MC & UM Algae/Biodiesel Project
• Background Review
• Status as of May 12, 2009
MCES Interest in Algae
CO2 + P + N + light
GHG 1.0 -> 0.3 Hypoxia
Concept
1) Extract oil from algal cell mass – some species => 50% oil by weight
2) Use catalytic hydrothermal gasification on wet material to generate usable synthetic gas, heavy oil, and char
Project Goal
Determine the technical and economic
feasibility of using algae to reduce
nutrient and carbon dioxide emissions
and subsequently recover oil and other
energy products from the algal cell mass.
MC Focus
• Phosphorus removal
– MPCA proposing substantial reduction in effluent limits
– Any value from cell mass reduces net cost of P removal
• CO2 removal and value of credits
• Nitrogen removal
Metro Plant Schematic
ScrnGrit
PrimarySettling
ActivatedSludgeAeration
Final Settling
Disinfect
Sludge ThickeningDewatering
Sludge Incineration
centrate
Application at Metro
Concentration Mass Total N
centrate
125 mg/l 1,040 lb/day
Soluble P
centrate
190 mg/l 1,580 lb/day
CO2 incineration
1.7 – lb/lb dry sludge burned
430 ton/day
Oil Production Potential
centrate P - mg/l 200 measure
P removal - % 50 assume
centrate flow - mgd 1 known
algal cell mass - % P 1 literature
P removal - lb/day 833 calculate
algal cell mass produced - lb/day 83,300 calculate
algal cell oil content - % 20 assume
oil recovery efficiency - % 80 assume
oil production - lb/day 13,328 calculate
oil production – gal/day 1,780 calculate
UM Screening Algal Species
UM Bioreactor Design
UM/MC Harvesting Experiments
Metro Pilot Plant
Located in SMB
Door closed to protect intellectual property – reactor design
Experimental Reactors
Reactor A Reactor B
Tanks 4 4
Type Plug Flow Mixed
Light intensity
1.5 X X
Simplified Growth Model
CO2 + N + P + light O2 +
Corganic + O2 + N + P CO2 +
Pilot Plant Performance*
Reactor A Reactor B
TSS Produced 497 gm/day 415 gm/day
STP removed 47 gm/day 43 gm/day
STP removed 67% 60%
* Varying wasting schedule during startup – not steady state operation
Project Funding
Phase 1 Phase 2
MC $40k $250k
UM – IREE $40k $250k
Xcel Energy $150k
State of Minn ______ $500k__
Totals $230k $1,000k