Vladimir SidorovInput: J. Hylen Fermilab7 High Power Targetry Workshop5 June 2018
NOVA Medium Energy Target ME-1 autopsy procedure and equipment
th
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 2
1. Target operating conditions and history
2. Purpose and Scope
3. Target autopsy facility
4. Target autopsy tools and equipment
5. Target autopsy procedure5.1 Target delivery ,installation and alignment5.2 Downstream flange removal5.3 Cameras trolley insertion5.4 Graphite fins observation
6. Graphite chip removal
7. Conclusions
Contents
NuMI-NOVA target MET-01 first saw beam on 9/2/2013, and last beam to the target was on 7/29/2016. It took 1.116 x1021 Protons at 120 GeV/Proton during that time. Proton beam spot size varied, mostly between 1.1 mm RMS and 1.3 mm RMS.Beam power was initially around 300 kW and increased to around 540 kW during the last half-year.
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 3
The target can developed a helium leak where the downstream beryllium window is e-beam welded to the aluminum flange. The leak was big enough to be seen starting on May 26, 2016.
The target was run with increasing helium leak rate until it reached about 7 liters per minute after about two weeks.
The flow was then limited to 7 liters per minute, and the pressure allowed to gradually decrease during the rest of the run, being at somewhere around a couple tenths to half a psi at the end.
Beam power during operation of MET-01.
1.Target operating conditions and history J. Hylen
2. Purpose and Scope
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 4
The purpose of this ME-1 Target autopsy phase is to investigate the condition of the target graphite fins. To observe the graphite fins, the downstream flange has to be removed. The Screw driver tool accesses the flange via the remote positioning fixture and is operated remotely by drive mechanisms and the through-wall manipulator.
DownstreamFlange
Graphite fins
3. Target autopsy facility
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 5
The ME Target is installed inside the C-0 Work cell in the front of the lead glass window and aligned with the special fixture equipped with the screw driver tool. The fixture has X-Y-Z directions movements and reachable by tele-manipulators.A mock-up target was constructed and steps practiced before starting the autopsy with the actual target.
Tele-manipulator
Fixture
Target support standTarget mock-up
Hand wrench
CaskWork cell door
Lead glass window
Tele-manipulator
Videocenter
Motors control
4. Target autopsy tools and equipment
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 6
The special Screw driver tool is designed and fabricated for this ME target autopsy. The tool is mounted on the existing remote positioning fixture inside the C-0 Work Cell. Two cameras are attached to the trolley that is inserted into the target canister for the both sides of the target fins observation. The trolley is equipped with lights . The six feet aluminum tubes with the tele-manipulator holder provides cameras delivery to the upstream end of the target.
Screw driver tool
Trolley
Camera Light
Screw driver tool Flange holder Flange support
Trolley-tubeassembly
5. Target autopsy procedure
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 7
Delivery target into the Work cell. Pick up target by crane and placed on the support stands.Align target with screw driver tool.
5.1 Target delivery installation and alignment
TargetScrew drivertool
Target
Cask
Target DS Flange
Target cart
Unscrew nine top flange screws and install flange holding bracket. Hold it with the manipulator. Unscrew all others flange screws. Moved the fixture cart with screw driver out from target. The flange is loosened from the gasket by second manipulator and placed into the support stand located in the plastic pan.
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 8
5.2 Downstream flange removal
Flange support stand Flange
Flange holder
Tele-manipulatorjaw
First the target was observed with a wall mounted camera. The cameras cart is picked up by manipulator and installed into the target canister. Cameras are moved slowly into the target canister till the upstream end of the target.
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 9
5.3 Cameras trolley insertion
Target downstream end
Target upstream end
Trolley
Graphite chip
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 10
5.4 Graphite fins observation
Target upstream end
Target downstream end
All 50 fins of the target graphite at beam level looks in very good condition.There was discoloration of the fins that appears to follow the hottest areas on the fins; not much on the fins near upstream and downstream end, and large areas on fins near shower maximum.
Shower maximum
Beam
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 11
6. Graphite chip removalThe only sign of internal damage is a chip that is believed to have come off the bottom of a fin. The bottoms of the fins are notched to set height of fin, and the notch can create a weaker point.
Example fin (un-used because it cracked before installation) to show notch.
Chip removingbracket
Gluetape
Graphite chip
7. Conclusions
8/3/2018 V.Sidorov/ NOVA ME-1 Target Autopsy Procedure and equipment 12
1. No visible radiation damage to target graphite ; Monte Carlo based estimate of about 1.1 DPA at peak.
2. The target can be used as a spare target with new downstream end flange.
8/3/2018 V.Sidorov/ NOVA Medium energy ME-1 Target autopsy procedure and equipment 13
Target autopsy team
Jim HylenTarget autopsy coordinator and maker of physics-based decisions
Vladimir SidorovEngineer, tools and equipment constructor
Cervando CastroOperator of remote tele-manipulators and crane
Mike CoburnOperator of tools motionsystems
Robert AlbrechtOperator of video recorderand second tele-manipulatoroperator
Keith AndersonVideo systemconstructor
Jim ZahuronesOperator of video recorder
Ralph FordTarget mock-upassembly
Tony BuschRadiation safety oversight