25
EROSION PREVENTION & SEDIMENT CONTROL E-1.00a

EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

EROSION PREVENTION & SEDIMENT CONTROL

E-1.00a

AutoCAD SHX Text
GENERAL EROSION PREVENTION & SEDIMENT CONTROL NOTES 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE AND IN WORKING CONDITION PRIOR TO ANY LAND DISTURBING ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE AND IN WORKING CONDITION PRIOR TO ANY LAND DISTURBING ACTIVITY INCLUDING CLEARING OR GRADING. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE APPROVED BY THE CITY EROSION SPECIALIST PRIOR TO THE COMMENCEMENT OF WORK. AN ON-SITE INSPECTION SHALL BE REQUESTED WHEN EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AND PRIOR TO COMMENCEMENT OF WORK. ONCE APPROVED, THE SITE MUST BE MAINTAINED THROUGH THE LIFE OF THE PROJECT, AS SHOWN ON THE PLANS. ADDITIONAL MEASURES MAY BE REQUIRED TO MEET THE PROVISIONS OF THE CITY EROSION PREVENTION AND SEDIMENT CONTROL ORDINANCE VMC 14.24. 2. EROSION AND SEDIMENT CONTROL BMPS SHALL BE SITED, DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS IN EROSION AND SEDIMENT CONTROL BMPS SHALL BE SITED, DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS IN THE CITY OF VANCOUVER'S LATEST VERSION OF GENERAL REQUIREMENTS AND STANDARD DETAILS MANUAL AND THE WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON, WHERE THE CITY OF VANCOUVER GENERAL REQUIREMENTS SHALL TAKE PRECEDENCE. 3. THE DEVELOPER AND/OR OWNER IS RESPONSIBLE FOR MAINTAINING EROSION PREVENTION AND SEDIMENT CONTROL BMPS DURING AND THE DEVELOPER AND/OR OWNER IS RESPONSIBLE FOR MAINTAINING EROSION PREVENTION AND SEDIMENT CONTROL BMPS DURING AND AFTER INSTALLATION OF ALL UTILITY WORK ASSOCIATED WITH UTILITY TRENCHES. 4. PRIOR TO ANY SITE EXCAVATION, ALL STORM DRAIN INLETS SHALL BE PROTECTED DOWN SLOPE FROM ANY DISTURBED OR CONSTRUCTION PRIOR TO ANY SITE EXCAVATION, ALL STORM DRAIN INLETS SHALL BE PROTECTED DOWN SLOPE FROM ANY DISTURBED OR CONSTRUCTION AREAS PER STANDARD DETAIL E-2.20 TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREAS. CLEAN INLET FILTER AS NECESSARY TO MAINTAIN DRAINAGE. REMOVE FILTER AND CLEAN CATCH BASINS FOLLOWING COMPLETION OF SITE WORK. 5. NEWLY CONSTRUCTED OR MODIFIED INLETS AND CATCH BASINS SHALL BE PROTECTED FROM SEDIMENT IMMEDIATELY UPON INSTALLATION. NEWLY CONSTRUCTED OR MODIFIED INLETS AND CATCH BASINS SHALL BE PROTECTED FROM SEDIMENT IMMEDIATELY UPON INSTALLATION. 6. THE CONTRACTOR SHALL NOT ALLOW SEDIMENT OR DEBRIS TO ENTER NEW OR EXISTING PIPES, CATCH BASINS OR INFILTRATION SYSTEMS. THE CONTRACTOR SHALL NOT ALLOW SEDIMENT OR DEBRIS TO ENTER NEW OR EXISTING PIPES, CATCH BASINS OR INFILTRATION SYSTEMS. IF THIS OCCURS, THE CONTRACTOR SHALL REMOVE ALL ACCUMULATED SEDIMENT FROM THE CATCH BASINS, DRYWELLS, AND STORM PIPES IMMEDIATELY. FINAL ACCEPTANCE WILL NOT BE ISSUED BY THE CITY UNTIL THIS OCCURS. 7. PRIOR TO LEAVING A CONSTRUCTION SITE OR PRIOR TO DISCHARGING INTO AN INFILTRATION SYSTEM, SEDIMENT-LADEN WATER SHALL PRIOR TO LEAVING A CONSTRUCTION SITE OR PRIOR TO DISCHARGING INTO AN INFILTRATION SYSTEM, SEDIMENT-LADEN WATER SHALL PASS THROUGH A SEDIMENT POND, TRAP, OR OTHER APPROVED BMP SYSTEM. 8. ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY THE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). FROM OCTOBER ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY THE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). FROM OCTOBER 1 TO APRIL 30, NO SOILS SHALL BE EXPOSED AND UNWORKED FOR MORE THAN TWO (2) DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL BE EXPOSED AND UNWORKED FOR MORE THAN SEVEN (7) DAYS. 9. SOIL STOCKPILES SHALL BE STABILIZED FROM EROSION, PROTECTED WITH SEDIMENT TRAPPING MEASURES, AND WHEN POSSIBLE, BE SOIL STOCKPILES SHALL BE STABILIZED FROM EROSION, PROTECTED WITH SEDIMENT TRAPPING MEASURES, AND WHEN POSSIBLE, BE LOCATED AWAY FROM STORM DRAIN INLETS, WATER WAYS AND DRAINAGE CHANNELS. 10. CONSTRUCTION ROADS AND PARKING AREAS SHALL BE STABILIZED WHEREVER THEY ARE CONSTRUCTED, WHETHER PERMANENT OR TEMPORARY, FOR THE USE OF CONSTRUCTION TRAFFIC. 11. IF THE BMPS APPLIED TO A SITE ARE INSUFFICIENT TO PREVENT SEDIMENT FROM REACHING WATER BODIES, ADJACENT PROPERTIES,STORM FACILITIES OR PUBLIC RIGHT-OF-WAY, THEN THE CITY SHALL REQUIRE ADDITIONAL BMPS. 12. IF THE CITY INSPECTOR OR ENGINEER(S) HAS EVIDENCE OF POOR CONSTRUCTION PRACTICES OR IMPROPER EROSION PREVENTION IF THE CITY INSPECTOR OR ENGINEER(S) HAS EVIDENCE OF POOR CONSTRUCTION PRACTICES OR IMPROPER EROSION PREVENTION BMPS, CITATIONS AND /OR A STOP WORK ORDER SHALL BE ISSUED UNTIL PROPER MEASURES HAVE BEEN TAKEN AND APPROVED BY THE CITY OF VANCOUVER. PROTECTION OF ADJACENT PROPERTIES, ROADS/STREETS AND PAVED SURFACES 13. PROVIDE A 12-INCH DEEP PAD OF CRUSHED ROCK FOR A DISTANCE OF 100 FEET INTO THE SITE FOR ALL ACCESS PROVIDE A 12-INCH DEEP PAD OF CRUSHED ROCK FOR A DISTANCE OF 100 FEET INTO THE SITE FOR ALL ACCESS POINTS UTILIZED BY CONSTRUCTION EQUIPMENT AND TRUCKS. PAD WIDTH SHALL BE A MINIMUM OF 20 FEET. ALL VEHICLES LEAVING POINTS UTILIZED BY CONSTRUCTION EQUIPMENT AND TRUCKS. PAD WIDTH SHALL BE A MINIMUM OF 20 FEET. ALL VEHICLES LEAVING THE SITE SHALL EGRESS ACROSS THE PAD. ACCUMULATED SEDIMENT SHALL BE PERIODICALLY REMOVED, OR ADDITIONAL ROCK SHALL BE PLACED UPON THE PAD SURFACE. ROCK SHALL BE CLEAN 4-INCH TO 8-INCH QUARRY SPALLS. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS SHALL BE REMOVED IMMEDIATELY. MECHANICAL BROOM SWEEPERS ARE NOT ALLOWED. 14. IF SEDIMENT, MUD OR DEBRIS IS TRANSPORTED ONTO A PAVED SURFACE OR ROADWAY, THE PAVED SURFACES SHALL BE THOROUGHLY CLEANED WITH HIGH EFFICIENCY STREET SWEEPERS AT THE END OF EACH WORKDAY, OR MORE OFTEN IF NECESSARY. PUBLICLY TRAVELED PAVED SURFACES NEED TO BE CLEANED IMMEDIATELY. SIGNIFICANT SOIL DEPOSITS SHALL BE REMOVED FROM ROADS BY SHOVELING AND SWEEPING. STREET WASHING IS NOT ALLOWED UNLESS APPROVED BY THE DIRECTOR AND ONLY AFTER SEDIMENT IS REMOVED IN THE MANNER DESCRIBED ABOVE. MECHANICAL BROOM SWEEPERS ARE NOT ALLOWED. 15. SLURRY AND CUTTINGS SHALL BE VACUUMED DURING CUTTING AND SURFACING OPERATIONS. COLLECTED SLURRY AND CUTTINGS SHALL BE DISPOSED OF IN A MANNER THAT DOES NOT VIOLATE GROUNDWATER OR SURFACE WATER QUALITY STANDARDS. 16. A WHEEL WASH MAY BE REQUIRED IF CONSTRUCTION ENTRANCE IS NOT SUFFICIENT IN PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT. WHEEL WASH SHALL BE PER STANDARD PLAN E-1.06 AND THE STORMWATER MANUAL. 17. INSTALL SEDIMENT FENCE PER STANDARD PLAN E-2.33 PRIOR TO BUILDING CONSTRUCTION AND/OR EXCAVATION TO PREVENT SILT INTRUSION UPON ADJACENT LOTS. IF CONSTRUCTION OCCURS SIMULTANEOUSLY ON ADJACENT LOTS AND THE LOTS HAVE THE SAME INTRUSION UPON ADJACENT LOTS. IF CONSTRUCTION OCCURS SIMULTANEOUSLY ON ADJACENT LOTS AND THE LOTS HAVE THE SAME OWNER DURING CONSTRUCTION, THE SILT FENCE ALONG THE COMMON LOT LINE MAY BE ELIMINATED.
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
05/15/18
AutoCAD SHX Text
KAO
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
11/01/06
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
AMG
AutoCAD SHX Text
AMG
AutoCAD SHX Text
DN
Page 2: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

EROSION PREVENTION & SEDIMENT CONTROL

E-1.00b

AutoCAD SHX Text
GENERAL EROSION PREVENTION & SEDIMENT CONTROL NOTES (CONTINUED) 18. PROPOSED PERMEABLE PAVEMENT AREAS SHALL BE SHOWN ON THE EROSION CONTROL PLAN. PERMEABLE PAVEMENT AREAS SHALL BE PROTECTED FROM SEDIMENT DURING AND AFTER INSTALLATION, UNTIL THE DEVELOPMENT CONSTRUCTION IS COMPLETED. 19. WASHOUT OF CONCRETE TRUCKS MUST BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. WASHING OUT WASHOUT OF CONCRETE TRUCKS MUST BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. WASHING OUT CONCRETE TRUCKS, CHUTES, TOOLS OR EQUIPMENT ON THE GROUND OR INTO STORM DRAINS, OPEN DITCHES, STREETS OR STREAMS IS PROHIBITED 20. SUBMIT DEWATERING PLAN PRIOR TO DISCHARGING TURBID AND CONTAMINATED STORMWATER AND GROUNDWATER OFF-SITE. TREATMENT OR DISPOSAL OPTIONS MAY INCLUDE: INFILTRATION, TRANSPORT OFF-SITE IN A VEHICLE, FOR LEGAL DISPOSAL IN A MANNER THAT DOES NOT POLLUTE STATE WATER; ECOLOGY APPROVED ON-SITE CHEMICAL TREATMENT; SANITARY OR COMBINED SEWER DISCHARGE WITH LOCAL SEWER DISTRICT APPROVAL; USE OF THE SEDIMENTATION BAG WITH OUTFALL TO A DITCH OR SWALE FOR SMALL VOLUMES OF LOCALIZED DEWATERING. 21. PERMANENT STORM WATER FACILITIES SHALL BE ISOLATED AND PROTECTED FROM SEDIMENTATION WITH AN APPROVED BMP. PERMANENT STORM WATER FACILITIES SHALL BE ISOLATED AND PROTECTED FROM SEDIMENTATION WITH AN APPROVED BMP. MAINTENANCE OF EROSION PREVENTION AND SEDIMENT CONTROL BMPS 22. ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE REGULARLY INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. 23. THE CONTRACTOR/CESCL SHALL MAINTAIN AND HAVE ON-SITE A WRITTEN LOG OF EROSION PREVENTION AND SEDIMENT CONTROL BMP MAINTENANCE. CONSTRUCTION SITES SHALL BE INSPECTED AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL EVENT. 24. ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER SITE STABILIZATION IS ACHIEVED OR AFTER TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED PER THE STORMWATER MANUAL. DUST CONTROL 25. IN AREAS SUBJECT TO SURFACE AND AIR MOVEMENT OF DUST, REFER TO THE STORMWATER MANUAL FOR DUST CONTROL BMP'S. TEMPORARY SEEDING 26. EXPOSED SURFACES THAT WILL NOT BE BROUGHT TO FINAL GRADE OR GIVEN A PERMANENT COVER TREATMENT WITHIN 30 DAYS OF THE EXPOSURE SHALL HAVE SEED MIX AND MULCH PLACED TO STABILIZE THE SOIL AND REDUCE EROSION SEDIMENTATION. SEEDED AREAS AREAS SHALL BE CHECKED REGULARLY TO ASSURE A GOOD STAND OF GRASS IS BEING MAINTAINED. AREAS THAT FAIL TO ESTABLISH VEGETATION VEGETATION COVER ADEQUATE TO PREVENT EROSION WILL BE RESEEDED AS SOON AS SUCH AREAS ARE IDENTIFIED. 27. AN APPROVED TEMPORARY SEEDING MIXTURE SHALL BE APPLIED TO THE PREPARED SEED BED AT A RATE OF 120 LBS/ACRE. NOTE: "HYDROSEEDING" APPLICATIONS WITH APPROVED SEED-MULCH-FERTILIZER MIXTURES MAY ALSO BE USED. PROTECTION OF LOW IMPACT DEVELOPMENT (LID) BMP'S 28. PROTECT ALL BIORETENTION AND RAIN GARDEN FACILITIES FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMP'S. 29. RESTORE LID FACULTIES TO FULL FUNCTIONING CONDITION IF THEY ACCUMULATE SEDIMENT DURING CONSTRUCTION. 30. MAINTAIN THE INFILTRATION CAPABILITIES OF BIORETENTION AND RAIN GARDEN FACILITIES BY PROTECTING AGAINST COMPACTION. 31. CONTROL EROSION AND PREVENT SEDIMENT FROM CONTAMINATING PERMEABLE PAVEMENTS. CLEAN PERMEABLE PAVEMENT FOULED WITH SEDIMENT OR NO LONGER PASSING AN INITIAL INFILTRATION TEST. 32. KEEP HEAVY EQUIPMENT OFF EXISTING SOILS UNDER PROPOSED LID FACILITIES THAT HAVE BEEN EXCAVATED TO FINAL GRADE TO RETAIN THE SOIL INFILTRATION RATE. 33. CLEARING LIMITS FOR CRITICAL AREAS AND THEIR BUFFERS, AND TREES THAT ARE TO BE PRESERVED WITHIN THE CONSTRUCTION AREA SHALL BE CLEARLY MARKED PRIOR TO LAND-DISTURBING ACTIVITY.
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
AMG
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
11/01/06
AutoCAD SHX Text
KAO
AutoCAD SHX Text
AMG
AutoCAD SHX Text
05/15/18
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
Page 3: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-0.10SYMBOLS

AutoCAD SHX Text
OP
AutoCAD SHX Text
LS
AutoCAD SHX Text
CD
AutoCAD SHX Text
TSD
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
OUTLET PROTECTION
AutoCAD SHX Text
CHECK DAMS
AutoCAD SHX Text
LEVEL SPREADER
AutoCAD SHX Text
C209
AutoCAD SHX Text
C208
AutoCAD SHX Text
C207
AutoCAD SHX Text
C206
AutoCAD SHX Text
TRIANGULAR SILT DIKE (GEOTEXTILE-ENCASED CHECK DAM)
AutoCAD SHX Text
FIL
AutoCAD SHX Text
FB
AutoCAD SHX Text
VS
AutoCAD SHX Text
SW
AutoCAD SHX Text
CT
AutoCAD SHX Text
STB
AutoCAD SHX Text
BB
AutoCAD SHX Text
IP
AutoCAD SHX Text
ST
AutoCAD SHX Text
SW
AutoCAD SHX Text
VS
AutoCAD SHX Text
SF
AutoCAD SHX Text
FIL
AutoCAD SHX Text
CT
AutoCAD SHX Text
SP
AutoCAD SHX Text
FB
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
3, 4
AutoCAD SHX Text
3, 4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
4
AutoCAD SHX Text
7
AutoCAD SHX Text
C234
AutoCAD SHX Text
C235
AutoCAD SHX Text
C240
AutoCAD SHX Text
C241
AutoCAD SHX Text
C250
AutoCAD SHX Text
C251
AutoCAD SHX Text
C233
AutoCAD SHX Text
VEGETATED STRIP
AutoCAD SHX Text
STRAW WATTLES
AutoCAD SHX Text
SEDIMENT TRAP
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
BRUSH BARRIER
AutoCAD SHX Text
C232
AutoCAD SHX Text
C231
AutoCAD SHX Text
C230
AutoCAD SHX Text
C220
AutoCAD SHX Text
CONSTRUCTION STORMWATER CHEMICAL TREATMENT
AutoCAD SHX Text
CONSTRUCTION STORMWATER FILTRATION
AutoCAD SHX Text
TEMPORARY SEDIMENT POND
AutoCAD SHX Text
GRAVEL FILTER BERM
AutoCAD SHX Text
STRAW BALE BARRIER
AutoCAD SHX Text
STORM DRAIN INLET PROTECTION
AutoCAD SHX Text
GT
AutoCAD SHX Text
CONCRETE HANDLING
AutoCAD SHX Text
MATERIALS ON HAND
AutoCAD SHX Text
DUST CONTROL
AutoCAD SHX Text
GRADIENT TERRACES
AutoCAD SHX Text
DC
AutoCAD SHX Text
CH
AutoCAD SHX Text
MOH
AutoCAD SHX Text
GT
AutoCAD SHX Text
DC
AutoCAD SHX Text
BZ
AutoCAD SHX Text
5
AutoCAD SHX Text
5, 6
AutoCAD SHX Text
9
AutoCAD SHX Text
FE
AutoCAD SHX Text
SWF
AutoCAD SHX Text
C151
AutoCAD SHX Text
C150
AutoCAD SHX Text
C140
AutoCAD SHX Text
C131
AutoCAD SHX Text
KEY
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
VEG
AutoCAD SHX Text
SWF
AutoCAD SHX Text
HVF
AutoCAD SHX Text
BZ
AutoCAD SHX Text
VEG
AutoCAD SHX Text
CL
AutoCAD SHX Text
WB
AutoCAD SHX Text
ID
AutoCAD SHX Text
IS
AutoCAD SHX Text
SUD
AutoCAD SHX Text
PSD
AutoCAD SHX Text
ID
AutoCAD SHX Text
IS
AutoCAD SHX Text
SUBSURFACE DRAINS
AutoCAD SHX Text
PIPE SLOPE DRAIN
AutoCAD SHX Text
WATER BARS
AutoCAD SHX Text
CHANNEL LINING
AutoCAD SHX Text
GRASS-LINED CHANNELS
AutoCAD SHX Text
INTERCEPTOR DIKE AND SWALE
AutoCAD SHX Text
SMALL PROJECT CONSTRUCTION STORMWATER POLLUTION PREVENTION
AutoCAD SHX Text
SCHEDULING
AutoCAD SHX Text
PAYMENT OF EROSION CONTROL WORK
AutoCAD SHX Text
SAW
AutoCAD SHX Text
SCL
AutoCAD SHX Text
PAY
AutoCAD SHX Text
SCH
AutoCAD SHX Text
WB
AutoCAD SHX Text
SMP
AutoCAD SHX Text
CL
AutoCAD SHX Text
GC
AutoCAD SHX Text
PSD
AutoCAD SHX Text
PAM
AutoCAD SHX Text
9
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
PC
AutoCAD SHX Text
NET
AutoCAD SHX Text
SO
AutoCAD SHX Text
C205
AutoCAD SHX Text
C204
AutoCAD SHX Text
C203
AutoCAD SHX Text
C202
AutoCAD SHX Text
C201
AutoCAD SHX Text
C200
AutoCAD SHX Text
C180
AutoCAD SHX Text
C162
AutoCAD SHX Text
C161
AutoCAD SHX Text
C160
AutoCAD SHX Text
C152
AutoCAD SHX Text
MU
AutoCAD SHX Text
SR
AutoCAD SHX Text
TO
AutoCAD SHX Text
PAM
AutoCAD SHX Text
SO
AutoCAD SHX Text
PC
AutoCAD SHX Text
NET
AutoCAD SHX Text
CRS
AutoCAD SHX Text
WW
AutoCAD SHX Text
CE
AutoCAD SHX Text
TPS
AutoCAD SHX Text
CRS
AutoCAD SHX Text
SR
AutoCAD SHX Text
TO
AutoCAD SHX Text
TPS
AutoCAD SHX Text
MU
AutoCAD SHX Text
CONTRACTOR EROSION AND SPILL CONTROL LEAD
AutoCAD SHX Text
SAWCUTTING AND SURFACING POLLUTION PREVENTION
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
CITY OF VANCOUVER SPECIFICATIONS
AutoCAD SHX Text
WESTERN WASHINGTON SWMM SPECIFICATIONS
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
BMP#
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
ELE#
AutoCAD SHX Text
C104
AutoCAD SHX Text
C103
AutoCAD SHX Text
C102
AutoCAD SHX Text
C101
AutoCAD SHX Text
BUFFER ZONES
AutoCAD SHX Text
5, 6
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5, 6
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
C130
AutoCAD SHX Text
C126
AutoCAD SHX Text
C125
AutoCAD SHX Text
C124
AutoCAD SHX Text
C123
AutoCAD SHX Text
C122
AutoCAD SHX Text
C121
AutoCAD SHX Text
C120
AutoCAD SHX Text
C107
AutoCAD SHX Text
C106
AutoCAD SHX Text
C105
AutoCAD SHX Text
TOPSOILING
AutoCAD SHX Text
SODDING
AutoCAD SHX Text
PLASTIC COVERING
AutoCAD SHX Text
NETS AND BLANKETS
AutoCAD SHX Text
MULCHING
AutoCAD SHX Text
WHEEL WASH
AutoCAD SHX Text
SURFACE ROUGHENING
AutoCAD SHX Text
POLYACRYLAMIDE FOR SOIL EROSION PROTECTION
AutoCAD SHX Text
TEMPORARY AND PERMANENT SEEDING
AutoCAD SHX Text
CONSTRUCTION ROAD / PARKING STABILIZATION
AutoCAD SHX Text
STABILIZED CONSTRUCTION ENTRANCE
AutoCAD SHX Text
STAKE AND WIRE FENCE
AutoCAD SHX Text
HIGH VISIBILITY PLASTIC OR METAL FENCE
AutoCAD SHX Text
PRESERVING NATURAL VEGETATION
AutoCAD SHX Text
5,6,8
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
06/07/04
AutoCAD SHX Text
MDH
AutoCAD SHX Text
AMG
AutoCAD SHX Text
8/10/09
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 4: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-0.20aSMALL PROJECT EROSION PREVENTION DETAIL

AutoCAD SHX Text
(DETAIL E-1.05)
AutoCAD SHX Text
MINIMUM 20 FEET IN LENGTH
AutoCAD SHX Text
STABILIZED CONSTRUCTION ACCESS
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
DETAIL E-1.23
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UNDISTURBED SOIL
AutoCAD SHX Text
SILT FENCING (DETAIL E-2.33)
AutoCAD SHX Text
INLET PROTECTION
AutoCAD SHX Text
(DETAIL E-2.20)
AutoCAD SHX Text
UNTIL PERMANENT
AutoCAD SHX Text
VEGETATION AS BUFFER
AutoCAD SHX Text
LEAVE IN NATURAL
AutoCAD SHX Text
LANDSCAPING
AutoCAD SHX Text
AND TIED DOWN
AutoCAD SHX Text
WITH PLASTIC, STAKED
AutoCAD SHX Text
STOCKPILE COVERED
AutoCAD SHX Text
CONCRETE WASTE
AutoCAD SHX Text
COLLECTION BASIN
AutoCAD SHX Text
DEBRIS/TRASH
AutoCAD SHX Text
COLLECTION AND
AutoCAD SHX Text
CONTAINMENT AREA
AutoCAD SHX Text
TYPICAL FLOW ROUTES
AutoCAD SHX Text
DISTURBED SOIL RELATED TO CONSTRUCTION
AutoCAD SHX Text
DISTURBED SOILS COVERED WITH STRAW TO STABILIZE THE SITE
AutoCAD SHX Text
COMPLETED ROADWAY
AutoCAD SHX Text
LABLE STREET ADDRESS AND CROSS STREETS
AutoCAD SHX Text
INCLUDE ON STORMWATER SITE PLAN: 1. ADD APPLICANT'S NAME AND PHONE NUMBER ADD APPLICANT'S NAME AND PHONE NUMBER 2. LABEL STREET ADDRESS AND CROSS STREETS LABEL STREET ADDRESS AND CROSS STREETS 3. TOTAL PROJECT SQUARE FOOTAGE TOTAL PROJECT SQUARE FOOTAGE 4. SHOW ALL CRITICAL AREAS (SLOPES, WETLANDS, SHORELINES) SHOW ALL CRITICAL AREAS (SLOPES, WETLANDS, SHORELINES) 5. INCLUDE TOTAL OF LAND DISTURBING IN SQUARE FEET INCLUDE TOTAL OF LAND DISTURBING IN SQUARE FEET 6. INCLUDE TOTAL OF REPLACED OR NEW PLUS REPLACED IMPERVIOUS IN SQUARE INCLUDE TOTAL OF REPLACED OR NEW PLUS REPLACED IMPERVIOUS IN SQUARE FEET.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/05/05
AutoCAD SHX Text
AMG
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
DN
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
05/08/18
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
AMG
Page 5: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-0.20bSMALL PROJECT EROSION PREVENTION DETAIL

AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
DN
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
AMG
AutoCAD SHX Text
05/08/18
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
SMALL PROJECT EROSION PREVENTION PLAN NOTES THE FOLLOWING BMP'S ARE REQUIRED FOR ALL CONSTRUCTION UNLESS IT CAN BE SHOWN THAT IT IS NOT NECESSARY: 1. CONTRACTOR SHALL CONFORM TO ALL EROSION PREVENTION AND SEDIMENT CONTROL NOTES AND DETAILS. CONTRACTOR SHALL CONFORM TO ALL EROSION PREVENTION AND SEDIMENT CONTROL NOTES AND DETAILS. AN EROSION CONTROL INSPECTION (ZON510) MUST BE SCHEDULED AND APPROVED PRIOR TO LAND DISTURBING ACTIVITY. 2. CONCRETE TRUCK CHUTES AND PUMPS SHALL BE WASHED OUT ONLY INTO A FORMED AREA. WHEN NO CONCRETE TRUCK CHUTES AND PUMPS SHALL BE WASHED OUT ONLY INTO A FORMED AREA. WHEN NO FORMED AREAS ARE AVAILABLE, WASHWATER AND LEFTOVER PRODUCT SHALL BE CONTAINED IN A LINED CONTAINER OR HAULED OFF-SITE BY CONTRACTOR. 3. PROTECT PERMEABLE PAVEMENT AND LID (LOW IMPACT DEVELOPMENT) FACILITIES IN THE ROAD AND PROTECT PERMEABLE PAVEMENT AND LID (LOW IMPACT DEVELOPMENT) FACILITIES IN THE ROAD AND DRIVEWAY. 4. A GRAVEL CONSTRUCTION ENTRANCE SHALL BE PLACED FROM THE CURB TO THE STRUCTURE PRIOR TO A GRAVEL CONSTRUCTION ENTRANCE SHALL BE PLACED FROM THE CURB TO THE STRUCTURE PRIOR TO STARTING WORK. THE ROCK MUST EXTEND THE FULL WIDTH OF THE INGRESS/EGRESS AREA (MIN. 20'). THE CONSTRUCTION ENTRANCE SHALL BE KEPT FREE OF EXCESSIVE MUD AND SHALL BE REPAIRED TO GOOD WORKING CONDITION AS NECESSARY. IF IT IS DISCOVERED THAT THE CONSTRUCTION ENTRANCE IS BEING CIRCUMVENTED, CONSTRUCTION FENCING WILL BE IMMEDIATELY REQUIRED AROUND THE ENTIRE PROPERTY PERIMETER. 5. SILT FENCE SHALL BE INSTALLED ON THE ENTIRE FRONTAGE OF ALL IMPERVIOUS SURFACES. THE PURPOSE SILT FENCE SHALL BE INSTALLED ON THE ENTIRE FRONTAGE OF ALL IMPERVIOUS SURFACES. THE PURPOSE OF THIS FENCE IS TO PROTECT NEIGHBORING PROPERTIES, CRITICAL AREAS AND RIGHT-OF-WAYS FROM SEDIMENT DEPOSITS, DELINEATE CLEARING LIMITS, AND TO CHANNEL ALL CONSTRUCTION TRAFFIC TO THE GRAVEL CONSTRUCTION ENTRANCE. 6. CATCH BASIN INSERTS MUST BE INSTALLED (SEE DETAIL E2.20A AND/OR E2.20B) CATCH BASIN INSERTS. CATCH BASIN INSERTS MUST BE INSTALLED (SEE DETAIL E2.20A AND/OR E2.20B) CATCH BASIN INSERTS. INLET PROTECTION SHALL BE MAINTAINED OR REPLACED AS NECESSARY UNTIL FINAL LANDSCAPING IS APPROVED. 7. ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY THE APPROPRIATE BEST MANAGEMENT ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY THE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). FROM OCTOBER 1 TO APRIL 30, NO SOILS SHALL BE EXPOSED AND UNWORKED FOR MORE THAN TWO (2) DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL BE EXPOSED AND UNWORKED FOR MORE THAN SEVEN (7) DAYS. SOIL STOCKPILES MUST BE COVERED BY THE END OF EACH WORKDAY. 8. PROTECT EXISTING AND PROPOSED LID STRUCTURES AND SYSTEMS FROM COMPACTION AND SEDIMENTATION. PROTECT EXISTING AND PROPOSED LID STRUCTURES AND SYSTEMS FROM COMPACTION AND SEDIMENTATION. AVOID DRIVING CONSTRUCTION EQUIPMENT OVER LID (LOW IMPACT DEVELOPMENT) STRUCTURES AND SYSTEMS. 9. AN ABBREVIATED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MAY BE REQUIRED. THE AN ABBREVIATED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MAY BE REQUIRED. THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS A SEPARATE CHECKLIST THAT DESCRIBES HOW EROSION, SEDIMENT AND STORMWATER WILL BE CONTROLLED DURING CONSTRUCTION. THE FORM IS AVAILABLE AT THE CITY OF VANCOUVER'S PERMIT COUNTER. 10. THE CONTRACTOR/CESCL SHALL MAINTAIN AND HAVE ON-SITE A WRITTEN LOG OF EROSION PREVENTION THE CONTRACTOR/CESCL SHALL MAINTAIN AND HAVE ON-SITE A WRITTEN LOG OF EROSION PREVENTION AND SEDIMENT CONTROL BMP MAINTENANCE. 11. SUBMIT A DEWATERING PLAN PRIOR TO DISCHARGING TURBID AND CONTAMINATED STORMWATER AND SUBMIT A DEWATERING PLAN PRIOR TO DISCHARGING TURBID AND CONTAMINATED STORMWATER AND GROUNDWATER OFF-SITE. TREATMENT OR DISPOSAL OPTIONS MAY INCLUDE: INFILTRATION, TRANSPORT OFF-SITE IN A VEHICLE, FOR LEGAL DISPOSAL IN A MANNER THAT DOES NOT POLLUTE STATE WATER; ECOLOGY APPROVED ON-SITE CHEMICAL TREATMENT; SANITARY OR COMBINED SEWER DISCHARGE WITH LOCAL SEWER DISTRICT APPROVAL; USE OF THE SEDIMENTATION BAG WITH OUTFALL TO A DITCH OR SWALE FOR SMALL VOLUMES OF LOCALIZED DEWATERING. 12. CONSIDER THE PLACEMENT OF STRAW WATTLES BEHIND CURBING AND AT DRIVEWAY DROPS DURING THE CONSIDER THE PLACEMENT OF STRAW WATTLES BEHIND CURBING AND AT DRIVEWAY DROPS DURING THE WET SEASON (OCTOBER 1ST-APRIL 30TH). 13. ADDITIONAL BMP'S MAY BE REQUIRED WHERE THOSE LISTED DO NOT ADEQUATELY PROTECT AGAINST EROSION ADDITIONAL BMP'S MAY BE REQUIRED WHERE THOSE LISTED DO NOT ADEQUATELY PROTECT AGAINST EROSION AND SEDIMENT CONTROL. 14. IN AREA SUBJECT TO SURFACE AND AIR MOVEMENT OF DUST, REFER TO THE STORMWATER MANUAL FOR IN AREA SUBJECT TO SURFACE AND AIR MOVEMENT OF DUST, REFER TO THE STORMWATER MANUAL FOR DUST CONTROL BMP'S (BEST MANAGEMENT). CONTROL BMP'S (BEST MANAGEMENT). 15. MARK ALL CLEARING LIMITS FOR CRITICAL AREAS AND THEIR BUFFERS, AND TREES THAT ARE TO BE MARK ALL CLEARING LIMITS FOR CRITICAL AREAS AND THEIR BUFFERS, AND TREES THAT ARE TO BE PRESERVED WITHIN THE CONSTRUCTION AREA.
Page 6: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-1.05STABILIZED CONSTRUCTION ENTRANCE

AutoCAD SHX Text
1. IF THE ENTRANCE SITS ON A SLOPE, PLACE A FILTER FABRIC FENCE DOWN GRADIENT. IF THE ENTRANCE SITS ON A SLOPE, PLACE A FILTER FABRIC FENCE DOWN GRADIENT. 2. TOP DRESS THE PAD WITH CLEAN 3" MINUS ROCK WHEN THE CONSTRUCTION ENTRANCE TOP DRESS THE PAD WITH CLEAN 3" MINUS ROCK WHEN THE CONSTRUCTION ENTRANCE BECOMES CLOGGED WITH SEDIMENTS. 3. ANY SEDIMENT CARRIED FROM THE SITE ONTO THE STREET OR PAVED SURFACES SHALL BE ANY SEDIMENT CARRIED FROM THE SITE ONTO THE STREET OR PAVED SURFACES SHALL BE CLEANED UP IMMEDIATELY. 4. IF EQUIPMENT TRAVELS EXTENSIVELY ON UNSTABILIZED ROADS ON THE SITE, A TIRE AND IF EQUIPMENT TRAVELS EXTENSIVELY ON UNSTABILIZED ROADS ON THE SITE, A TIRE AND VEHICLE UNDERCARRIAGE WASH NEAR THE ENTRANCE WILL BE NEEDED. PERFORM WASHING ON CRUSHED ROCK. WASH WATER WILL REQUIRE TREATMENT IN A SEDIMENT POND OR TRAP. 5. WHERE CONSTRUCTION ACCESS ABUTS A CURB, MINIMUM 2" DIAMETER PVC AND AND COLD-PATCH ASPHALT SHOULD BE USED TO CONSTRUCT THE APPROACH IN ORDER TO PROTECT IN ORDER TO PROTECT THE CURB AND MINIMIZE OBSTRUCTION TO STORMWATER FLOW IN THE GUTTER. STORMWATER FLOW IN THE GUTTER. 6. TRUCKS LEAVING THE SITE SHALL EGRESS ACROSS THE FULL LENGTH OF THE PAD. PAD. 7. SINGLE FAMILY LOT ENTRANCES MAY HAVE THE PAD LENGTH REDUCED TO 2 0 FEET IN LENGTH AND ROCK SHALL BE CLEANED 2 INCH TO 4INCH.0 FEET IN LENGTH AND ROCK SHALL BE CLEANED 2 INCH TO 4INCH.
AutoCAD SHX Text
100' MIN.
AutoCAD SHX Text
20' MIN.
AutoCAD SHX Text
R = 25' MIN.
AutoCAD SHX Text
EXISTING ROAD
AutoCAD SHX Text
12" MIN. THICKNESS
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
4"-8" QUARRY SPALLS
AutoCAD SHX Text
INSTALL DRIVEWAY CULVERT IF
AutoCAD SHX Text
THERE IS A ROADSIDE DITCH
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
PRESENT
AutoCAD SHX Text
DRIVEWAYS SHALL BE PAVED TO THE EDGE OF R-O-W PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY.
AutoCAD SHX Text
IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD.
AutoCAD SHX Text
PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/06/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 7: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

WHEEL WASH

E-1.06

AutoCAD SHX Text
3'
AutoCAD SHX Text
5'
AutoCAD SHX Text
12'
AutoCAD SHX Text
18'
AutoCAD SHX Text
50'
AutoCAD SHX Text
15'
AutoCAD SHX Text
20'
AutoCAD SHX Text
15'
AutoCAD SHX Text
15'
AutoCAD SHX Text
1:1 SLOPE
AutoCAD SHX Text
9
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
1 1/2" SCHEDULE 40 FOR SPRAYERS
AutoCAD SHX Text
3
AutoCAD SHX Text
2" SCHEDULE 40
AutoCAD SHX Text
LEGEND: 1. ASPHALT CONSTRUCTION ENTRANCE 6 IN. ASPHALT TREATED BASE (ATB). ASPHALT CONSTRUCTION ENTRANCE 6 IN. ASPHALT TREATED BASE (ATB). 2. 3 IN. TRASH PUMP WITH FLOATS ON THE SUCTION HOSE. 3 IN. TRASH PUMP WITH FLOATS ON THE SUCTION HOSE. 3. MIDPOINT SPRAY NOZZLES, IF NEEDED. MIDPOINT SPRAY NOZZLES, IF NEEDED. 4. 6 IN. SEWER PIPE WITH BUTTERFLY VALVES. BOTTOM ONE IS A DRAIN. LOCATE TOP 6 IN. SEWER PIPE WITH BUTTERFLY VALVES. BOTTOM ONE IS A DRAIN. LOCATE TOP PIPE'S INVERT 1 FT. ABOVE BOTTOM OF WHEEL WASH. 5. 8 FT. X 8 FT. SUMP WITH 5 FT. OF CATCH. BUILD SO CAN BE CLEANED WITH 8 FT. X 8 FT. SUMP WITH 5 FT. OF CATCH. BUILD SO CAN BE CLEANED WITH TRACKHOE. 6. 6-IN. ASPHALT CURB ON THE LOW ROAD SIDE TO DIRECT WATER BACK TO POND. 6-IN. ASPHALT CURB ON THE LOW ROAD SIDE TO DIRECT WATER BACK TO POND. 7. 6-IN. SLEEVE UNDER ROAD. 6-IN. SLEEVE UNDER ROAD. 8. BALL VALVES. BALL VALVES. 9. 15 FT. ATB APRON TO PROTECT GROUND FROM SPLASHING WATER.15 FT. ATB APRON TO PROTECT GROUND FROM SPLASHING WATER.
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
2%
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
5:1
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
5:1
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
2%
AutoCAD SHX Text
1:1 SLOPE
AutoCAD SHX Text
WATER LEVEL
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
WHEEL WASH PLAN
AutoCAD SHX Text
ELEVATION VIEW
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
06/07/04
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
AMG
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 8: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

INTERMITTENT CHECK SLOT

TERMINAL SLOPE AND CHANNEL

ANCHOR TRENCH

INITIAL CHANNEL ANCHOR TRENCH

6"

CHECK SLOT AT 25' INTERVALS

ISOMETRIC VIEW

12"

6"

LONGITUDINAL ANCHOR TRENCH

6"

6"

C

H

A

N

N

E

L

B

O

T

T

O

M

STAKE AT 3' TO 5'

INTERVALS

12"

CHANNEL INSTALLATION

SLOPE INSTALLATION

NETS AND BLANKETS

E-1.22

AutoCAD SHX Text
PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCUR
AutoCAD SHX Text
LIME, FERTILIZE AND SEED BEFORE INSTALLATION.
AutoCAD SHX Text
THE END UNDER 4" AND STAPLE AT 12" INTERVALS
AutoCAD SHX Text
BRING MATERIAL DOWN TO A LEVEL AREA, TURN
AutoCAD SHX Text
AND STAPLE AT 12" INTERVALS
AutoCAD SHX Text
UPSLOPE OF THE BERM
AutoCAD SHX Text
TOP OF SLOPE, ANCHOR
AutoCAD SHX Text
IF THERE IS A BERM AT THE
AutoCAD SHX Text
ANCHOR IN 6"x6" MIN. TRENCH
AutoCAD SHX Text
PLACEMENT FOR PROPER SOIL CONTACT
AutoCAD SHX Text
SLOPE SURFACE SHALL BE SMOOTH BEFORE
AutoCAD SHX Text
ALLOW THE ROLLS TO MOLD TO ANY
AutoCAD SHX Text
DO NOT STRETCH BLANKETS/MATTINGS TIGHT
AutoCAD SHX Text
MAY BE PLACED IN HORIZONTAL STRIPS
AutoCAD SHX Text
FOR SLOPES LESS THAN 3H:1V, ROLLS
AutoCAD SHX Text
MANUFACTURER'S RECOMMENDATIONS
AutoCAD SHX Text
OVERLAP
AutoCAD SHX Text
MIN. 2"
AutoCAD SHX Text
STAPLING PATTERN AS PER
AutoCAD SHX Text
STAPLE OVERLAPS
AutoCAD SHX Text
MAX. 5' SPACING
AutoCAD SHX Text
AFTER INSTALLATION.
AutoCAD SHX Text
MIN. 6" OVERLAP
AutoCAD SHX Text
NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED PER MANUFACTURE'S SPECIFICATIONS. 2. STAKING OF STAPLING LAYOUT PER MANUFACTURES SPECIFICATIONS.
AutoCAD SHX Text
IRREGULARITIES
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
01/24/02
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MDH
AutoCAD SHX Text
BY
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 9: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-1.23PLASTIC COVERING

AutoCAD SHX Text
NOTES: 1. PLASTIC SHEETING IS USED TO PROVIDE IMMEDIATE PROTECTION PLASTIC SHEETING IS USED TO PROVIDE IMMEDIATE PROTECTION TO SLOPES AND STOCKPILES. 2. DO NOT USE PLASTIC COVERING UPSLOPE OF AREAS SUCH AS DO NOT USE PLASTIC COVERING UPSLOPE OF AREAS SUCH AS STEEP AND/OR UNSTABLE SLOPES THAT MIGHT BE ADVERSELY AFFECTED BY CONCENTRATED RUNOFF. 3. WHEN POSSIBLE, INSTALL AN INTERCEPTOR DIKE AT THE TOP WHEN POSSIBLE, INSTALL AN INTERCEPTOR DIKE AT THE TOP OF THE PLASTIC TO DIVERT FLOWS AWAY FROM THE PLASTIC. 4. TOE-IN THE TOP OF THE SHEETING IN A 6"x6" TRENCH TOE-IN THE TOP OF THE SHEETING IN A 6"x6" TRENCH BACKFILLED WITH COMPACTED NATIVE MATERIAL. 5. INSTALL A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE INSTALL A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION AT THE TOP OF THE SLOPE IN ORDER TO DISSIPATE RUNOFF VELOCITY. 6. ANCHOR THE PLASTIC USING SANDBAGS OR OTHER SUITABLE ANCHOR THE PLASTIC USING SANDBAGS OR OTHER SUITABLE TETHERED ANCHOR SYSTEM SPACED ON A 10' GRID SPACING IN ALL DIRECTIONS. 7. OVERLAP SEAMS 1-2', TAPE, ROLL AND STAKE THE SEAMS OVERLAP SEAMS 1-2', TAPE, ROLL AND STAKE THE SEAMS AND THEN WEIGH DOWN THE ENTIRE LENGTH. 8. PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED. PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED. 9. REPLACE TORN SHEETS AND REPAIR OPEN SEAMS. COMPLETELY REPLACE TORN SHEETS AND REPAIR OPEN SEAMS. COMPLETELY REMOVE AND REPLACE PLASTIC WHEN IT BEGINS TO DETERIORATE.
AutoCAD SHX Text
%%UPLASTIC SHEETING
AutoCAD SHX Text
PROVIDE ENERGY DISSIPATION AT TOE WHEN NEEDED.
AutoCAD SHX Text
MINIMUM 12" OVERLAP
AutoCAD SHX Text
OF SEAMS.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
AMG
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/05/05
AutoCAD SHX Text
DN
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
AMG
Page 10: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

TRACKING

'TRACKING' WITH MACHINERY UP AND

DOWN THE SLOPE PROVIDES GROOVES

THAT WILL CATCH SEED, FERTILIZER,

MULCH, RAINFALL AND DECREASE RUNOFF.

1

MAXIMUM

3

6" MIN

GROOVES WILL CATCH SEED,

FERTILIZER, MULCH, RAINFALL

AND DECREASE RUNOFF.

CONTOUR FURROWS

E-1.30SURFACE ROUGHENING

AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/22/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
DN
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
AMG
Page 11: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-1.31GRADIENT TERRACES

AutoCAD SHX Text
ALL GRADIENT TERRACES SHOULD HAVE ADEQUATE OUTLETS. SUCH AN OUTLET MAY BE A GRASSED WATERWAY, VEGETATED AREA, OR TILE OUTLET. IN ALL CASES THE OUTLET MUST CONVEY RUNOFF FROM THE TERRACE OR TERRACE SYSTEM TO A POINT WHERE THE OUTFLOW WILL NOT CAUSE DAMAGE. VEGETATIVE COVER SHOULD BE USED IN THE OUTLET CHANNEL.
AutoCAD SHX Text
SLOPE TO ADEQUATE OUTLET
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
50' MAX.
AutoCAD SHX Text
10' MIN.
AutoCAD SHX Text
50' MAX.
AutoCAD SHX Text
50' MAX.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/05/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 12: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.00INTERCEPTOR DIKE & SWALE

AutoCAD SHX Text
1. MAXIMUM SLOPE OF FLOW PATH SHALL BE EQUAL TO OR LESS THAN 5 PERCENT. 2. SIDE SLOPE OF INTERCEPTOR SWALES SHALL BE NO GREATER THAN 2:1 3. MAXIMUM LENGTH BETWEEN SWALES:
AutoCAD SHX Text
DIKE SPACING DEPENDS ON SLOPE GRADIENT
AutoCAD SHX Text
2' MIN.
AutoCAD SHX Text
90% MODIFIED PROCTOR
AutoCAD SHX Text
DIKE MATERIAL COMPACTED
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
2:1 MAX. SLOPE
AutoCAD SHX Text
LEVEL BOTTOM
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
2' MIN.
AutoCAD SHX Text
2:1 MAX. SLOPE
AutoCAD SHX Text
SWALE SPACING DEPENDS ON SLOPE GRADIENT
AutoCAD SHX Text
DISTANCE
AutoCAD SHX Text
100 FT
AutoCAD SHX Text
10-40%
AutoCAD SHX Text
200 FT
AutoCAD SHX Text
5-10%
AutoCAD SHX Text
300 FT
AutoCAD SHX Text
<5%
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/09/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 13: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

GRASS-LINED CHANNELS

E-2.01

AutoCAD SHX Text
TYPICAL V-SHAPED CHANNEL CROSS-SECTION
AutoCAD SHX Text
TYPICAL PARABOLIC CHANNEL CROSS-SECTION
AutoCAD SHX Text
TYPICAL TRAPEZOIDAL CHANNEL CROSS-SECTION
AutoCAD SHX Text
WITH ROCK CENTER FOR BASS FLOW
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
OVERCUT CHANNEL 2" TO ALLOW
AutoCAD SHX Text
BULKING DURING SEEDBED
AutoCAD SHX Text
PREPARATION AND GROWTH OF
AutoCAD SHX Text
VEGETATION
AutoCAD SHX Text
DESIGN DEPTH
AutoCAD SHX Text
6"-9"
AutoCAD SHX Text
WITH ROCK
AutoCAD SHX Text
CENTER FOR
AutoCAD SHX Text
BASE FLOW
AutoCAD SHX Text
KEY IN FABRIC
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
WITH CHANNEL LINER
AutoCAD SHX Text
GRASS LINED
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
WITH ROCK CENTER
AutoCAD SHX Text
KEY IN FABRIC
AutoCAD SHX Text
6"-9"
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
01/24/02
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MDH
AutoCAD SHX Text
BY
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
04_WATER_DETAILS
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 14: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.04PIPE SLOPE DRAINS

AutoCAD SHX Text
END SECTION
AutoCAD SHX Text
STANDARD FLARED
AutoCAD SHX Text
WITH GASKETED WATERTIGHT FITTINGS
AutoCAD SHX Text
SECURELY FASTENED TOGETHER
AutoCAD SHX Text
INLET AND ALL SECTIONS MUST BE
AutoCAD SHX Text
90% MODIFIED PROCTOR
AutoCAD SHX Text
DIKE MATERIAL COMPACTED
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
INTERCEPTOR DIKE
AutoCAD SHX Text
CORRUGATED METAL, CPEP,
AutoCAD SHX Text
HDPE, OR EQUIVALENT PIPE
AutoCAD SHX Text
DISCHARGE TO A STABILIZED
AutoCAD SHX Text
WATERCOURSE, SEDIMENT RETENTION
AutoCAD SHX Text
FACILITY OR STABILIZED OUTLET
AutoCAD SHX Text
PROVIDE RIP RAP PAD
AutoCAD SHX Text
OR EQUIVALENT ENERGY
AutoCAD SHX Text
DISSIPATION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/11/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 15: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.06LEVEL SPREADER

AutoCAD SHX Text
36" MIN
AutoCAD SHX Text
1" MIN
AutoCAD SHX Text
6" MIN
AutoCAD SHX Text
18" MIN REBAR SUPPORTS
AutoCAD SHX Text
8' MAX. SPACING
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
DENSELY VEGETATED FOR A
AutoCAD SHX Text
MIN OF 100' AND SLOPE
AutoCAD SHX Text
LESS THAN 5:1
AutoCAD SHX Text
PRESSURE-TREATED
AutoCAD SHX Text
2"X10" BOARD
AutoCAD SHX Text
12" MIN
AutoCAD SHX Text
MAX
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. SPREADER MUST BE LEVEL END TO END. 2. TREATED 2"X10" WOOD BEAMS MAY BE ABUTTED END TO END FOR MAX SPREADER LENGTH OF 50 FEET. 3. ALTERNATIVELY, 6 INCH DIAMETER CMP MAY BE USED AS A SPREADER. THE PIPE SHALL BE BURIED SO THAT ONLY 1 INCH EXTENDS ABOVE GROUND.
AutoCAD SHX Text
6" MIN
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/18/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 16: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.07CHECK DAM

AutoCAD SHX Text
2"-4" ROCK
AutoCAD SHX Text
A AND B ARE OF EQUAL ELEVATION
AutoCAD SHX Text
L = THE DISTANCE SUCH THAT POINTS
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
B
AutoCAD SHX Text
2:1 SLOPES
AutoCAD SHX Text
8'
AutoCAD SHX Text
24"
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
L=
AutoCAD SHX Text
**NOT ALLOWED
AutoCAD SHX Text
80 ft
AutoCAD SHX Text
50 ft
AutoCAD SHX Text
40 ft
AutoCAD SHX Text
30 ft
AutoCAD SHX Text
26 ft O.C.
AutoCAD SHX Text
50 ft
AutoCAD SHX Text
33 ft
AutoCAD SHX Text
26 ft
AutoCAD SHX Text
20 ft
AutoCAD SHX Text
16 ft O.C.
AutoCAD SHX Text
25 ft
AutoCAD SHX Text
15 ft
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
**
AutoCAD SHX Text
2%
AutoCAD SHX Text
3%
AutoCAD SHX Text
4%
AutoCAD SHX Text
5%
AutoCAD SHX Text
6%
AutoCAD SHX Text
18 INCH
AutoCAD SHX Text
12 INCH
AutoCAD SHX Text
6 INCH
AutoCAD SHX Text
MINIMUM WEIR DEPTH
AutoCAD SHX Text
DITCH GRADE
AutoCAD SHX Text
CHECK DAM NOTES: 1. CHECK DAMS ARE CONSTRUCTED ACROSS A SWALE OR DITCH TO REDUCE VELOCITIES OF CONCENTRATED FLOWS, THEREBY REDUCING EROSION AND ALLOWING A SIGNIFICANT AMOUNT OF SUSPENDED SEDIMENT TO SETTLE OUT. 2. CHECK DAMS SHALL BE USED IN TEMPORARY OR PERMANENT CHANNELS THAT DRAIN 10 ACRES OR LESS, ARE NOT YET VEGETATED, AND WHEN INSTALLING CHANNEL LINING IS NOT FEASIBLE. 3. USE TYPICAL ROCK SIZE OF 2-4 INCH. PLACE ROCK BY HAND OR BY MECHANICAL MEANS RATHER THAN DUMPING THE ROCK. BRIDGE ENTIRE DITCH OR SWALE WIDTH AND ENSURE THE CENTER OF THE DAM IS 6" LOWER THAN THE OUTER ENDS. FOR HIGHER VELOCITY FLOWS: ±5 FPS USE 6"-12" RIPRAP, AND HAND PLACE LARGER ROCK ON UPSTREAM SIDE OF DAM. 4. REMOVE CHECK DAMS FROM GRASS-LINED DITCHES AND SWALES ONCE THE GRASS IS ESTABLISHED. SEED, MULCH OR MAT THE AREA WHERE THE CHECK DAMS WERE, IMMEDIATELY FOLLOWING REMOVAL. 5. INSPECT ONCE PER WEEK ON ACTIVE SITES, ONCE EVERY TWO WEEKS ON INACTIVE SITES, AND WITHIN 24 HOURS FOLLOWING A 0.5 INCH RAIN EVENT. REMOVE SEDIMENT ONCE IT REACHES ONE-THIRD THE DEPTH OF THE ROCK WEIR. REPLACE ROCK WEIR WHEN FILTERING CAPACITY IS REDUCED BY ONE-HALF. 6. SPACING TABLE FOR CHECK DAMS:
AutoCAD SHX Text
SPACING BETWEEN CHECK DAMS
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/18/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
01/06/05
AutoCAD SHX Text
AMG
AutoCAD SHX Text
DN
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
AMG
Page 17: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.20aINLET PROTECTION DETAILS

AutoCAD SHX Text
1. INLET PROTECTION MUST BE REGULARLY INSPECTED TO INSURE PROPER PLACEMENT/FUNCTION AND INLET PROTECTION MUST BE REGULARLY INSPECTED TO INSURE PROPER PLACEMENT/FUNCTION AND MAINTENANCE. FILTER BAG
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
TRIM GEOTEXTILE
AutoCAD SHX Text
5" MAX.
AutoCAD SHX Text
SEDIMENT AND DEBRIS
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
FRAME
AutoCAD SHX Text
OVERFLOW BYPASS
AutoCAD SHX Text
WATER
AutoCAD SHX Text
FILTERED
AutoCAD SHX Text
OVERFLOW BYPASS
AutoCAD SHX Text
RETRIEVAL SYSTEM
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
ISOMETRIC VIEW
AutoCAD SHX Text
NOTES: 1. SIZE THE BELOW GRATE INLET DEVICE (BGID) FOR THE STORM WATER STRUCTURE IT WILL SERVICE. 2. THE REMOVAL SYSTEM MUST ALLOW REMOVAL OF THE BGID WITHOUT SPILLING THE COLLECTED MATERIAL. 3. THE BGID SHALL HAVE A BUILT-IN HIGH-FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 4. THE CONTRACTOR SHALL INSPECT THE BAG AFTER EACH STORM EVENT AND AT REGULAR INTERVALS. 5. THE FILTER BAG SHALL BE CLEANED OR REPLACED WHEN THE BAG BECOMES HALF FULL.
AutoCAD SHX Text
CURB INLET SEDIMENT DAM Material: 100% Non-woven Polyfiber Color: Blue Height: 5" (Custom) Widths: 36" - 54" -70" (Custom) Installation: Place strap through hole(s) provided. Wrap around the horizontal rod in mouth of curb inlet and extend strap through adjacent hole and tie.
AutoCAD SHX Text
CURB INLET SEDIMENT DAM
AutoCAD SHX Text
CATCH BASINATCH BASIN
AutoCAD SHX Text
OVERFLOW SPILLWAY
AutoCAD SHX Text
CURB INLET SEDIMENT DAM
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
06/07/04
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 18: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

PLAN VIEW

E-2.20bINLET PROTECTION DETAILS

AutoCAD SHX Text
NOTES: 1. USE FILTER MAT SEDIMENT BARRIER WHEN CURB INLET IS LOCATED IN GENTLY SLOPING STREET, WITH MINIMAL NEED, WHERE WATER CAN FILTER AND ALLOW SEDIMENT TO SEPARATE FROM RUNOFF. 2. BARRIER SHALL ALLOW FOR OVERFLOW FROM SEVERE STORM EVENT. 3. INSPECT BARRIERS AND REMOVE SEDIMENT AFTER EACH STORM EVENT. SEDIMENT MUST BE REMOVED FROM THE TRAVELED WAY IMMEDIATELY.
AutoCAD SHX Text
CURB INLET
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
BACK OF CURB
AutoCAD SHX Text
CURB INLET
AutoCAD SHX Text
36" WIDE FILTER MAT
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
06/07/04
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 19: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.31BRUSH BARRIER

AutoCAD SHX Text
2' MIN. HEIGHT
AutoCAD SHX Text
MAX. 6" DIAMETER WOODY DEBRIS.
AutoCAD SHX Text
MIN. 5' WIDE BRUSH BARRIER WITH
AutoCAD SHX Text
OVER BRUSH AND SECURE IN 4"x4"
AutoCAD SHX Text
IF REQUIRED, DRAPE BURLAP, JUTE
AutoCAD SHX Text
MIN. TRENCH WITH COMPACTED
AutoCAD SHX Text
SANDBAGS, OR EQUIVALENT
AutoCAD SHX Text
FABRIC WITH STAKES,
AutoCAD SHX Text
ANCHOR DOWNHILL EDGE OF
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
ALTERNATIVELY, TOPSOIL STRIPPINGS
AutoCAD SHX Text
MAY BE USED TO FORM THE BARRIER.
AutoCAD SHX Text
MATTING, OR EQUIVALENT FABRIC
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/09/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/05/05
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 20: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.33SILT FENCE

AutoCAD SHX Text
3' MAX.
AutoCAD SHX Text
BURY FILTER FABRIC 6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
%%UFRONT VIEW
AutoCAD SHX Text
%%USIDE VIEW
AutoCAD SHX Text
FILTER FABRIC
AutoCAD SHX Text
BACKFILL TRENCH WITH
AutoCAD SHX Text
NATIVE SOIL OR 3/4"-1.5"
AutoCAD SHX Text
WASHED GRAVEL
AutoCAD SHX Text
MINIMUM 4"x4" TRENCH
AutoCAD SHX Text
2"x2" WOOD POSTS, STEEL
AutoCAD SHX Text
FENCE, POSTS, REBAR, OR
AutoCAD SHX Text
6' MAX.
AutoCAD SHX Text
MAINTENANCE STANDARDS: ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY 1. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT POND. 3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 4. SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN THE DEPOSIT REACHES SEDIMENT DEPOSITS SHALL EITHER BE REMOVED WHEN THE DEPOSIT REACHES APPROXIMATELY ONE-THIRD THE HEIGHT OF THE SILT FENCE, OR A SECOND SILT FENCE SHALL BE INSTALLED. 5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
AutoCAD SHX Text
EQUIVALENT
AutoCAD SHX Text
NOTE: FILTER FABRIC FENCES SHALL BE INSTALLED ALONG : FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE
AutoCAD SHX Text
POST SPACING MAY BE INCREASED TO 8' IF WIRE BACKING IS USED
AutoCAD SHX Text
JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, SEWN IN POCKETS OR EQUIVALENT TO ATTACH FABRIC TO POSTS.
AutoCAD SHX Text
2"x2" BY 14 GAUGE WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/06/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 21: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.35STRAW WATTLES

AutoCAD SHX Text
SEDIMENT, ORGANIC MATTER,
AutoCAD SHX Text
AND NATIVE SEEDS ARE
AutoCAD SHX Text
CAPTURED BEHIND THE ROLLS.
AutoCAD SHX Text
ADJACENT ROLLS SHALL
AutoCAD SHX Text
TIGHTLY ABUT
AutoCAD SHX Text
STRAW ROLLS MUST BE PLACED
AutoCAD SHX Text
ALONG SLOPE CONTOURS
AutoCAD SHX Text
3"-5"
AutoCAD SHX Text
8"-10" DIA.
AutoCAD SHX Text
1" X 1" STAKE
AutoCAD SHX Text
LIVE STAKE
AutoCAD SHX Text
SPACING DEPENDS
AutoCAD SHX Text
ON SOIL TYPE AND
AutoCAD SHX Text
SLOPE STEEPNESS
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
10'-25'
AutoCAD SHX Text
STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE ROLL IN A TRENCH, 3"-5" DEEP, DUG ON CONTOUR. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL.
AutoCAD SHX Text
3'-4'
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/06/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 22: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.40SEDIMENT TRAP

AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
FLAT BOTTOM
AutoCAD SHX Text
1.5' MIN.
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
2"-4" ROCK
AutoCAD SHX Text
3/4"-1.5"
AutoCAD SHX Text
WASHED GRAVEL
AutoCAD SHX Text
1' MIN. OVERFLOW
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
3H:1V MAX.
AutoCAD SHX Text
3.5'-5'
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
MIN. 1' DEPTH
AutoCAD SHX Text
2"-4" ROCK
AutoCAD SHX Text
WASHED GRAVEL
AutoCAD SHX Text
MIN. 1' DEPTH 3/4"-1.5"
AutoCAD SHX Text
NATIVE SOIL OR
AutoCAD SHX Text
COMPACTED BACKFILL
AutoCAD SHX Text
1' MIN. DEPTH OVERFLOW SPILLWAY
AutoCAD SHX Text
6' MIN.
AutoCAD SHX Text
NOTES: 1. SEDIMENT TRAP MAY BE CONSTRUCTED BY EXCAVATION SEDIMENT TRAP MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM. 2. OUTFLOW CHANNEL SHALL BE CONSTRUCTED BY OUTFLOW CHANNEL SHALL BE CONSTRUCTED BY EXCAVATION. 3. SEDIMENT TRAPS SHALL BE LIMITED TO LESS THAN 1 SEDIMENT TRAPS SHALL BE LIMITED TO LESS THAN 1 ACRE. FOR ANY SITE GREATER THAN 1 ACRE, SEE SEDIMENT BASIN. 4. SEDIMENT SHALL BE REMOVED BEFORE 1 FOOT SEDIMENT SHALL BE REMOVED BEFORE 1 FOOT ACCUMULATES.
AutoCAD SHX Text
DISCHARGE TO STABILIZED CONVEYANCE, OUTLET OR LEVEL SPREADER
AutoCAD SHX Text
NOTE: TRAP MAY BE FORMED BY BERM OR BY PARTIAL OR TRAP MAY BE FORMED BY BERM OR BY PARTIAL OR COMPLETE EXCAVATION
AutoCAD SHX Text
SURFACE AREA DETERMINED AT TOP OF WEIR
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/09/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 23: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

ˆ

E-2.41SEDIMENT POND

AutoCAD SHX Text
3.5' MIN.
AutoCAD SHX Text
1. STRUCTURES HAVING A MAXIMUM STORAGE CAPACITY AT THE TOP OF THE DAM OF 10 ACRE-FT (435,600 FT 3) OR MORE ARE SUBJECT TO THE WASHINGTON DAM 3) OR MORE ARE SUBJECT TO THE WASHINGTON DAM SAFETY REGULATIONS (CHAPTER 173-175 WAC). 2. GRADE BOTTOM OF BASIN AS LEVEL AS POSSIBLE. 3. SPILLWAY SHALL BE LINED WITH 2"-4" ROCKS. 4 ALL INLETS AND OUTLETS SHALL BE PROTECTED WITH RIPRAP. 5. IF THE POND POSES A SAFETY HAZARD, IT SHALL BE FENCED. 6. REMOVE SEDIMENT BEFORE 1-FOOT ACCUMULATES.
AutoCAD SHX Text
EQUIVALENT DIVIDER
AutoCAD SHX Text
WITH FILTER FABRIC, OR
AutoCAD SHX Text
STAKED HAY BALES WRAPPED
AutoCAD SHX Text
WIRE-BACKED SILT FENCE,
AutoCAD SHX Text
6' MIN. WIDTH
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
CREST OF
AutoCAD SHX Text
1'
AutoCAD SHX Text
EMERGENCY SPILLWAY
AutoCAD SHX Text
95% PERVIOUS MATERIALS
AutoCAD SHX Text
SUCH AS GRAVEL OR CLEAN
AutoCAD SHX Text
EMBANKMENT COMPACTED
AutoCAD SHX Text
2H:1V MAX.
AutoCAD SHX Text
DISCHARGE TO STABILIZED
AutoCAD SHX Text
CONVEYANCE, OUTLET OR
AutoCAD SHX Text
LEVEL SPREADER
AutoCAD SHX Text
SAND SHALL NOT BE USED.
AutoCAD SHX Text
3H:1V MAX.
AutoCAD SHX Text
RISER PIPE
AutoCAD SHX Text
TRASH RACK
AutoCAD SHX Text
DEWATERING DEVICE
AutoCAD SHX Text
DEWATERING
AutoCAD SHX Text
ORIFICE
AutoCAD SHX Text
(SEE RISER DETAIL)
AutoCAD SHX Text
3H:1V MAX.
AutoCAD SHX Text
(PRINCIPAL SPILLWAY)
AutoCAD SHX Text
OPEN AT TOP WITH
AutoCAD SHX Text
CONCRETE BASE
AutoCAD SHX Text
(SEE RISER DETAIL)
AutoCAD SHX Text
PER FIG. 4.4.4E
AutoCAD SHX Text
BERM OR BY PARTIAL OR
AutoCAD SHX Text
NOTE: POND MAY BE FORMED BY
AutoCAD SHX Text
AROUND SIDES
AutoCAD SHX Text
TO PREVENT FLOW
AutoCAD SHX Text
KEY DIVIDER INTO SLOPE
AutoCAD SHX Text
EQUIVALENT DIVIDER
AutoCAD SHX Text
SILT FENCE OR
AutoCAD SHX Text
INFLOW
AutoCAD SHX Text
THE POND LENGTH SHALL
AutoCAD SHX Text
BE 3 TO 6 TIMES THE
AutoCAD SHX Text
POND LENGTH
AutoCAD SHX Text
CONVEYANCE, OUTLET OR
AutoCAD SHX Text
LEVEL SPREADER
AutoCAD SHX Text
DISCHARGE TO STABILIZED
AutoCAD SHX Text
RISER PIPE
AutoCAD SHX Text
SPILLWAY
AutoCAD SHX Text
EMERGENCY OVERFLOW
AutoCAD SHX Text
PREVENT FLOTATION
AutoCAD SHX Text
AND WIRE MAY BE USED TO
AutoCAD SHX Text
ALTERNATIVELY, METAL STAKES
AutoCAD SHX Text
DEWATERING ORIFICE, SCHEDULE
AutoCAD SHX Text
DIAMETER AS PER CALCULATIONS
AutoCAD SHX Text
40 STEEL STUB MIN.
AutoCAD SHX Text
PROVIDE ADEQUATE
AutoCAD SHX Text
STRAPPING
AutoCAD SHX Text
POLYETHYLENE CAP
AutoCAD SHX Text
METAL RISER
AutoCAD SHX Text
TACK WELD
AutoCAD SHX Text
WATERTIGHT
AutoCAD SHX Text
COUPLING
AutoCAD SHX Text
CORRUGATED
AutoCAD SHX Text
PERFORATED POLYETHYLENE
AutoCAD SHX Text
DRAINAGE TUBING, DIAMETER
AutoCAD SHX Text
MIN. 2" LARGER THAN
AutoCAD SHX Text
DEWATERING ORIFICE.
AutoCAD SHX Text
TUBING SHALL COMPLY
AutoCAD SHX Text
WITH ASTM F667 AND
AutoCAD SHX Text
AASHTO M294.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
CONCRETE BASE
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
RISER DETAIL
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
2X RISER DIA. MIN.
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
MAXIMUM POND WIDTH
AutoCAD SHX Text
OR COMPLETE EXCAVATION
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/09/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 24: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.45SILTATION TRENCH BEHIND CURB

AutoCAD SHX Text
1.0'
AutoCAD SHX Text
.5'
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
MDH
AutoCAD SHX Text
01/06/02
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
01/31/15
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
Page 25: EROSION PREVENTION & SEDIMENT CONTROLerosion prevention & sediment control e-1.00a. general erosion prevention & sediment control notes 1. all erosion and sediment control measures

E-2.46SEDIMENT BAG DETAIL

AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
SEDIMENT BAG
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
TOP VIEW
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
AGGREGATE OR STRAW BALES UNDERLAYMENT
AutoCAD SHX Text
OPENING ACCOMMODATES UP TO 4" DISCHARGE HOSE
AutoCAD SHX Text
PUMP DISCHARGE HOSE
AutoCAD SHX Text
WATER FLOW FROM PUMP
AutoCAD SHX Text
HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE
AutoCAD SHX Text
SEWN IN SPOUT
AutoCAD SHX Text
HIGH STRENGTH DOUBLE STITCHED "J" TYPE SEAMS
AutoCAD SHX Text
BAG PLACED ON AGGREGATE OR STRAW
AutoCAD SHX Text
NOTES: 1. INSTALL THE BAG ON A SLIGHT SLOPE SO INCOMING WATER FLOWS DOWNHILL THROUGH INSTALL THE BAG ON A SLIGHT SLOPE SO INCOMING WATER FLOWS DOWNHILL THROUGH BAG. PLACE THE BAG ON AN AGGREGATE OR STRAW BALE BED TO MAXIMIZE WATER FLOW THROUGH THE SURFACE AREA OF THE BAG. STRAP THE NECK OF BAG TIGHTLY TO THE OF THE BAG. STRAP THE NECK OF BAG TIGHTLY TO THE DISCHARGE HOSE. 2. FLOW RATES WILL VARY DEPENDING ON THE SIZE OF BAG, TYPE AND AMOUNT OF SEDIMENT FLOW RATES WILL VARY DEPENDING ON THE SIZE OF BAG, TYPE AND AMOUNT OF SEDIMENT DISCHARGED INTO BAG, THE SURFACE UNDER THE BAG AND THE DEGREE OF SLOPE THE BAG IS INSTALLED ON. CARE SHOULD BE TAKEN TO PROPERLY MONITOR PERFORMANCE TO ENSURE THAT PUMP RATES OR CONCENTRATIONS OF SEDIMENT ARE NOT EXCESSIVE. FAILURE TO DO SO MAY CAUSE BAG TO RUPTURE OR HOSE ATTACHMENT STRAPS TO FAIL. 3. FILTERED WATER MAY BE INFILTRATED INTO GROUND. FOLLOW APPROPRIATE EROSION FILTERED WATER MAY BE INFILTRATED INTO GROUND. FOLLOW APPROPRIATE EROSION PREVENTION BMPS FOR FILTERED WATER DISCHARGES. 4. BAGS SHALL BE MADE FROM NONWOVEN POLYPROPYLENE GEOTEXTILE.BAGS SHALL BE MADE FROM NONWOVEN POLYPROPYLENE GEOTEXTILE.
AutoCAD SHX Text
NONWOVEN POLYPROPYLENE GEOTEXTILE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STANDARD PLAN NO.
AutoCAD SHX Text
DN
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV. NO.
AutoCAD SHX Text
SURFACE WATER MANAGEMENT
AutoCAD SHX Text
DEPARTMENT OF PUBLIC WORKS
AutoCAD SHX Text
CITY OF VANCOUVER
AutoCAD SHX Text
08/10/09
AutoCAD SHX Text
AMG
AutoCAD SHX Text
DN
AutoCAD SHX Text
AMG
AutoCAD SHX Text
AMG
AutoCAD SHX Text
01/31/15