28
Submitted by the General Services Administration Final Site and Building Plans Synopsis December 3, 2015 NCPC File # 7707 St. Elizabeths West Campus Center Building Adaptive Reuse _______________

NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

Submitted by the General Services Administration

Final Site and Building Plans

Synopsis

December 3, 2015

NCPC File # 7707

St. Elizabeths West CampusCenter Building Adaptive Reuse

_______________

Page 2: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

2

Historic Topographic Plan (1860)

Page 3: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

3

St. Elizabeths Campus Plan (1860)

Page 4: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

4

Center Building - Aerial Photograph

Page 5: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

5

Master Plan - 2012

Page 6: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

6

Center Building – Construction Chronology

1882 - 1884

1859 - 1860

1856 - 1859

1855 - 1856

1871 - 18721869 –

1871

(Demolished 1965) Building Number = Red #

1 & 2

6

3

4

5

7

8

Page 7: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

7

Existing - Interior

Page 8: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

8

Interior Comparison

Page 9: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

9

Existing Conditions - Exterior

Page 10: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

10

Background

This assemblage of buildings, which consisted of patient rooms facing north and south along double loaded corridors,stretches nearly 1,000 feet and is essentially symmetrical in layout and massing. The architect for this Gothic Revival stylecomplex was Thomas U. Walter, who is noted as the 4th Architect of the US Capitol building and responsible for the designof the Capitol dome.

Page 11: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

11

The basic design intent and performance requirements documented in thissubmission are to meet the basic objectives of the government. Simply stated,these project goals are:

• Preservation – To respect architecturally significant parts of the existing buildings, particularly in the Zone 1 preservation areas in Buildings 1 & 2;

• Flexibility – To provide modern flexible work places for tenant groups, complying with accessibility, life safety and security requirements;

• Sustainability – To incorporate environmentally sustainable design with the goal of achieving LEED Gold certification.

Project Design Intent

Page 12: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

12

Proposal

Page 13: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

13

Proposal – Landscape

Page 14: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

14

Floor Plans

Page 15: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

15

Proposal - Sections

Page 16: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

16

Proposal – North Elevation, Building

Page 17: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

17

Proposal – West Elevation

Page 18: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

18

Proposal – Window Restoration

Page 19: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

19

Proposal – Window Restoration Detail

Page 20: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

20

Porte Cochere - Existing

Page 21: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

21

Porte Cochere - Proposed

Page 22: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

22

Porte Cochere – Proposed Rendering

Page 23: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

23

Roofs - Existing

Page 24: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

24

Roofs – Proposed with Security

Page 25: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

25

Roofs – Parapets

Parapet Section Detail

Page 26: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

26

Building Access

Page 27: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

27

North Entrance – Proposed

Page 28: NCPC File # 7707 St. Elizabeths West Campus · 2015-11-16 · complex was Thomas U. Walter,who is noted as the 4th Architect of the US Capitol building and responsible for the design

28

South Entrance - Proposed