Submitted by the General Services Administration
Preliminary Site Development Plans
NCPC File #: 7624
St. Elizabeths West CampusI-295 /Malcolm X Interchange Improvement Project
______________
2
Project Information
Project summary:The General Services Administration submitted for preliminary approval an access roadway project associated with theSaint Elizabeths West Campus development. This project consists of the following:
• An Off-Site Access Road through Shepherd Parkway connecting to the previously approved and constructed On-SiteAccess Road and connecting to an improved I-295/Malcolm X Interchange;
• Two retaining walls support the Off-Site Access Road: The retaining wall along the eastern side (adjacent to ShepherdParkway) is designated RW-1 and the retaining wall along the western side (between NB I-295 and the Off-Site AccessRoad) is designated RW-2. These wall heights range from less than 5 feet to as tall as 20 feet.
• I-295 Malcolm X interchange improvements, inclusive of six new bridges, one existing bridge widening, and additionalretaining walls to accommodate access to the Off-Site Access Road. These wall heights range from less than 5 feet toup to 32 feet.
• 80% of the retaining walls are less than 15 feet. The other 20% are between 15 and 32 feet.• Landscape, lighting, signage, utilities and site work within the Limits of Disturbance (LOD) associated with the
construction of these Off-Site Transportation Improvements.• More than a mile long and• Requires a land transfer from NPS
Commission meeting date: May 7, 2015
NCPC review authority: USC 40 8722 (b)(1) and (d)
Applicant request: Preliminary site development approval
Delegated / consent / open / executive session: Open
NCPC Review Officer: Hart
NCPC File number: 7624
3
Project Location
4
Existing Conditions
5
Project Area
6
Limits of Disturbance
7
Wall Heights – Northern Section
8
Wall Heights – Middle Section
9
Wall Heights – Southern Section
10
Landscape Design Concept
11
Roadway Landscaping
12
Roadway Landscaping
13
Roadway Landscaping
14
Roadway Section with Landscaping
15
Roadway Section with Landscaping
16
Area of Potential Effects
17
Detail Section
Design specifics:• Three 11-foot travel
lanes• 10-foot shared use
path• Handrails, fencing,
lighting• Bio-retention areas
18
View Simulation – Westward along Malcolm X Avenue
Existing View Proposed View
19
View Simulation – Looking eastward from JBAB
Existing View Proposed View
20
Section
21
Proposed Signage
22
Proposed Lighting