  • NATIONAL POWER TRANSMISSION CORPORATION

    NORTHERN VIET NAM POWER PROJECT MANAGEMENT BOARD

    TRANSMISSION EFFICIENCY PROJECT

    TR2-09-005B

    SUB-PROJECT

    BAC NINH 3 220KV SUBSTATION AND

    CONNECTION LINE

    ENVIRONMENTAL MANAGEMENT PLAN

    (Final)

    January 2015

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    P ub

    lic D

    is cl

    os ur

    e A

    ut ho

    riz ed

    WB406484 Typewritten Text SFG1160 v5

  • NATIONAL POWER TRANSMISSION CORPORATION

    NORTHERN VIET NAM POWER PROJECT MANAGEMENT BOARD

    TRANSMISSION EFFICIENCY PROJECT

    TR2-09-005B

    SUB-PROJECT

    BAC NINH 3 220KV SUBSTATION AND

    CONNECTION LINE

    ENVIRONMENTAL MANAGEMENT PLAN (Final)

    Power Engineering Consulting Northern Viet Nam Power Project

    Joint Stock Company 2 Management Board

    32 Ngo Thoi Nhiem St., Ward 7 04 Nguyen Khac Nhu St.,

    District 3, Ho Chi Minh City Hoan Kiem District, Ha Noi City

  • Bac Ninh 3 220kV substation and connection line

    Environmental Management Plan

    Page 1

    ABBREVIATIONS

    CP : Government

    CSC : Construction Supervision Consultant

    EVN NPT : National Power Transmission Corporation

    EMP : Environmental Management Plan

    EIA : Environmental Impact Assessment

    EHS : Environmental, Health, and Safety

    ESMF : Environmental and Social Management Frame

    MONRE : Ministry of Natural Resources and Environment

    PC : People’s Committee

    PECC2 : Power Engineering Consulting Joint Stock Company 2

    QCVN : Vietnam Codes

    QCVN QTD : Vietnam Codes and Power Process

    SEO : Safety and Environment Officer

    SEMP : Site Environmental Management Plan

    NPMB : Southern Vietnam Power Project Management Board

    TEP : Transmission Efficiency Project

    TCVN : Vietnam Standards

    VND : Vietnamese Dong

    WB : Work Bank

  • Bac Ninh 3 220kV substation and connection line

    Environmental Management Plan

    Page 2

    TABLE OF CONTENTS

    TABLE OF CONTENTS ......................................................................................................... 2

    List of tables ............................................................................................................................. 3

    Figure ........................................................................................................................................ 3

    Appendices ............................................................................................................................... 3

    II. POLICIES, REGULATIONS AND INSTITUTIONAL FRAMEWORKS ...................... 4

    2.1. Government’s Environmental Regulations................................................................... 4

    2.2. WB’s Safeguard Policy .................................................................................................. 6

    III. SUBPROJECT DESCRIPTION ....................................................................................... 8

    3.1. Objectives of the Subproject ......................................................................................... 8

    3.2. Scope of the Subproject ................................................................................................. 8

    3.3. Location of the Subproject ............................................................................................ 8

    3.4. Subproject Management and Operation ...................................................................... 8

    3.5. Scope of the Subproject ................................................................................................. 9 3.5.1. 220 kV substation ................................................................................................... 9

    3.5.2. Connection line.......................................................................................................10

    3.6. Subproject Main Activities ...........................................................................................15 3.6.1. Main activities of the subproject before and during construction period ..................15

    3.6.2. Source of equipment and material and transportation alternative .............................15

    3.6.3. Subproject Main Work Quantity .............................................................................16

    3.6.4. Employment ...........................................................................................................20

    3.7. Subproject Implementation Schedule and Total Investment ......................................21 3.7.1. Subproject Implementation Schedule ......................................................................21

    3.7.2. Total Investment .....................................................................................................21

    IV. SUBPROJECT ENVIRONMENTAL BACKGROUND .................................................21

    4.1. Geographical Location .................................................................................................21

    4.2. Climate, Topography, Pedology ...................................................................................21

    4.3. Natural Resource ..........................................................................................................22

    4.5. Environmental Baseline Data .......................................................................................25

    4.5.1 Air Environment Quality and Noise .........................................................................25

    4.5.2 Water Environment Quality .....................................................................................26

    4.6. Socio-economic Status...................................................................................................26 4.6.1. Economics ..............................................................................................................26

    4.6.2. Culture and Society ................................................................................................26

    V. POTENTIAL IMPACTS ...................................................................................................27

    VI. MITIGATION MEASURES ............................................................................................41

    VII. MONITORING PROGRAM ..........................................................................................65

    7.1. Objectives ......................................................................................................................65

    7.2. Environmental Monitoring Plan ..................................................................................65

    VIII. EMP IMPLEMENTATION ARRANGEMENTS ........................................................73

    8.1. EMP Implementation Arrangement ............................................................................73

    8.2. EMP Implementation Reporting Requirement ...........................................................75

    8.3. Capacity Building for EMP Implementation ...............................................................76

  • Bac Ninh 3 220kV substation and connection line

    Environmental Management Plan

    Page 3

    IX. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ............................77

    9.1. Public Consultation .......................................................................................................77

    9.2. Information Disclosure .................................................................................................84

    APPENDICES .........................................................................................................................85

    List of tables

    Table 3.1. Description of connection line route

    Table 3.2. Main construction items of substation

    Table 3.3. Quantity of main construction and erection of substation

    Table 3.4. Quantity of main construction and erection of connection line

    Table 3.5. Investment cost of the subproject

    Table 4.1. Land use situation on area affected by subproject

    Table 4.2. House and building affected in ROW

    Table 5.1. Potential negative impacts of the subproject

    Table 6.1. Environmental Mitigation Measures of the subproject

    Table 7.1. Environmental monitoring plan of the subproject

    Table 8.1. Responsibility for EMP implementation by different stakeholders

    Table 8.2. Reporting procedures

    Table 8.3. Proposed training of environmental management program

    Table 8.4. Cost estimate for training program

    Table 9.1. Summary of ideas of public consultation meeting

    Figure

    Figure 1.1. Location of the subproject

    Figure 4.1. Situation of paddy field at substation location

    Figure 4.2. Interi