Norfolk Boreas Offshore Wind Farm
Compulsory Acquisition Objections Schedule (Version 3) (Tracked Changes) Applicant: Norfolk Boreas Limited Document Reference: ExA.CA.D72.V32
Deadline 76
Date: March 2020 Revision: Version 32 Author: Royal HaskoningDHV
Photo: Ormonde Offshore Wind Farm
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 2
Date Issue No. Remarks / Reason for Issue Author Checked Approved
26/11/19 01D First draft for review AP/PG CC/JT/JL JL
09/12/2019 02D Second draft for review AP/PG CC/JT/JL JL
09/12/2019 01F Final for submission at Deadline 2 AP JL JL
02/03/2020 02F Final for submission at Deadline 6 AP/PG CC JL
27/03/2020 03F Final for submission at Deadline 7 AP/PG CC JL
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 3
Table of Contents
1 Introduction ........................................................................................................... 5
2 Compulsory Acquisition Schedule ............................................................................ 7
Table of Tables
Table 1. Compulsory Acquisition Schedule 7
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 4
Glossary of Acronyms
CA Compulsory Acquisition
DCO Development Consent Order
HoTs Heads of Terms
LIG Land Interest Group
NFU National Farmers’ Union
OWF Offshore Wind Farm
VWPL Vattenfall Wind Power Limited
UK United Kingdom
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 5
1 Introduction
1. Norfolk Boreas Limited (‘the Applicant’, an affiliate company of Vattenfall Wind Power
Ltd (VWPL)) is seeking a Development Consent Order (DCO) for Norfolk Boreas (the
Application), an offshore wind farm (OWF) in the southern North Sea.
2. Since May 2018, prior to submission of the Application, the Applicant has been in
discussions with the landowners (and representing land agents) from whom the
Applicant requires land/rights over land to deliver the project. Discussions have
focussed around Heads of Terms (HoTs) for an option for an easement, acquisition
and lease of land.
3. Key to these discussions has been the ongoing negotiations with the Land Interest
Group (LIG), led by Savills and the National Farmers’ Union (NFU), with whom over 50
rounds of communications have been held to date.
4. In May 2018, the majority of the HoTs were issued to landowners and representatives.
5. At the time of writing on 27th 3rd March 2020 a total of 830 HoTs have been signed
with Landowners, out of the 100 total number of HoTs that the Applicant is currently
seeking; representing 830%. The total number of HoTs the applicant is seeking has
reduced by 1 since the version submitted at the start of the examination due to the
sale of land from one landowner in the scheme to another (who was already included),
removing the entirety of their interest.
6. The Applicant is also in on-going discussions with those landowners where HoTs have
not yet been agreed. The applicant remains hopeful that a number of these can be
completed before the close of the examination. Where this is not possible, the
applicant will continue to engage with the landowners in an attempt to reach an
agreement.
7. The Applicant has now agreed the final form of the Option Agreement and Deed of
Easement (subject to a few final amendments) and is working with the solicitors
representing the landowners to convert the HoTs to legal agreements as soon as
possible. The applicant remains hopeful that the large majority of HoTs can be
converted to agreements by the close of the examination.
8. The following schedule lists parties identified by the Examining Authority as having
submitted a relevant representation in respect of the Application.
9. A number of the parties listed do not hold an interest in the land required for the
project, and therefore no compulsory acquisition powers are being sought over their
land. These parties have been identified where applicable.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 6
10. A number of parties identified are tenants or occupiers of the land affected. To date
the Applicant has focussed on negotiations with the landowners of the affected land
in the first instance, however it has made contact with occupiers of land in relation to
completing an occupiers consent agreement. Of the 4239 parties who own land that
are listed, HoTs have been agreed with 362 of these.
11. A number of the parties listed refer to names which are not the same as those with a
legal interest in the affected land e.g. The Jones Family (RR-097). Where this has
occurred the legal names with whom the Applicant is seeking an agreement have
been added and cross referred if listed elsewhere (e.g. RR-097 and RR-070). This
cross referencing has been confirmed as correct in the NFU deadline 5 submission
response to written questions.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 7
2 Compulsory Acquisition Schedule
Table 1. Compulsory Acquisition Schedule
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
1 Penelope Malby 20022487 RR-004
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-004) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
2 Necton Farms Ltd 20022489 RR-009
Occupier Permanent Freehold Acquisition
Scenario 2 – 40/13 Scenario 1 & 2 – 40/14a Scenario 1 & 2 – 40/14b Scenario 1 & 2 – 40/14c Scenario 2 – 40/15 Scenario 1 & 2 – 40/16 Scenario 1 – 40/16b Scenario 1 & 2 – 40/16c Scenario 2 – 40/17 Scenario 2 – 40/18 Scenario 2 – 40/19 Scenario 2 – 40/21 Scenario 2 – 40/22 Scenario 2 – 40/22a Scenario 2 – 40/24 Scenario 1 – 40/24b
Yes Whilst to date the Applicant has been focussed on negotiations with owners of the affected land, further negotiations with Necton Farms Ltd to acquire its interest are now progressing in the form of an occupiers consent.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 8
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 40/24c Scenario 2 – 40/24d Scenario 2 – 40/25 Scenario 2 – 40/29 Scenario 2 – 40/30 Scenario 2 – 41/02 Scenario 2 – 41/04 Scenario 2 – 41/06 Scenario 2 – 41/06b Scenario 2 – 41/19 Scenario 1 & 2 – 41/26 Scenario 1 & 2 – 41/26a Scenario 1 – 41/26b Scenario 1 – 41/26d Scenario 1 – 41/26e Scenario 1 – 41/26g Scenario 2 – 41/28a Scenario 1 – 41/28b Scenario 1 – 41/28c Scenario 1 – 41/28d Scenario 2 – 41/29 Scenario 2 – 41/30a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 9
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 41/35 Scenario 2 – 41/37 Scenario 2 – 42/01
Acquisition of Permanent New Rights
Scenario 1 – 40/13a Scenario 1 & 2 – 40/14 Scenario 2 – 40/15a Scenario 2 – 40/15b Scenario 1 – 40/16a Scenario 1 – 40/19 Scenario 1 – 40/22a Scenario 2 – 40/23 Scenario 1 – 40/24a Scenario 1 – 40/24c Scenario 1 – 40/24d Scenario 1 – 40/25 Scenario 2 – 40/26 Scenario 2 – 40/27 Scenario 1 – 40/29 Scenario 1 – 40/30 Scenario 2 – 40/33a Scenario 2 – 41/01a Scenario 2 – 41/03
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 10
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 & 2 – 41/03a Scenario 2 – 41/03b Scenario 1 – 41/03c Scenario 2 – 41/05 Scenario 1 – 41/06a Scenario 1 – 41/06b Scenario 2 – 41/15 Scenario 2 – 41/28 Scenario 2 – 41/30b Scenario 2 – 41/30c Scenario 2 – 41/30d Scenario 2 – 41/40 Scenario 1 – 42/01
Acquisition of Permanent New Rights, Access Only
Scenario 1 – 41/05 Scenario 1 & 2 – 41/10 Scenario 1 & 2 – 41/11
Temporary Rights Scenario 1 – 40/13 Scenario 2 – 40/13a Scenario 1 – 40/15 Scenario 1 – 40/15b Scenario 2 – 40/15c Scenario 1 & 2 – 40/15d
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 11
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 40/17a Scenario 2 – 40/20 Scenario 1 & 2 – 40/20a Scenario 2 – 40/26a Scenario 2 – 40/27a Scenario 2 – 40/28 Scenario 2 – 40/32 Scenario 2 – 40/33 Scenario 2 – 40/33b Scenario 2 – 41/01 Scenario 2 – 41/01b Scenario 1 – 41/15 Scenario 1 & 2 – 41/18 Scenario 2 – 41/26c Scenario 1 – 41/26f Scenario 2 – 41/30 Scenario 2 – 41/30e Scenario 2 – 41/30f Scenario 2 – 41/40a Scenario 1 & 2 – 42/02 Scenario 1 & 2 – 42/03
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 12
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Rights Permanent Freehold Acquisition
Scenario 2 – 41/20 Scenario 1 – 41/23 Scenario 1 – 41/23a Scenario 1 – 41/24 Scenario 1 – 41/25 Scenario 2 – 41/28a Scenario 1 - 41/28b Scenario 1 – 41/28c Scenario 2 – 41/31 Scenario 2 – 41/34 Scenario 2 – 41/36 Scenario 2 – 41/38
Acquisition of Permanent New Rights
Scenario 2 – 41/14 Scenario 2 – 41/14a Scenario 2 – 41/14b Scenario 2 – 41/14c Scenario 1 – 41/22 Scenario 2 – 41/23 Scenario 2 – 41/23a Scenario 2 – 41/24 Scenario 2 – 41/25 Scenario 1 – 41/25a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 13
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 41/33
Acquisition of Permanent New Rights, Access Only
Scenario 1 & 2 – 41/08 Scenario 1 & 2 – 41/13 Scenario 1 – 41/14b Scenario 1 & 2 – 41/16 Scenario 2 – 41/22
Temporary Rights Scenario 1 & 2 – 41/07 Scenario 1 & 2 – 41/09 Scenario 1 – 41/14 Scenario 1 & 2 – 41/17 Scenario 2 – 41/27 Scenario 2 – 41/39
3 Polly Brockis 20022632 RR-018
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-018) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
4 Helen Savage 20022805 RR-023
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-023) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024) and the Applicant is in active dialogue with Cawston PC and Norfolk CC with respect to traffic concerns brought forward by local residents and their locally elected representatives.
5 Cadent Gas Limited 20022850 RR-024
Occupiers - Apparatus Acquisition of Permanent New Rights
05/08 06/04 09/03
Yes Agreement has been reached with Cadent which the Applicant hopes will shortly be signed to allow removal of Cadent's
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 14
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
09/15 10/01 14/20 35/15 35/16
representation.Protective provisions are being negotiated, and the parties are close to agreement. The Applicant considers that agreement will be reached by the close of the examination.
Acquisition of Permanent New Rights, Access Only
14/11
Temporary Rights (Scenario 2 only)
09/04 09/05 14/21
6 Vanessa Long 20022869 RR-026
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-026) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
7 Alison Shaw 20022884 RR-027
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR‐027) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
8 Diana Lockwood 20022886 RR-031
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR‐031) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
9 Paul King NORB-001 RR-038
Potential Rights Permanent Freehold Acquisition
Scenario 2 - 40/13 Scenario 1 & 2 – 40/14a Scenario 1 & 2 – 40/14b Scenario 1 & 2 – 40/14c
Yes The Applicant has responded to this party’s Relevant Representation (RR-038) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 15
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 40/15 Scenario 1 & 2 – 40/16 Scenario 1 – 40/16b Scenario 1 & 2 – 40/16c Scenario 2 – 40/17 Scenario 2 – 40/18 Scenario 2 – 40/19 Scenario 2 – 40/21 Scenario 2 – 40/22 Scenario 2 – 40/22a Scenario 2 – 40/24 Scenario 1 – 40/24b Scenario 2 – 40/24c Scenario 2 – 40/24d Scenario 2 – 40/25 Scenario 2 – 41/02 Scenario 2 – 41/04 Scenario 2 – 41/06 Scenario 2 – 41/06b Scenario 2 – 41/19 Scenario 2 – 41/20 Scenario 1 – 41/23
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 16
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 41/23a Scenario 1 – 41/24 Scenario 1 – 41/25 Scenario 1 & 2 – 41/26 Scenario 1 & 2 – 41/26a Scenario 1 – 41/26b Scenario 1 – 41/26d Scenario 1 – 41/26e Scenario 1 – 41/26g Scenario 2 – 41/28a Scenario 1 – 41/28b Scenario 1 – 41/28c Scenario 1 – 41/28d Scenario 2 – 41/29 Scenario 2 – 41/30a Scenario 2 – 41/31 Scenario 2 – 41/34 Scenario 2 – 41/35 Scenario 2 – 41/36 Scenario 2 – 41/37 Scenario 2 – 41/38
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 17
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Acquisition of Permanent New Rights
Scenario 1 – 40/13a Scenario 1 & 2 – 40/14 Scenario 2 – 40/15a Scenario 2 – 40/15b Scenario 1 – 40/16a Scenario 1 – 40/19 Scenario 1 – 40/22a Scenario 2 – 40/23 Scenario 1 – 40/24a Scenario 1 – 40/24c Scenario 1 – 40/24d Scenario 1 – 40/25 Scenario 2 – 40/26 Scenario 2 – 40/27 Scenario 2 – 40/33a Scenario 2 – 41/01a Scenario 2 – 41/03 Scenario 1 & 2 – 41/03a Scenario 2 – 41/03b Scenario 1 – 41/03c Scenario 2 – 41/05 Scenario 1 – 41/06a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 18
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 41/06b Scenario 2 – 41/14 Scenario 2 – 41/14a Scenario 2 – 41/14b Scenario 2 – 41/14c Scenario 2 – 41/15 Scenario 1 – 41/22 Scenario 2 – 41/23 Scenario 2 – 41/23a Scenario 2 – 41/24 Scenario 2 – 41/25 Scenario 1 – 41/25a Scenario 2 – 41/28 Scenario 2 – 41/30b Scenario 2 – 41/30c Scenario 2 – 41/30d Scenario 2 – 41/33 Scenario 2 – 41/40
Acquisition of Permanent New Rights, Access Only
Scenario 1 – 41/05 Scenario 1 & 2 – 41/08 Scenario 1 & 2 – 41/10 Scenario 1 & 2 – 41/11
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 19
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 & 2 – 41/13 Scenario 1 – 41/14b Scenario 1 & 2 – 41/16 Scenario 2 – 41/22
Temporary Rights Scenario 1 – 40/13 Scenario 2 – 40/13a Scenario 1 – 40/15 Scenario 1 – 40/15b Scenario 2 – 40/15c Scenario 1 & 2 – 40/15d Scenario 2 – 40/17a Scenario 2 – 40/20 Scenario 1 & 2 – 40/20a Scenario 2 – 40/26a Scenario 2 – 40/27a Scenario 2 – 40/33 Scenario 2 – 40/33b Scenario 2 – 41/01 Scenario 2 – 41/01b Scenario 1 & 2 – 41/07 Scenario 1 & 2 – 41/09 Scenario 1 – 41/14
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 20
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 41/15 Scenario 1 & 2 – 41/17 Scenario 1 & 2 – 41/18 Scenario 2 – 41/26c Scenario 1 – 41/26f Scenario 2 – 41/27 Scenario 2 – 41/30 Scenario 2 – 41/30e Scenario 2 – 41/30f Scenario 2 – 41/39 Scenario 2 – 41/40a
10 The Crown Estate 20022909 RR-045
Freehold Acquisition of Permanent New Rights
01/01 01/02 01/03 01/17 01/19
No The Applicant has entered into agreements for lease for the offshore parcels of land relating to the Crown and is seeking Crown consent in respect of the relevant plots under section 135 of the Planning Act 2008. The Applicant and the Crown Estate Commissioners (the Commissioners) are continuing to work together to agree a position which would provide the Commissioners with sufficient assurance as to the way in which compulsory acquisition powers of any third party interests in Crown land forming part of the Crown Estate may be exercised. This would permit the Commissioners to provide their consent to the compulsory acquisition of the third party interests in the relevant plots for the purpose of section 135(1) of the Planning Act 2008 and their consent to the provisions of the dDCO for the purpose of section 135(2) of the 2008 Act.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 21
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
11 Savills (UK) Ltd on behalf of Thomas Love
20022911 RR-055
Freehold Acquisition of Permanent New Rights
01/06
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Freehold and Occupier Acquisition of Permanent New Rights
01/07 01/08 01/10 01/11 01/13 02/01 02/02 02/03 02/04 03/02 03/05 04/05 04/08
Acquisition of Permanent New Rights, Access Only
01/15
Temporary Rights (scenario 2 only)
04/06 04/07
12 Peter Soldan 20022915 RR-053
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR‐053) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
13 Savills (UK) Ltd on behalf of Mr Charles Sayer
20022921 RR-049
Freehold and Occupier Acquisition of Permanent New Rights
27/15
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
27/13
14 Savills (UK) Ltd on behalf of Mr Cubitt Siely
20022920 RR-050
Freehold Acquisition of Permanent New Rights
01/09 02/12
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
01/14 01/16 02/06 02/07 02/08
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 22
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Freehold and Occupier Acquisition of Permanent New Rights
01/11 02/03
Acquisition of Permanent New Rights, Access Only
01/15
Occupier Acquisition of Permanent New Rights
02/09
Acquisition of Permanent New Rights, Access Only
02/10
15 Savills (UK) Ltd on behalf of Mrs C B Hart
20022919 RR-051
Freehold Acquisition of Permanent New Rights
01/05 01/18 01/20
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
16 Glenn Berry 20022923 RR-047
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR‐047) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024). The Applicant is also in communication with the party, answering questions where appropriate and directing him to relevant application and examination documents.
17 Savills (UK) Ltd on behalf of G F de Feyter & Partners
20022935 RR-065
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
06/11 06/13 07/02
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights
06/14 07/01
Temporary Rights (Scenario 2 only)
06/12
Occupier Acquisition of Permanent New Rights
03/08 03/13 04/02 04/03 04/10
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 23
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
18 Savills (UK) Ltd on behalf of E H Wenn (Happisburgh) Ltd
20022934 RR-062
Freehold and Occupier Acquisition of Permanent New Rights
03/08 03/09 03/13 04/01 04/02 04/03 04/09 04/10 04/11
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
19 Savills (UK)Ltd on behalf of HBSH Pension Scheme
20022933 RR-066
Freehold and Occupier Acquisition of Permanent New Rights
03/11 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
20 Savills (UK) Ltd on behalf of Church Farms (Gimingham) Ltd
20022932 RR-059
Occupiers Acquisition of Permanent New Rights
02/14 02/23 03/01 03/04 03/07
Yes Whilst to date the Applicant has been focussed on negotiations with owners of the affected land (and HoTs have been agreed with the owners), further negotiations with Church Farms (Gimingham) Ltd to agree an occupier's consent are now progressing.
Acquisition of Permanent New Rights, Access Only
02/15 03/03
21 Eni UK Limited 20022931 RR-063
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-063) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024). The Applicant met with Eni UK Limited on the 7th October with regards to the representation submitted. On the 3rd December 2019, the Applicant received an email from Eni UK Limited confirming that they no longer hold an interest in land affected by Norfolk Boreas. This was further confirmed by Eni UK Limited at the request of the ExA in REP5-094 at Deadline 5
22 Savills (UK) Ltd on behalf of Mrs A Green
20022930 RR-080
Freehold and Occupier Acquisition of Permanent New Rights
02/21 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 24
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Acquisition of Permanent New Rights, Access Only
02/20 both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
23 Savills (UK) Ltd on behalf of Mrs P Hinton
20022929 RR-082
Freehold Acquisition of Permanent New Rights
02/14 02/23 03/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
02/15
24 Savills (UK) Ltd on behalf of Mr G Hales
20022928 RR-072
Freehold Acquisition of Permanent New Rights
02/09
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
02/10
25 Savills (UK) Ltd on behalf of Dr G Cubitt
20022936 RR-061
Freehold Acquisition of Permanent New Rights
04/12 05/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
05/02
26 Savills (UK) Ltd on behalf of Bradenham Hall Farms
20022952 RR-058
Occupier Permanent Freehold Acquisition
Scenario 1 – 40/12c Scenario 1 – 40/12d
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement for the cable easement have been agreed and signed by the landowner. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation. Formal Heads of Terms (HoTs) for an option agreement for acquisition of land from the landowner have been issued by the Applicant and negotiations are ongoing. The Applicant is hopeful that the necessary land and rights can be acquired by agreement.
Acquisition of Permanent New Rights
37/22 38/01 38/04 38/09 38/11 39/01 39/02 39/09 39/10 39/12 39/13 40/01 40/04 40/11 40/12
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 25
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 - 40/12a Scenario 1 – 40/12b
Acquisition of Permanent New Rights, Access Only
38/02 38/05 38/08 38/12 39/04 39/05 39/06 39/07 39/15 39/16 40/02 40/03
27 Savills (UK) Ltd on behalf of L Padulli
20022951 RR-068
Freehold and Occupier Acquisition of Permanent New Rights
10/17 11/01 11/05
Yes HoTs Issued. Formal Heads of Terms (HoTs) for an option agreement have been agreed but not yet signed. It is anticipated that HoTs will be signed in the near future, following which discussions will commence to negotiate the form of Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
11/04
28 Savills (UK) Ltd on behalf of Mr M Howell (Presumed to be Dorothy May Howell and David Robert Howell)
20022950 RR-076
Freehold and Occupier Acquisition of Permanent New Rights
36/04 36/07
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
36/05 36/06 36/08 36/10 36/11
29 Savills (UK) Ltd on behalf of Diocese of Norwich
20022949 RR-060
Freehold Acquisition of Permanent New Rights
17/03 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
30 Savills (UK) Ltd on behalf of Mr R Baldwin
20022948 RR-079
Freehold and Occupier
Acquisition of Permanent New Rights
36/20 37/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway Temporary Rights
(Scenario 2 only) 36/19
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 26
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Occupier Acquisition of Permanent New Rights
36/18
between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
36/15 36/16 36/17
31 Savills (UK) Ltd on behalf of Farnham Farms Ltd
20022947 RR-064
Freehold and Occupier Acquisition of Permanent New Rights
37/07 37/09 37/16 37/18
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
37/05 37/13
Temporary Rights (Scenario 2 only)
37/03 37/04 37/06 37/10 37/12 37/15
32 Savills (UK) Ltd on behalf of Mr G Anderson (Dillington Hall Estate)
20022946 RR-071
Freehold Acquisition of Permanent New Rights
33/16 34/01 34/07 35/01 35/07
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation. Acquisition of
Permanent New Rights, Access Only
34/03 34/04 34/09 34/10 34/11 34/13
Temporary Rights (Scenario 2 only)
33/17 34/02 34/12 35/02
33 Savills (UK) Ltd on behalf of Mr P Bunting
20022945 RR-077
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
32/06 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights
32/07
34 Savills (UK) Ltd on behalf of Mr J Carrick
20022944 RR-073
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
30/04 30/05 30/06
Yes HoTs Issued. Formal Heads of Terms (HoTs) for an option agreement have been issued by the
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 27
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Applicant and negotiations are ongoing. The Applicant considers that it will be possible to reach agreement in due course.
Occupier Acquisition of Permanent New Rights
28/08 29/02
Temporary Rights (Scenario 2 only)
28/09 28/10 29/01 29/03 29/04
Acquisition of Permanent New Rights, Access Only
29/05
35 Savills (UK) Ltd on behalf of Mr & Mrs M Jones
20022943 RR-070
Freehold and Occupiers Temporary Rights (Scenario 2 only)
29/06 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
29/07 29/09 29/12 30/02
Acquisition of Permanent New Rights
29/08 29/13 30/01
36 Savills (UK) Ltd on behalf of Mrs A Jones
20022942 RR-081
Freehold Acquisition of Permanent New Rights
27/16 28/01 28/03
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
28/05
Temporary Rights (Scenario 2 only)
28/06 28/07
37 Savills (UK) Ltd on behalf of National Trust
20022941 RR-083
Freehold Temporary Rights (Scenario 2 only)
15/06 15/09
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions have commenced to complete the form of option agreement. The representation to Norfolk Boreas has also been withdrawn by the National Trust.
Acquisition of Permanent New Rights
15/07 15/10 15/13 15/15 16/03 16/08 16/09 16/10 16/13 17/01 17/02
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 28
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
17/04 17/07 18/01
Acquisition of Permanent New Rights, Access Only
15/08 15/12 15/14 16/02 16/04 16/07 16/11 16/14 17/06
Occupier Acquisition of Permanent New Rights
17/03
38 Savills (UK) Ltd on behalf of Mr P Mutimer
20022940 RR-078
Freehold Acquisition of Permanent New Rights
11/14 12/02
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
11/15 12/01
39 Savills (UK) Ltd on behalf of Albanwise Ltd
20022939 RR-057
Freehold Acquisition of Permanent New Rights, Access Only
24/17 24/18 25/01 25/03 25/05
Yes HoTs Issued. Formal Heads of Terms (HoTs) for an option agreement have been agreed but not yet signed. It is anticipated that HoTs will be signed in the near future, following which discussions will commence to negotiate the form of Option and Deed documentation.
Acquisition of Permanent New Rights
12/03 (subsoil) 12/05 (Subsoil) 24/19 25/02 25/06
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
24/13 24/15
Acquisition of Permanent New Rights
24/11
Temporary Rights (Scenario 2 only)
24/12
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 29
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Occupier Acquisition of Permanent New Rights, Access Only
11/04
Acquisition of Permanent New Rights
10/17 11/01 11/05
40 Savills (UK) Ltd on behalf of Mr M and Mrs J Ditch (Also known as the Ditch Household in row 51 below)
20022938 RR-075
Freehold and Occupier Acquisition of Permanent New Rights
09/12 09/16 10/02 10/05 10/14 10/16
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
09/13 09/14 10/07 10/09
Temporary Rights (Scenario 2 only)
10/03 10/06 10/10 10/12 10/13
41 Savills (UK) Ltd on behalf of Trustees of WM & SJ Bulwer Long 1983 Settlement Also known as the Heydon Estate in row 45)
20022958 RR-088
Freehold Acquisition of Permanent New Rights
20/06 20/07 20/09 20/10
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
19/08 20/08 20/11
Rights Acquisition of Permanent New Rights
20/03
Acquisition of Permanent New Rights, Access Only
20/05
42 Savills (UK) Ltd on behalf of Trustees of Stinton Hall Trust
20022957 RR-087
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
20/05 Yes HoTs issued. Formal Heads of Terms (HoTs) for an option agreement have been issued by the Applicant and negotiations are ongoing. The Applicant considers that it will be possible to reach agreement in due course.
Acquisition of Permanent New Rights, Access Only
21/12 21/13
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 30
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Temporary Rights (Scenario 2 only)
21/10 21/11 21/17
43 Savills (UK) Ltd on behalf of Trustees of Salle Park Trust
20022956 RR-086
Freehold and Occupier Acquisition of Permanent New Rights
21/08 20/17 20/19 20/20 21/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
20/18 20/21 21/07 21/09
Temporary Rights (Scenario 2 only)
21/02 21/04 21/06
44 Savills (UK) Ltd on behalf of Mr Kyle White
20022955 RR-074
Freehold and Occupier Acquisition of Permanent New Rights, Access Only
21/16 22/02
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
45 Savills (UK) Ltd on behalf of Heydon Estate (Also known as Trustees of WM & SJ Bulwer Long 1983 Settlement in row 41)
20022954 RR-067
Freehold Please refer to entry row 41 above
Please refer to entry row 41 above
Yes HoTs Agreed. Please refer to entry row 41 above.
46 Savills (UK) Ltd on behalf of William Youngs & Son (Farms) Ltd
20022953 RR-089
Freehold and Occupier Acquisition of Permanent New Rights
18/04 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Temporary Rights (Scenario 2 only)
18/03
47 Patricia Lockwood 20022964 RR-103
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR‐103) in the Applicant's Comments on Relevant
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 31
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Compulsory Acquisition are being sought over their land.
Representations (document reference ExA.RR.D0.V1; AS-024).
48 Addleshaw Goddard LLP on behalf of Network Rail Infrastructure Limited
20022970 RR-100
Freehold and Occupiers Acquisition of Permanent New Rights
10/04 Yes Protective provisions are being negotiated, and the Applicant considers that agreement will be reached by the close of the examination.
49 Bidwells on behalf of Christopher S Wright
20022968 RR-092
Freehold Acquisition of Permanent New Rights
12/04 12/06 24/05 (Subsoil) 24/10 (Subsoil) 24/16 (Subsoil) 25/04 (Subsoil)
Yes HoTs issued. Formal Heads of Terms (HoTs) for an option agreement have been issued by the Applicant and negotiations are ongoing. The Applicant considers that it will be possible to reach agreement in due course.
Acquisition of Permanent New Rights, Access Only
12/07
Temporary Rights (Scenario 2 only)
12/08
50 Cruso & Wilkin on behalf of David Perry Warnes
20022973 RR-093
Freehold and Occupiers Acquisition of Permanent New Rights
22/07 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
22/08
51 Savills (UK) Ltd on behalf of Ditch Household (Also known as Mr M and Mrs J Ditch in row 40 above)
20022977 RR-094
Freehold and Occupier Please refer to entry row 40 above.
Please refer to entry row 40 above.
Yes HoTs Agreed. Please refer to entry row 40 above.
52 Savills (UK) Ltd on behalf of Jones Household (Also known as Mr & Mrs M Jones in row 35 above)
20022976 RR-097
Freehold and Occupiers Please refer to entry row 35 above.
Please refer to entry row 35 above.
Yes HoTs Agreed. Please refer to entry row 35 above.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 32
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
53 Savills (UK) Ltd on behalf of Mrs P Riches
20022975 RR-098
Freehold Acquisition of Permanent New Rights
02/09 02/10
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
54 Nicola Banham 20022980 RR-105
This party has no land interest within the Order Limits for Norfolk Boreas and therefore no powers of Compulsory Acquisition are being sought over their land.
N/A N/A No The Applicant has responded to this party’s Relevant Representation (RR-105) in the Applicant's Comments on Relevant Representations (document reference ExA.RR.D0.V1; AS-024).
55 Colin King 20022983 RR-109
Potential Rights Permanent Freehold Acquisition
Scenario 2 - 40/13 Scenario 1 & 2 – 40/14a Scenario 1 & 2 – 40/14b Scenario 1 & 2 – 40/14c Scenario 2 – 40/15 Scenario 1 & 2 – 40/16 Scenario 1 – 40/16b Scenario 1 & 2 – 40/16c Scenario 2 – 40/17 Scenario 2 – 40/18 Scenario 2 – 40/19 Scenario 2 – 40/21 Scenario 2 – 40/22 Scenario 2 – 40/22a
Yes To date the Applicant has been focussed on negotiations with owners of the affected land in the first instance. This party does have third party historic rights listed on the owner's title, which are as a result of a 1972 conveyance. However the area of land over which these rights exist within the landowner's title, is currently unknown. The Applicant has investigated these rights and also requested the Land Registry to provide copies but the Land Registry have confirmed that no copies of the Conveyance were lodged on first registration, therefore there is no plan to show the precise locations referred to. The Applicant is therefore engaging with this party in order to further understand these historic rights. The plot references have been corrected to reflect the Book of Reference.
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 33
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 40/24 Scenario 1 – 40/24b Scenario 2 – 40/24c Scenario 2 – 40/24d Scenario 2 – 40/25 Scenario 2 – 41/02 Scenario 2 – 41/04 Scenario 2 – 41/06 Scenario 2 – 41/06b Scenario 2 – 41/19 Scenario 2 – 41/20 Scenario 1 – 41/23 Scenario 1 – 41/23a Scenario 1 – 41/24 Scenario 1 – 41/25 Scenario 1 & 2 – 41/26 Scenario 1 & 2 – 41/26a Scenario 1 – 41/26b Scenario 1 – 41/26d Scenario 1 – 41/26e Scenario 1 – 41/26g Scenario 2 – 41/28a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 34
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 41/28b Scenario 1 – 41/28c Scenario 1 – 41/28d Scenario 2 – 41/29 Scenario 2 – 41/30a Scenario 2 – 41/31 Scenario 2 – 41/34 Scenario 2 – 41/35 Scenario 2 – 41/36 Scenario 2 – 41/37 Scenario 2 – 41/38
Acquisition of Permanent New Rights
Scenario 1 – 40/13a Scenario 1 & 2 – 40/14 Scenario 2 – 40/15a Scenario 2 – 40/15b Scenario 1 – 40/16a Scenario 1 – 40/19 Scenario 1 – 40/22a Scenario 2 – 40/23 Scenario 1 – 40/24a Scenario 1 – 40/24c Scenario 1 – 40/24d
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 35
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 40/25 Scenario 2 – 40/26 Scenario 2 – 40/27 Scenario 2 – 40/33a Scenario 2 – 41/01a Scenario 2 – 41/03 Scenario 1 & 2 – 41/03a Scenario 2 – 41/03b Scenario 1 – 41/03c Scenario 2 – 41/05 Scenario 1 – 41/06a Scenario 1 – 41/06b Scenario 2 – 41/14 Scenario 2 – 41/14a Scenario 2 – 41/14b Scenario 2 – 41/14c Scenario 2 – 41/15 Scenario 1 – 41/22 Scenario 2 – 41/23 Scenario 2 – 41/23a Scenario 2 – 41/24 Scenario 2 – 41/25
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 36
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 1 – 41/25a Scenario 2 – 41/28 Scenario 2 – 41/30b Scenario 2 – 41/30c Scenario 2 – 41/30d Scenario 2 – 41/33 Scenario 2 – 41/40
Acquisition of Permanent New Rights, Access Only
Scenario 1 – 41/05 Scenario 1 & 2 – 41/08 Scenario 1 & 2 – 41/10 Scenario 1 & 2 – 41/11 Scenario 1 & 2 – 41/13 Scenario 1 – 41/14b Scenario 1 & 2 – 41/16 Scenario 2 – 41/22
Temporary Rights Scenario 1 – 40/13 Scenario 2 – 40/13a Scenario 1 – 40/15 Scenario 1 – 40/15b Scenario 2 – 40/15c Scenario 1 & 2 – 40/15d Scenario 2 – 40/17a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 37
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
Scenario 2 – 40/20 Scenario 1 & 2 – 40/20a Scenario 2 – 40/26a Scenario 2 – 40/27a Scenario 2 – 40/33 Scenario 2 – 40/33b Scenario 2 – 41/01 Scenario 2 – 41/01b Scenario 1 & 2 – 41/07 Scenario 1 & 2 – 41/09 Scenario 1 – 41/14 Scenario 1 – 41/15 Scenario 1 & 2 – 41/17 Scenario 1 & 2 – 41/18 Scenario 2 – 41/26c Scenario 1 – 41/26f Scenario 2 – 41/27 Scenario 2 – 41/30 Scenario 2 – 41/30e Scenario 2 – 41/30f Scenario 2 – 41/39 Scenario 2 – 41/40a
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 38
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
56 Clan Farms Ltd 20022984 RR-108
Occupier Acquisition of Permanent New Rights
05/04 05/08
Yes Whilst to date the Applicant has been focussed on negotiations with owners of the affected land (and HoTs have been agreed with the owners), further negotiations with Clan Farms Ltd to agree an occupier's consent are now progressing.
Acquisition of Permanent New Rights, Access Only
05/05 05/09
57 Mr Geoffrey Vout NORB-AFP067 N/A AS-015 Freehold Acquisition of Permanent New Rights, Access Only
22/11 Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions are underway between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights
22/12
58 James Edward Keith Freehold Acquisition of Permanent New Rights
32/08 32/10 31/11 33/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions will now commence between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
32/09 32/12 32/14 33/02 33/04
Temporary Rights (Scenario 2 only)
33/05
Occupier Acquisition of Permanent New Rights
31/11
59 Bawdeswell Estate (David Edward Brown , Kate Alice Paul and William David Winslow Barr)
FreeholdQu Acquisition of Permanent New Rights
25/07 26/01 26/03 26/09 27/07 27/09 27/11
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions will now commence between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
26/02 26/05 26/10
Temporary Rights (Scenario 2 only)
27/03 27/12
Compulsory Acquisition Objections Schedule Norfolk Boreas Offshore Wind Farm ExA.CA.D72.V32 March 2020 Page 39
Obj No.i
Name/ Organisation
IP/AP Ref Noii
RR ref Noii
WR REF Noiv
Other Doc
Ref Nov
Interestvi
Permanent/ Temporary vii
Plot(s)
CA?viii
Status of objection
60 Bawdeswell Estate (David Quintin Gurney, David Edward Brown , Kate Alice Paul and William David Winslow Barr)
Freehold Acquisition of Permanent New Rights
26/12 26/14 26/15 27/01
Yes HoTs Agreed. Formal Heads of Terms (HoTs) for an option agreement have been agreed and signed by both parties. Discussions will now commence between legal teams to agree the wording of the Option and Deed documentation.
Acquisition of Permanent New Rights, Access Only
26/04 26/06 26/11 26/13 27/04
Rights Acquisition of Permanent New Rights
26/07
Acquisition of Permanent New Rights, Access Only
26/08 27/02