MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
PROVISIONAL BILLS OF QUANTITIES
FOR
NORTH WEST DEPARTMENT OF HEALTH
NORTH WEST PROVINCE
AUGUST 2017
PRELIMINARIES AND GENERALS Cover PageBID NO: NWDOH/PS/06/16
1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
DISCLAIMER
This library is supplied "AS IS", without any warranty ofany kind, express or implied. ACE Solutions cc does notwarrant that the content of this library will be error free,nor does it assume any responsibility or liabilitywhatsoever for any damages suffered as a result of the useof, or inability to use the product.
NOTE This WinQS library is based onthe JBCC Series 2000 documents asfollows:
Principal Building Agreement Code 21014th EditionMarch 2004 (including State Provisions)
AND
PRELIMINARIES Code 2103 3rd EditionJanuary 2003
SECTION NO 1
BILL NO. 1
PRELIMINARIES
NOTES
i) The agreement is to be the JBCC Series 2000Principal Building Agreement, 5th Edition July 2007,and other contract documents that together form thecontract between the employer and contractor
ii) The preliminaries are to be the JBCC Series 2000Preliminaries prepared by the Joint Building ContractsCommittee, January 2003 edition and shall be deemedto be incorporated herein
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
iii) Tenderers are referred to the abovementioneddocuments for the full intent and meaning of eachclause thereof (hereinafter referred to by heading andclause number only) for which such allowance must bemade as may be considered necessary
iv) Where standard clauses or alternatives are notentirely applicable to this contract such modifications,corrections or supplements as will apply are givenunder each relevant clause heading
v ) Where any item is not relevant to this specificcontract such item is marked N/A (signifying "notapplicable")
vi) If Alternative A as set out in clause B10.3 hereinafteris to be used for the adjustment of the preliminarieseach item priced is to be allocated to one or more ofthe three categories, where "F" denotes a fixed amount(amount not to be varied), "V" denotes an amountvariable in proportion to value and "T" denotes anamount in proportion to time
-------------------------
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
SECTION A: PRINCIPAL BUILDING AGREEMENT
Definitions (A1)
1 Definitions and interpretation (clause 1)
F:............................. V:............................ T:............................ Item
Objective and Preparation (A2)
2 Offer acceptance and performance (clause 2)
F:............................. V:............................ T:............................ Item
Preparation (A3-A14)
3 Documents (clause 3)
F:............................. V:............................ T:............................ Item
4 Design responsibility (clause 4)
F:............................. V:............................ T:............................ Item
5 Employer's agents (clause 5)
F:............................. V:............................ T:............................ Item
6 Site representative (clause 6)
F:............................. V:............................ T:............................ Item
7 Compliance with regulations (clause 7)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
8 Works risk (clause 8)
F:............................. V:............................ T:............................ Item
9 Indemnities (clause 9)
F:............................. V:............................ T:............................ Item
10 Works insurances (clause 10)
F:............................. V:..................T:............................ Item
11 Liability insurances (clause 11)
F:............................. V:............................ T:............................ Item
12 Effecting insurance (clause 12)
F:............................. V:............................ T:............................ Item
13 State Provisions (clause 13)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
14 Security (clause 14)
This clause shall be amended as follows;
14.1 The Contractor shall furnish the Employer with asuretyship equal to ten percent (10%) of the contract sum asset out in 8.2 of the tender documents
14.2 On the date of practical completion the Employer shallreturn the surety to the contractor
14.3 The Employer's entitlement to recover expense and loss interms of 33.0 shall take precedence over the reducing of thesurety or portions thereof
14.4 The Employer shall aquire ownership of the surety only interms of 33.4. The parties expressly agree that neither theEmployer nor the Contractor shall be entitled to cede the rightsto the surety to any third party and the Employer shall apply thesecurity strictly according to the provisions of this agreement
F:.......................... V:......................... T: ......................... Item
Execution (A15-A23)
15 Preparation for and execution of the works (clause 15) fixed
F:............................. V:............................ T:............................ Item
16 Access to the works (clause 16)
F:............................. V:............................ T:............................ Item
17 Contract instructions (clause 17)
F:............................. V:............................ T:............................ Item
18 Setting out of the works (clause 18)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
The contractor shall notify the principal agent if anyencroachments of adjoining foundations, buildings, structures,pavements, boundaries, etc. exist in order that the necessaryarrangements may be made for the rectification of any suchencroachments.
19 Assignment (clause 19)
F:............................. V:............................ T:............................ Item
20 Nominated subcontractors (clause 20)
F:............................. V:............................ T:............................ Item
21 Selected subcontractors (clause 21)
F:............................. V:............................ T:............................ Item
22 Employer's Direct Contractors (clause 22)
Tenderers are to note that this contract will be carried out inconjunction with and by a building contractor on site during thecontract. The contractors will be required to plan and carry outtheir respective work in conjunction with each other under thesupervision of the Principal Agent. No claims for additionalcosts or other claims will be considered or entertained due tothese circumstances
F:............................. V:............................ T:............................ Item
23 Contractor's Domestic Sub-Contractors (Clause 23)
F:............................. V:............................ T:............................ Item
Completion (A24-A30)
24 No clause (clause 23)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
25 Practical completion (clause 24)
F:............................. V:............................ T:............................ Item
26 Works completion (clause 25)
F:............................. V:............................ T:............................ Item
27 Final completion (clause 26)
F:............................. V:............................ T:............................ Item
28 Latent defects liability period (clause 27)
F:............................. V:............................ T:............................ Item
29 Sectional completion (clause 28)
F:............................. V:............................ T:............................ Item
30 Revision of date of practical completion (clause 29)
F:............................. V:............................ T:............................ Item
31 Penalty for non-completion (clause 30)
F:............................. V:............................ T:............................ Item
Payment (A31 - A35)
32 Interim payment to the contractor (clause 31)
Materials and goods stored off site shall not be included in theamount authorised for payment unless specifically authorizedby the Employer.
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Clause 31.6.5 shall be deemed to be deleted
Clause 31 shall be deemed to be extended as follows;
31.15 Retention Fund
31.15.1 The Employer shall withhold from the Contractor tenper cent (10%), with a maximum of five per cent (5%) of allpayments made before the issuing of the certificate of practicalcompletion as a retention fund. No interest is to be paid to theContractor on the retention fund. The retention fund shall beheld by the Employer as a guarantee to the Employer for thecompletion of the contract.
31.15.2 Two fifths (2/5) of the retention fund shall be paid to theContractor on the issuing of the certificate of practicalcompletion, and two fifths (2/5) on the issuing of the certificateof final completion and the remainder on the issuing of the finalaccount
33 Adjustment to the contract value (clause 32)
F:............................. V:............................ T:............................ Item
34 Recovery of expense and loss (clause 33)
F:............................. V:............................ T:............................ Item
35 Final account and final payment (clause 34)
F:............................. V:............................ T:............................ Item
36 Payment to other parties (clause 35)
F:............................. V:............................ T:............................ Item
Cancellation (A36-A39)
37 Cancellation by employer - contractor's default (clause 36)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
38 Cancellation by employer - loss and damage (clause 37)
F:............................. V:............................ T:............................ Item
39 Cancellation by contractor - employer's default (clause 38)
F:............................. V:............................ T:............................ Item
40 Cancellation - cessation of the works (clause 39)
F:............................. V:............................ T:............................ Item
Dispute (A40)
41 Dispute Settlement (clause 40)
F:............................. V:............................ T:............................ Item
Contract variables (A41)
Information necessary for completion of those clausescontained in the schedule which are necessary for tenderpurposes is given hereunder
42 Pre-tender information (clause 41)
F:............................. V:............................ T:............................ Item
THE SCHEDULE
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
41.1 CONTRACTING AND OTHER PARTIES
41.1.1Employer:
North West Department of Health
Physical address:Cnr. First and Sekame StreetNew Office ParkMmabatho2791
Tel: (018) 391 4133Fax: (018) 391 9314
E-mail: [email protected]
41.1.2 PRINCIPAL AGENT
41.1.3 Agents service:Architect
41.1.4 Agents service:Quantity Surveyor
41.1.5Agents service: Structural/Civil Engineer
41.1.6Agents service: Electrical Engineers
41.1.7Agents Service : Mechanical & Fire Engineer
41.1.8Agents Service :
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
41.1.9Agents Service :
41.2 CONTRACT DETAILS
41.2.1 Works Description:
Construction of New Motswedi Cilinc
41.2.2 Site Description:Motswedi Clinic, North West Province
41.2.3 Work or installations by direct contractors: No
41.2.4 This agreement is for a government contract:Yes
4 1 . 2 . 5 Date on which possession of the site is intendedto be given:
TBC
4 1 . 2 . 6 Period for the commencement of the works afterthe contractor takes possession of the site
7 calendar days
4 1 . 2 . 7 Intended date of practical completeion and thepenalty per calendar day for the works as a whole
TBC
Penalty - 0.05% of the Contract Amount
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
41.2.8 Intended date of practical completion and thepenalty per calender day for the works in sections
Section 1......................................... Date
R......................... Penalty Amount
Section 2......................................... Date
R......................... Penalty Amount
Section 3......................................... Date
R......................... Penalty Amount
Section 4......................................... Date
R......................... Penalty Amount
41.2.9 The law applicable to this abreement shall be that of theRepublic of South Africa
41.3 INSURANCES
41.3.1 Contract works insurance to be effected by:
Contractor:
For the Sum of: Tender amount inclusive of VAT plus 20%
With a deductible as determined by the Insurers.
41.3.2 Supplementary insurance is requiredYes
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
41.3.3 Public liability insurance to be effected by:Contractor
For the Sum of R2,000,000.00
With a deductible to be determined by the Insurer
41.4 DOCUMENTS
4 1 . 4 . 1 Waivers of contractors lien or right of continuingpossession is required
Yes
41.4.2 Number of construction document copies to besupplied to the contractor free of charge:
3 Copies
4 1 . 4 . 3 Bills of Quantities/Lump sum documentschedule of rates drawn up in accordance with:
Standard System of Measuring Building Works
4 1 . 4 . 4 On acceptance of the tender the bills ofquantities/lump sum document is to be submitted within 7 calendar days
4 1 . 4 . 5 JBCC Engineering General Conditions are to beincluded in the contract documents:
No
4 1 . 4 . 6 The contract value is to be adjusted using escalationadjustment indices
Yes - CPAP
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
4 1 . 4 . 7 Details of changes made to the provision ofJBCC standard documentation:.......................................................................................................................................................................................................................................
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
SECTION B: PRELIMINARIES
Definition and interpretation (B1)
43 Definition and interpretation (B1.1 - B1.6.5)
F:............................. V:............................ T:............................ Item
Documents (B2)
44 Checking of documents (B2.1)
F:............................. V:............................ T:............................ Item
45 The items in these bills of quantities are to be read and pricedin conjunction with and the descriptions regarded as amplifiedby the Model Preambles for Trades as recommended andpublished by the Association of South African QuantitySurveyors, 1999 edition, and no claim arising from brevity ofdescription of items fully described in the said Model Preamblesfor Trades will be entertained
Item
46 Provisional bills of quantities (B2.2)
F:............................. V:............................ T:............................ Item
47 These bills of quantities are in Multiple Procurement format i.e.the "Wet Trades" - earthworks, concrete, formwork andreinforcement, precast concrete, masonry, waterproofing andsub-surface drainage are fully measured and the subsequenttrades are budgetary allowances
F:............................. V:............................ T:............................ N/A
48 Availability of construction documentation (B2.3)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
49 The budgetary allowances allocated for subsequent tradesincluded in this document will be separately procured, based onmultiple procurement of nominated/selected subcontractorsduring the construction period
F:............................. V:............................ T:............................ Item
50 Interests of agents (B2.4)
F:............................. V:............................ T:............................ Item
51 Priced documents (B2.5)
F:............................. V:............................ T:............................ Item
52 Tender submission (B2.6)
F:............................. V:............................ T:............................ Item
The site (B3)
53 Defined works area (B3.1)
F:............................. V:............................ T:............................ Item
54 The area of the works to be occupied by the contractor, anyrestriction on the area and the limit of access or exit will bepointed out to the contractor by the principal agent on handingover of the site
F:............................. V:............................ T:............................ Item
55 Geotechnical investigation (B3.2)
F:............................. V:............................ T:............................ Item
56 Inspection of the site (B3.3)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
57 No claims for extras arising from the contractor having failed tocomply with the above clause will be entertained
F:............................. V:............................ T:............................ Item
58 Existing premises occupied (B3.4)
F:............................. V:............................ T:............................ Item
59 Previous work - dimensional accuracy (B3.5)
F:............................. V:............................ T:............................ Item
Work executed under a previous contract is:
60 Previous work - defects (B3.6)
F:............................. V:............................ T:............................ Item
61 Services - known (B3.7)
F:............................. V:............................ T:............................ Item
62 Services - unknown (B3.8)
F:............................. V:............................ T:............................ Item
63 Protection of trees etc (B3.9)
F:............................. V:............................ T:............................ Item
64 Articles of value (B3.10)
F:............................. V:............................ T:............................ Item
65 Inspection of adjoining properties etc (B3.11)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Management of contract (B4)
66 Management of the works (B4.1)
F:............................. V:............................ T:..................... Item
67 Programming for the works (B4.2)
F:............................. V:............................ T:............................ Item
68 Progress meetings (B4.3)
F:............................. V:............................ T:............................ Item
69 Technical meetings (B4.4)
F:............................. V:............................ T:............................ Item
Samples and shop drawings (B5)
70 Samples of materials (B5.1)
F:............................. V:............................ T:............................ Item
71 Workmanship samples (B5.2)
F:............................. V:............................ T:............................ Item
72 Shop drawings (B5.3)
F:............................. V:............................ T:............................ Item
Temporary works and plant (B6)
73 Deposits and fees (B6.1)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
1 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
74 Enclosure of the works (B6.2)
F:..................... V:............................ T:............................ Item
75 Advertising (B6.3)
F:............................. V:............................ T:............................ Item
76 Plant, equipment, sheds and offices (B6.4)
F:................... V:............................ T:........... Item
77 Main notice board (B6.5)
F:................. V:............................ T:............................ Item
78 Subcontractors notice board (B6.6)
F:............................. V:............................ T:............................ Item
Temporary services (B7)
79 Location (B7.1)
F:............................. V:............................ T:............................ Item
80 Water (B7.2)
F:............................. V:............................ T:................... Item
81 Electricity (B7.3)
F:.................... V:............................ T:............................ Item
82 Telecommunication equipment (B7.4)
F:................. V:............................ T:................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
83 Ablution facilities (B7.5)
F:............... V:............................ T:............................ Item
Prime cost amounts (B8)
84 Responsibility for prime cost amounts (B8.1)
F:............................. V:............................ T:............................ Item
Attendance on N/S Subcontractors (B9)
85 General attendance (B9.1)
F:............................. V:............................ T:............................ Item
86 Special attendance (B9.2)
F:............................. V:............................ T:............................ Item
87 Commissioning - Fuel, water and power (B9.3)
F:............................. V:............................ T:............................ Item
Financial aspects (B10)
Statutory taxes, duties and levies (B10.1)
F:............................. V:............................ T:............................ Item
88 Provision is made in the summary of these bills of quantities forthe inclusion of Value Added Tax (VAT)
F:............................. V:............................ T:............................ Item
89 Payment of preliminaries (B10.2)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
90 Adjustment of preliminaries (B10.3)
F:............................. V:............................ T:............................ Item
91 Payment certificate cash flow (B10.4)
F:............................. V:............................ T:............................ Item
92 Contractor information supply (B10.5)
F:............................. V:............................ T:............................ Item
General (B11)
93 Protection of works (B11.1)
F:............................. V:............................ T:............................ Item
94 Protection/isolation of existing/sectionally occupied works(B11.2)
F:............................. V:............................ T:............................ Item
95 Site security (B11.3)
F:............................. V:............................ T:.................. Item
96 Notice before covering work (B11.4)
F:............................. V:............................ T:............................ Item
97 Disturbance (B11.5)
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
98 Works cleaning and clearing (B11.6)
F:.................. V:............................ T:............................ Item
99 Vermin (B11.7)
F:............................. V:............................ T:............................ Item
100 Overhand work (B11.8)
F:............................. V:............................ T:............................ Item
Schedule of variables (B12)
101 Pre-tender information (B12.1)
F:............................. V:............................ T:............................ Item
Information necessary for elections and completion of thoseclauses contained in the schedule which are necessary fortender purposes is given hereunder. Where no information isgiven it shall mean that either no details or specificrequirements are available or that the clause is not relevant tothis specific contract
12.1.1 Provisional bills of quantities (B2.2)The quantities are provisional:
Yes
12.1.2 Availability of construction documentation (B2.3)Construction documentation is not complete
No
12.1.3 Interest of agents (B2.4)
12.1.4 Defined works area (B3.1)
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
12.1.5 Geotechnical investigation (B3.2)
None
12.1.6 Existing premises occupied (B3.4) No
12.1.7 Services - known (B3.7)Existing services and points of connection are shownon the site plan or will be pointed out on site by theprincipal agent
Yes
12.1.8 Protection of trees (B3.9)
12.1.9 Inspection of adjoining properties (B3.11)
12.1.10 Enclosure of the works (B6.2)
12.1.11 Offices (B6.4.3)
12.1.12 Main notice board (B6.5)
A notice board is requiredYes
12.1.13 Subcontractors notice board (B6.6)A notice board is required
No
12.1.14 Water (B7.2)Alternative Selected:
A
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
12.1.15 Electricity (B7.3)Alternative selected:
A
12.1.16 Telecommunications (B7.4)Alternative selected:
A
12.1.17 Ablution facilities (B7.5)Alternative selected:
A
12.1.8 Special attendance (B9.2)
12.1.19 Protection of the works (B11.1)
12.1.20 Protection of existing/sectionally occupied works(B11.2)
Protection is requiredYes
12.1.21 Disturbance (B11.5)
102 Post tender information (B12.2)
F:............................. V:............................ T:............................ Item
12.2.1 Payment of preliminariesAlternative selected: B
12.2.2 Adjustment of preliminariesAlternative selected: A
12.2.3 Additional agreed preliminaries items
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
SECTION C: SPECIFIC PRELIMINARIES
Any special items to meet the parrtcular circumstances of aspecific project are embodied in this section. Where requiredfor an aspect of the works to be executed according to a designby a consulting engineer, a recital of the headings to theindividual clauses of the JBCC Engineering General Conditionsare included
103 PROPRIETARY BRANDED PRODUCTSThe contractor shall take delivery of, handle, store, use applyand/or fix all proprietary branded products in strict accordancewith the manufacturers' instruction after consultation with themanufacturer's authorised representative
F:............................. V:............................ T:............................ Item
104 OVERTIME
Should overtime be required to be worked for any reasonwhatsoever, the costs of such overtime are to be borne by thecontractor unless the principal agent has specifically authorisedin writing, prior to the execution thereof, that costs for suchovertime are to be borne by the employer.
F:............................. V:............................ T:............................ Item
105 AS BUILT DRAWINGS
The position of construction breaks and the extent of individualconcrete pours are to be recorded by the contractor on thestructural engineer's drawings and are to be submitted to theprincipal agent and the structural engineer for their records.
F:............................. V:............................ T:............................ Item
106 SITE INSTRUCTIONS
Site instructions issued on site are to be recorded in triplicate ina site instruction book which is to be maintained on site by thecontractor
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
107 LABOUR DESK
The contractor shall establish a labour desk on site with adedicated office of maximum 9m2 with a desk 2 chairs andelectricity. From the labour desk, the contractor will appoint adedicated community laison officer at a minimum monthly grossremuneration of R 7000.00, subject to all statutory deductions.The community laison officer will be employed by and will reportto the contractor, who will in turn forward such reports to thePrincipal Agent
Item
108 LABOUR RECORD
At the end of each week the contractor shall provide theprincipal agent with a written record, in schedule form, reflectingthe number and description of tradesmen and labourersemployed by him and all subcontractors on the works each day.
F:............................. V:............................ T:............................ Item
109 PLANT RECORD
At the end of each week the contractor shall provide theprincipal agent with a written record, in schedule form, reflectingthe number, type and capacity of all plant, excluding hand tools,currently used on the works.
F:............................. V:............................ T:............................ Item
110 NON CESSION OF MONIES
The contractor shall not cede nor assign his rights or claims toany monies due or to become due under this contract
F:............................. V:............................ T:............................ Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
111 GENERAL SPECIFICATION
The general specification for the works is the Model PreamblesFor Trades 1999 as published by the Association of QuantitySurveyors. Tenderers are to avail themselves of the fullcontract thereof and the document will be deemed to be part ofthe conditions of of tender and contract
F:............................. V:............................ T:............................ Item
SECTION D: HEALTH & SAFETYPRELIMINARIES
Total cost of "Health and Safety Measures"
112 Administration and Management Cost Item
113 Occupational Health and Safety Personnel Item
114 Training and Development Cost Item
115 Personal Protective Equipment Cost Item
116 OHS Awareness, Promotion and Signage Cost Item
117 OCCUPATIONAL HEALTH AND SAFETY ACT - SECTION37(2)
The tenderers attention is drawn to the fact that theOccupational Health and Safety Act (Act 85 of 1993) is in force.Copies of the Act are available from the Government PrintingWorks, 149 Bosman Street, Pretoria (Private Bag X85,Pretoria, 0001, Tel No. (012) 334-4500).
Tenderers are expected to be fully aquainted with therequirements of the Act.
Tenderers, should they deem it necessary to provide for theabove-mentioned requirements are to allow for all costimplications herewith.
F:.............. V:............................ T:................. Item
Carried to Collection R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 1
PRELIMINARIES AND GENERALS
Bill No. 1
Preliminaries
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Carried Forward R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
2 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 1
PRELIMINARIES AND GENERALS
Bill No. 1
Preliminaries
COLLECTION
Page AmountNo
Brought Forward R
Total Brought Forward from Page No. 19
20
21
22
23
24
25
26
27
28
Carried to Final Summary R Section No. 1PRELIMINARIES AND GENERALSBill No. 1PreliminariesBID NO: NWDOH/PS/06/16
3 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 1
ALTERATIONS
For preambles see "Model Preambles for Trades (2008Edition)" and Supplementary preambles as specified in theTrades as well as Engineering Specifications attached to thesedocuments.
SUPPLEMENTARY PREAMBLES
View site
Before submitting his tender the contractor shall visit the siteand satisfy himself as to the nature and extent of the work to bedone and the value of the materials contained in the buildingsor portions of the buildings to be demolished. No claim for anyvariations of the contract sum in respect of the nature andextent of the work or of inferior or damaged materials will beentertained
Explosives
No explosives whatsoever may be used for demolitionpurposes unless otherwise stated
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
General
The contractor shall carry out the whole of the works with aslittle mess and noise as possible and with a minimum ofdisturbance to adjoining premises and their tenants. He shallprovide proper protection and provide, erect and remove whendirected, any temporary tarpaulins that may be necessaryduring the progress of the works, all to the satisfaction of theprincipal agent
Water supply pipes and other piping that may be encounteredand found necessary to disconnect or cut, shall be effectuallystopped off or grubbed up and removed, and any newconnections that may be necessary shall be made with properfittings, to the satisfaction of the principal agent
Doors, fanlights, fittings, frames, linings, etc which are to bere-used shall be thoroughly overhauled before refixing includingtaking off, easing and rehanging, cramping up, re-wedging arequired and making good cramps, dowels, etc, and easing,oiling, adjusting and repairing ironmongery as necessaryreplacing any glass damaged in removal or subsequently andstopping up all nail and screw holes with tinted plastic wood tomatch timber, unless otherwise described. Re-painting orre-varnishing is given separately
Prices for taking out of doors, windows, etc shall include forremoval of all beads, architraves, ironmongery, etc
Prices for taking out and removing doors and frames shallinclude for removing door stops, cabin hooks, etc and makinggood floor and wall finishes to match existing
With regard to building up of openings in existing walls, cementscreeds and pavings, granolithic, tops of walls, etc, shall belevelled and prepared for raising of brickwork
Making good of finishes shall include making good of the brickand concrete surfaces onto which the new finishes are applied,where necessary
The contractor will be required to take all dimensions affectingthe existing buildings on the site and he will be held solelyresponsible for the accuracy of all such dimensions where usedin the manufacture of new items (doors, windows, fittings, etc)
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Old materials
Old materials from alterations except where described to bere-used or handed over, become the property of the Contractor
Old materials from the alterations except where described to bere-used or handed over, as well as all rubbish etc. must beregularly carted from the site and not be allowed to accumulateon or around the site
None of the old materials are to be used for new work exceptwhere specifically described as being set aside for re-use
Where certain materials or articles from demolitions oralterations are described as to be handed over by thecontractor to the Principal Agent such materials or articles shallbe properly stored by the contractor, until handing over thereof.The contractor shall obtain an official receipt listing thematerials or articles and dates of handing over. If the contractorfails to submit the receipt when requested to do so it shall bedeemed that the materials or articles are still in his possesionand he will be held liable to the Client for the full replacementvalue thereof which amount will be deducted from any moniesdue to the Contractor
Credit for old materials
Credit for old materials, if so desired, is to be allowed for by theContractor and a list of such credit items and rates will beincluded as part of the priced bills of quantities
Client reserves the right to keep any or all of the old materialsdescribed in the bills of quantities irrespective of such materialshaving been listed and priced or not at the rates for therespective materials
REMOVAL OF EXISTING WORK
Breaking up and removing mass concrete includingcutting off and removing reinforcement
1 Steps and ramps m3 20
2 85-150mm Thick surface bed including digging up foundationsand making good m2 1 645
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
3 Beams m3 Rate Only
4 Columns m3 Rate Only
5 225mm Thick slabs m2 Rate Only
Breaking down and removing brickwork etc
6 Mass Brickwork m3 Rate Only
7 Half brick wall m2 491
8 One brick wall m2 2 086
Taking out doors, windows, etc including thresholds, sills,etc and setting aside
9 Timber single door and frame approximately 813 x 2032mmhigh No 45
10 Timber double door and frame approximately 1500 x 2032mmhigh No 1
11 Glazed steel window type NE1 size 533 x 654mm high fromone brick wall No 24
12 Glazed steel window type SS33 size 987 x 1445mm high fromone brick wall No 97
13 Glazed steel window type ND2F size 1022 x 1245mm high fromone brick wall No 1
14 Glazed steel window type NE4 size 1511 x 654mm high fromone brick wall No 9
15 Glazed steel window type NES3 size 1511 x 654mm high fromone brick wall No 12
16 Glazed steel window type NC4F size 1511 x 949mm high fromone brick wall No 1
17 Glazed steel window type ND4F size 1511 x 1245mm high fromone brick wall No 1
18 Glazed steel window type ND53S size 1511 x 1559mm highfrom one brick wall No 3
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
19 Glazed steel window type NG4ND4 size 1511 x 1559mm highfrom one brick wall No 1
20 Glazed steel window type ND11F size 2000 x 1245mm highfrom one brick wall No 6
Taking down and removing roofs, floors, panelling,ceilings, partitions, etc and setting aside
21 Corrugated iron roof covering and timber purlins includingtimber trusses and purlins, eaves soffit covering, fascias, bargeboards, gutters and rainwater pipes m2 2 490
22 Gypsum plasterboard ceilings including cornices, timberbrandering, etc m2 1 593
23 Drywall partitioning 3.2m high including doors, ironmongery,glazed borrowed lights, etc m Rate Only
Taking out and removing sundry joinery work
Taking out and removing sundry joinery work, settingaside for re-use and later refixing in new position
24 Timber skirtings from brickwork m Rate Only
Taking out and removing joinery fittings etc, setting aside
25 Timber wall cupboard No Rate Only
26 Timber floor cupboard No Rate Only
Taking up and removing vinyl floor coverings, carpeting,etc
27 Vinyl tile floor covering including preparing screed for new vinylfloor covering m2 Rate Only
28 Vinyl sheet floor covering with welded joints including preparingscreed for new vinyl floor covering m2 Rate Only
29 Carpet tile floor covering including preparing screed for newcarpeting m2 Rate Only
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Taking out and removing ironmongery, etc and settingaside
30 Mortice lock and striking plate from timber door and steel frameNo Rate Only
31 Chromium plated towel rail not exceeding 1000mm long No Rate Only
32 Chromium plated toilet paper holder No Rate Only
33 Chromium plated hat and coat hook No Rate Only
Taking out/off and removing sundry metalwork, etc andsetting
34 Steel balustrade 900mm high from concrete stairs includingmaking good granolithic finish to kerb m 137
35 Steel wire mesh burglar proofing with framing 813 x 2032mmhigh bolted to brickwork No 19
36 Steel wire mesh burglar proofing with framing 1511 x 2032mmhigh bolted to brickwork No 1
Hacking up/off and removing ceramic tile floor and wallfinishes including removing mortar bed or backing andpreparing concrete or brick surfaces for new screed,plaster or tile finishes
37 Ceramic floor tiles m2 1 593
38 Ceramic walls tiles m2 708
39 Tile skirting m Rate Only
Taking out paving and setting aside
40 Precast concrete including levelling of the site m2 3 800
Taking out and removing piping, sanitary fittings, etcincluding disconnecting piping from fittings and makinggood floor and wall finishes (making good tiling andpaintwork elsewhere)
41 Galvanised steel piping including fittings and brackets m Rate Only
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
42 Cast iron piping including fittings and brackets m Rate Only
43 Copper piping including fittings and brackets m 300
44 Stainless steel wash hand basin No Rate Only
45 Vitreous china wash hand basin No 10
46 Vitreous china WC pan with cistern No 23
47 Vitreous china WC pan with flush valve No Rate Only
48 Vitreous china wall hung urinal with flush valve No 1
49 Stainless steel urinal approximately 1900 x 1800mm highincluding breaking up and removing 220mm wide concreteurinal step No 1
Carried to Collection R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 1
ALTERATIONS
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 31
32
33
34
35
36
37
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 1ALTERATIONSBID NO: NWDOH/PS/06/16
3 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 2
FOUNDATIONS
SUPPLEMENTARY PREAMBLES
Nature of ground
The nature of the ground is assumed to be sandy weatheredgranite, therefore "earth", but possibly interspersed with "hardrock"
Excavation for working space in rock
Notwithstanding clause 11 page 8 of the Standard System ofMeasuring Building Work, excavation for working space in rockwill be measured in cubic metres to the extent executed andgiven as "extra over" bulk excavation or trench and holeexcavation as the case may be
Carting away of excavated material
Descriptions of carting away of excavated material shall bedeemed to include loading excavated material onto trucksdirectly from the excavations or, alternatively, from stock pilessituated on the building site
Filling
Notwithstanding the reference to prescribed multiple handling inclause 1 page 6 of the Standard System of Measuring BuildingWork, prices for filling and backfilling shall include for allselection and any multiple handling of material
EXCAVATIONS
Excavation in earth not exceeding 2m deep
1 Trenches m3 690
2 Holes m3 22
Carried to Collection R Section No. 2BUILDING WORKSBill No. 2FOUNDATIONSBID NO: NWDOH/PS/06/16
3 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
3 Rip and scarify ground level to a depth of 150mm andconsolidate to 90% mod. AASHTO density (minimum CBR 3) m2 2 172
Extra over trench and hole excavations in earth forexcavation in
4 Soft rock m3 71
5 Hard rock m3 36
Extra over all excavations for carting away
6 Surplus material from excavations and/or stock piles on site toa dumping site to be located by the contractor m3 517
Risk of collapse of excavations
7 Sides of trench and hole excavations not exceeding 1,5m deep m2 2 110
Keeping excavations free of water
8 Keeping excavations free of waterItem
FILLING ETC
Earth filling of selected granular material supplied by thecontractor, compacted to 95% Mod AASHTO density
9 Backfilling to trenches, holes, etc m3 217
Earth filling of G7 material supplied by the contractor,compacted to 95% Mod AASHTO density
10 Under floors, steps, pavings, etc m3 977
Compaction of surfaces
11 Compaction of ground surface under floors etc, includingscarifying for a depth of 150mm, breaking down oversizematerial, adding suitable material where necessary andcompacting to 93% Mod AASHTO density m2 2 203
Prescribed density tests on filling
12 "Mod. AASHTO Density" test No 21
Carried to Collection R Section No. 2BUILDING WORKSBill No. 2FOUNDATIONSBID NO: NWDOH/PS/06/16
4 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
SOIL POISONING
Soil insecticide to be executed with SABS compliance by afirm of specialists under a five (5) year guarantee
13 Under floors etc, including forming and poisoning shallowfurrows against foundation walls etc, filling in furrows andramming m2 2 172
14 To bottoms and sides of trenches etc m2 3 137
UNREINFORCED CONCRETE CAST AGAINSTEXCAVATED SURFACES
15MPa/19mm concrete
15 Surface blinding under footings and bases m3 17
REINFORCED CONCRETE CAST AGAINSTEXCAVATED SURFACES
30MPa/19mm concrete
16 Strip footings m3 100
17 Column bases m3 9
TEST CUBES
18 Making and testing 150 x 150 x 150mm concrete strength testcube (Provisional) No 10
REINFORCEMENT
High tensile steel reinforcement to structural concretework
19 10mm Diameter bars t 17.36
MASONRY
Brickwork of "Corobrik Imperial NFXE" 20Mpa nominalcompressive strength bricks in class II mortar
20 Half brick walls m2 243
Carried to Collection R Section No. 2BUILDING WORKSBill No. 2FOUNDATIONSBID NO: NWDOH/PS/06/16
4 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
21 One brick walls m2 495
BRICKWORK SUNDRIES
Steel bar reinforcement
22 12mm Diameter high tensile steel bars built in horizontally t 10.21
Brickwork reinforcement
23 75mm Brick reinforcement m 1 620
24 150mm Wide reinforcement built in horizontally m 5 674
FACE BRICKWORK
Fce brick: FBX "Corobrick" Firelight Satin or similarapproved burnt clay face brick, manufacture in accordancewith SANS 227:2007, bedded in (3:1) sand/cement mixtureand joints pointed with square jointing tool in horizontaland vertical joints. (PC Amount R4 000.00/thousand VATexcl supplied and delivered to site)
Note: All face brick shall be cleaned down as the workproceeds and shall be covered up with approved means.External facing shall be treated with an approved facebrick sealant.
25 Extra over brickwork for face brickwork built in horizontallym2 495
Carried to Collection R Section No. 2BUILDING WORKSBill No. 2FOUNDATIONSBID NO: NWDOH/PS/06/16
4 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 2
FOUNDATIONS
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 39
40
41
42
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 2FOUNDATIONSBID NO: NWDOH/PS/06/16
4 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 3
CONCRETE, FORMWORK ANDREINFORCEMENT
SUPPLEMENTARY PREAMBLES
Cost of tests
The costs of making, storing and testing of concrete test cubesas required under clause 7 "Tests" of SABS 1200 G shallinclude the cost of providing cube moulds necessary for thepurpose, for testing costs and for submitting reports on thetests to the architect. The testing shall be undertaken by anindependent firm or institution nominated by the contractor andto the approval of the architect. (Test cubes are measuredseparately)
Breeze concrete
Breeze concrete shall consist of twelve parts clean dry furnaceash, free from coal or other foreign matter, to one part cement(12:1), the ash graded up to particles which will pass a 16,5mmring from a minimum which fails to pass a 4,75mm mesh. Thefiner materials from the screening are to be first mixed with thecement into a mortar and the ash added afterwards andthoroughly incorporated
Formwork
Description of formwork shall be deemed to include use andwaste only (except where described as "left in" or "permanent"),for fitting together in the required forms, wedging, plumbing andfixing to true angles and surfaces as necessary to ensure easyrelease during stripping and for reconditioning as necessarybefore re-use
The vertical strutting shall be carried down to such constructionas is sufficiently strong to afford the required support withoutdamage and shall remain in position until the newly constructedwork is able to support itself
Carried to Collection R Section No. 2BUILDING WORKSBill No. 3CONCRETE, FORMWORK & REINFORCEMENTBID NO: NWDOH/PS/06/16
4 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Formworks to soffits of solid slabs etc shall be deemed to beslabs not exceeding 250mm thick unless otherwise described
Formwork to soffits of slabs, beams, etc shall be deemed to bepropped up exceeding 1,5m and not exceeding 3,5m highunless otherwise described
Formwork to sides of bases, pile caps, ground beams, etc willonly be measured where it is prescribed by the engineer fordesign reasons. Formwork necessitated by irregularity orcollapse of excavated faces will not be measured and the costthereof shall be deemed to be included in the allowance fortaking the risk of collapse of the sides of the excavations,provision for which is made in "Earthworks"
REINFORCED CONCRETE
30MPa/19mm concrete
1 Surface beds m3 217
2 Surface beds cast in panels on waterproofing m3 35
3 Slabs including beams and inverted beams m3 60
4 Stub columns m3 1
5 Upstand beams m3 75
TEST CUBES
6 Making and testing 150 x 150 x 150mm concrete strength testcube (Provisional) No 40
CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with a woodfloat/steel trowel
7 Surface beds, slabs, etc m2 2 788
SMOOTH FORMWORK (DEGREE OF ACCURACYI)
Carried to Collection R Section No. 2BUILDING WORKSBill No. 3CONCRETE, FORMWORK & REINFORCEMENTBID NO: NWDOH/PS/06/16
4 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Smooth formwork to sides
8 Upstand beams m2 681
9 Stub columns m2 14
Smooth formwork to soffits
10 Soffit of slabs m2 229
11 Beams propped up not exceeding 3,5m high m2 155
MOVEMENT JOINTS ETC
Expansion joints with bitumen impregnated softboardbetween concrete and brickwork
12 10mm Joints not exceeding 300mm high along edges ofsurface beds m 2 307
Two layers of three ply malthoid slip joints betweenhorizontal concrete and brick surfaces including cementmortar bed all to manufacturer's instructions
13 Not exceeding 300mm wide m 2 307
REINFORCEMENT
Mild steel reinforcement to structural concrete work
14 8mm Diameter bars t 1.60
High tensile steel reinforcement to structural concretework
15 12mm Diameter bars t 22.91
Fabric reinforcement
16 Type 100 fabric reinforcement in concrete surface beds, slabs,etc m2 2 559
Carried to Collection R Section No. 2BUILDING WORKSBill No. 3CONCRETE, FORMWORK & REINFORCEMENTBID NO: NWDOH/PS/06/16
4 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 3
CONCRETE, FORMWORK & REINFORCEMENT
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 44
45
46
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 3CONCRETE, FORMWORK & REINFORCEMENTBID NO: NWDOH/PS/06/16
4 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 4
MASONRY
SUPPLEMENTARY PREAMBLES
BRICKWORK
Sizes in descriptions
Where sizes in descriptions are given in brick units, "one brick"shall represent the length and "half brick" the width of a brick
Linings to concrete
Descriptions of linings to concrete, unless otherwise described,shall be deemed to include wire ties
Hollow walls etc
Descriptions of hollow walls shall be deemed to include wall tiesand leaving every fifth perpend of the bottom course of theexternal skin open as a weep hole
Wall ties shall be vertical twist type wall ties galvanised750g/m2 zinc in accordance to SABS - 1986, and shall be atevery 5th brick course at 500mm centres staggered in diamondformation
Reinforced brick lintels
Lintels shall bear at least 160mm onto adjacent walling. Wheresuch bearing cannot be obtained due to the proximity ofadjacent openings the lintel shall be continuous
Face bricks
Bricks shall be ordered timeously to obtain uniformity in sizeand colour
Carried to Collection R Section No. 2BUILDING WORKSBill No. 4MASONRYBID NO: NWDOH/PS/06/16
4 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Pointing
Descriptions of recessed pointing to fair face brickwork andface brickwork shall be deemed to include square recessed,hollow recessed, weathered pointing, etc
SAMPLES
Samples of all masonry building units, shall consist of aminimum of 6 units
SUPERSTRUCTURE
Brickwork of NFP bricks in class II mortar
1 Half brick walls m2 1 571
2 One brick walls m2 4 843
3 One brickwalls in beamfilling m2 138
BRICKWORK SUNDRIES
Steel bar reinforcement
4 12mm Diameter high tensile steel bars built in horizontally t 52.52
Brickwork reinforcement
5 75mm Wide reinforcement built in horizontally m 8 976
6 150mm Wide reinforcement built in horizontally m 23 297
"Allied Concrete" prestressed fabricated lintels
7 110 x 70mm Lintels in lengths not exceeding 3m m 673
Turning pieces
8 230mm Wide turning pieces to lintels etc m 232
Galvanised hoop iron cramps, ties, etc
9 32 x 1,6mm Roof tie built 750mm deep into brickwall, wrappedover truss and fixed with four (4) galvanised nails 40mm long No 2
Carried to Collection R Section No. 2BUILDING WORKSBill No. 4MASONRYBID NO: NWDOH/PS/06/16
4 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
FACE BRICKWORK
Fce brick: FBX "Corobrick" Firelight Satin or similarapproved burnt clay face brick, manufacture in accordancewith SANS 227:2007, bedded in (3:1) sand/cement mixtureand joints pointed with square jointing tool in horizontaland vertical joints. (PC Amount R4 000.00/thousand VATexcl supplied and delivered to site)
Note: All face brick shall be cleaned down as the workproceeds and shall be covered up with approved means.External facing shall be treated with an approved facebrick sealant.
10 Extra over brickwork for face brickwork m2 3 573
11 Extra over brickwork for brick-on-edge header course lintel m 230
12 230mm Wide sill set sloping and slightly projecting m 210
Carried to Collection R Section No. 2BUILDING WORKSBill No. 4MASONRYBID NO: NWDOH/PS/06/16
5 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 4
MASONRY
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 48
49
50
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 4MASONRYBID NO: NWDOH/PS/06/16
5 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 4
BILL NO. 5
WATERPROOFING
SUPPLEMENTARY PREAMBLES
Waterproofing
Waterproofing of roofs, basements, etc shall be laid under a tenyear guarantee by an approved applicator. Waterproofing toroofs shall be laid to even falls to outlets etc with necessaryridges, hips and valleys. Descriptions of sheet or membranewaterproofing shall be deemed to include additional labour toturn-ups and turn-downs
DAMPPROOFING OF WALLS AND FLOORS
Gundle® API Brickgrip DPC 250µm damp proof course insolid walls conforming to SANS 952-1:2011 laid withminimum 150mm overlaps.
1 In walls m2 198
Gundle® API USB Green 170µm damp proof membraneunder concrete surface beds conforming to SANS952-1:2011 laid with minimum 150mm overlaps and sealedwith Gunplas pressure sensitive tape.
2 Under surface beds m2 2 559
WATERPROOFING TO ROOFS, BASEMENTS,ETC
Carried to Collection R Section No. 2BUILDING WORKSBill No. 5WATERPROOFINGBID NO: NWDOH/PS/06/16
5 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Waterproofing to exposed concrete roofs with bituminousaluminium paint finish.
Apply one coat a.b.e. bituprime to all surfaces including allverges and around outlets and protrusions.
Apply one layer of a.b.e. 4mm abegum dual reinforcedwaterproofing membrane, fully bonded by means of "torchon fusion", with 75mm side laps and 100mm end laps.Flashing strip 150mm girth at turn-ups using a.b.e. superlaykold. Apply one coat of a.b.e. silvakote bituminousaluminium protective coating, all in accordance withmanufacturer's recommendations.
3 On flat floors m2 229
Carried to Collection R Section No. 2BUILDING WORKSBill No. 5WATERPROOFINGBID NO: NWDOH/PS/06/16
5 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 5
WATERPROOFING
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 52
53
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 5WATERPROOFINGBID NO: NWDOH/PS/06/16
5 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 5
BILL NO. 6
ROOF COVERINGS, ETC.
SUPPLEMENTARY PREAMBLES
All items are measured net unless otherwise described
Flashings, trimming plates, etc.
Prices to include for all cutting and waste and relevant fixingmaterial, unless otherwise described
All rates for flashings, trimmings, etc., to include for formingdrips and closed ends to troughs of sheet steel roof coveringwhere applicable
All items are unless otherwise described measured net
PROFILED METAL SHEETING ANDACCESSORIES
Safintra SAFLOCK 700 or equal aprroved 0,58mm lightindustrial interlocking roof sheeting with chromadeckfinish to one side only, fixed to in the High Wind LoadSystem method. The sheet shall be cold roll profile on sitein single lengths to each roof slope
1 Roof coverings with pitches not exceeding 25 degrees(maximum length 21m long)
m2 2 566
2 0,8mm Chromadek sheet iron cover flashing with turned upedges of flashing and waterproofing turn-ups, shall be flashedover with cover flashing, having upper bent and set not lessthan 25mm deep into joints in the masonry m 252
3 0,8mm Chromadek purpose made barge flashing 460mm girth,four times bent along girth. m 146
Carried to Collection R Section No. 2BUILDING WORKSBill No. 6ROOF COVERING, ETC.BID NO: NWDOH/PS/06/16
5 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
4 0,8mm Chromadek Raking valley flashing 460mm girth, sixtimes bent along girth.
m 57
INSULATION, ETC
Roof insulation to be Isoboard® or equal approved 50mmhigh density 32-36kg/m³ rigid extruded polystyrene 100%closed cell insulation panels laid over roof purlins underroof sheeting in accordance to manufacturer specifications
5 50mm Thick insulation boards fixed concurrent with roofcovering etc. m2 2 566
Carried to Collection R Section No. 2BUILDING WORKSBill No. 6ROOF COVERING, ETC.BID NO: NWDOH/PS/06/16
5 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 6
ROOF COVERING, ETC.
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 55
56
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 6ROOF COVERING, ETC.BID NO: NWDOH/PS/06/16
5 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 7
CARPENTRY AND JOINERY
SUPPLEMENTARY PREAMBLES
Particle board:
Particle board shall comply with the following specifications:
a) SABS 1300 Particle board: exterior and flooring type
b) SABS 1301 Particle board: interior type
Joinery:
Descriptions of frames shall be deemed to include frames,transomes, mullions, rails, etc
Descriptions of hardwood joinery shall be deemed to includepelleting of bolt holes
Fixing
Items described as "nailed" shall be deemed to be fixed withhardened steel nails or shot pins to brickwork or concrete
Decorative laminate finish:
Laminate finish shall be glued under pressure. Edge stripsshall be butt jointed at junctions with adjacent similar finish
ROOFS ETC
Sawn softwood
1 38 x 114mm Wall plates m 458
Sundries
2 Two coats creosote on sawn timbers m2 389
Carried to Collection R Section No. 2BUILDING WORKSBill No. 7CARPENTRY & JOINERYBID NO: NWDOH/PS/06/16
5 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Sawn softwood
3 Complete roof construction for staff housing complete withtrusses, jack rafters, permanent bracing and 50 x 76mmpurlins/battens (PC Amount R126 000-00 Vat excl. supplied,delivered and installed to site by Specialists) No 1
4 Complete roof construction for guard houses complete withtrusses, jack rafters, permanent bracing and 50 x 76mmpurlins/battens (PC Amount R11 250-00 Vat excl. supplied,delivered and installed to site by Specialists) No 2
5 Complete roof construction for pump houses complete withtrusses, jack rafters, permanent bracing and 50 x 76mmpurlins/battens (PC Amount R9 000-00 Vat excl. supplied,delivered and installed to site by Specialists) No 1
6 Complete roof construction for LV houses complete withtrusses, jack rafters, permanent bracing and 50 x 76mmpurlins/battens (PC Amount R12 150-00 Vat excl. supplied,delivered and installed to site by Specialists) No 1
EAVES, VERGES, ETC
"Everite FC77" pressed fibre-cement
7 Everite medium density plain ungrooved Nutec fascia boards,size 225 x 12mm thick, fixed to timber rafters twice screwedwith 12 x 40mm countersunk brass screws with ChromaprepH-profile fascia joiner between boards m 695
DOORS, ETC
44mm Solid core masonite door with hardwoord edgecoverstrips on both sides
8 Door size 813 x 2032mm high No 68
9 Double door size 1500 x 2032 with two equal leaves
No 4
10 Double door size 1511 x 2032 with two equal leaves
No 3
Carried to Collection R Section No. 2BUILDING WORKSBill No. 7CARPENTRY & JOINERYBID NO: NWDOH/PS/06/16
5 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
44mm Solid core masonite door with hardwoord edgecoverstrips on both sides cut 20mm shorter at bottom
11 Door size 813 x 2032mm high No 21
44mm Solid meranti framed and ledged timber panel door
12 Door size 813 x 2032mm high No 3
13 Double door size 1500 x 2032 with two equal leaves with flushmeeting stiles
No 2
14 Double door size 1511 x 2032 with two equal leaves with flushmeeting stiles
No 2
Carried to Collection R Section No. 2BUILDING WORKSBill No. 7CARPENTRY & JOINERYBID NO: NWDOH/PS/06/16
6 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 7
CARPENTRY & JOINERY
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 58
59
60
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 7CARPENTRY & JOINERYBID NO: NWDOH/PS/06/16
6 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO.2
BILL NO. 8
CEILINGS, ETC.
SUPPLEMENTARY PREAMBLES
Descriptions:
Items described as "nailed" shall be deemed to be fixed withhardened steel nails or pins or shot pinned to brickwork orconcrete
Items described as "plugged" shall be deemed to includescrewing to fibre, plastic or metal plugs at not exceeding600mm centres, and where described as "bolted" the boltshave been given elsewhere
CEILINGS ETC
SUSPENDED CEILINGS
Nutec fibre cement thermo clad ceiling boards size 595 x595mm suspended in open T-grid system comprising ofT38 main tee with T25 cross tee between each tilesincluding hold-down clips, etc all suspended with 4mmdiameter galvanised rods
1 Ceilings suspended not exceeding 1m below steel trusses m2 1 053
6mm "Everite Nutec" fibre-cement boards and skimmedjoints
2 Ceilings including 50 x 75mm sawn softwood brandering at600mm centres m2 684
3 Sloping ceilings including 50 x 75mm sawn softwoodbrandering at 600mm centres m2 318
"Everite Nutec" cornices
4 75mm Coved cornices m 663
Carried to Collection R Section No. 2BUILDING WORKSBill No. 8CEILINGS, ETC.BID NO: NWDOH/PS/06/16
6 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
BULKHEADS
Nutec fibre cement
5 Soffit and side of horizontal bulkheads, size 490 x 350mmdeep, suspended not exceeding 1m below timber/steel purlins m 947
Carried to Collection R Section No. 2BUILDING WORKSBill No. 8CEILINGS, ETC.BID NO: NWDOH/PS/06/16
6 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 8
CEILINGS, ETC.
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 62
63
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 8CEILINGS, ETC.BID NO: NWDOH/PS/06/16
6 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO. 2
BILL NO. 9
FLOOR COVERINGS, WALLS,ETC.
FLOOR COVERINGS
Polyflor Type XL Pu 2,0mm thick Fossil 3710Homogeneous vinyl floor sheeting, fully flexible sheetflooring welded with Polyfor welding rod, laid in suitableapproved adhesive for the substrate on to which theproduct will be installed and laid by an approvedcontractor. Use Polyflor Poly levelmster self levellingscreed to make up floor finish level difference.
1 On floors m2 489
2 Polish of vynil flooring m2 489
Polyflor Type XL Pu 2,0mm thick Ruby 384 Homogeneousvinyl floor sheeting, fully flexible sheet flooring weldedwith Polyfor welding rod, laid in suitable approvedadhesive for the substrate on to which the product will beinstalled and laid by an approved contractor. Use PolyflorPoly levelmster self levelling screed to make up floor finishlevel difference.
3 Polish of vynil flooring m2 489
4 On floors m2 489
Entrance matt by "Poly Sales" code: PF9100 vinyl nonwoven continuous filament floor mat with open continuouspatterned surface having a "Z Web" pattern on the topsurface to act as a scraper removing foot soles dirt, andbonded together into a resilient continuous durable mat of8.3kgs and 11.4mm thick. Colour: Grey
5 Matt No 1
WALL LININGS
Carried to Collection R Section No. 2BUILDING WORKSBill No. 9FLOOR COVERINGS, ETCBID NO: NWDOH/PS/06/16
6 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Polyflor Type XL Pu 1,5mm thick vinyl wall sheeting to beapplied as per manufacturers specification
6 On walls m2 356
SKIRTINGS, NOSINGS, ETC
"Polyflor"
7 Polyflor Polycove PC20 fold vinyl strtip size 200mm high, all inaccordance with manufacturer's specifications. m 908
Carried to Collection R Section No. 2BUILDING WORKSBill No. 9FLOOR COVERINGS, ETCBID NO: NWDOH/PS/06/16
6 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 9
FLOOR COVERINGS, ETC
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 65
66
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 9FLOOR COVERINGS, ETCBID NO: NWDOH/PS/06/16
6 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 10
IRONMONGERY
SUPPLEMENTARY PREAMBLES
Descriptions
Items described as "plugged" shall be deemed to includescrewing to fibre, plastic or metal plugs
SUPPLEMENTARY PREAMBLES
Proprietary items
Where applicable the manufacturers' names or productcatalogue titles are given in sub-headings preceding the items
Prices are to be based on the specific products/articlesspecified. If tenderers wish to offer alternative products/articlesfor certain items, these items are to be clearly marked and thealternative specification given with supporting brochures etcclarifying the features of the products/articles offered
On request returnable samples are to be provided to theprincipal agent for consideration
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
6 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Finishes to ironmongery
Where applicable finishes to ironmongery are indicated bysuffixes in accordance with the following list:BS Satin bronze lacqueredCH Chromium platedSC Satin chromium platedSE Silver enamelledGE Grey enamelledAN Anodised naturalAS Anodised silverAB Anodised bronzeAG Anodised goldABL Anodised blackPB Polished brassPL Polished and lacqueredPT Epoxy coatedSD Sanded
HINGES, BOLTS, ETC
"Dorma"
1 Brass hinge with nylon washers No 99
2 100mm Brass hinge No 24
LOCKS
"Dorma"
3 35mm Narrow stile deadlock (Stainless Steel) code: D02735SS No 11
4 35mm Bracket narrow stile sashlock (Stainless Steel) code:D02635 SS No 24
5 Adjustable roller bolt (Stainless Steel) code: DBC-SS-022 No 63
6 66mm Ten pin euro-profile double cylinder master keyed (SatinNickel) code: DDC106601MK No 67
7 43mm Ten pin euro-profile single cylinder master keyed (SatinNickel) code: DSC104301MK No 26
8 Narrow stile cylinder escutcheon (Stainless Steel) No 11
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
6 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
9 Flushbolt on passive door No 63
10 Dust proof strike (Stainless Steel) code: DSP-SS-032 No 32
11 Cylinder sashlock (Stainless Steel) code: D036S SS No 44
12 Cylinder deadlock code: D037D SS No 8
13 Nickel plated rebated kit code: D038R NP No 12
14 Satin chrome 150 x 32mm Necked heavy duty bolt code: NBHD150 No 12
15 Satin chrome 150 x 32mm Barrel heavy duty bolt code: BHD150 No 12
16 Bathroom deadlock (Stainless Steel) code: D032D SS No 23
17 Bathroom deadlock (Stainless Steel) code: DMWC-SS-008 No 21
18 Disabled WC indicator bolt (Red & White) and turnknob code:DWC-SS-006 No 23
19 Bathroom WC indicator bolt (Red & White) and turnknob code:DWC-SS-005 No 21
HANDLES
"Dorma" or equal approved
20 DPH301C Brushed stainless steel Pull handle on 150 x 300 x1.2mm plate code: DHP-SS-BL with Male/Female fixing screws No 8
21 DPH301A Brushed stainless steel back to back Pull handle on75 x 170 x 1.2mm plate code: DHP-SS-BL with Male/Femalefixing screws No 21
22 382 x 32mm Stainless steel D shaped offset tubular pull handleBTB (BTB fixing sets included) DPH215 BTB Pairs 12
23 325 x 25mm Stainless Steel Straight tubular pull handle flangefixing code: DPH301B Pairs 23
24 Exterior access lock with lever handle code: PHT3901 No 6
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
7 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
25 PHA3/S Three point locking panic bar with components (2101.2101. 2104. 2201. PHX02. PHX04) No 6
26 Lever handles on N/S rose with N/S cylinder escutcheons(Stainless Steel) code: TH120 N/S Cyl S.S Sets 21.0
27 Lever handles on 170 x 170 plate with cylinder cutout (StainlessSteel) code: TH120/BP Cyl S.S Sets 47.0
PUSH PLATES AND KICKING PLATES
"Dorma" or equal approved
28 813mm long x 200mm high x 1,2mm thick stainless steel kickplate code:DKP-SS-200 No 62
29 170 x 170 x 1,2mm Push plate cylinder code: DPP-SS-CL 170x 170 No 8
DOOR CLOSERS
"Dorma" or equal approved
30 Floor mounted door stop (Nikel Plated) code: DDS-SS-018 No 121
31 Hold open double action floor spring code: BTS75 DAA No 5
32 Hold open single action floor spring code: BTS75 DAA No 6
33 TS73V EN 2-4 Parallel Arm delayed action door closerincluding TS73V PA DC parallel arm brackets No 23
34 TS91B EN 3 Cam action silver slide channel NON HOLDOPEN door closer-hydraulic speed control No 8
SUNDRIES
"Dorma" or equal approved
35 Stainless steel Hat and Coat Hook with rubber buffer code:DHC-SS-031B No 21
36 150mm Satin chrome cabin hook code: CH 150 No 27
PELMETS AND CURTAIN TRACKS
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
7 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
"Yokota Racer"
37 Chromium plated curtain or hanging rail 1480mm long includingflanged end brackets No 9
BATHROOM FITTINGS
"Franke"
38 "Franke" Stratos STRX 600 or similar approved 1,2/1,5mmthick grade 304 18/10 satin stainless steel paper toweldispenser size 305 x 300 x 134mm high, plugged and screwedto the wall with stainless steel screws.
No 63
39 "Franke" Stratos STRX 605 or similar approved 1,2/1,5mmthick grade 304 18/10 satin stainless steel waste disposal bins,size 300 x 270 x 520mm high, plugged and screwed to the wallwith stainless steel screws.
No 63
40 "Franke" Stratos STRX 615 or similar approved 1,2/1,5mmthick grade 304 18/10 satin stainless steel sanitary bagdispenser, size 250 x 156 x 90mm high, plugged and screwedto the wall with stainless steel screws.
No 27
41 "Franke" stratos STRX 618 or simialr approved 1,2/1,5mm thickgrade 304 18/10 satin stainless steel soap dispenser, size 304x 100 x 134mm deep with a replacement and refillable 1 litrecontainer, cylinder lock with standard Franke key, plugged andscrewed to the wall with stainless steel screws. No 63
42 "Franke" stratos STRX 611 or similar approved 1,2/1,5mm thickgrade 304 18/10 satin stainless steel recessed sanitary toweldisposal bins, size 232 x 135 x 331mm deep, plugged andscrewed to the wall with stainelss steel screws
No 46
43 "Franke" stratos STRX 671 or similar approved 1,2/1,5mm thickgrade 304 18/10 satin stainless steel toilet roll holders, size 305x 156 x 141mm deep for 2 rolls maximum 108mm diameterwith spindle system and cylinder lock with standard Franke key,plugged and screwed to the wall with stainelss steel screws No 46
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
7 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
44 PD037 Dispenser PPE Large for Gloves, Masks and ApronsPD037 No 22
BATHROOM FITTINGS
"Franke"
45 Franke CNTX 600 32mm diameter Grade 304 18/10 stainlesssteel grab rails (code: 359872), size 600mm x 95mm deep withFranke Fine Grip surface, plugged and screwed to the wall withstainless steel screws. No 8
46 Franke CNTX 700 A 32mm diameter Grade 304 18/10stainless steel angle bars (code: 359877), size 256 x 618 x95mm deep with Franke Fine Grip surface, plugged andscrewed to the wall with stainless steel screws. No 8
STEEL LOCKERS
"Greenfield" steel lockers with Beige Powder coated finish
47 2 Door locker 380 x 450 x 1800mm high code: GB002 No 172
Carried to Collection R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
7 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 10
IRONMONGERY
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 68
69
70
71
72
73
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 10IRONMONGERYBID NO: NWDOH/PS/06/16
7 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 11
STRUCTURAL STEELWORK
SUPPLEMENTARY PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts andwashers
Descriptions of L-shaped and U-shaped anchor bolts shall bedeemed to include bending, threading, nuts and washers andembedding in concrete
Descriptions of expansion anchors and bolts and chemicalanchors and bolts shall be deemed to include nuts, washersand mortices in brickwork or concrete
Descriptions of L-shaped and U-shaped anchor bolts shall bedeemed to include bending, threading, nuts and washers andembedding in concrete. Where anchor bolts are described asembedded in sides or soffits of concrete it shall be deemed toinclude holes through formwork.
Descriptions of expansion anchors and bolts and chemicalanchors and bolts shall be deemed to include nuts, washersand mortices in brickwork or concrete.
Note:
All structural steelwork to be Grade 300w
STEEL COLUMNS AND BEAMS
Welded columns in single lengths with flat section base,top, bearer and connection plates bolted to ?
1 100 x 50 x 4mm Rectangular Hollow-section columns t 0.54
Carried to Collection R Section No. 2BUILDING WORKSBill No. 11STRUCTURAL STEELWORKBID NO: NWDOH/PS/06/16
7 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Bolts to columns, beams, etc
2 M12 chemical anchor bolt kg 10
Welded beams in single lengths with flat section bearerand connection plates bolted to columns
3 180 x 91mm x 18,8kg/m IEP180 -section beams t 1.03
4 200 x 100mm x 22,4kg/m IEP200 -section beams t 0.75
STEEL TRUSSES ETC
Welded roof trusses of angle section rails, struts, braces,cleats, etc and flat section bearer, gusset and connectionplates bolted to steel
5 3 (No) monopitched trusses 3266 x 1510mm high extreme(Truss No.1) t 0.49
6 3 (No) monopitched trusses 8540 x 2960mm high extreme(Truss No.2) t 1.30
7 4 (No) monopitched trusses 3819 x 1240mm high extreme(Truss No.3) t 0.65
8 4 (No) monopitched trusses 7034 x 2550mm high extreme(Truss No.4) t 1.38
9 4 (No) monopitched trusses 12267 x 2554mm high extreme(Truss No.5) t 2.26
10 4 (No) monopitched trusses 6089 x 2141mm high extreme(Truss No.6) t 1.18
11 6 (No) monopitched trusses 2634 x 1236mm high extreme(Truss No.7) t 0.78
12 3 (No) monopitched trusses 6442 x 2447mm high extreme(Truss No.8) t 1.01
13 3 (No) monopitched trusses 6275 x 2000mm high extreme(Truss No.9) t 0.82
14 3 (No) monopitched trusses 2799 x 1060mm high extreme(Truss No.10) t 0.37
Carried to Collection R Section No. 2BUILDING WORKSBill No. 11STRUCTURAL STEELWORKBID NO: NWDOH/PS/06/16
7 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
15 5 (No) monopitched trusses 3145 x 1170mm high extreme(Truss No.11) t 0.64
16 3 (No) monopitched trusses 5929 x 2150mm high extreme(Truss No.12) t 0.84
17 4 (No) monopitched trusses 4511 x 1380mm high extreme(Truss No.13) t 0.78
18 4 (No) monopitched trusses 5786 x 1870mm high extreme(Truss No.14) t 1.04
19 4 (No) monopitched trusses 3458 x 1400mm high extreme(Truss No.15) t 0.66
20 3 (No) monopitched trusses 6083 x 2500mm high extreme(Truss No.16) t 0.94
21 3 (No) monopitched trusses 3543 x 1330mm high extreme(Truss No.17) t 0.48
22 3 (No) monopitched trusses 6222 x 2500mm high extreme(Truss No.18) t 0.90
23 9 (No) monopitched trusses 7123 x 2464mm high extreme(Truss No.19) t 3.47
24 3 (No) monopitched trusses 2149 x 660mm high extreme(Truss No.20) t 0.11
25 3 (No) monopitched trusses 4222 x 1720mm high extreme(Truss No.21) t 0.60
26 2 (No) monopitched trusses 2149 x 660mm high extreme(Truss No.22) t 0.07
27 3 (No) monopitched trusses 6233 x 1880mm high extreme(Truss No.24) t 0.82
28 3 (No) monopitched trusses 3307 x 1250mm high extreme(Truss No.25) t 0.45
PURLINS, GIRTS, BRACING, ETC
Carried to Collection R Section No. 2BUILDING WORKSBill No. 11STRUCTURAL STEELWORKBID NO: NWDOH/PS/06/16
7 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Purlins and girts bolted to steel
29 60 x 60 x 6mm Equal angle t 5.11
30 75 x 50 x 20 x 2.5mm CF Channel t 1
31 100 x 50 x 20 x 2.0mm CF Channel t 9
Carried to Collection R Section No. 2BUILDING WORKSBill No. 11STRUCTURAL STEELWORKBID NO: NWDOH/PS/06/16
7 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 11
STRUCTURAL STEELWORK
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 75
76
77
78
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 11STRUCTURAL STEELWORKBID NO: NWDOH/PS/06/16
7 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 12
METALWORK
SUPPLEMENTARY PREAMBLES
Descriptions
Descriptions of bolts shall be deemed to include nuts andwashers
Descriptions of expansion anchors and bolts and chemicalanchors and bolts shall be deemed to include nuts, washersand mortices in brickwork or concrete
Metalwork described as"holed for bolt(s)" shall be deemed toexclude the bolts unless otherwise described
Drawings
Tenderers are referred to architect's drawings annexed to thisdocument for full details of the windows, doors, etc
ALUMINIUM WINDOWS, DOORS, ETC
AAAMSA guide
All windows, doors, etc shall comply with and meet theminimum recommended performance requirements as set outin the General Specification for Architectural Aluminium andGlass Products (Third Edition) as published by the Associationof Architectural Aluminium Manufacturers of South Africa(AAAMSA)
Finish
The windows, doors, etc shall be natural anodised to athickness of 25 micron and shall comply with SABS 999 and1407
Carried to Collection R Section No. 2BUILDING WORKSBill No. 12METALWORKBID NO: NWDOH/PS/06/16
8 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Glass
Glazing to be with patent rubber gaskets with glazing beadsand comply with BS 952. Thickness of glass shall be inaccordance with table 1 (Part N : Glazing ). Safety glass shallcomply with SABS 1263. The National Building Regulationsshall be observed with regard to the specification of safetyglass
Design indemnity
The contractor is to submit with his tender the "Form ofIndemnity", annexed to this document, fully completed andsigned
Drawings
Tenderers are referred to architect's drawings annexed to thesebills of quantities for full details of windows, doors, etc
Pricing.
All window prices should include alluminium louvres as shown
General
Workshop drawings to be approved by the architect beforemanufacture
PRESSED STEEL DOOR FRAMES
1,2mm Pressed double rebated mild steel frames suitablefor half brick walls
1 Frame for door size 813 x 2032mm high No 10
2 Frame for door size 813 x 2032mm high with 305mm highfanlight No 54
3 Frame for door 1500 x 2032mm high No 1
4 Frame for door 1511 x 2032mm high No 2
Carried to Collection R Section No. 2BUILDING WORKSBill No. 12METALWORKBID NO: NWDOH/PS/06/16
8 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
1,2mm Pressed double rebated mild steel frames suitablefor one brick walls
5 Frame for door size 813 x 2032mm high No 19
6 Frame for door size 813 x 2032mm high with 305mm highfanlight No 1
7 Frame for door 1500 x 2032mm high No 5
8 Frame for door 1511 x 2032mm high No 3
NATURAL ANODISED ALUMINIUM LOUVREUNITS
ALUMINIUM WINDOWS, DOORS, ETC
Note: Tenderers are referred to architect's drawings numberedMOT-DSCH annexed to these bills of quantities/accompanyingthese bills of quantities for tender purposes
ALUMINIUM WINDOWS, ETC.
Natural anodised purposed made aluminium window with6,4mm LOW E frosted laminated safety glass, with clip-onglazing beads and neoprene gasket seals as permanufacturer or similar approved
9 Purpose made aluminium window size 600 x 600mm high No 39
10 Purpose made aluminium window size 600 x 1200mm high No 1
11 Purpose made aluminium window size 1200 x 600mm high No 12
Natural anodised purposed made aluminium window with8mm LOW E clear laminated safety glass, with clip-onglazing beads and neoprene gasket seals as permanufacturer or similar approved
12 Purpose made aluminium window size 900 x 600mm high No 6
13 Purpose made aluminium window size 1200 x 600mm high No 11
14 Purpose made aluminium window size 1200 x 900mm high No 3
15 Purpose made aluminium window size 1200 x 1200mm high No 50
Carried to Collection R Section No. 2BUILDING WORKSBill No. 12METALWORKBID NO: NWDOH/PS/06/16
8 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
16 Purpose made aluminium window size 1800 x 450mm high No 16
17 Purpose made aluminium window size 1500 x 1200mm high No 9
18 Purpose made aluminium window size 1800 x 1200mm high No 5
19 Purpose made aluminium window size 2400 x 1200mm high No 10
20 Purpose made aluminium window size 3600 x 1500mm high No 1
Natural anodised purposed made aluminium door with8mm LOW E clear laminated safety glass, as persmartglass intruderprufe with clip-on glazing beads andneoprene gasket seals as per manufacturer or similarapproved
21 Purpose made aluminium one and half door size 1300 x2090mm high with 200mm kickplate No 2
22 Purpose made aluminium one and half door size 1500 x2090mm high with 200mm kickplate No 19
23 Purpose made aluminium double swing door size 1500 x2090mm high with 200mm kickplate No 1
24 Purpose made aluminium double door size 1800 x 2090mmhigh with 200mm kickplate No 2
25 Purpose made aluminium double swing door size 1800 x2400mm high with 200mm kickplate including 900 x 2400mmfixed sidelight comprising of 390 x 450mm high panels No 1
26 Purpose made aluminium double swing door size 1800 x2090mm high with 200mm kickplate No 9
NATURAL ANODISED ALUMINIUM LOUVREUNITS
27 Purpose made aluminium louvre unit size 1800 x 450mm highincluding vermin and flyscreens to approval No 6
Carried to Collection R Section No. 2BUILDING WORKSBill No. 12METALWORKBID NO: NWDOH/PS/06/16
8 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 12
METALWORK
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 80
81
82
83
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 12METALWORKBID NO: NWDOH/PS/06/16
8 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 13
PLASTERING
SUPPLEMENTARY PREAMBLES
Plastering of concrete soffits
The plasterer should make sure that the surface to be plastereddoes not deviate from the required plane by more than 10mm.All high areas should be removed by hacking or cutting. Fill lowareas by applying undercoats of plaster not exceeding 15m inthickness, apply one coat plaster to surface, leave to stiffen,strike off with a striker board, and wood float to an even surfaceand to a thickness of 10 - 15mm thick.
SCREEDS
Screeds on concrete
3:1 Cement plaster screeds wood floated on concrete
1 30mm thick screed on floors and landings m2 2 172
2 Average 30mm thick on floors to falls m2 229
GRANOLITHIC
Untinted granolithic on concrete
3 50-30mm Thick on floors and landings m2 302
INTERNAL PLASTER
Carried to Collection R Section No. 2BUILDING WORKSBill No. 13PLASTERINGBID NO: NWDOH/PS/06/16
8 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
12-15mm Thick one coat plaster (4:1) of sand/cementsmooth plaster finished with a steel float.
Note: All plaster splashes, loose material and surfacecontamination to be removed by brushing or scrapping.Using approved filler, all defects to be made good. Removepowdery residues once dry.
4 On walls m2 5 399
5 On narrow widths m2 84
One coat cement plaster and once coat rhinolite plaster
6 On ceilings m2 229
Carried to Collection R Section No. 2BUILDING WORKSBill No. 13PLASTERINGBID NO: NWDOH/PS/06/16
8 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 13
PLASTERING
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 85
86
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 13PLASTERINGBID NO: NWDOH/PS/06/16
8 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 14
TILING
WALL TILING
"Johnson" or equal approved glazed ceramic wall tiles,size 200 x 250 x 4,7mm thick, fixed with approved tieadhesive and fill joints with "Ivory 328t" or equal approvedepoxy grouting, colour to architect
1 On walls m2 688
"Johnson" or equal approved glazed ceramic wall tiles,size 200 x 200 x 4,7mm thick, fixed with approved tieadhesive and fill joints with "Ivory 328t" or equal approvedepoxy grouting, colour to architect
2 On walls m2 237
3 On narrow widths, etc. m2 23
FLOOR TILING
600 x 600 x 8mm Thick grade 1 acid resisting, slip resistantporcelain tile bedded to a true and even surface in 3:1cement mortar and with joints not exceeding 8mm widefixed with TAL floor grout and layed at 90-degree angle asper detail drawings
4 On floors m2 872
5 Skirting of 100mm high cut tile
m 955
SUNDRIES
"Kirk Marketing"
6 M-Trim Aluminium square edge rim, plugged and fixed aroundtile edges m 1 246
Carried to Collection R Section No. 2BUILDING WORKSBill No. 14TILINGBID NO: NWDOH/PS/06/16
8 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
CORNER PROTECTORS, DIVIDING STRIPS, ETC
7 90 Degree Stainless steel corner protectors fixed to brickworkor concrete m 30
8 25 x 3mm Flat section brass dividing strips between differentfloor finishes m 80
Carried to Collection R Section No. 2BUILDING WORKSBill No. 14TILINGBID NO: NWDOH/PS/06/16
8 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 14
TILING
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 88
89
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 14TILINGBID NO: NWDOH/PS/06/16
9 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 15
PLUMBING AND DRAINAGE
SUPPLEMENTARY PREAMBLES
"Polycop" polypropylene pipes:
Polypropylene pipes 54mm diameter and under shall beseamless copper coloured class 16 pipes jointed with"Fast-fuse" heat welded thermoplastic or brass compressionfittings as designed for use with copper pipes as stated
Pipes shall be firmly fixed to walls etc with coloured nylonsnap-in pipe clips with provision for accommodating thermalmovement and jointed and fixed strictly in accordance with themanufacturer's instructions
All pipe diameters are nominal external
"Polylink" polypropylene pipes:
Polypropylene pipes 63mm diameter and over shall be class 12pipes jointed with cast iron "Supraclamp" running joints
Fusion welded bends, once or twice mitred as necessary, andtees shall be factory manufactured
Fusion welded bends and tees shall include jointing to pipeswith PVC rubber ring double Z joint couplers
Branch tees shall include flanged and bolted joints to "Polycop"branch pipes in addition and for brass compression male iron tocopper straight couplers
Reducers shall include jointing to pipes with PVC rubber ringdouble Z joint couplers and reducers shall be of sufficientoverall length to accommodate same
All pipes shall be jointed and fixed strictly in accordance withthe manufacturer's instructions
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
All pipe diameters are nominal external
Concrete pipes:
Pipes shall be jointed with ogee joints with rubber collars orsocket and spigot joints with rubber rings
Vitrified clay pipes:
Pipes shall rest on solid ground and, where necessary, pocketsof sufficient size shall be cut around joints to enable the jointingto be properly performed or, alternatively, pipes shall be beddedfull length on and including unreinforced concrete laid in asemi-dry state immediately before pipes are laid
Sewer and drainage pipes and fittings shall be jointed andsealed with butyl rubber rings
uPVC pipes and fittings:
Soil, waste and vent pipes and fittings shall be solvent weldjointed
uPVC pressure pipes and fittings:
Pipes for water supply shall be of the class stated
Pipes of 40mm diameter and smaller shall be plain ended withsolvent welded uPVC loose sockets and fittings
Pipes of 50mm diameter and greater shall have sockets andspigots with push in type integral rubber ring joints. Bends shallbe uPVC and all other fittings shall be cast iron, all with similarpush-in type joints
Copper pipes:
Pipes shall be hard drawn and half-hard pipes of the classstated. Class 0 (thin walled hard drawn) pipes shall not bebent. Class 1 (thin walled half-hard), class 2 (half-hard) andclass 3 (heavy walled half-hard) pipes shall only be bent withbenders with inner and outer formers. Fittings to copper waste,vent and anti-syphon pipes, capillary solder fittings andcompression fittings shall be "Cobra Watertech" type. Capillarysolder fittings shall comply with ISO 2016. Only compressionfittings shall be used in walls or in ground
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Fixing of pipes
Unless specifically otherwise stated, descriptions of pipesshall be deemed to include fixing to walls etc, casting in,building in or suspending not exceeding 1m belowsuspension level
Lead pipes and fittings
All soldered joints shall be wiped and brass unions shall beused for jointing lead to steel
Reducing fittings
Where fittings have reducing ends or branches they aredescribed as "reducing". In the case of pipes with diametersnot exceeding 60mm only the largest end or branch size isgiven. Should the contractor wish to use other fittings andbushes or reducers he may do so on the understanding that noclaim in this regard will be entertained. In the case of pipeswith diameters exceeding 60mm all sizes are given and noclaim for extra bushes, reducers, etc will be entertained
Wire gratings
Descriptions of gutter outlets etc shall be deemed to includewire balloon gratings
Septic tanks
Descriptions of septic tanks shall be deemed to includeexcavation, bedding and jointing, concrete base slabs, jointingto drains and backfilling, compaction, etc all in accordance withthe manufacturer's instructions
Exposed concrete surfaces
Exposed surfaces of concrete stormwater channels, coverslabs, inspection eye marker slabs, gulley tops, cleaning eyetops, catchpits, inspection chambers, etc shall be finishedsmooth with plaster
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Excavations
No claim for rock excavation will be entertained unless thecontractor has timeously notified the quantity surveyor thereofprior to backfilling
"Soft rock" and "hard rock" shall be as defined in "Earthworks"
Laying, backfilling, bedding, etc. of pipes
Pipes shall be laid and bedded and trenches shall be carefullybackfilled in accordance with manufacturers' instructions
Where no manufacturers' instructions exist pipes shall be laid inaccordance with clauses 5.1 and 5.2 of each of the following: SABS 1200 L : Medium-pressure pipelines LD : Sewers LE : Stormwater drainage Pipe trenches etc shall be backfilled in accordance with clauses3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB : Earthworks (Pipe trenches) Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1,5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes). Unless otherwise described bedding of rigid pipes shall beclass B bedding
Flush pans
Flush pans shall have straight or side outlets and "P" or "S"traps as necessary
Stainless steelbasins, sinks, wash troughs, urinals, etc.
Units shall have standard aprons on all exposed edges andtiling keys against walls where applicable
Waste unions
Descriptions of waste unions shall be deemed to include rubberor vulcanite plugs and chains fixed to fittings
Steel sectional water tanks
Tanks shall comply with SABS CKS 114
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
"Densyl" petrolatum anti-corrosion tape as manufacturedby Denso SA (Pty) Ltd.
Pipes to be taped shall be coated with the appropriate primerand the tape shall be applied with minimum 15mm lap perspiral unless otherwise described
Couplings and fittings to pipes shall be taped in strictaccordance with the manufacturer's instructions including allmastic, tape, "Layflat" sheeting, securing of same, etc
SANITARY FITTINGS ETC
"Vaal"
1 Vaal Sanitaryware Hibiscus vitreous china basin colour White(Code: 7050), size 510 x 405mm with one taphole includingintegrated overflow and chainstay hole bolted to wall with two10mm bolts (Code: 8448Z0) and sealed with silicone sealantwhere basin meets wall. No 26
2 Vaal Sanitaryware Sola Medical 610 ceramic vitreous chinahospital basin colour White (code: 703800), size 610 x 400mmbolted to wall with two 10mm bolts (code: 8448Z0) and sealedwith silicone sealant where basin meets wall. No 16
3 Vaal Sanitaryware Hibiscus vitreous china close coupled suitecolour White, comprising 90º outlet open rim pan (Code:772654) with matching 6/3 litre top dual flush cistern (Code:772656) including lid and fitments and Jazz Thermoset seat(code: 8531Z0). No 38
4 Vaal sanitary ware vitreous china "Pearl Paraplegic" semi closecouple 90° outlet open rim washdown pan and matching 9 litrecistern complete with lid, fitmets and purpose made C.Pside-flush lever (left or right) supplied with purpose made ureaseat and cover (code:7300SC) No 8
5 Vaal Sanitaryware 600 x 385 x 380mm Lavatera white vitreouschina wall mounted top inlet urinal (code: 705427) including38mm chromium plated domical grating (code: 8787) andchromium plated top inlet spreader spreader (code: 7042Z0),flush valve (by others - Recommended: Cobra FJ6000) andflush pipe (by others - Recommended: Cobra FJT5.5), fixed onand including two hanger brackets (code: 8127Z0)(urinaldivision). No 4
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
"Splashworks"
6 Splashworks Nero rectangular built-in white acrylic bath, size1700 x 750 x 390mm high (code: BTHNE7) with outlet for38mm waste (waste union elsewhere specified), supported on38 x 38mm timber battens fixed to adjacent walls and beddedin 1:5 cement mortar on a brick bed, three bricks wide for fulllength of bath with the void between the bath and enclosing wallfilled with 1:10 uncompacted cement mix and point all roundwith abe Dow Corning 785 acetoxy silicone sealant betweenbath and tiles, all in accordance with manufacturer'srecommendations. No 3
"Franke"
7 "Franke" model PLN611 or similar approved Grade 304 18/10polished stainless steel single end bowl insert sink (code:821047), overall size 800 x 460mm wide with one 340 x 370 x150mm deep bowl, fitted onto cupboard (elsewhere measured)and including sealing all round sink with sealicone sealent No 9
8 Franke Model WB001 Wash Hand Basin, 535 x 420 x 150mmdeep. Unit to be manufactured from a high grade austeniticStainless Steel, 0,8mm gauge. Basin to include a pressed bowl410x300x140mm deep with a 40mm waste outlet and 32mmapron all round. Unit to be fixed to wall with pair of galvanisedmild steel Eagle Brackets (Optional - please specify). No 21
9 Franke Model LDL Drop-on Washtrough 600 x 500 x 257mm.Unit to be manufactured from Grade 304 (18/10) StainlessSteel, 0,9mm gauge. Unit to include a pressed bowl 525 x 425x 257mm deep (43 litres) with a 40mm waste outlet. Unit to befixed to the wall with a pair of galvanised mild steel FalconBrackets (brackets optional, please specify). No 2
10 Franke model LDS drip sink 600 x 500 x 258mm deepmanufactured from Grade 304 (18/10) stainless steel 0,9mmthick and with a 40mm waste outlet. Unit fitted with stainlesssteel hinged bucket grid manufactured from 10mm stainlesssteel round bar and a pair of stainless steel Eagle brackets.Unit fixed to wall 600mm high from the top of the front apron tothe finish floor level with 4 off anchor bolts (bolts specifiedelsewhere). No 3
WASTE UNIONS ETC
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
"Cobra Watertech"
11 Cobra Watertech 32mm chrome plated slotted basin wasteunion (no chain or stay) (Code: 303) No 26
12 Cobra Watertech 32mm chrome plated unslotted basin wasteunion (no chain or stay) (Code: 308) No 16
13 Cobra Watertech 32mm chrome plated anti-theft plug (Code:309-40). No 11
14 "Cobra Ref. 316" bath or sink waste with 70mm diameterflange, 45mm long shank, backnut, plug and chain No 35
15 Cobra Watertech 40mm chrome plated Aqua unslotted bathwaste (Code: 318-40) with 70mm diameter flange and 55mmlong shank. No 3
TRAPS ETC
"Marley"
16 40 x 300mm Sink combination for single bowl with deepseal "P"trap No 14
17 40mm Reseal bath trap with overflow outlet and pipe No 3
18 uPVC anti-vac bottle trap (code: DB20A/V) No 77
"Cobra Watertech"
19 Cobra Watertech 40mm chrome plated deep seal bottle trapwith outlet for 50mm PVC (Code: 345/50).
No 4
20 Cobra Watertech 40mm rough brass shower P trap (Code:373SQ) with shallow seal and chrome plated square grating. No 9
"PolyDrains" Shower drains/channel
21 Polyflor Grade 304 stainless steel shower drain SD1v (SO 50)round with 50mm side outlet and fat trap, fitted with a specialnylon holding clamp to secure Polyfloor vinyl sheeting (code403234) No 9
SANITARY PLUMBING
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
SANITARY PLUMBING
uPVC, soil and vent pipes
22 50mm Pipes m 200
23 50mm Pipes chased into brickwork m 300
Extra over uPVC, soil and vent pipes for fittings
24 110mm Access bend No 46
25 110mm Pan connector No 46
26 110mm Access junction No 46
27 110mm Junction No 46
28 110mm Access bend with anti-syphon horn No 46
29 110mm Access double junction No 46
30 110mm Air vent cowl No 46
31 110mm GI vent valve No 46
SOIL DRAINAGE
SOIL DRAINAGE
uPVC gulleys
32 110mm Gulley not exceeding 750mm deep with standardconcrete gulley sorround No 12
TAPS, VALVES, ETC
"Cobra Watertech"
33 Cobra Watertech Noka 15mm chrome plated basin mixer withcast fixed outlet, pop-up waste, mounting kit and angle valves(code: NA-952) and and water saving aerator (code: P-WS/6)
No 18
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
34 Cobra Watertech Medical mixer (code: 515/055H-21) wallmounted and water saving aerator (code: P-WS/6); chromeplated 15mm Elbow action wall type with 1/4 turn ceramic diskhead parts, bent inlet connections at 178mm fixed centres, wallflanges and swan nek outlet (code: S-044)
No 22
35 Cobra Watertech 15mm chrome plated wall mounted medicalmixer (Code: 505-21B) pillar taps (hot & cold) square patternelbow action with 1/4 ceramic disk head part and blue for coldwater applications and flanged backnut and water savingaerator (code: WS/6) , and angle regulating valves No 58
36 Cobra Watertech Carina 15mm chrome wall mounted sinkmixer with overarm swivel outlet, adjustable wall flanges andexposed connections (Code: 166/041CA and S-041). No 3
37 Cobra Watertech Carina off the wall bath/shower mixer withdiverter. ¾ BSP male inlets, adjustable wall flanges andexposed connections (Code: 249CA). No 3
38 Cobra Watertech chrome plated 15mm outlet x 215mm longwith 27mm offset urinal flush pipe (Code: FJT5.5). No 4
39 Cobra Watertech chrome plated junior flashmaster (code:J6000) No 4
40 Cobra Watertech Stella Bright 15mm undertile shower setconsisting of FI x FI undertile stoptaps, shower arm with slidingwall flange and Pretex shower head with ball joint connection inChrome
No 9
41 Cobra Watertech Star Hose bib tap with ¾ BSP hose unionoutlet and ½ BSP male inlet (code: 107EC-15). No 7
42 Cobra Watertech Hose bib tap. ¾" BSP hose union. ½" BSPmale iron connection end. SANS 226 TYPE 2 No 7
ELECTRIC WATER HEATERS
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
9 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
"Kwikot"
43 Kwikot 100 Litre Slimline 600 Dual electric water heater (Code :ESG-100) complying with SABS 151-2002, overall size 990 x480mm high, operating at 400kPa with temperature andpressure safety relief valve including 20mm female draincockwith inlet compression. Geyser to be installed horizontally inroof space with 1160 x 560mm wide polyethylene drip tray withunion and back nut connected to 20mm PVC overflow pipetaken out at eaves (Code : GSTP-1200) and 15mm pipe workincluding two 15mm vacuum breakers (Code : KHN4.150CX)installed on hot and cold water supply. Installation to include a15mm 400kPa Kwikot Mono control and expansion relief valve(Code : KHN3.104), all in accordance with SANS 10254,connected to single phase electrical power supply with isolator1m away from connection on geyser. No 6
TESTING
44 Provide all necessary water, etc., for and test the whole of theplumbing services, sanitary fittings, pumps, etc., and in stagesas deemed necessary, including chlorination, complete to thesatisfaction of the architect and the local authority, replace anydefective work free of charge, including any necessaryre-testing and leave in perfect condition upon completion Item
45 Allow for testing and commisioning the whole of the plumbingservices, sanitary fittings, pumps, etc., including any necessaryre-setting, etc., for optimal perfomance of the entire system toduration of the contract, maintenance and guarantee period
Item
AS-BUILT DRAWINGS
46 Allow for an updated set of as-built drawings to be handed tothe architect at completion of the contract
Item
Carried to Collection R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
1 0 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 15
PLUMBING AND DRAINAGE
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 91
92
93
94
95
96
97
98
99
100
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 15PLUMBING AND DRAINAGEBID NO: NWDOH/PS/06/16
1 0 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 16
GLAZING
GLAZING TO STEEL WITH PUTTY
3mm Clear float glass
1 Panes not exceeding 0,1 m2 m2 14
MIRRORS, ETC
"Franke"
2 Franke M 600 HD 13mm Grade 304 18/10 stainless steelmirrors (code: 359922), size 500 x 600 x 13mm deep,concealed thief resistant fixings, plugged and screwed to thewall with stainless steel screws. No 63
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 16GLAZINGBID NO: NWDOH/PS/06/16
1 0 2
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO 2
BILL NO. 17
PAINTWORK
ON FLOATED PLASTER
Apply one coat Plascon Merit Plaster Primer, two coatsPlascon Double Velvet Pure Acrylic paint or similarapproved to interior walls, columns, etc. Colour: "BrokenWhite (VE17)"
1 On internal walls m2 2 468
Apply one coat Plascon Merit Plaster Primer, two coatsPlascon Double Velvet Pure Acrylic paint or similarapproved to interior walls, columns, etc. Colour:"Mushroom (Y1-D2-2)"
2 On internal walls m2 1 650
ON SMOOTH CONCRETE
Prepare ares with slash coat and apply one coat universalundercoat and two coats Plascon Acrylic White
3 On soffits m2 229
ON FIBRE-CEMENT
Prepare surfaces, apply Earthcote Alkali resisting primerdiluted 20% with turpentine. Apply two coats Peinture,appplied at 3m2 per litre per coat all as per manufacturer'sspecifications and application instructions
4 On fascias and barge boards m2 320
One coat undercoat with Universal undercoat and twocoats Plascon "Polvin White"
5 On ceilings and cornices m2 1 002
ON METAL
Carried to Collection R Section No. 2BUILDING WORKSBill No. 17PAINTINGBID NO: NWDOH/PS/06/16
1 0 3
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
One coat Universal undercoat and two coats Plascon"Valvaglo" colour Battleship Grey G13
6 On door fames m2 145
ON WOOD
One coat undercoat with Universal undercoat and twocoats Plascon "Velvaglo"
7 On doors m2 750
Preapre surface and apply three coats clear matt varnishplascon polyurethane matt varnish, suede x 44 or similarapproved
8 On doors m2 83
Carried to Collection R Section No. 2BUILDING WORKSBill No. 17PAINTINGBID NO: NWDOH/PS/06/16
1 0 4
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
Bill No. 17
PAINTING
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 103
104
Carried Forward to Summary of Section No. 2 R Section No. 2BUILDING WORKSBill No. 17PAINTINGBID NO: NWDOH/PS/06/16
1 0 5
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 2
BUILDING WORKS
SECTION SUMMARY - BUILDING WORKS
Bill Page AmountNo No
1 38ALTERATIONS
2 43FOUNDATIONS
3 47CONCRETE, FORMWORK & REINFORCEMENT
4 51MASONRY
5 54WATERPROOFING
6 57ROOF COVERING, ETC.
7 61CARPENTRY & JOINERY
8 64CEILINGS, ETC.
9 67FLOOR COVERINGS, ETC
10 74IRONMONGERY
11 79STRUCTURAL STEELWORK
12 84METALWORK
13 87PLASTERING
14 90TILING
15 101PLUMBING AND DRAINAGE
16 102GLAZING
17 105PAINTING
Carried to Final Summary R Section No. 2BUILDING WORKSBID NO: NWDOH/PS/06/16
1 0 6
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Item Quantity Rate AmountNo
SECTION NO. 3
PROVISIONAL SUMS
BILL NO. 1
PREAMBLES
All provisional sums are nett and exclude builder's discount.The contractor is referred to the preliminaries in this regard.The contractor is to allow for profit and attendance under therelevant item and must note that he is required to allow forgiving every facility to, attending upon and making good in alltrades after the specialists have completed their work. No profitshould be claimed on money provisions.
SUB-CONTRACTORS
Work for which Provisional Sums for Specialist SelectedSubcontractors is provided is envisaged to be executed by asubcontractor after a tender process as detailed elsewhere inthis tender enquiry document. These Provisional Sums may beincreased, decreased or deducted in whole or part as theEmployer's requirements dictate. No claims for loss of profit orgeneral attendance from the Contractor will be entertainedshould these Provisional Sums decrease or be deducted in fullfrom the Contract
In exceptional cases where work for Provisional Sums is not tobe carried out by Specialist Selected/NominatedSubcontractors the Principal/Main Contractior will be required toprovide three quotations for approval to Quantity Surveyorbefore the work can commence
KITCHEN CUPBOARDS
1 Provide the sum of R 270,000.00 (Two Hundred and SeventyThousand Rands) for the supply and installation of KitchenCupboards complete,to be expended as theAgent/Representative may direct or deduct in whole or in part, ifnot required
Item 270 000 00
2 Profit %
Carried to Collection R Section No. 3PROVISIONAL SUMSBill No. 1Provisional SumsBID NO: NWDOH/PS/06/16
1 0 7
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
3 Attendance %
BUILT-IN CUPBOARDS
4 Provide the sum of R 75,000.00 (Seventy Five ThousandRands) for the supply and installation of Built-in Cupboardscomplete,to be expended as the Agent/Representative maydirect or deduct in whole or in part, if not required
Item 75 000 00
5 Profit %
6 Attendance %
COUNTERS
7 Provide the sum of R 32,500.00 (Thirty Two Thousand FiveHundred Rands) for the supply and installation of Counterscomplete,to be expended as the Agent/Representative maydirect or deduct in whole or in part, if not required
Item 32 500 00
8 Profit %
9 Attendance %
VANITY TOPS
10 Provide the sum of R 10,400.00 (Ten Thousand Four HundredRands) for the supply and installation of Vanity Tops complete,to be expended as the Agent/Representative may direct ordeduct in whole or in part, if not required
Item 10 400 00
11 Profit %
12 Attendance %
SHELVES
13 Provide the sum of R 310,000.00 (Three Hundred and TenThousand Rands) for the supply and installation of Shelvescomplete,to be expended as the Agent/Representative maydirect or deduct in whole or in part, if not required
Item 310 000 00
Carried to Collection R Section No. 3PROVISIONAL SUMSBill No. 1Provisional SumsBID NO: NWDOH/PS/06/16
1 0 8
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
14 Profit %
15 Attendance %
INTERBED CURTAIN RALS
16 Provide the sum of R 52,500.00 (Fifty Two Thousand FiveHundred Rands) for the supply and installation of InterbedCurtain Rails complete,to be expended as theAgent/Representative may direct or deduct in whole or in part, ifnot required
Item 52 500 00
17 Profit %
18 Attendance %
STAINLESS STEEL SEATING
19 Provide the sum of R 220,000.00 (Two Hundred and TwentyThousand Rands) for the supply and installation of PerforatedStainless Steel Seating complete,to be expended as theAgent/Representative may direct or deduct in whole or in part, ifnot required
Item 220 000 00
20 Profit %
21 Attendance %
STAINLESS STEEL BALUSTRADE & GUARDRAIL
22 Provide the sum of R 300,000.00 (Three Hundred ThousandRands) for the supply and installation of Stainless Balustradeand Gard Rails complete,to be expended as theAgent/Representative may direct or deduct in whole or in part, ifnot required
Item 300 000 00
23 Profit %
24 Attendance %
Carried to Collection R Section No. 3PROVISIONAL SUMSBill No. 1Provisional SumsBID NO: NWDOH/PS/06/16
1 0 9
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
PARTITIONS
25 Provide the sum of R 24,000.00 (Twenty Four ThousandRands) for the supply and installation of Toilet Partitionscomplete,to be expended as the Agent/Representative maydirect or deduct in whole or in part, if not required
Item 24 000 00
26 Profit %
27 Attendance %
COMMUNITY LIAISON OFFICER (CLO)
28 Provide the sum of R 240,000.00 (Two Hundred and FortyThousand Rands) for appointment of community liaison offer,tobe expended as the Agent/Representative may direct or deductin whole or in part, if not required
Item 240 000 00
29 Profit %
30 Attendance %
EXTENDED PUBLIC WORKS PROGRAMME(EPWP)
31 Provide the sum of R 2, 600,000.00 (Two Million and SixHundred Thousand Rands) for extended public worksprogramme (EPWP),to be expended as theAgent/Representative may direct or deduct in whole or in part, ifnot required
Item 2 600 000 00
32 Profit %
33 Attendance %
Carried to Collection R Section No. 3PROVISIONAL SUMSBill No. 1Provisional SumsBID NO: NWDOH/PS/06/16
1 1 0
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
Section No. 3
PROVISIONAL SUMS
Bill No. 1
Provisional Sums
COLLECTION
Page AmountNo
Total Brought Forward from Page No. 107
108
109
110
Carried to Final Summary R Section No. 3PROVISIONAL SUMSBill No. 1Provisional SumsBID NO: NWDOH/PS/06/16
1 1 1
MOTSWEDI CLINICPROVISIONAL BILLS OF QUANTITIES
CONSTRUCTION OF NEW CLINICNORTH WEST DEPARTMENT OF HEALTH
FINAL SUMMARY
Section Page AmountNo No
1 30PRELIMINARIES AND GENERALS
2 106BUILDING WORKS
3 111PROVISIONAL SUMS
Sub Total R
Annexure A - Civil Works SUM
Annexure B - Electrical InstallationSUM
Annexure C - Mechanical InstallationSUM
SUB TOTAL R
Add: Contingency Item 4 583 007 17
SUB-TOTAL R
Add: Escalation in cost Item 2 605 018 00
SUB-TOTAL R
ADD VAT @ 14% R
R
BID NO: NWDOH/PS/06/16
1 1 2