Page 1: Monthly safety report 2012 11

C270 (HK BIODIESEL PLANT) Safety Report

Page 3: Monthly safety report 2012 11

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – November 2012

Page 4: Monthly safety report 2012 11

SAFETY INSPECTION / MEETING

Weekly Safety Meetings

C270 Monthly Safety Report – November 2012

Page 5: Monthly safety report 2012 11

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

HOUSEKEEPINGWorkplace should be kept tidy and clean

Improvement – Rubbish removed and workplace kept tidy and clean

C270 Monthly Safety Report – November 2012

Page 6: Monthly safety report 2012 11

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

GUSRDING OF MOVING PARTGuard shield of moving parts should not be removed

Improvement – Guard shield of moving parts maintained in place

C270 Monthly Safety Report – November 2012

Page 7: Monthly safety report 2012 11

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

SAFE USE OF LADDERMalpractice of working with ladder

Improvement – Sufficient length ladder + Safety Harness + Co-worker

C270 Monthly Safety Report – November 2012

Page 8: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Launching of “N” and “P” label system for New Workers to site

C270 Monthly Safety Report – November 2012

Page 9: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Inspection by Labour Inspector of Labour Department

C270 Monthly Safety Report – November 2012

Page 10: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Inspection by Occupational Safety Officer of Labour Department

C270 Monthly Safety Report – November 2012

Page 11: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

C270 Monthly Safety Report – November 2012

Follow Up Meeting with Safety Representatives

Inspection by Occupational Safety Officer of Labour Department

Page 12: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Routine Safety Regularity Action

C270 Monthly Safety Report – November 2012

Elimination of Substandard Electrical Equipment

Elimination of Substandard Lifting Gear

Page 13: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Technical Visit – HKIE on 24/11/2012

C270 Monthly Safety Report – November 2012

Page 14: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Technical Visit – China Light & Power Co Ltd

C270 Monthly Safety Report – November 2012

Page 15: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Specific Safety Meeting – Review Safety Deficiency of subcontractor

C270 Monthly Safety Report – November 2012

Page 16: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Specific Safety Meeting – Review Safety Deficiency of subcontractor

C270 Monthly Safety Report – November 2012

Page 17: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Specific Safety Meeting – Review Safety Deficiency of subcontractor

C270 Monthly Safety Report – November 2012

Page 18: Monthly safety report 2012 11

POSITIVE SAFETY ATTITUDE

Specific Safety Meeting – Review Safety Deficiency of subcontractor

C270 Monthly Safety Report – November 2012

Page 19: Monthly safety report 2012 11

SAFETY TRAINING

Site Specific Safety Induction

Current MonthAccumulate

(Oct 2011 – Nov 2012)

No. of class 21 276

No. of Attendee 82 1296

C270 Monthly Safety Report – November 2012

INDUCTIONTRAINING

Page 20: Monthly safety report 2012 11

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendeeEnvironmental Waste Management 89 nos.Environmental Dust Control Measure 89 nos.

Occupational Safety Fire Prevention 91 nos.Occupational Safety Inclement Weather Safety 89 nos.Occupational Safety Safe Use of Scaffold 6Occupational Safety Working in Confined Space 23Occupational Safety Lifting Safety 13Occupational Safety Electricity Safety 8

Current Month Total 408 nos.

Accumulated Total : 4,214 nos.

C270 Monthly Safety Report – November 2012

Page 21: Monthly safety report 2012 11

SAFETY Promotion

4 nos. Safety News Sharing

5 nos. Safety Reminder to Subcontractors

5 nos. General Safety Advice on Construction Safety

1 no. Internal – BDI – Damage Bamboo Scaffold

1 no. Risk Assessment – Installation of IC Reactor

1 no. Thunderstorm Warning

Safety Circulation

C270 Monthly Safety Report – November 2012

Page 22: Monthly safety report 2012 11

C270 Monthly Safety Report – November 2012