10
Module 9: BR component This section reviews: Requirements for Job Retention Services (JRS) Requirements for Job Retention Service Extension (JRSE) Choosing the correct activity JRS vs JRSE Managing JRS and JRSE components Updated 10/2021

Module 9: BR component - Wa

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Module 9: BR component - Wa

Module 9: BR componentThis section reviews:

Requirements for Job Retention Services (JRS)

Requirements for Job Retention Service Extension (JRSE)

Choosing the correct activity JRS vs JRSE

Managing JRS and JRSE components

Updated 10/2021

Page 2: Module 9: BR component - Wa

JRS vs JRSE

Job Retention Services (JRS) and Job Retention Service Extension (JRSE) are both activities used to support participants who have gained employment. Both activities use the BR component in eJAS. But JRS and JRSE have slightly different requirements and different time frames where they can be used.

The following information reviews the activities and how to use eJAS to correctly enter and track the Job Retention activities.

Updated 10/2021

Page 3: Module 9: BR component - Wa

Opening JRS ActivityUse JRS when a participant exits BFET JS/JT/BE/VE component(s) due to employment.

Information Required in eJAS to open the JRS:• Participant must have been in a BFET component within the last 30 days, and• Must have secured employment while participating in BFET activities, and• Employment is entered into the Employment Information screen in eJAS, and• All other BFET components (except SL) are closed.• BR start date is on or after the employment start date.• BR is opened for a minimum of 30 days up to up to a maximum of 90 days.• Document employment and change in the Client Notes.

Updated 10/2021

Page 4: Module 9: BR component - Wa

Opening JRSE ActivityUse JRSE when a participant completed JRS, is employed and would benefit from additional job performance support, and:

BFA is closed• Participation in other BFET activities is not

required• Must engage in Financial Empowerment

Training

BFA is Open• working Part-Time (31 hours or less)• Participation in other BFET activities is required.

A least on of the following components is also required JT/JS/SL/BE/VE

• Must engage in Financial Empowerment Training

OR

Updated 10/2021

Page 5: Module 9: BR component - Wa

Opening JRSE Activity

Information required in eJAS for JRSE

• Employment is entered into the Employment Information screen in eJAS• BFA is closed or participant is co-enrolled in (JT/JS/BE/VE/SL) component• Documentation of progress in Financial Empowerment Training in the Client

Notes• Documentation of the reason for JRSE• BR component opened for 90 day increments. It can be extended up to 275

days of total JRSE services.

Updated 10/2021

Page 6: Module 9: BR component - Wa

Choosing the Correct Activity: JRS or JRSE

You must check the Component History in eJAS to determine if you must use JRS or JRSE.

In the above example, the BR component was opened from 1/20/2020 – 04/18/2020 = 90 days. This is JRS.The next time BR is used is 07/16/2020 – 10/11/2020, which is JRSE.

Count the number of days the BR component was opened since 10/01/2019.

Be sure to include the first and last days in your day count.This online Date duration calculator: https://www.timeanddate.com/date/duration.htmlcan be useful.

Job Retention Services (JRS) and Job Retention Services Extension (JRSE) both use the BR component.

Updated 10/2021

Page 7: Module 9: BR component - Wa

Managing JRS and JRSE components

Currently eJAS limits access to cases when the participant’s Basic Food Assistance (BFA) case has been closed for greater than 90 days.

This will impact how you manage the eJAS cases for participants that are engaged in Job Retention activities.

Once the BFA case closes, the participant will not display on your active caseload screen in eJAS. You must use the Historical Report to find and access the case.

Updated 10/2021

Page 8: Module 9: BR component - Wa

Managing JRS and JRSE componentsYou can access the participant’s case from the Historical Report as long as there is an active FI

component. You can view the case, enter client notes and enter Participant Reimbursements.

Please note that the

BF closure reason

will not be accurate

You can manage components as usual for the first 90 days after the BFA closure.

Updated 10/2021

Page 9: Module 9: BR component - Wa

Managing JRS and JRSE components

After 90 days, you will no longer be able to make changes to the components in eJAS yourself.

The “Edit” link and “Add Component” button will not be available after 90 days of BFA closure.

The BFET Field Operations team will make all component updates for you in these cases.

Use the Eligibility List to request updates to components such as changing the hours, adding components, extending component scheduled end date, or closing components.

Submit all Eligibility Lists via secure email to [email protected]

Updated 10/2021

Page 10: Module 9: BR component - Wa

Questions??

For any eJAS related questions or for assistance please don’t hesitate to contact your assigned BFET Field Operations team member or email [email protected]

Updated 10/2021