Patricia Egen Consulting 1
Microsoft Project
Tips & Techniques Lab
August 2004 New York Session 1482Patricia Egen
www.egenconsulting.com
8/3/2019 Ms Project Using
2/20
Patricia Egen Consulting 2
Summary Slide
Changing Row Height
Clear Baseline
Roll Up Tasks for Project
Use Month as a Duration Unit
Fill Handles
8/3/2019 Ms Project Using
3/20
Patricia Egen Consulting 3
Summary Slide (cont.)
Layout tips
Layout Tips 2
Gantt Chart Tips
Printing Gantt Charts
Working with Tasks
Working with Dates Resource Leveling
Reports
8/3/2019 Ms Project Using
4/20
Patricia Egen Consulting 4
Summary Slide (cont.)
Why does Project ignore priorities?
Why dont subtasks get included in
summary tasks' timelines?
Why does Project leave gaps?
8/3/2019 Ms Project Using
5/20
Patricia Egen Consulting 5
Changing Row Height
Single row:
Drag the row line between tasks to the height
you want.
All Rows
Click the upper left hand corner to highlight all
rows then adjust row size
8/3/2019 Ms Project Using
6/20
Patricia Egen Consulting 6
Clear Baseline
Point to Tracking on the Tools menu, and thenclick Clear Baseline.
To clear baseline information for specific tasks only,select those tasks.
To clear baseline information for the entire project, startwith next step.
Click Clear baseline plan or Clear interim plan. To
clear an interim plan, you need to select it in thelist box.
Click Entire project or Selected tasks.
8/3/2019 Ms Project Using
7/20
Patricia Egen Consulting7
Roll Up Tasks for Project
To easily display multiple Gantt bars on a
single task line for the whole project.
On the Format menu, click Layout.
Click Always roll up Gantt bars.
8/3/2019 Ms Project Using
8/20
Patricia Egen Consulting8
Use Month as a Duration Unit
Typing 3mos in the duration field is recognized as
three months.
By default, a month has 20 days, but you can alsospecify how many days constitute a month.
On the Tools menu, click Options, and then click
the Calendar tab.
Specify the number of days in the Days per month
box.
8/3/2019 Ms Project Using
9/20
Patricia Egen Consulting9
Fill Handles
Use fill handles to copy task or resourceinformation up or down in the sheet portion of anyview, such as the left-hand portion of the GanttChart.
Select the cell that contains the information you want tocopy.
Click and drag the square in the lower right hand corner
to highlight cells up or down. Release the mouse button to fill highlighted cells with
the contents of the original cell.
8/3/2019 Ms Project Using
10/20
Patricia Egen Consulting10
Layout tips
In the Gantt Chart, double click on the right edge of acolumn header to "best fit" the column.
To quickly change the name of a column, doubleclick in the column header and enter a new name for
the field in the Title field. Example, abbreviate the Duration field name to Dur
To quickly change the field in a column, double clickin the column header and select the new field from
the Field Name list. While in the Field Name list, press the first letter of the
desired field to go to that field.
8/3/2019 Ms Project Using
11/20
Patricia Egen Consulting11
Layout Tips 2
To quickly modify or delete a dependency, double click on
the dependency line between the two tasks to display the
Task Dependency form
In any drop down list such as the list of Resource Names
or the list of Filters you can press the first letter of the item
you are looking for to quickly go that item.
Use the Insert key on your keyboard to quickly insert rows
and columns.
In the Gantt chart, click on a row and press the Insert key to insert
a blank row above the selected row. Click on a column header to highlight a column and press Insert to
insert a column to the left of the selected column.
Use the Delete key to reverse this process
8/3/2019 Ms Project Using
12/20
8/3/2019 Ms Project Using
13/20
Patricia Egen Consulting13
Printing Gantt Charts
When printing any timescaled charts such as Gantt
Charts you can adjust the width of the timescale to
fit the page without changing the timescale units.
Double click on the Timescale and increase the number
in the % field to make the timescale take up more of the
page or decrease the number in the % field to make the
timescale narrower.
The latter step is useful when a chart is just a little toowide to fit on a page.
8/3/2019 Ms Project Using
14/20
Patricia Egen Consulting14
Working with Tasks
To select two or more non-adjacent tasks, click on a
task (in the table area), hold down the Ctrl Key and
click on another task in the chart.
Continue holding the Ctrl key to select other tasks. This
is especially useful for linking or unlinking tasks that are
not on consecutive rows.
To change information for a number of tasks at
once, highlight the desired tasks and select the Task
Information button. Enter the common information in one of the fields
displayed in the "Multiple Task Information" dialog box.
8/3/2019 Ms Project Using
15/20
Patricia Egen Consulting15
Working with Dates To remove a date constraint from a task, select the task (or
multiple tasks) and select the Task Information button.
Click in the Advanced tab, change the Type field to As Soon
As Possible and click OK. This removes any date constraint
in the task and allows it to be scheduled based on the
dependencies rather than a date. If a task does not move (reschedule) based on a dependency, it
may contain a "fixed" date of some kind.
A fixed date could be an Actual Start or a constraint such as
Must Start On or Start No Earlier Than. Use the Tasks with Fixed Dates Filter to view only those
tasks in a plan that contain fixed dates.
8/3/2019 Ms Project Using
16/20
Patricia Egen Consulting16
Resource Leveling
If after removing the Actual Start and anyconstraint a task still does not reschedule based ona dependency, check the Resource Levelingfeature.
Make sure Automatic Leveling is turned off byselecting Resource Leveling from the Tools menu andchoosing Manual.
If a task still does not move, it may contain a delaybased on a previous Resource Level.
Select Resource Leveling again from the Tools menuand choose Clear Leveling.
Select whether or not to remove Leveling from theselected tasks or for the entire project.
8/3/2019 Ms Project Using
17/20
Patricia Egen Consulting17
Reports
A handy report is the Calendar view using aResource Filter.
Select Calendar from the View menu.
Select the Using Resource Filter and type inthe name of the desired resource to display theCalendar for a particular resource.
This produces a nice printout of a resources
tasks with each month of a project on a separatepage.
8/3/2019 Ms Project Using
18/20
8/3/2019 Ms Project Using
19/20
8/3/2019 Ms Project Using
20/20
Patricia Egen Consulting20
Why does Project leave gaps?
You have collapsed some summary tasks.
Subtasks that are collapsed don't show up
anywhere, leaving gaps. To fix this, select all tasks, and click on Expand (the
plus sign).