2
MobilisationOf
Coal Supply
Assessment of Coal Requirement. Coal Vision, IEP, Working Group, Expert Committee.
Assessment of Indigenous Production Capacity (Raw Coal). CIL, SCCL, IISCO / TISCO / Captive Block allocatees.
Assessment of Capacity to extract CBM, Underground Gasification.
Assessment of Gap / Mechanism to Import
Competitive Pricing
Cost of Production
Remunerative Pricing
Notified Price for Utilities
Market Price for Others
Notified Price to approximateTo International Market Price-Quality adjustments.
Transport of Coal from Production Point to Consumption Point
Capacity ( Corridors Sea Route )
Cost of Transportation
Rationale of transporting of Inertmaterial.
FSTACoal Quality
Ash % age.
Size
Consistency.
GCV based Grading with lesser band width.
PRESENTATION COVERAGEMOBILISATION
OF COAL SUPPLY
Assessment
SOURCE SECTOR/PERIOD
06-07
2010 11-12 2015 16-17
20-21
21-22 24-25 2025
X PLAN WORKING GROUP
POWER 322 469 617
CAPTIVE POWER
28 32 37
STEEL 43 40 40
CEMENT 25 24 25
FERTILISER 4 5 5
OTHERS 51 50 56
TOTAL 473 620 780
COAL VISION 2025 & 8% GDP
POWER 322 427 553 699 804
CAPTIVE POWER
28 44 63 90 112
STEEL 4
CEMENT 43 54 69 90 123
FERTILISER 25 39 61 95 123
OTHERS 51 65 82 106 123
TOTAL 473 630 828 1079 1267
ASSESSMENT OF COAL REQUIREMENT
CONTD.
MOBILISATION OF
COAL SUPPLY
3
4
SOURCE SECTOR/PERIOD
06-07
2010 11-12
2015 16-70
20-21
21-22
24-25
2025
INTEGRATED ENERGY POLICY
498 1015 877 1113 1541(26-27)2040
(31-32)
HYDROCARBON VISION 2025
BEST CASE 1118 1402 1483
BUSINESS AS USUAL
538 659
(EIA) ENERGY INFORMATION ADMINISTRATION, PARIS
HIGH 408 473 548 611 629
LOW 374 411 447 481 490
REFERENCE 390 439 493
(IEA) INTEGRATED ENERGY AGENCY, USA
484 623 713
P&E DIV.PLNG. COMM.
481 612 764 920 957 1417(31-32)
MOBILISATION OF
COAL SUPPLY
ASSESSMENT OF COAL REQUIREMENT
5
AUGMENTATION OF EXISTING PRODUCTION CAPACITY
EFFORT BY COAL PRODUCER
MAXIMISATION OF PRODUCTION
A ENVIRONMENTAL FRIENDLY MANNER
B LEAST HUMAN DISPLACEMENT/ SUFFERING
C HIGHEST EFFICIENCY/ LOW COST OF PRODUCTION
D BENEFICIATION
INITIATIVE BY STATE AGENCIES
1 SIMPLER LAND ACQUISITION
2 NATIONAL R & R POLICY – LEGALLY ENFORCEABLE
3 SPEEDY EMP/ FORESTRY CLEARANCE/ NPV
4 MODIFICATION : CONTRACT LABOUR REGULATION & ABOLITION ACT 1971 + LABOUR LAWS.
5 SCRAPPING OF NCWAs
6 LAW & ORDER SITUATION
7 EVACUATION OF COAL
MOBILISATION OF
COAL SUPPLY
6
CAPTIVE DISPENSATION BLOCK RESERVE (MT)
POWER PUBLIC 29 5486.48
PRIVATE 9 1496.47
STEEL & SPONGE IRON PUBLIC 4 372
PRIVATE 42 7699.34
CEMENT PUBLIC NIL -
PRIVATE 1 7
NON-CAPTIVE DISPENSATION
ISOLATED PATCHES NOT REQUIRING RAIL TRANSPORT
PUBLIC 2 92.18
PRIVATE NIL -
CENTRAL/STATE/CORPORATION OWNED BY CENTRAL GOVT. (GENERALLY NOT FULLY EXPLORED ONES)
11 4291.58
100 19445.05
Start of production within 3 Years (OC), 4 Years(UG) Grace of six months if forest land
PRODUCTION FROM CAPTIVE CAPTIVE BLOCKMOBILISATION OF
COAL SUPPLY
7
SOURCE NO.OF BLOCKS ALLOTTED RESERVE (BCM)
AREA (SQ. KM)
COAL BED METHANE
16 820 7800
10 TO BE ALLOTED BY SEPT’06
597 5791
STATUS OF OPERATION : CIL-ONGC(JV)-OBTAINED 2 BLOCKS. JHARIA-CIL COMPLETED 8 SLIM HOLES. METERAGE DRILLED: 9000. DEWATERING IN PROGRESS.
U/G GASSIFICATION
NO. OF BLOCK CHOSEN (5 NOS.) -HINGANA BAZARGAON, KASTA, WANI MANDAR, LAPANGA (CHORDHARA), BHARATWADA.
ONE BLOCK TO SELECT FROM FIVE IDENTIFIED BLOCKS.CMPDI IDENTIFYING MORE BLOCKS.
STATUS OF OPERATION CIL JOINS HAND WITH ONGC.CONSULTANT-SKOCHINSKY INSTITUTE OF MINING,RUSSIA
STATUS OF COAL BED METHANE & U/G COAL GASSIFICATIONMOBILISATION
OF COAL SUPPLY
8
Producing Unit Projected Production (Mt)
X-Plan (06-07)
XI-Plan (11-12)
XII-Plan (16-17)
XIII-Plan (21-22)
2025
CIL TOTAL(Incl. NE)
373 536 648 730 782
Non-CIL Areas Unblocked Areas
- - 5 25 57
Total CIL 373 536 653 755 839
Coal-equivalentCBM-UCG
- - 5 15 25
SCCL 37 41 45 47 47
Others : Captive TISCO/IISCO/
19 44 75 125 175
GRAND TOTAL (Domestic)
429 621 778 942 1086
ASSESSED COAL PRODUCTION CAPACITYMOBILISATION
OF COAL SUPPLY
9
IMPORT OF COAL
2005-06 : 39.4 MT (IMPORT) + 15.6 MT (COASTAL MOVEMENT)
CAPACITY ENHANCEMENT : 200MT BY NEAR FUTURE AUGMENTATION OF 4 MINOR PORTS TO MAJOR PORT
MOBILISATION OF
COAL SUPPLY
YEAR COKING NON-COKING
<12% ASH >12% ASH
1991-92 5% 85% 85%
2000-01 9.72% 21.16% 32.6%
2005-06 NIL 5% 5%
YEAR IMPORT (MT)
2004-05 31.8
2005-06 39.4
2025-26 (Projected) 455.0
2031-32 (Projected) > 800
REDUCTION OF DUTY
DEVELOPMENT OF PORT CAPACITY
11
EVACUATION OF COAL
I. DEDICATED FREIGHT CORRIDOR – (DFC)CHITPUR TO LUDHIANA ; MOURIGRAM TO BHUSAWAL; TALCHER TO VIZAYWADA
II. ELIMINATION OF X-SUBSIDISATION
III. CONSUMPTION POINTS NEAR PRODUCTION POINT
IV. FSTA
MOBILISATION OF
COAL SUPPLY
YEAR COAL TOTAL %SHARE
1991-92 46 338 43
2000-01 224 473 47
2005-06 294 667 44
2024-25 664 1650 40
CAGR (05-25) 4.4% 4.9%
RAIL MOVEMENT OF COAL (INCLUDING IMPORT)
12
COAL QUALITY / BENEFICIATION
CAPACITY ENVISAGED IN 2025 :
TOTAL : 464 MTY (UNDER CONSTRUCTION- 87 MTY+ FROM EXISTING - 81MTY(CIL
-11; PRIVATE -70 ) + ADDITIONAL -296)
INVESTMENT : RS.5920 CRORES FOR ADDITIONAL CAPACITY OF 296 MTY
INDUCEMENT :
CIL OFFERING INFRASTRUCTURE FACITILTY TO PROMOTE WASHING ON CHARHEABLE BASIS.
REMUNERATIVE PRICING: RS.100.00 /TONNE
COKING NON-COKING TOTAL
CIL 19.7 19.7 39.4
PRIVATE 11.3 69.3 80.6
TOTAL 31.0 89.0 120.00
MOBILISATION OF
COAL SUPPLY
PRESENT CAPACITY
13
COMPETITIVE PRICING
BICP : MARCH 1996
COAL COMPANIES : JANUARY 2000
TARIFF COMMISSION : MAY 2006
MOBILISATION OF
COAL SUPPLY
A. UNIFORM PRICING ACROSS CIL
B. NORMATIVE COST OF PRODUCTION + 15% RETURN ON NET WORTH
C. DIFFERENTIAL PRICING(I) POWER UTILITIES + FERTILIZERS(II) CEMENT & STEEL AT REASONABLE PRICE(III) MARKET DRIVEN PRICE FOR REST.
14
COMPETITIVE PRICING
SUGGESTIONS:
I) MARKET DRIVEN FOR SOME
II) REST TO APPROXIMATE INTERNATIONAL PRICING WITH QUALITY ADJUSTMENTS
MOBILISATION OF
COAL SUPPLY
15
CONCLUSIONMOBILISATION
OF COAL SUPPLY
COAL SECTOR TO AUGMENT COAL PRODUCTION IN ENVIRONMENT FRIENDLY MANNER WITH LEAST HUMAN SUFFERING , APPROPRIATE BENEFICIATION AND COST REDUCTION.
GOVT. TO ENSURE FASTER LAND ACQUISITION, UNIFORM LEGALLY ENFORCEABLE R&R POLICY, SPEEDY ENVIRONMENTAL AND FORESTRY CLEARANCE AND MODIFICATION OF LABOUR LAWS.
NEED TO FACILITATE REMUNERATIVE PRICE FOR COAL PRODUCERS, SETTING UP OF COAL WASHERIES, SIGNING AND EXECUTION OF FSTA.
STATE TO ENSURE LOCATION OF CONSUMPTION CENTRES NEAR PRODUCTION POINTS.
OPTIMUM PRODUCTION BY COAL SECTOR STILL SHORT OF REQUIREMENT : DEVELOPMENT OF INFRASTUCTRE FACILITY TO FACILITATE IMPORT.