Page 2: Monthly Safety Report Aug 2012

Month: Jul 2012 Aug 2012Accumulated man-hour: 279,201 314,771Days worked since project commenced: 265 296Accumulated man-day lost: 51 113Cumulative Accident Frequency Rate: 0.72 0.64

ALL are an important stakeholder !

SAFETY STATISTICS

C270 Monthly Safety Report – August 2012

Page 3: Monthly Safety Report Aug 2012

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – August 2012

Page 4: Monthly Safety Report Aug 2012

SAFETY INSPECTION / MEETING

Weekly Safety Meetings

C270 Monthly Safety Report – August 2012

Page 5: Monthly Safety Report Aug 2012

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

FALL FROM HEIGHTFloor opening should be covered

Improvement – Floor opening covered by plywood

C270 Monthly Safety Report – August 2012

Page 6: Monthly Safety Report Aug 2012

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

FALL FROM HEIGHTFloor edge fencing should be reinstalled immediately

Improvement – Floor edge fencing reinstalled in position

C270 Monthly Safety Report – August 2012

Page 7: Monthly Safety Report Aug 2012

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

HOUSEKEEPINGConstruction waste should be removed and disposed on time

Improvement – Construction waste removed and disposed

C270 Monthly Safety Report – August 2012

Page 8: Monthly Safety Report Aug 2012

POSITIVE POINTERS

Meeting with client and subcontractors for promotion of positive climate

Pre-work meeting with different level of subcontractors prior to commencement of works

C270 Monthly Safety Report – August 2012

Page 9: Monthly Safety Report Aug 2012

SAFETY AWARD

Mr. Au Wai Chiu (Section Manager) presented SAFETY IMPROVEMENT AWARD to subcontractor Chung Kong

Commendations

C270 Monthly Safety Report – August 2012

Page 10: Monthly Safety Report Aug 2012

SAFETY TRAINING

INDUCTION

TRAINING

Site Specific Safety Induction

Current MonthAccumulate

(Oct 2011 – Aug 2012)

No. of class 22 211

No. of Attendee 95 1020

C270 Monthly Safety Report – August 2012

Page 11: Monthly Safety Report Aug 2012

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Occupational Safety Prevent Heatstroke 81 nos.

Occupational Safety Inclement Weather 81 nos.

Occupational Health General Duties 72 nos.

Occupational Safety Prevention of Slip & Trip 76 nos.

Current Month Total 310 nos.

Accumulated Total : 2,595 nos.

C270 Monthly Safety Report – August 2012

Page 12: Monthly Safety Report Aug 2012

SAFETY Promotion

12 days Very Hot Weather Warning

8 days Thunderstorm Warning

2 days Typhoon Warning

6 nos.AECOME – BDI – Safety Alert – incompliance to statutory requirement

4 nos. HSE news sharing

3 nos. Safety Warning to subcontractors

7 nos. Safety Comment to Method Statements

2 nos. General Safety Requirement Reminder

Safety Circulation

C270 Monthly Safety Report – August 2012

Page 13: Monthly Safety Report Aug 2012

GOVERNMENT / AUTHORITIES VISIT

LD conducted site inspection to our site on 30/8/2012

C270 Monthly Safety Report – August 2012

Page 14: Monthly Safety Report Aug 2012

GOVERNMENT / AUTHORITIES VISIT

SE of HyD visit on 8/8/2012 ICE conduct Environment Audit on 23/8/2012

SE of HyD visited our site for CCSA 2012 assessment

ICE conduct regular Environment Audit to the site

C270 Monthly Safety Report – August 2012

Page 15: Monthly Safety Report Aug 2012

HKIE Technical Visit to our site on 18/8/2012

GOVERNMENT / AUTHORITIES VISIT

C270 Monthly Safety Report – August 2012

Page 16: Monthly Safety Report Aug 2012

GOVERNMENT / AUTHORITIES VISIT

HKIE Technical Visit to our site on 18/8/2012

C270 Monthly Safety Report – August 2012

Page 17: Monthly Safety Report Aug 2012

Thanks for watching!!

THE END

C270 Monthly Safety Report – August 2012