Louisiana Safe Routes to School Program. The Application. Applying For SRTS Funding. WHEN TO APPLY January 3, 2011 – Application period begins March 4, 2011 – Application deadline PREPARING TO APPLY THE APPLICATION. Preparing To Apply. Don’t Wait – Start Now Form A Team - PowerPoint PPT Presentation

Citation preview

Page 1: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Louisiana Safe Routes to School

Program

The Application

Page 2: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Applying For SRTS Funding

• WHEN TO APPLY

– January 3, 2011 – Application period begins

– March 4, 2011 – Application deadline

• PREPARING TO APPLY

• THE APPLICATION

Page 3: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Preparing To Apply• Don’t Wait – Start Now

• Form A Team

• Collect Information

• Identify Problems

• Identify Solutions

Page 4: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Project Funding

• Reimbursable Program – Not A Grant– Sponsor pays and is reimbursed

• Federal Share Is 100%– No match is required– Use of other sources encouraged

• Some Activities Will Not Be Funded– Right of Way– Utility Relocations

Page 5: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Project Funding (Cont.)

• Infrastructure Projects

– Maximum of $250,000

• Non-Infrastructure Activities

– Maximum of $50,000 for local projects

– Maximum of $150,000 for regional projects

– Maximum of $200,000 for statewide projects

Page 6: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Inappropriate Use Of Funds

• Projects that do not specifically serve the stated purpose of the SRTS program

• Funds for reoccurring costs

• Projects solely to accommodate drivers or bus transportation

• Projects not within 2 miles of elementary or middle school

Page 7: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Funding Questions

• Do I have the staff to administer funding?

• Do I have funding to pay project costs until reimbursed?

• Do I have funding to support costs that will not be reimbursed?

• Do I have resources to support the continuation of the program or project?

Page 8: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

The Application

• Applicant/Sponsor Information

• Proposed Project/Activity Information

• School Information

• Detailed Information

• Sponsor Certification

Page 9: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Applicant/Sponsor Information

• APPLICANT – Can be any organization

• SPONSOR – Must be able to finance and manage project

• SCHOOL(S) – Focus of project

• LOCAL SUPPORT – Infrastructure owner

Page 10: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Proposed Project Information

• Name and description of project

• Estimated cost

• Location – House and Senate Districts

• Questions concerning R/W, MPO support, etc.

• SRTS categories for infrastructure and non-infrastructure

Page 11: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

School Information

• School District Information Including Superintendent

• General Information Concerning School(s) Affected By Project

Page 12: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Detailed Project Information

• Identify The Problem(s)

• Proposed Improvement/Activity

• Project Support

• Measures For Success

• Estimated Project Cost

Page 13: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Identify The Problem25 Points

• Identify Obstacles To Walking/Bicycling To School (8)

• Identify Safety Risks To Children Who Walk Or Bike To School (8)

• Describe Current Environment (5)

• Supply Engineering Or Other Studies Or Reports (4)

Page 14: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Proposed Improvement/Activity 30 Points

• Describe The Proposed Improvement And/Or Activities (20 Points)

• Explain How Each Of The 4 E’s Was Considered (10 Points)

Page 15: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Maps Plans And Photographs 10 Points

• Attach Project Location Maps (8)

• Include Photographs Of Existing Facilities (2)

Page 16: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Project Support10 Points

• Supporting Organizations (4)

– Include local agency support

• Maintenance responsibility and funding (4)

• Reoccurring cost estimate (2)

Page 17: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Surveillance and Evaluation10 Points

• Identify Outcomes That Will Be Measured

• Describe How They Will Be Made And Evaluated

Page 18: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Estimated Project Cost15 Points

• DETAILED COST ESTIMATE (15)– List items with description est. quantities, unit

prices and total amount– Include items for mobilization, signs and

barricades, construction layout, etc.– Use guidelines for estimates of engineering– Indicate those items being paid for with local

funds

Page 19: Louisiana  Safe Routes to School Program

Construction Costs

ITEMUNIT OF

MEASUREQUANTITY

(A)

UNIT PRICE (B)

AMOUNT(AxB)

LOCAL FUNDS

REQUESTED SRTS

FUNDS)

             

             

             

             

             

             

             

             

             

             

             

             

             

             

  Subtotal      

Mobilization (5-10%)            

Traffic Control (2-10%)            

Construction Layout (0-5%)            

Contingencies (5-10%)            

CONSTRUCTION COSTS TOTAL      

Infrastructure Cost Estimate

Page 20: Louisiana  Safe Routes to School Program

Engineering Costs TOTAL LOCAL SRTS

Preliminary Engineering10% of Total Construction

Amount      

Construction Engineering/Contingency10% of Total Construction

Amount      

ENGINEERING COSTS TOTAL      

Other Costs

Right-of-Way            

Utility Relocation            

Miscellaneous            

OTHER COSTS TOTAL      

TOTAL PROJECT COSTS Const. + Engr. + Other      

The amount in the shaded box will be the total SRTS Funding requested

Infrastructure - Other Costs

Page 21: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Page 22: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Non-Infrastructure Costs

• Non-infrastructure cost can cover a wide variety of items such as purchasing materials, equipment, training, etc.

• These costs should be itemized listing the items, quantities, price, and amounts.

Page 23: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Bonus Section 10 Points

• Attach an Action Plan– List all identified required improvements– Provide a cost estimate of each– Assign a priority– Identify possible funding sources– Propose a time frame for accomplishing

Page 24: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Certification

• The application must be certified by someone who has legal authority to enter into a contract on behalf of the Sponsor to implement the project.

Page 25: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Project Selection

• Initial Review

–Check Required Information

• Staff Evaluation

–Score Applications

–Rank Application

• Oversight Committee Review

• Sponsor Notified

Page 26: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

The Project Process

• Assure project is in STIP/TIP

• Initiate environmental process

• Process SPONSOR/STATE agreement

• Obtain federal authorization to incur charges

Page 27: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Engineering And Construction Contracts

• Federal Requirements– Chapter 1 Title 23

• State Requirements– State Constitution

• Preconstruction Services– DOTD Selects And Sponsor Contracts

• Construction– DOTD Bids And Sponsor Contracts

Page 28: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Sponsor/State Agreement

• Project Description And Scope

• Responsibility For Providing Services

• Responsibility For Providing Funds

Page 29: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

Engineering Considerations

• AASHTO Design Guides

• ADA Requirements

• DOTD Requirements

• Utility Relocations

• Right Of Way

Page 30: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

REFERENCES

• NATIONAL CENTER FOR SRTS

www.saferoutesinfo.org

• SRTS PROGRAM –FHWA – safety.FHWA.dot.gov/saferoutes/index.htm

• NATIONAL HIGHWAY TRAFFIC SAFETY ADMIN.

www.nhtsa.dot.gov/people/injury/pedbimot/bike/safe-routes-2002/toc.html

Page 31: Louisiana  Safe Routes to School Program

Louisiana Safe Routes to School Program

Department of Transportation and Development

SRTS DOTD Staff• SHALANDA COLE, MBA - SRTS Coordinator

[email protected]

– (504) 484-0204

• DENNIS BABIN, P.E. - SRTS Engineer

[email protected]

– (225) 242-4585

• BRIAN PARSONS - BICYCLE/PED. Coordinator and SRTS Program Manager

[email protected]