Next-Generation Systems and Software Cost Estimation. Wilson Rosa Technical Advisor Air Force Cost Analysis Agency (AFCAA) October 28, 2008. Problem Statement. Emerging technologies such as Systems of Systems (SoS) Model Driven Architecture (MDA) Enterprise Resource Planning (ERP) - PowerPoint PPT Presentation

Citation preview

Page 1: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Headquarters U.S. Air Force

Next-Generation Systems and Software

Cost Estimation

Wilson RosaTechnical Advisor

Air Force Cost Analysis Agency (AFCAA)

October 28, 2008

Page 2: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Problem Statement

Emerging technologies such as • Systems of Systems (SoS)

• Model Driven Architecture (MDA)

• Enterprise Resource Planning (ERP)

• Service-Oriented Architecture (SOA)

• Commercial Off the Shelf (COTS)

• Design for Reuse (RUSE)

are complicating AFCAA's job of producing accurate software cost estimates

2

Page 3: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED3

Next-Generation Systems Challenges

1. Lines of Code not appropriate for Model Driven Architecture COTS-Based Systems (SOA, ERP, etc.)

2. No guidelines for estimating beyond software design: Infrastructure (servers, LAN, routers, etc.) Concurrent Users Enterprise Services (collaboration, discovery, etc.) Data Migration, External Interfaces Interoperability and Interdependency

3. Unfamiliar with total system size and cost drivers

4. Lack of Empirical Research – SOA, ERP, SoS, MDA

Page 4: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Data Challenges

AFCAA has multiple software datasetsUnable to combine software datasets because of

inconsistencies and lack of standardization Schedule seems to be reported at program and not CSCI level --

all CSCI’s have same schedule No reporting of % re-design, % re-coding, % re-test No common counting method – logical, physical, etc. No standard application type definitions No common code counting tool Product size only reported in lines of code No reporting of COCOMO, SEER, PRICE parameters No reporting of quality measures – defects, MTBF, etc.

4

Page 5: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 5

Parametric Model Challenges

Most DoD Program Offices rely on software parametric models which have not been calibrated with recent DoD data

Parametric Models only cover software design not total system – infrastructure, users, etc.

Calibration will help reduce the program office estimating error rate

Electronic Systems Center (Hanscom AFB) SEER-SEM

Aeronautical Systems Center (WPAFB) True-S

Software Technology Center (Hill AFB) Sage

Space and Missile Systems Center SEER-SEM

Page 6: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Consequence: Significant Cost Growth (%)

6

Statistics *Total System **Software OnlyMinimum -64% -80%

Mean 45% 37%

Median 27% 8%

High 471% 623%

Standard Deviation 71% 107%

Milestone Phase Development Development

Sample Size 137 111

Year of Data 1993-2003 2002-2008

Source : *John McCrillis, 36th DOD Cost Analysis Symposium (2003) **Defense Automated Cost Information System

Page 7: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Headquarters U.S. Air Force

7

Software Cost Metrics Manual

OVERVIEW

Page 8: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 8

Scope

Cost Agencies in conjunction with University of Southern California will publish a manual to help analysts develop quick software estimates using reliable metrics from recent programs

Page 9: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 9

Data Sources

Commodity Source Format Year Projects CSCIs

Space, Ground, Air Software Resource Data Reports DD-Form 2630 2002-2008 32 103

Space AEHF SEER 2008 6 53

Air F-22 EMD and Increment II Boeing 2004 13 112

Space MILSTAR SEER 1990s 4 28

Space FAB-T DD-Form 2630 2008 7 21

Space NPOESS SEER 2008 3 67

Space TSAT DD-Form 2630 2007 3 3

Air, Ground Northrop Grumman COCOMO, SEER 1997-2008 15 32

Space, Ground Raytheon COCOMO 1997-2008 33 49

Air, Ship, Ground Naval Center for Cost Analysis TECHNOMICS 1992-2001 21 68

Air Lockheed Martin COCOMO 1996-2004 2 2

Air Army Cost and Economics Analysis Center TECHNOMICS 2001-2004 16 16

Ground Future Combat System DD-Form 2630 2003-2008 13 42

Space NRO SEER TBD TBD TBD

Space, Ground Aerospace Unknown Unknown TBD TBD

Space, Ground SMC Unknown Unknown TBD TBD

Space NASA JPL Unknown Unknown TBD TBD

>168 >598Note: Expecting over 1600 CSCIs by 2010

Page 10: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 10

Data Normalization

USC will interview program offices and developers to obtain additional information…1. COCOMO II Parameters

2. Reuse Type – auto generated, re-hosted, translated, modified

3. Reuse Source – in-house, third party

4. Degree-of-Modification – %DM, %CM, %IM

5. Method – Model Driven Architecture, Object-Oriented, Traditional

Available Data1. DoDAF – System Views, Operational Views, etc.

2. Software Resource Data Report – Software Size, Effort, Schedule

3. Cost Analysis Requirements Description (CARD) System Description, Users, Infrastructure, locations, interfaces, etc.

Page 11: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 11

Software Cost Manual Content

Chapter 1: Basic Software Cost Estimation

Chapter 2: Product Size Metrics

Chapter 3: Historical Growth

Chapter 4: Default Effective Size (ESLOC) Parameters

Chapter 5: Historical Productivity Dataset

Chapter 6: Default COCOMO Parameters

Chapter 7: SLIM-ESTIMATE Calibration

Chapter 8: Risk and Uncertainty Parameters

Chapter 9: Data Cleansing

Chapter 10: Space Software Cost Estimation

Chapter 11: Software Maintenance

Page 12: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Chapter 4: ESLOC Parameters

12

Reuse Type Reuse SourceDesign

Modified Code

ModifiedIntegration Modified ESLOC

           Auto Generated In-House 0% 0% 50% 15%

Third Party 0% 0% 100% 30%

           Re-Host In-House 0% 0% 100% 30%

Third Party 0% 24% 100% 37%

           Translated In-House 0% 100% 100% 60%

Third Party 15% 100% 100% 66%

           Modified In-House 0% 100% 100% 60%

Third Party 100% 100% 100% 100%

           Unmodified In-House 0% 0% 32% 10%

Third Party 0% 0% 100% 30%

Default values from recent programsBased on Reuse Type and Reuse Source

Page 13: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED 13

Chapter 5: Historical Productivity

Overview and Guidelines Historical Productivity Dataset by ApplicationDefault Productivity Ranges by Application

IOC

CSCI Application

Productivity

(ESLOC/MM)

Raw (KSLOC) ESLOC

Effort

(MM)

Peak Effort

(FTE)Schedule

(Months)

1999 Signal Processing

Avionics 60 90000 90000 1000 69 71

2008 Spot Antenna Control

Payload 39 78000 5000 2000 95 69

2008 Bootstrap Bus 44 35000 31000 800 70 60

Page 14: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Significance of Software Cost Metrics Manual

Collected data can be used for Systems of Systems cost research

COCOMO improvement initiatives Understanding relationships between Next-

Generation Processes and COCOMO cost drivers can encourage researchers to explore new strategies to improve available cost models…

14

Page 15: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED

Way Ahead

Short Term (2009-2010) Send Software Data Call to program offices,

developers, and USC Affiliates Write Chapters 4 & 5 (2009) Publish Software Cost Metrics Manual (2010)

Long Term (2010-2012) ERP Cost Guide (2010) Impact of MDA on Software Productivity (2010) SOA Cost Study (2012)

15

Note: Any data you provide will not be attributed to your company or program, but will be combined with like data from other sources and generic zed"

Page 16: Next-Generation  Systems and Software  Cost Estimation

I n t e g r i t y - S e r v i c e - E x c e l l e n c eUNCLASSIFIED16

Backup Slides

I n t e g r i t y - S e r v i c e - E x c e l l e n c e