Thomas L Meikle V. ME2120 PPZ and PRT Modeling Update: 2/7/2011. Presentation Outline. Introduction AP1000 Plant Configuration Component Configuration Modeling Elements. Westinghouse AP1000 Plant Layout. Reactor Coolant System (RCS) P&ID. Pressurizer (PPZ) P&ID. - PowerPoint PPT Presentation

Citation preview

Page 1: ME2120 PPZ and PRT Modeling Update: 2/7/2011

ME2120 PPZ AND PRT MODELING

UPDATE: 2/7/2011

Thomas L Meikle V

Page 2: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Presentation Outline Introduction AP1000 Plant Configuration Component Configuration Modeling Elements

Page 3: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Westinghouse AP1000 Plant Layout

Page 4: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Reactor Coolant System (RCS) P&ID

Page 5: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Pressurizer (PPZ) P&ID

Page 6: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Pressurizer (PPZ) Configuration

Page 7: ME2120 PPZ and PRT Modeling Update: 2/7/2011

PPZ Surge Line Configuration

Page 8: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Design Information (AP1000 DCD)

Page 9: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Design Information (AP1000 DCD)

Page 10: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Design Information (AP1000 DCD)

Page 11: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Simplified Model

Page 12: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Conservation of Energy Equation 4-39, Nuclear Systems 1:

Thermal Hydraulic Fundamentals

Page 13: ME2120 PPZ and PRT Modeling Update: 2/7/2011

General Mass and Energy Equations

Page 14: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Pressurizer Relief Tank (PRT) Notes

Page 15: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Required Inputs and Outputs – Pressurizer (PPZ)

System Worksheet

Component: Pressurizer (PPZ)

Required Outputs System PressurePressurizer LevelTemperature (?)

Initial Conditions Initial pressureInitial pressurizer level

Required Inputs Surge line flow rate and enthalpySpray line flow rate and enthalpyRelief flow ratePressurizer heater power levelAmbient heat loss (?)Spray Valve PositionRelief Valve Position

Required Geometry Area as a function of height of the pressurizer

Pertinent Physics Conservation of mass and energyConcept of equilibrium conditionsDo we want to do non-equilibrium (?)

Viewable Signals System pressurePressurizer levelRelief valve positionsPORV positionsRelief flowSpray flowHeater power level (number of heaters "on")Spray valve position (?)

Open issues

Page 16: ME2120 PPZ and PRT Modeling Update: 2/7/2011

Required Inputs and Outputs – Pressurizer Relief Tank (PRT)

System Worksheet

Component: Pressurizer Relief Tank (PRT)

Required Outputs Pressure (?)Level

Initial Conditions Initial pressure (?)Initial level

Required Inputs Relief flow rateRelief Valve Position

Required Geometry Area as a function of height

Pertinent Physics Conservation of mass

Viewable Signals Pressure (?)Level

Open issues