pike.
IMPACT: Two-way traffic will be maintained utilizing a temporary traffic
signal. Hackney Road at SR 91 will be closed for approximately 90 days.
Motorists will be detoured via SR 87 to Roundwood Road to Shaker
Boulevard. Overnight complete closures of SR 91 are expected, details will
be forthcoming.
MAP NUMBER 43 MAP NUMBER 44
2016 DISTRICT 12 CONSTRUCTION PROGRAM
CUYAHOGA COUNTY 28
MAP NUMBER 45
LOCATION: Hawthorn Parkway,
Solon
ESTIMATED START DATE: March 2016
BID AMOUNT: $749,479 ESTIMATED COMPLETION
DATE: June 2016
PROJECT I.D.: 98758
DESCRIPTION: Bridge repair on Hawthorn Parkway over U.S. 422 in
the city of Solon.
IMPACT: Hawthorn Parkway has been closed since the spring of 2015
and will remain closed until June 2016. Off-peak lane closures on U.S.
422.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 29
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 30
MAP NUMBER 101
LOCATION: U.S. Route 322,
Chester Township
ESTIMATED START DATE:
May 2016
BID AMOUNT: $1,974,965
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 84301
DESCRIPTION: Resurface U.S. 322 (Mayfield Road) between the
Cuyahoga/Geauga county line and Heath Road and perform guardrail
replacement, drainage and culvert repair and minor intersection widening at
U.S. 322 and SR 306 (Chillicothe Road) in Chester Township.
IMPACT: U.S. 322 (Mayfield Road) east and westbound will be closed
between County Line Road and Caves Road for approximately 40 days in
order to perform culvert replacement operations. Two-way traffic maintained
utilizing flaggers during resurfacing operations. Local traffic will be
detoured via County Line Road, Wilson Mills Road and Caves Road.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 31
MAP NUMBER 102
LOCATION: State Route 166, State Route 306 and U.S. Route 322, Thompson,
Huntsburg and Bainbridge Townships
BID AMOUNT: $1,005,614
PROJECT I.D.: 87470
ESTIMATED START DATE: April 2016
ESTIMATED COMPLETION DATE: October 2016
DESCRIPTION: Culvert repairs on SR 166 between SR 528 and Dewey Road in Thompson Township, SR 306 near Beacon Hill Drive in Bainbridge
Township and U.S. 322 between Hunt Road and Townline Road in Huntsburg Township.
IMPACT: SR 306 near Beacon Hill will be closed for approximately 25 days. Motorists will be detoured via SR 43 (Aurora Rd), SR 91 (SOM Center
Road) and U.S. 422. Before and after the closure on SR 306, two-way traffic will be maintained utilizing flaggers. On SR 166 between SR 528 and
Dewey Road and U.S. 322 between Hunt Road and Townline Road, two-way traffic will be maintained utilizing a temporary traffic signal.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 32
MAP NUMBER 103 MAP NUMBER 104
LOCATION: U.S. Route 422,
Bainbridge and Auburn
Townships
BID AMOUNT: $19,021,660
START DATE: April 2014
ESTIMATED COMPLETION
DATE: July 2016
LOCATION: U.S. Route 322,
Munson Township
BID AMOUNT: $1,020,000
PROJECT I.D.: 85598
ESTIMATED START DATE: May
2016
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 22220
DESCRIPTION: Minor rehabilitation of U.S. 422 between SR 306 and
SR 44, including replacing the U.S. 422 eastbound exit and westbound
entrance ramps to SR 44, in Bainbridge and Auburn townships.
IMPACT: Lane closures are expected.
DESCRIPTION: Resurface U.S. 322 (Mayfield Road) between Heath Road
and SR 44 (Ravenna Road) in Munson Township.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 33
MAP NUMBER 105 MAP NUMBER 106
LOCATION: State Route 44,
Chardon Township
BID AMOUNT: $1,278,510
ESTIMATED START DATE:
March 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 608,
Hambden Township
ESTIMATED COST: $810,000
PROJECT I.D.: 90913
ESTIMATED START DATE:
May 2016
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 84298
DESCRIPTION: Resurface SR 44 (Ravenna Road) between Mentor
Road and the Geauga/Lake County Line in Chardon Township.
IMPACT: Two-way traffic maintained utilizing flaggers.
DESCRIPTION: Resurface SR 608 (Old State Road) between U.S. 6 (GAR
Highway) and the Geauga/Lake County Line in Hambden Township.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 34
MAP NUMBER 107 MAP NUMBER 108
LOCATION: State Route 87, Burton
and Middlefield Townships
BID AMOUNT: $691,872
PROJECT I.D.: 92602
ESTIMATED START DATE: May 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 88/State
Route 528, Parkman & Middlefield
Townships and Village of
Middlefield
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION DATE:
October 2016
ESTIMATED COST: $1,475,000
PROJECT I.D.: 90908
2016 DISTRICT 12 CONSTRUCTION PROGRAM
GEAUGA COUNTY 35
DESCRIPTION: Resurface and replace guardrail on SR 87 (Kinsman Road)
between Peckham Road and Tare Creek in Burton and Middlefield
townships.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
DESCRIPTION: Resurface SR 88/SR 528 (Madison Road) between U.S. 422
and Nash Road and SR 528 (Madison Road) between Nash Road and SR 87
(Kinsman Road) in Parkman Township, Middlefield Township and the village
of Middlefield.
IMPACT: Two-way traffic maintained utilizing flaggers.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 36
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 37
MAP NUMBER 201 MAP NUMBER 202
LOCATION: Interstate 90,
Wickliffe and Willoughby Hills
ESTIMATED COST: $1,650,000
ESTIMATED START DATE: June 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 84 and
Norton Parkway and Interstate 90
and State Route 615, Mentor
ESTIMATED START DATE:
April 2016
ESTIMATED COMPLETION
DATE: October 2016
PROJECT I.D.: 24857 BID AMOUNT: $1,342,059
DESCRIPTION: Resurface I-90 between the Lake/Cuyahoga county line
and Rockefeller Road in the cities of Wickliffe and Willoughby Hills.
IMPACT: Off-peak lane and ramp closures.
PROJECT I.D.: 80976
DESCRIPTION: Bike trail installation between SR 84 and Norton
Parkway and enhancements to the I-90 and SR 615 interchange in the city
of Mentor.
IMPACT: Short-term lane closures on SR 615, SR 84 and Norton Parkway
are expected.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 38
MAP NUMBER 203 MAP NUMBER 204
LOCATION: State Route 615,
Mentor
ESTIMATED COST: $480,000
PROJECT I.D.: 94337
ESTIMATED START DATE:
May 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: Auburn Road and
Crile Road, Concord Township
START DATE: June 2015
ESTIMATED COMPLETION
DATE: October 2016 BID AMOUNT: $8,713,039
PROJECT I.D.: 89046
DESCRIPTION: Bridge repair on SR 615 (Center Street) over the Norfolk
Southern Railroad in the city of Mentor.
IMPACT: At least one lane of traffic will be maintained.
DESCRIPTION: Build a connector road between Auburn & Crile Roads
near the SR 44/Auburn Rd intersection, reconfigure the SR 44/Auburn Rd
intersection and the Auburn Rd/Crile Rd intersection in Concord Township.
IMPACT: Auburn Road at Capital Parkway will be closed for
approximately 60 days; Crile Road at Auburn Road will be closed for
approximately 45 days; and northbound Auburn Road between Concord-
Hambden Road and Crile Road will be closed for the duration of the
project. Detours will be posted.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 39
MAP NUMBER 205 MAP NUMBER 206
LOCATION: State Route 44,
Concord Township
ESTIMATED COST: $1,645,000
ESTIMATED START DATE:
March 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 84 and
State Route 86, Concord and
Painesville Townships
ESTIMATED START DATE:
June 2016
ESTIMATED COMPLETION
DATE: September 2016
PROJECT I.D.: 96593
ESTIMATED COST: $1,000,000
DESCRIPTION: Resurface SR 44 between the Lake/Geauga county line
and I-90 in Concord Township.
IMPACT: Two-way traffic will be maintained utilizing flaggers on two-
lane section. Off-peak single lane closures on divided highway section.
PROJECT I.D.: 85608
DESCRIPTION: Resurface SR 84 (Johnnycake Ridge Road) between
Carrington Drive and SR 86 (Painesville Warren Road) in Concord and
Painesville Townships.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 40
MAP NUMBER 207 MAP NUMBER 208
LOCATION: State Route 283,
Painesville Township and Grand
River Village
ESTIMATED START DATE:
June 2016
ESTIMATED COMPLETION
DATE: September 2016
LOCATION: Interstate 90,
Madison Township
ESTIMATED COST: $320,000
ESTIMATED START DATE: May 2016
ESTIMATED COMPLETION
DATE: October 2016 BID AMOUNT: $1,632,270
PROJECT I.D.: 101048
PROJECT I.D.: 89235
DESCRIPTION: Routine bridge maintenance on I-90 over the Grand
River in Madison Township.
IMPACT: Traffic will be maintained utilizing temporary lane shifts.
DESCRIPTION: Resurface SR 283 (Lakeshore Boulevard/Singer Avenue,
River Street) between SR 44 (Heisley Road) and SR 535 (Richmond Street)
in Painesville Township and Grand River Village.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LAKE COUNTY 41
LOCATION: State Route 307,
Madison Township
ESTIMATED COST: $170,000
PROJECT I.D.: 100450
ESTIMATED START DATE:
July 2016
ESTIMATED COMPLETION
DATE: October 2016
LOCATION: State Route 84,
Madison Township
ESTIMATED START DATE: May 2016
ESTIMATED COMPLETION
DATE: October 2016
ESTIMATED COST: $290,000
PROJECT I.D.: 95321
DESCRIPTION: Resurface SR 307 (Warner Road) between SR 528
(Madison Road) the Lake/Ashtabula county line in Madison Township.
IMPACT: Two-way traffic will be maintained utilizing flaggers.
DESCRIPTION: Culvert repairs on SR 84 at Townline Road and west of
Dayton Road in Madison Township.
IMPACT: Two-way traffic will be maintained utilizing a temporary traffic
signal.
MAP NUMBER 209 MAP NUMBER 210
2016 DISTRICT 12 CONSTRUCTION PROGRAM
REGIONAL PROJECTS 42
DISTRICT 12 REGIONAL PROJECTS
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 87469
Guardrail repairs on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Begin:
April 2015/Complete: April 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97219
Sign structure maintenance on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Begin: April 2015/Complete: Complete: May
2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 94078
Lighting upgrades on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Begin: May 2015/Complete: May 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97221
Traffic signal repairs on various routes in Lake County and as needed in other District 12 locations. Traffic will be maintained. Lane closures expected during
off-peak hours. Begin: July 2015/Complete: June 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 98602
Pavement repairs at various locations in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Begin:
May 2016/Complete: October 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97300
Sign structure repairs on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Begin: June 2016/Complete: October 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 94082
Lighting upgrades on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Begin: June 2016/Complete: October 2016
2016 DISTRICT 12 CONSTRUCTION PROGRAM
REGIONAL PROJECTS 43
DISTRICT 12 REGIONAL PROJECTS
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97372
Bridge repair at locations in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Begin: May
2016/Complete: October 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 99993
Bridge maintenance at locations in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Begin: June
2016/Complete: October 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97291
Pavement markings on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Begin: December 2015/Complete: Complete:
November 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97301
Traffic signal repairs on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours.
Begin: May 2016/Complete: November 2016
Various Routes, Cuyahoga, Geauga and Lake Counties
PROJECT I.D.: 97311
Guardrail repairs on various routes in Cuyahoga, Geauga and Lake counties. Traffic will be maintained. Lane closures expected during off-peak hours. Begin:
June 2016/Complete: April 2017
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LOCAL LET PROJECTS 44
Cuyahoga County – Local Let Projects
Project I.D. Managing Agency Description Projected Cost
82566 County Engineer Major pavement reconstruction on Ridge Road between Delora Avenue and Memphis
Avenue in the city of Brooklyn. $8,309,354
85207 County Engineer
Reconfigure the six-legged intersection of U.S. 422 (Chagrin Boulevard), Warrensville
Center Road, SR 8 (Northfield Road) and Van Aken Boulevard in the city of Shaker
Heights.
$8,372,654
94629 City of Cleveland Streetscape on Fleet Avenue between I-77 and Broadway Avenue in the city of
Cleveland. $8,856,419
10900 County Engineer Widen and reconstruct Bagley Road/Pleasant Valley Road between U.S. 42 (Pearl
Road) and York Road in the cities of Middleburg Heights and Parma. $22,945,485
89723 Cleveland Metroparks Mill Creek Connector Trail part 2 between Bacci Park and Garfield Boulevard &
Warner Road intersection in Garfield Heights. $3,293,000
89037 City of Westlake Traffic signal upgrades at various locations in the city of Westlake. $4,877,300
95632 City of Cleveland Heights Resurface and streetscape on Lee Road between Corydon Road and Superior Road in
the city of Cleveland Heights. $3,453,801
95548 City of Brooklyn Intersection improvement on Tiedeman Road at I-480 in the city of Brooklyn. $898,679
80729 County Engineer Grade separation on Stearns Road at the Norfolk Southern Railroad tracks in Olmsted
Township. $8,209,055
98346 City of Beachwood Resurface U.S. 422 between SR 175 and I-271 in the city of Beachwood. $710,847
84289 City of Cleveland Resurface SR 10 (Lorain Avenue) between West 150th Street and West 117th Street in
the city of Cleveland. $8,325,493
95105 City of Brecksville Stream mitigation on Riverview Road north of Vaughn Road in the city of Brecksville. $375,525
95099 City of Brecksville Culvert repair at the intersection of Riverview Road and Vaughn Road in the city of
Brecksville. $489,708
99436 City of Beachwood Resurface SR 87 (Shaker Boulevard) between Sulgrave Road and SR 175 in the city of
Beachwood. $439,431
100301 County Commissioners Provide a fleet of bicycles for a bike share program that would be available to the public
at locations for trips within the city of Cleveland. $443,394
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LOCAL LET PROJECTS 45
Cuyahoga County - Local Let Projects
Project I.D. Managing Agency Description Projected Cost
84406 City of Cleveland Provide a fleet of bicycles for a bike share program that would be available to the public
at locations for trips within the city of Cleveland. $9426,430
100303 Port Authority Install bike boxes on existing bicycle paths throughout the Flats area in the city of
Cleveland. $30,000
100240 City of Strongsville Resurface U.S. 42 between Shurmer Road and I-80 in the city of Strongsville. $2,004,466
100245 City of Mayfield Heights Resurface U.S. 322 between Eastwood Avenue and Lander Road in the city of Mayfield
Heights. $1,184,293
98352 City of Fairview Park
Safe Routes to School Project to improve sidewalks, signals, pedestrian areas and
lighting at Gilles-Sweet Elementary and Lewis F. Mayer Middle School in the city of
Fairview Park.
$274,300
86256 City of Brooklyn Resurface Memphis Avenue between Peelor Avenue and Ridge Road in the city of
Brooklyn. $2,858,460
97888 Cleveland Metroparks
Construct a multi-purpose trail between Broadview Road and Brecksville Road in the
Cleveland Metroparks’ Brecksville Reservation in the cities of Broadview Heights and
Brecksville.
$1,600,200
91042 County Engineer Replace the Lakeshore Boulevard bridge over Nine Mile Creek in the village of
Bratenahl. $1,480,000
98620 City of Brecksville Install storm sewer line on Valleybrook Drive near I-80 in the city of Brecksville. $360,000
95891 City of Westlake Resurface SR 254 (Detroit Road) between the Cuyahoga/Lorain county line and Brick
Mill Run in the city of Westlake. $2,963,695
91039 County Engineer Replace the Cedar Avenue bridge over Doan Brook in the city of Cleveland. $2,708,411
93827 City of Berea Replace the West Center Street bridge over the Rocky River in the city of Berea. $3,013,560
100241 City of Euclid Resurface SR 175 between Euclid Avenue and I-90 in the city of Euclid. $863,223
89039 County Engineer Repair four bridges on Highland Road over Euclid Creek in the city of Euclid. $12,367,881
2016 DISTRICT 12 CONSTRUCTION PROGRAM
LOCAL LET PROJECTS 46
Lake County - Local Let Projects
Project I.D. Managing Agency Description Projected Cost
80955 Painesville Township Streetscape project on U.S. 20 (Mentor Avenue) between Wellesley Road and Fern
Drive in Painesville Township. $183,555
89047 City of Mentor Widen Heisley Road between Mentor Avenue and Jackson Street in the city of Mentor. $4,949,439
5669 County Engineer
Build a new Vrooman Road bridge over the Grand River in Perry and LeRoy
Townships and major pavement rehabilitation on Vrooman Road between I-90 and the
Vrooman Road Bridge in LeRoy Township.
$24,751,370
98809 City of Mentor Resurface SR 306 between SR 84 and SR 283 in the city of Mentor. $3,520,000
85131 County Engineer Resurface Vrooman Road between I-90 and Vrooman Road in LeRoy Township. $2,217,948
93611 County Engineer Safe Routes to School project in Painesville Township to add sidewalks, bicycle racks
and updated pavement markings. $408,836
100261 City of Painesville Resurface North State Street between Erie Street and Chester Street/Storrs Street in the
city of Painesville. $263,000
100246 County Engineer Resurfacing SR 91 between the Cuyahoga/Lake county line and U.S. 20 in the cities of
Willoughby Hills and Willoughby. $2,120,038
For more information please contact,
Amanda McFarland, Public Information Officer, (216) 584-2005
Jocelynn Clemings, Public Information Officer, (216) 584-4030
Like us on Facebook: www.facebook.com/District12Cleveland
Follow us on Twitter: www.twitter.com/ODOT_Cleveland
Statewide Traffic Information: www.Ohgo.com
For general information, call 216-581-2100 or visit District 12’s Web site at: www.transportation.ohio.gov/dist12
Printed March 2016