NERACA DAYA SISTEM PALU
Pasokan/Kebutuhan Unit 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Kebutuhan Produksi Energi GWh 155.9 168.4 176.2 190.8 206.5 223.5 243.3 265.0 288.9 315.3 344.4 376.5 Beban Puncak MW 32.3 33.2 34.5 37.3 40.3 43.5 47.2 51.2 55.6 60.5 65.9 71.8 Load Faktor % 55.0 57.9 58.3 58.4 58.5 58.7 58.9 59.1 59.3 59.5 59.7 59.9 Pasokan Kapasitas Terpasang MW 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 44.7 Pembangkit PLN Manufactu Size Jlh unit PLTD MAK 2.5 4 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 MAK 2.5 3 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Sulzer 7.6 2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 15.2 Hitachi 12 1 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Daihatsu 0.5 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Project PLN Palu PLTD 10 Palu PLTU 15 15
Jumlah Kapasitas MW 44.7 44.7 44.7 54.7 54.7 69.7 84.7 84.7 84.7 84.7 84.7 84.7 Cadangan MW 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5 14.5
Pemeliharaan 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Operasi 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Surplus/Defisit MW -2.1 -3.0 -4.3 2.9 -0.1 11.7 23.0 19.0 14.6 9.7 4.3 -1.6
NERACA DAYA SISTEM KENDARI
Pasokan/Kebutuhan Unit 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Kebutuhan
Produksi Energi GWh 2,555.7 2,709.0 2,844.5 2,986.7 3,195.8 3,419.5 3,658.8 3,914.9 4,189.0 4,482.2
Beban Puncak MW 405.2 429.5 451.0 473.5 506.7 542.2 580.1 620.7 664.2 710.7
Load Faktor % 72.0 72.0 72.0 72.0 72.0 72.0 72.0 72.0 72.0 72.0
Pasokan
Kapasitas Terpasang MW 632.7 632.7 632.7 632.7 632.5 632.5 632.5 632.5 632.5 632.5
Derating kapasitas MW 50.37 50.37 50.37 50.37 50.37 50.37 50.37 50.37 50.37 50.37
Pembangkit PLN
PLTD Pesanggaran PLTD 75.82 75.82 75.82 75.82 75.58 75.58 75.58 75.58 75.58 75.58
PLTG Pesanggaran PLTG 125.5 125.5 125.5 125.5 125.5 125.5 125.5 125.5 125.5 125.5
PLTG Gilimanuk PLTG 133.8 133.8 133.8 133.8 133.8 133.8 133.8 133.8 133.8 133.8
PLTG Pemaron PLTG 97.6 97.6 97.6 97.6 97.6 97.6 97.6 97.6 97.6 97.6
Kabel laut 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0
Project IP
PLTGU Pesanggaran PLTGU 40
PLTGU Pemaron PLTGU 30
Jumlah kapasitas MW 632.7 632.7 632.7 632.7 632.5 702.5 702.5 702.5 702.5 702.5
Cadangan MW
Pemeliharaan
Operasi
Reserve Margin % 56.2 47.3 40.3 33.6 24.8 29.6 21.1 13.2 5.8 -1.1
NERACA DAYA SISTEM BANGKA
Pasokan/Kebutuhan Unit 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Kebutuhan Produksi Energi GWh 130.8 140.3 148.8 160.8 173.8 187.8 203.9 221.3 232.4 244.0 256.2 269.0 Beban Puncak MW 26.2 28.0 29.7 32.1 34.7 37.5 40.7 44.2 46.4 48.7 51.2 53.7 Load Faktor % 57.1 57.1 57.1 57.1 57.1 57.1 57.1 57.2 57.2 57.2 57.2 57.2 Pasokan Kapasitas Terpasang MW 33.1 34.3 34.3 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 Derating Kapasitas 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 Pembangkit PLN Manufacture Size Jlh unit PLTD Niigata 2.50 1 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 M.A.K. 2.54 2 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 5.1 Mirrless 5.22 2 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4 Shinko 0.12 1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alen 5.00 3 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 Pembangkit Pemda PLTD 1.20 1 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 Sewa Pembangkit 17.7 -17.7 Retirement Project PLN Bangka PLTD
PLTU 15 15 15
Jumlah Kapasitas MW 26.5 45.4 45.4 45.3 45.3 42.6 57.6 57.6 57.6 57.6 72.6 72.6 Cadangan MW 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7
Pemeliharaan 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 Operasi 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Surplus/Defisit MW -7.3 9.7 8.0 5.5 2.9 -2.6 9.2 5.7 3.5 1.2 13.7 11.2
TABEL . 2.2
NERACA DAYA SISTEM RIAU
Pasokan/Kebutuhan Unit 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Kebutuhan Produksi Energi GWh 780.9 835.5 859.0 1,137.2 947.4 995.0 1,044.9 1,097.3 1,152.4 1,210.0 1,270.5 Beban Puncak MW 156.2 167.0 171.72 180.3 189.3 198.8 208.7 219.2 230.1 241.6 253.7 Load Faktor % 57.1 57.1 57.1 72.0 57.1 57.1 57.1 57.2 57.2 57.2 57.2 Pasokan Kapasitas Terpasang MW 164.7 164.7 164.7 164.7 164.7 164.7 164.7 164.7 164.7 164.7 164.7 Derating Kapasitas 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 Pembangkit PLN Manufacture Size Jlh unit Kaplan # 1- # 3 38.00 3 PLTA 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 114.0 Sulzer IX 7.50 1 PLTD 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 7.5 Alsthom 21.60 2 PLTG 43.2 43.2 43.2 43.2 43.2 43.2 43.2 43.2 43.2 43.2 43.2
Exess power Pertamina UP II Dumai PLTU 5 25
Jumlah Kapasitas MW 158.1 158.1 158.1 158.1 158.1 163.1 188.1 188.1 188.1 188.1 188.1 Cadangan MW 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7
Pemeliharaan 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 Operasi 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5
Surplus/Defisit MW eeww -16.7 q -29.9 -38.9 -43.4 -28.3 -38.8 -49.7 -61.2 -73.3
TABEL . 2.2
NERACA DAYA SISTEM RIAU
2013
1,334.0 266.4
57.2
164.7 6.6
114.0 7.5
43.2
188.1 7.7 5.2 2.5
-86.0
NERACA DAYA TAHUN 2005 - 2016SISTEM SUMATERA SELATAN
Uraian Unit 2005 2006 2007 2008 Kebutuhan Produksi Energi GWh 6,854 7,586 8,581 9,723 Beban Puncak MW 1,294 1,431 1,619 1,827 Load Faktor % 60 61 60 61 Pasokan Kapasitas Terpasang MW 1,810 1,810 1,518 1,518 Pembangkit PLN PLTD 273 273 PLTG 255 255 255 255 PLTU 486 486 486 486 PLTA 504 504 504 504 IPP Kaji #1 PLTG 33 33 33 33 Pertamina PLTG 12 12 Pusri PLTG 7 7 Indralaya PLTG 50 50 50 50 Palembang Timur PLTGU 150 150 150 150 Indralaya PLTG 40 40 40 40 On going Projects Project PLN Tarahan PLTU 100 100 Musi PLTA 210 Relokasi PLTG 20
Project IPP Teluk lembu PLTG 20
Rencana Project PLN Ulubelu PLTP Lumut Balai PLTP Keramasan PLTG Keramasan PLTGU Pakanbaru PLTG Padang PLTG Tegineneng PLTG Project IPP Sengeti 28 Pagar Dewa PLTG Muba PLTG 80 Gunung Megang PLTG 80 Indralaya PLTGU 120 Duri/Dumai PLTG Pakanbaru PLTGU 150 Tarahan PLTU South Sumatera PLTU
Kambang PLTU Musi Rawas PLTU Riau PLTUKerinci PLTA Jumlah Kapasitas MW 1,850 2,160 2,248 2,426 Reserve Margin % 43 51 39 33 Sumber : PT PLN (Persero) P3B Sumatera (RPTL 2005-2015)
NERACA DAYA TAHUN 2005 - 2016SISTEM SUMATERA SELATAN
2009 2010 2011 2012 2013 2014 2015
11,079 12,442 14,024 15,782 17,700 19,947 22,193 2,067 2,311 2,586 2,896 3,229 3,620 4,038
61 61 62 62 63 63 63
1,518 1,518 1,518 1,518 1,518 1,518 1,518
255 255 255 255 255 255 255 486 486 486 486 486 486 486 504 504 504 504 504 504 504
33 33 33 33 33 33 33
50 50 50 50 50 50 50 150 150 150 150 150 150 150
40 40 40 40 40 40 40
110 110
100 86
50 50 50 50 50
100 100
100
100
200 300 300
100 100 200 200
200 200 350
2,926 3,522 3,922 4,082 4,832 5,232 5,632 42 52 52 41 50 45 39
NERACA DAYA TAHUN 2005 - 2016SISTEM SUMATERA UTARA
Uraian Unit 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Kebutuhan Produksi Energi GWh 5,862.0 6,338.0 7,013.0 7,781.0 8,799.0 9,792.0 10,903.0 12,147.0 13,540.0 15,103.0 16,890.0 Beban Puncak MW 1,054.0 1,130.0 1,253.0 1,379.0 1,567.0 1,719.0 1,910.0 2,098.0 2,335.0 2,567.0 2,863.0 Load Faktor % 63.0 64.0 64 64 64 65.0 65.0 65.0 66.0 66.0 67.0 Pasokan Kapasitas Terpasang MW 1,258.0 1,258.0 1,258.0 1,258.0 850.0 850.0 850.0 850.0 850.0 850.0 850.0 Pembangkit PLN PLTD 25.0 25.0 25.0 25.0 PLTG 123.0 123.0 123.0 123.0 PLTGU 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 PLTU 260.0 260.0 260.0 260.0 PLTA 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
On going Projects Project PLN Renun PLTA 82.0 Labuhan Angin PLTU 200.0 Project IPP Sicanang PLTU 70.0 35.0
Rencana Project PLN Peusangan 1-2 86.0 Leung Bata PLTG 50.0 50.0 Asahan III PLTA 154.0 Medan PLTG 100.0 100.0 100.0 100.0 Banda Aceh PLTG 100.0 100.0 Meulaboh PLTU 200.0 200.0 Project IPP Arun PLTG 60 Sarulla PLTP 110.0 55.0 Sibolga PLTU 200.0 200.0 Sumut 100.0 100.0 Asahan I PLTA 180.0
Jumlah Kapasitas MW 1,340.0 1,560.0 1,595.0 1,855.0 1,707.0 2,042.0 2,496.0 2,782.0 2,782.0 3,182.0 3,582.0 Reserve Margin % 27 38 27 35 9 19 31 33 19 24 25 Sumber : PT PLN (Persero) P3B Sumatera (RPTL 2005-2015)
1,402.00 1,417.00
(1.06)
Komponen Unit Kapasitas Kesiapan ( % )Trafo150/TM kV 63 2,244.5 MVA 9970/TM kV - - -IBT 275/150 Kv 2 160 MVA 100
Komponen Sirkit Panjang Kesiapan ( % )Transmisi150 Kv 2 3,799 kms 9970 kV - - -
URAIAN 2004 2005 2006 2007
Pembangkit
Kapasita MW 0 300 0 0
Retired MW 300
Tambahan MW 22236 23481 26181 28651
Pertumbuh % #DIV/0! 7827 #DIV/0! #DIV/0!
Total Ins MW 685 685 685 685
Variasi M (MW) 1110 1253 1384
Forced Ou(MW) 419 473 522
Derating (MW) 2177 2427 2656
Pemelihar(MW) 0 0 0
Long Ter (MW)
Kontrak K (MW)
Kendala T(MW) - - -
LSC (MW) 17824 19354 21325
Beban Pu (MW) 0 0 0
Pertumbu% 0.0 0.0 0.0
Cadangan (MW) 17824 19354 21325
Reserve M(MW) 685 685 685
Reserve M% #DIV/0! #DIV/0! #DIV/0!
Load Fact % 113981 124612 137306
Produksi (GWh) 9 9 10
Pertumbuh% 0.0 0.0 0.0
4)5)
3)
1) 2)
2008 2009 2010 2011 2012 2013 2014 2015
0 0 0 0 0 0 0 0
31111 34311 37411 40911 44911 48911 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
685 685 820 955 955 955 0 0
1514 1684 1822 1981 2065 2253 0 0
571 635 687 747 827 907 0 0
2884 3181 3468 3792 4163 4534 0 0
0 0 0 0 0 0 0 0
- - - - - - - -
23496 25729 28355 31262 34474 38021 0 0
0 0 0 0 0 0 0 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
23496 25729 28355 31262 34474 38021 0 0
685 685 820 955 955 955 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
### ### ### 202656 223477 246468 0 0
10 10 10 10 10 10 0 0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
4)5)
5) 6)
3)
7) 8) 9) 10) 11) 12)
Instalasi Komposisi Thn 2005 Instalasi baru Thn.2005 Jumlah Unit MVA Unit MVA Unit
Gardu Induk 275 kV 0150 kV 38 2,243.5 - - 3870 kV - - - - -Jumlah 38 2,243.5 - - 38
Transformator PLN
275/150 kV 1 80 1 80 2150/70 kV - - - - -150/TM kV 63 2,244 - 0 6370/TM kV - - - - -Jumlah 64 2,324 1 80 65
Transformator Konsumen 150/TM kV 2 147.5 - - 270/TM kV - -Jumlah 2 147.5 - - 2
Instalasi Komposisi Thn 2005 Instalasi baru Thn.2005 Jumlah Sirkuit kms Sirkuit kms Sirkuit
Saluran Udara 275 kV - 0 0 - 0150 kV 72 3,725 2 122 7470 kV - - - - -Jumlah 72 3,725 2 122 74Saluran Kabel150 kV - - - - -70 kV - - - - -Jumlah - - - - -
Jumlah MVA
2,243.5 -
2,243.5
160-
2,243.5 -
2,403.5
147.5
147.5
Jumlah kms
3,799 -
3,799
---
NERACA DAYA SISTEM SORONG
Pasokan/Kebutuhan Unit 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Kebutuhan Produksi Energi GWh 76.3 81.9 84.8 87.9 91.2 94.9 99.6 104.4 109.5 115.1 121.0 127.1 Beban Puncak MW 12.5 13.0 13.4 13.9 14.4 14.9 15.7 16.4 17.2 18.1 19.0 19.9 Load Faktor % 70.0 72.0 72.4 72.4 72.4 72.5 72.5 72.6 72.6 72.7 72.8 72.9 Pasokan Kapasitas Terpasang MW 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 17.19 Derating capacity 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 1.99 Pembangkit PLN Manufacture Size Jlh unit PLTD Klademak SWD 0.54 2 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 Cockeril 1.10 2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 Daihatsu 3.00 1 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 MAN 0.50 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Klasaman MAK 2.54 3 7.6 7.6 7.6 7.6 7.6 7.6 7.6 7.6 7.6 7.6 7.6 7.6 MAK 2.80 1 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 Sewa PLTD 3.0 -3.0 Project PLN Sorong (Denmark) PLTD 5 Sorong, PLTD Barge, KE 10 PLTU 5 5 Jumlah Efektif MW 18.2 18.2 33.2 30.2 30.2 40.2 40.2 40.2 40.2 40.2 40.2 40.2 Cadangan MW 3.5 3.5 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0
Pemeliharaan 3.0 3.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Operasi 0.5 0.5 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Surplus/Defisit MW 2.3 1.7 11.8 8.3 7.8 17.3 16.5 15.8 15.0 14.1 13.2 12.3