Upload
ksbbs
View
215
Download
0
Embed Size (px)
Citation preview
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 1/12
MoEF Notification 2006
Rk yadav
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 2/12
Presentation Plan
Ministry of Environment & Forests
Environmental Impact Assessment
The Notification Categorization
Stages in Environmental Clearance
Terms of Reference
The Flowchart
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 3/12
Ministry of Environment & Forests Environment
Protection
(Article
48
-
A)
The State shall endeavour to protect and improve the
environment and to safeguard the forests and wildlife of
the country Objectives
of
MoEF Conservati
on and survey of flora, fauna, forests and
wildlife
Prevention and control of pollution Afforestation and regeneration of degraded areas
Protection of environment and
Ensuring the welfare of animals
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 4/12
Environment Impact Assessment Environment
Impact
Assessment,
2006 Derives authority from Environ
mental Rules (1986)
1997 Amendment to include Public Hearing
Over 13 amendments with latest one in 2006 What
is
EIA?
A study to predict the effect of a proposed activity on
the environment
It compares various alternatives for a project andseeks to identify the one which represents the best
combination of economic and environmental costs and
benefits
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 5/12
The Notification
Any expansion or modernization of any activity shall
NOT
be undertaken in any part of India unless it
has been accorded EC by Centre as per the
procedure specified in the notification All new projects or activities listed in this notification
Expansion and modernization of existing projects which
cross threshold limit for concerned sector
Any change in product-mix in existing manufacturing unit
included in Schedule beyond the specified range
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 6/12
Categorization
EC from MoEF onrecommendation of Expert AppraisalCommittee (EAC)
In absence of SEIAA or SEACcategory B shall betreated as Category A project
Category
Aprojects EC from SEIAA
based onrecommendationsfrom SEAC
Category B further divided as B1 andB2, however guidelines for distinction have notbeen worked out
Category
Bprojects
Categorized based on spatial extent of potential impacts on human
health and natural and man-made resources
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 7/12
Environmental Clearance
Application shall be made in Form 1 and
supplementary Form 1A after identification of site
before commencing any construction activity
Along with the application a pre-feasibility project
report also needs to be furnished.
Exception to the above are construction projects
where conceptual plan needs to be furnished
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 8/12
Stages in Environmental ClearanceScreening (Category B projects)
Scrutiny to determine if project requires further studies for EIAreport
Scoping
Process by which EAC/SEAC determine comprehensive Terms of Reference (exceptions Construction/Township/Housing)
Public Consultation
Process by which concerns of local affected persons are
ascertained
Appraisal
Detailed scrutiny by EAC/SEAC for grant of EC withrecommendations to regulator leading to grant or rejection
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 9/12
Terms of Reference• statement of need for and objectives of the proposal
• project background and description
• study area or impact zone(s)
• applicable policy and institutional considerations• EIA requirements and decision-making particulars
• provisions for public involvement
• alternatives to be examined
• the impacts and issues to be studied
• the requirements for mitigation and monitoring
• the timeframe for completion of the EIA process
• the means for making changes to the ToR if necessary
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 10/12
Environmental Clearance contd.. Project Management to submit half -yearly
compliance reports to regulatory authority on 1st
June and 1st December of each calendar year
All compliance reports shall be public documents and shall also be displayed on website of regulator
Prior EC granted for a specific project may be
transferred during its validity to another legal
person with “no objection” by transferor andregulatory authority on same terms and conditions
under which EC was initially granted and for the
same validity period
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 11/12
7/27/2019 MOEF NOTIFICATION 2006
http://slidepdf.com/reader/full/moef-notification-2006 12/12
Thank you for listening!