Program Executive Office Space Systems (PEO SS) Navy Communications Satellite Program Office (PMW 146) Space-enabled capabilities for Naval, Joint and Allied Operations NDIA Program Update DISTRIBUTION STATEMENT A: Approved for public release, distribution is unlimited (17 OCTOBER 2017) CAPT Chris DeSena Mr. Eric Higgins Program Manager Deputy Program Manger [email protected] eric.higgins@navy,mil 619-524-7739 619-524-7759

NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

  • Upload
    vuque

  • View
    224

  • Download
    8

Embed Size (px)

Citation preview

Page 1: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

Program Executive Office Space Systems (PEO SS)Navy Communications Satellite Program Office (PMW 146)

Space-enabled capabilities for Naval, Joint and Allied Operations

NDIA Program Update

DISTRIBUTION STATEMENT A: Approved for public release, distribution is unlimited (17 OCTOBER 2017)

CAPT Chris DeSena Mr. Eric HigginsProgram Manager Deputy Program [email protected] eric.higgins@navy,mil619-524-7739 619-524-7759

Page 2: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

PMW 146 Portfolio

2

As Legacy capacity degrades, transition to WCDMA is critical

UHF Follow-On (UFO) JROC Requirement:72 UHF SATCOM Channels per AOR or 200 Accesses per AOR288 UHF Channels Worldwide or 800 Total Accesses Worldwide

Assumes all legacy channels are DAMA5kHz channel = 1 access and 25 kHz channel = 5 accesses

Mobile User Objective System (MUOS) JROC Threshold Requirement:3.0 Mbps in single theater (502 simultaneous accesses)

39.2 Mbps worldwide (1,997 simultaneous accesses)

Satellite Launch Age (years)

UFO-2 Sep-93 24.1

UFO-4 Jan-95 22.7UFO-8 Mar-98 19.6

UFO-10 Nov-99 17.9UFO-11 Dec-03 13.8

Satellite Launch Age (years)

MUOS-1 Feb-12 5.7MUOS-2 Jul-13 4.3MUOS-3 Jan-15 2.8MUOS-4 Sep-15 2.1MUOS-5 Jun-16 1.4

UFO (1993-TBD) Capability – Replaced the Fleet Satellite (FLTSAT) constellation – 8 Satellite architecture

– 2 satellites per AOR – 14 year design life

– 4 of 5 remaining UFOs beyond design life – UFO-2 beyond 10 degrees inclination; still providing service – Capacity augmented by FLTSAT-7, FLTSAT-8, and IS-22

MUOS (2012-TBD) Capability – Replaces the current UFO constellation – 5 satellite architecture

– 1 satellite per AOR with an on-orbit spare – 15 year design life – Two Payloads (Legacy and WCDMA)

– WCDMA has 10x capacity of Legacy – Full Operational Capability (FOC) in FY 2020

Page 3: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

MUOS Architecture

3

Page 4: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

MUOS Capabilities

• 3G cellular features

• 10x increase in capacity over UFO

• Worldwide coverage65 N to 65 S Latitude

• All IP architecture

• Priority based access

• Access to NIPRNet,SIPRNet, and DSN (Internet and Phone)

• Legacy Payload on each satellite

OS ( )

MUOS is the next generation of UHF Narrowband SATCOM System4

Page 5: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Capability Transition

From Dedicated, Circuit-based,Closed networks

To On Demand, IP Based, Adhoc Networks

Sender and Receiver must be in the same satellite footprint World-wide coverage for any Sender and Receiver

5

Page 6: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

MUOS End-to-End Capability

6

Page 7: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Spacecraft

• MUOS-1 Launched Feb 2012

• Supporting Legacy operations in Pacific slot since Nov 2012

• MUOS-2 Launched Jul 2013

• Supporting Legacy operations in CONUS slot since Jul 2014

• MUOS-3 Launched Jan 2015

• Supporting Legacy operations in Atlantic slot since Jan 2016

• MUOS-4 Launched Sep 2015

• Supporting Legacy operations in IO slot since Aug 2016

• MUOS -5 Launched Jun 2016

• Available for Legacy operations in CONUS slot by end of CY17

7

Page 8: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Ground and Satellite Control Sites

Ground Facilities Production is CompleteMUOS UPDATE (NDIA)

GGGGGGGGGGrrrooouuunnnddddddddd FFFFFFFFFaaaccciiiiiiiiillllllllliiiiiiiiitttttttiiiiiiiiieeesss PPPPPPPPPrrroooddddddddduuuccctttttttiiiiiiiiiooonnn iiiiiiiiisss CCCCCCCCCCooommmppppppppppllllllllleeettttttteeeGround Sites are Complete

Geraldton, Australia

Chesapeake, VAWahiawa, HI NAVSOC HQ, Pt Mugu, CA

NAVSOC Det Delta, CO

Ground Satellite Control

Niscemi, Italy

8

Page 9: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Waveform and Terminals

• MUOS waveformAvailable in JTNC Information RepositoryMIL-STD-188/187 published Jan 2015

Rev 1 expected to be published by end of CY17Rev 1 compliant WF v3.1.5 available by end of CY17ARSTRAT is the Certification AuthorityPMW 146 is the Test AgentMUOS labs available for MIL-STD Testing

General Dynamics in ScottsdaleSSC PAC in San Diego

• Industry Engagement Semi-Annual Technical Exchange Meeting

Focused on MIL-STD and Common Air InterfaceDeveloper Support (PKI access is required):

https://intelshare.intelink.gov/sites/muos-mil-std-community99

Page 10: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

MUOS Operational Use

• Legacy payload in operations supporting warfighter missions

• WCDMA payload accepted by USSTRATCOM for Early Combatant Command Use July 8, 2011

Approved for testing, training, exercises, and CONOPS development

Incremental expansion of operations as system and processes mature

Standard Combatant Command Acceptance expected in early FY20

10

Page 11: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Going Forward

• Transition from Legacy to WCDMA is imperativeUFO constellation is beyond design life

• MUOS terminal population will continue to growMultiple platforms – Manpack, Aircraft, Ship, SubmarineAN/PRC-117G likely first to operations with Air Force Air Combat Command, Navy Expeditionary Combatant Command, and USMC

• Interoperability will be requiredLegacy to WCMDA via DISA emerging technologies (MVG and MLGC)Exploring international partner access to WCDMA

11

Page 12: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

How Can Industry Help?

• Modern, sustainable ground infrastructureLeverage industry best practices for both hardware and softwareCybersecurity is a must

• Planning and Provisioning Tools for Narrowband SATCOM

• End User ApplicationsDefine the standardsDevelop, integrate, and verify new and existing applications

• Small and NanosatsRapid, inexpensive means to satisfy emerging Naval space needsResiliency through numbers

12

Page 13: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Summary

• MUOS is the replacement to UFO

Satellites, ground, and waveform are fielded

Waveform is integrated in multiple terminals

Legacy is supporting unrestricted Legacy operations

WCDMA is available for test, training, and exercises

WCDMA will be available for limited operational use next year

• The IP based capabilities of WCDMA will require the DoD to re-think how to use tactical Narrowband SATCOM in the future

Industry can help shape that future

13

Page 14: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

Points of Contact & Additional Info

• For additional information on MUOS:Jarratt Mowery, End-to-End Division [email protected]

• For additional information on PEO Space Systems programs/initiatives:

Austin Mroczek, APEO for S&[email protected]

• Visit the PEO website: http://www.public.navy.mil/spawar/PEOSpaceSystems/Pages/default.aspx

14

Page 15: NDIA Program Update - United States Navy€¦ · MUOS UPDATE (NDIA) PMW-146-D-17-0108 PMW 146 Portfolio 2 As Legacy capacity degrades, transition to WCDMA is critical UHF Follow-On

MUOS UPDATE (NDIA)PMW-146-D-17-0108

We influence, develop, integrate, and maintain

space-enabled capabilities for Naval, Joint

and Allied operations.