National Economic and Development Authority 28 March 2011 1 NORTH LUZON IRRIGATION PROJECT: Philippine Country Report Capacity Building Programme on the Economics of Climate Change Adaptation Supporting National/Sub-National Adaptation Planning and Action 2 nd Regional Training Workshop The Grand Milleninum Sukhumvit Hotel, Bangkok, Thailand 30 September – 4 October 2013

NORTH LUZON IRRIGATION PROJECT: Philippine Country Report

  • Upload
    fuller

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

Capacity Building Programme on the Economics of Climate Change Adaptation Supporting National/Sub-National Adaptation Planning and Action. NORTH LUZON IRRIGATION PROJECT: Philippine Country Report. 2 nd Regional Training Workshop The Grand Milleninum Sukhumvit Hotel, Bangkok, Thailand - PowerPoint PPT Presentation

Citation preview

Page 1: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 1

NORTH LUZON IRRIGATION PROJECT:

Philippine Country Report

Capacity Building Programme on the Economics of Climate Change AdaptationSupporting National/Sub-National Adaptation Planning and Action

2nd Regional Training WorkshopThe Grand Milleninum Sukhumvit Hotel, Bangkok, Thailand30 September – 4 October 2013

Page 2: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 2

Outline of the Presentation

Background Project Component and Interventions Cost and Benefit

2nd Regional Training on ECCA 01 October 2013 2

The NLIP generally intends to reduce the adverse effect of climate change and support enhanced water management in rural areas through the construction of water impounding facilities.

Specific objectives:

• Provide sustainable development in the rural areas by improving agricultural productivity;

• Increase agricultural production through the provision and improvement of irrigation and drainage infrastructure in the project area; and

• Increase farmers’ income.

Project Profile

Page 3: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 3

Outline of the Presentation

Background Project Component and Interventions Cost and Benefit

2nd Regional Training on ECCA 01 October 2013 3

Project Profile

Location: Isabela Province, Cagayan

Valley Beneficiaries: 685 to 933 families in five (5) barangays

Implementing Agency: National Government

Implementation Period: Four (4) Years

Project Cost: US$ 9.53 Million

Page 4: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 4

Outline of the Presentation

Background Project Component and Interventions Cost and Benefit

2nd Regional Training on ECCA 01 October 2013 3

Project Profile

Involves 4-year construction of:

•34-meter high earth-filled dam across the Pasa river

•Reservoir with an active storage of 4.28 mcm

•5.93 km main canal

•16.20 km lateral canals

Irrigates 980 has

Page 5: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 5

Outline of the Presentation

Background Project Component and Interventions Cost and Benefit

2nd Regional Training on ECCA 01 October 2013 4

Project Components

Page 6: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 62nd Regional Training on ECCA 01 October 2013 5

Costs and Benefits

Environmental Costs

Page 7: NORTH LUZON IRRIGATION  PROJECT: Philippine Country Report

National Economic and Development Authority 28 March 2011 7

Outline of the Presentation

Background Project Component and Interventions Cost and Benefit

2nd Regional Training on ECCA 01 October 2013 6

Thank you!