14
UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRION FACULTAD DE INGENIERIA ESCUELA DE FORMACION PROFESIONAL DE INGENIERIA GEOLÓGICA INFORME DE TOPOGRAFIA GENERAL CODIGO DEL CURSO: 99203 INFORME N° 02 NOMBRE DEL INFORME: NIVELACION DE UN POLIGONO ALUMNOS: ATACHAO ALIAGA, Jho!"! #R$%&o%!'($) DEUDOR ROBLES, A"ho* FERNANDE+ CAMPOS, U( %$% LA+ARO SALCEDO, D!- . ROJAS JIMENE+, D$ % +AVALETA SCH/ART+, Jo% A"o o SEMESTRE: III 1 20 A GRUPO: JUEVES BRIGADA: B D0CENTE: I45 JULIO MARCELO AMES FECHA DE REALI+ACION: 9 1 06 7 20 FECHA DE ENTREGA: 28 1 06 1 20 CERRO DE PASCO 7 PERU 20

NIVELACION TOPOGRAFICA UNDAC

Embed Size (px)

DESCRIPTION

TRABAJO DE NIVELACIÓN DE LA ESCUELA DE GEOLOGIA UNDAC

Citation preview

UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRIONFACULTAD DE INGENIERIAESCUELA DE FORMACION PROFESIONAL DE INGENIERIA GEOLGICA

INFORME DE TOPOGRAFIA GENERAL CODIGO DEL CURSO: 99203 INFORME N 02 NOMBRE DEL INFORME: NIVELACION DE UN POLIGONO ALUMNOS: ATACHAO ALIAGA, Jhonatan (Responsable)DEUDOR ROBLES, AnthonyFERNANDEZ CAMPOS, UlisesLAZARO SALCEDO, DavidROJAS JIMENEZ, DennisZAVALETA SCHWARTZ, Jos Antonio SEMESTRE: III 2014A GRUPO: JUEVES BRIGADA: B1 D0CENTE: Ing. JULIO MARCELO AMES FECHA DE REALIZACION: 19 06 - 2014 FECHA DE ENTREGA: 25 06 2014CERRO DE PASCO - PERU2014

NIVELACION DE UN POLIGONO

2. OBJETIVOS DE LA PRCTICA:2.1 OBJETIVO PRINCIPAL:El objetivo Principal de este trabajo consiste en forma ms comn de nivelacin, se comparan varios puntos (o planos) entre s y se determina su desnivel en metros o centmetros. En el segundo caso establecemos un nuevo "valor" llamado cota que relaciona individualmente a cada uno de los hechos fsicos que forman parte de la nivelacin con otro que se toma como referencia .2.2 OBJETIVOS SECUNDARIOS:-Aprender a manejar el nivel del ingeniero.- Aprender a leer la mira, y posteriormente elaborar los calculos3. DESCRIPCION DE LA ZONA:3.1 UBICACION:Lugar: PucayacuDistrito: YanacanchaProvincia: Cerro de PascoRegin: Pasco3.2 FECHA: 19-05-143.3 CLIMA: Soleado3.4 OTROS: El rea de nuestra Poligonal est rodeada por desniveles.4. EQUIPOS E INSTRUMENTOS UTILIZADOS:4.1 NIVEL DEL INGENIERO: Elnivel topogrfico, tambin llamado nivel ptico o equialtmetro es un instrumento que tiene como finalidad la medicin dedesnivelesentre puntos que se hallan a distintas alturas o el traslado decotasde un punto conocido a otro desconocido

4.2 MIRA: Entopografa, unaestadaomira estadimtrica, tambin llamadoestadalen Latinoamrica, es una regla graduada que permite mediante unnivel topogrfico, medir desniveles, es decir, diferencias de altura. Con una mira, tambin se pueden medir distancias conmtodos trigonomtricos

4.3 TRIPODE: Eltrpodeotripi1es un aparato de tres patas y parte superior circular o triangular, que permite estabilizar un objeto y evitar el movimiento propio de este. La palabra se deriva detripous, palabra griega que significa tres pies.

5. PROCEDIMIENTO:- Primero se realiza el estacionamiento del trpode en un lugar de terreno adecuado, asi mismo ya la mira tener listo en los 4m metros.- Lueego pasamos el estacionamiento del nivel del ingeniero y posteriormente poner en sus reparos.- Se comenz a trabajar a partir del punto A hacia el punto B con la ayuda de la mira, y los diversos estacionamiento que realizamos con el nivel del ingeniero, tomndose las medidas de dicho lado, y as sucesivamente de B a C, de C a D, de D a E, de E a F, y por ultimo de F a A. - Luego con los datos de campo ya obtenidos nos pasamos a retirar para trabajarlos en gabinete y as obtener la altura del instrumento y las cotas respectivas.- La prctica concluye con la fabricacin del plano usando los datos trabajados que fueron obtenidos en campo.6. DATOS DE CAMPOBM VERTICE APUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

BM------0.9464341.229------4340.283

140.11.5884338.9873.8304337.399

218.12.0204337.1023.9054335. 082

322.753.3364340.2560.1824336.920

425.22.7704342.7740.2524340.004

5202.2654343.5691.4704341.304

A16------------0.5174343.052

SUMATORIA142.15012.925------10.156------

VERTICE A BMPUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

A------0.2404343.292------4343.052

131.40.2454339-8473.6904339.602

275.11.8814331.0390.6894339.158

BM34.4------------0.7454340.294

SUMATORIA140.9002.366------5.124------

- HALLANDO ERROR DE CIERRE (Ec) : Ec = Cota Inicial Cota Final Ec = 4340.283 4340.294 Ec = - 0.011m- HALLANDO ERROR MAXIMO (Emax) : Emax = +_ 0.02k Emax = 0.02283.050/1000 Emax = 0.011m

COMPENSANDO COTAS: Ci = ai x Ec / Dtotal Ci = ai x -0.011 / 283.050 Ci = -3.886 x 10 x aiCOTAS COMPENSADASPUNTO VISADOCOTASCiaiCOTA COMPENSADA

BM4340.283------------4340.283

14337.399-0.00240.14337.397

24335. 082-0.00258.24335. 080

34336.920-0.00380.954336.917

44340.004-0.004106.154340.000

54341.304-0.005126.154341.299

A4343.052-0.006142.154343.046

14339.602-0.008173.554339.594

24339.158-0.010248.6504339.148

BM4340.294-0.011283.0594340.283

COTA VERTICE A = 4343.046 msnm

DATOS DE LA NIVELACION DEL POLIGONO LADO A B

PUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

A------3.6204346.666------4343.046

1------3.5444346.4585.7524342.914

2------3.5474349.2600.7454345.714

3------3.5484358.5180.2904348.970

B------------------0.9154351.603

SUMATORIA136.05914.259------5.702------

LADO B CPUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

B------0.3484351.951------4351.603

1------1.3404351.6741.6174350.334

2------2.8574352.1052.4444249.230

C------------------2.0904350.015

SUMATORIA167.4524.563------6.151------

LADO C DPUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

C------1.1654351.180------4350.015

1------0.5054348.6283.0574348.123

2------0.3634345.1713.8204344.808

3------0.1414341.3753.9374341.234

4------0.1664337.9413.6004337.775

5------0.5524334.9533.5404334.401

6------0.4624332.6562.7594332.194

D------------------1.9624330.694

SUMATORIA132.4393.354------22.657------

LADO D EPUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

D------0.1854330.879------4330.694

1------3.0404330.8353.0844327.795

2------1.4364331.6040.6674330.168

E------------------0.5744331.030

SUMATORIA117.5464.661------4.325------

LADO E FPUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

E------3.7534334.783------4331.030

1------3.8374338.2770.3434334.440

2------2.7654340.6120.4304337.847

F------------------1.3264339.286

SUMATORIA126.49110.355------2.099------

LADO F APUNTO VISADODISTANCIA (m)VISTA ATRASALTURA DE INSTRUMENTOVISTA ADELANTECOTA

F------2.2154341.501------

1------3.6934341.5943.645

2------2.3234343.1750.697

A------------------0.092

SUMATORIA130.5878.231------4.434------

- HALLANDO ERROR DE CIERRE (Ec) : Ec = Cota Inicial Cota Final Ec = 4343. 046 4343.083 Ec = - 0.037m- HALLANDO ERROR MAXIMO (Emax) : Emax = +_ 0.02k Emax = 0.02810.574/1000 Emax = 0.018m

COMPENSANDO COTAS: Ci = ai x Ec / Dtotal Ci = ai x -0.037 / 810.574 Ci = -4.565 x 10 x ai

COTAS COMPENSADAS PUNTO VISADOCOTASCiaiCOTA COMPENSADA

A4343.046------------4343.046

B4351.603-0.006136.0594351.603

C4350.015-0.013303.5114350.015

D4330.694-0.020435.9504330.694

E4331.030-0.025553.4964331.030

F4339.280-0.031679.9874339.280

A4343.083-0.037810.5744343.083

-

E F A1

AA2 D

A3

A4 B C

6. OBSERVACIONES: Se encontr el terreno con desniveles, que no causaron problemas, Nuestra Poligonal colinda con el cerco perimtrico de la UNDAC y es atravesado por un camino de herradura.Posteriormente no hubo ningn otro problema durante la toma de datos aparte de que el clima estuvo nublado, y se pudo trabajar normalmente.

7. INTEGRANTES DE LA BRIGADA:ATACHAO ALIAGA, JhonatanDEUDOR ROBLES, AnthonyFERNANDEZ CAMPOS, UlisesLAZARO SALCEDO, DavidROJAS JIMENEZ, DennisZAVALETA SCHWARTZ, Jos Antonio

8. PERSONAL RESPONSABLE:ATACHAO ALIAGA, Jhonatan; asumi el cargo de libretistaDEUDOR ROBLES, Antony; asumi el cargo de la miraFERNANDEZ CAMPOS, Ulises; asumi el cargo de tomar apuntes y croquis.LAZARO SALCEDO, David; asumi el cargo de leer la mira y el nivel ROJAS JIMENEZ, Dennis; asumi el cargo de estacionamiento del trpode y nievlZAVALETA SCHWARTZ, Jos Antonio; asumi el cargo de leer el nivel

CONCLUSIONES:- El uso del nievl del ingeniero es muy importante y necesario en el levantamiento topogrfico.- Conocer los desniveles entre puntos vecinos a partir de un punto de referencia con cota (altura con respecto a un plano de referencia por debajo la tierra). Conocida o dada en forma arbitraria.

RECOMENDACIONES: Al momento de tomar las medidas se recomienda tener el la mira recto, ya que se crean muchos errores si est en mala posicin. Se recomienda marcar el lugar de posicin de la mira con el punto que le corresponde para evitar posibles errores. Trabajar en clima soleado.BIBLIOGRAFIA: http://es.wikipedia.org/wiki/Planimetr%C3%ADa. Modificada el10 de enero 2012, a las 20:46 (GMT - 4:00) Universidad Politcnica de Madrid, Espaa: "Tema 4: Nivelacin Geometrica".Recuperado el 20 de enero de 2012, a las 16:40 (GMT -4:00) de:http://ocw.upm.es/ingenieria-cartografica-geodesica-y-fotogrametria/topografia-ii/Teoria_NG_Tema4.pdf Universidad de La Repblica, Uruguay. Instituto de agrimensura. Departamento de geodesia,"Elementos de topografa, Captulo 2".Recuperado el 20 de enero de 2012, a las 19:00 (GMT -4:00) de:http://www.fing.edu.uy/ia/deptogeo/elemtopo/Cap-2.pdf http://es.wikipedia.org/wiki/Altimetr%C3%ADaModificada el 22 de diciembre 2012, a las 14:57 (GMT - 4:00)