LEGEND
APPLICATION BOUNDARY
FLOW DIRECTION
PROPOSED STOCKPIPLE
LOCATION
PROPOSED TEMPORARY
SEDIMENT FENCE
>>
PROPOSED TEMPORARY CATCH
DRAIN
PROPOSED TEMPORARY SITE
WORKS FENCE
PROPOSED TEMPORARY
SEDIMENT BASIN
PROVIDE TEMPORARY
SANDBAGS AROUND PITS:
1. AFTER PAVEMENT WORKS
ARE COMPLETE IF WORKS
ARE ONGOING UPSTREAM
2. TO EXISTING GRATED PITS
DOWNSTREAM OF
CONSTRUCTION WORKS
NOTE:
- THIS PLAN IS FOR GUIDANCE ONLY.
- SITE MANAGER TO INSTALL SEDIMENT AND
EROSION CONTROL MEASURES IN
ACCORDANCE WITH LANDCOM - MANAGING
URBAN STORMWATER "BLUE BOOK"
GUIDANCE, TO COMPLEMENT SELECTED
CONSTRUCTION METHODS AND STAGING.
STRAW BALE SEDIMENT BARRIER
CLIENT
Billard Leece
Partnership Pty Ltd
Architects & Urban Planners
www.blp.com.au
F +61 3 9656 5050
Studio 201, 50 Holt Street
Surry Hills 2010
NSW Australia
T +61 2 8096 4066
ARCHITECT
CIVIL/STRUCTURAL
ELECTRICAL/DRY FIRE/COMMS & IT/SECURITY/VERTICAL TRANSPORT
HYDRAULIC/FIRE
MECHANICAL SERVICES
T +61 2 9320 9320
PROJECT MANAGER
KEY PLAN IS NOT TO SCALE
Level 10, 201 Kent Street
Sydney, NSW 2000
Arup Pty Ltd
www.arup.com
T +61 2 9416 1177
59 Hill Street
Roseville, NSW 2069
Donnelley Simpson
Cleary Consulting
Engineers Pty Ltd
www.dsc.com.au
T +61 2 8904 1444
Level 4, 2 Glen Street
Milsons Point, NSW 2061
Enstruct Group
Pty Ltd
www.enstruct.com.au
T +61 2 9437 1000
Level 23, 101 Miller Street
North Sydney, NSW 2060
JHA Consulting
Engineers Pty Ltd
www.jhaservices.com
T +61 2 8272 9334
Level 2, 14 Martin Place
Sydney, NSW 2000
Root Partnerships
Pty Ltd
www.rootpartnerships.com.au
T +61 2 9978 5402
Level 14, 77 Pacific Highway
North Sydney, NSW 2060
www.hinfra.health.nsw.gov.au
Health Infrastructure
NSW
N
KEY PLAN
REV AMENDMENT BY DATE
0
N
REVISION DATE
Scale
@A1
10 20 30 40 50m
DRAWING NUMBER REV.
DRAWING STATUS
PROJECT NUMBER
5582
DRAWN BY
PROJECT NAME
CAMPBELLTOWN
HOSPITAL REDEVELOPMENT
DESCRIPTION
FOR INFORMATION ONLY
CHECKED BY
ZONE 1 ZONE 2
ZONE 3 ZONE 4
ZONE 5 ZONE 6
CHR-ENS-CV-DWG-
1:500
02
PRMD
21/05/2018
01 ISSUE FOR INFORMATION MD 21/05/18
EROSION AND SEDIMENT CONTROL
PLAN FOR ROADS - ZONE 5
02 MD 25/05/1840% ISSUE FOR INFORMATION
-Z05-0411
>>
>>
>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
LEGEND
APPLICATION BOUNDARY
FLOW DIRECTION
PROPOSED STOCKPIPLE
LOCATION
PROPOSED TEMPORARY
SEDIMENT FENCE
>>
PROPOSED TEMPORARY CATCH
DRAIN
PROPOSED TEMPORARY SITE
WORKS FENCE
PROPOSED TEMPORARY
SEDIMENT BASIN
PROVIDE TEMPORARY
SANDBAGS AROUND PITS:
1. AFTER PAVEMENT WORKS
ARE COMPLETE IF WORKS
ARE ONGOING UPSTREAM
2. TO EXISTING GRATED PITS
DOWNSTREAM OF
CONSTRUCTION WORKS
NOTE:
- THIS PLAN IS FOR GUIDANCE ONLY.
- SITE MANAGER TO INSTALL SEDIMENT AND
EROSION CONTROL MEASURES IN
ACCORDANCE WITH LANDCOM - MANAGING
URBAN STORMWATER "BLUE BOOK"
GUIDANCE, TO COMPLEMENT SELECTED
CONSTRUCTION METHODS AND STAGING.
STRAW BALE SEDIMENT BARRIER
CLIENT
Billard Leece
Partnership Pty Ltd
Architects & Urban Planners
www.blp.com.au
F +61 3 9656 5050
Studio 201, 50 Holt Street
Surry Hills 2010
NSW Australia
T +61 2 8096 4066
ARCHITECT
CIVIL/STRUCTURAL
ELECTRICAL/DRY FIRE/COMMS & IT/SECURITY/VERTICAL TRANSPORT
HYDRAULIC/FIRE
MECHANICAL SERVICES
T +61 2 9320 9320
PROJECT MANAGER
KEY PLAN IS NOT TO SCALE
Level 10, 201 Kent Street
Sydney, NSW 2000
Arup Pty Ltd
www.arup.com
T +61 2 9416 1177
59 Hill Street
Roseville, NSW 2069
Donnelley Simpson
Cleary Consulting
Engineers Pty Ltd
www.dsc.com.au
T +61 2 8904 1444
Level 4, 2 Glen Street
Milsons Point, NSW 2061
Enstruct Group
Pty Ltd
www.enstruct.com.au
T +61 2 9437 1000
Level 23, 101 Miller Street
North Sydney, NSW 2060
JHA Consulting
Engineers Pty Ltd
www.jhaservices.com
T +61 2 8272 9334
Level 2, 14 Martin Place
Sydney, NSW 2000
Root Partnerships
Pty Ltd
www.rootpartnerships.com.au
T +61 2 9978 5402
Level 14, 77 Pacific Highway
North Sydney, NSW 2060
www.hinfra.health.nsw.gov.au
Health Infrastructure
NSW
N
KEY PLAN
REV AMENDMENT BY DATE
0
N
REVISION DATE
Scale
@A1
10 20 30 40 50m
DRAWING NUMBER REV.
DRAWING STATUS
PROJECT NUMBER
5582
DRAWN BY
PROJECT NAME
CAMPBELLTOWN
HOSPITAL REDEVELOPMENT
DESCRIPTION
FOR INFORMATION ONLY
CHECKED BY
ZONE 1 ZONE 2
ZONE 3 ZONE 4
ZONE 5 ZONE 6
CHR-ENS-CV-DWG-
1:500
02
PRMD
21/05/2018
01 ISSUE FOR INFORMATION MD 21/05/18
EROSION AND SEDIMENT CONTROL
PLAN FOR ROADS - ZONE 6
02 MD 25/05/1840% ISSUE FOR INFORMATION
-Z06-0411