149
© International Masonry Institute 2013 masonry job site troubleshooting

masonry job site troubleshooting

Embed Size (px)

Citation preview

Page 1: masonry job site troubleshooting

© International Masonry Institute 2013

masonry job site troubleshooting

Page 2: masonry job site troubleshooting

AIA policy

International Masonry Institute (IMI) is a Registered Provider with

The American Institute of Architect’s Continuing Education

Systems. Credit earned on completion of this program will be

reported to CES Records for AIA members.

Certificates of Completion for non-AIA members available on

request.

This program is registered with the AIA/CES for continuing

professional education. As such, it does not include content that

may be deemed or construed to be an approval or

endorsement by the AIA of any material of construction or any

method or manner of handling, using, distributing, or dealing in

any material or product. Questions related to specific materials,

methods, and services will be addressed at the conclusion of this

presentation.

Page 3: masonry job site troubleshooting

copyright materials

this presentation is protected by U.S. and

international copyright laws

reproduction, distribution, display and use of the

presentation without written permission of the

speaker is prohibited

© International Masonry Institute 2013

Page 4: masonry job site troubleshooting

course evaluation

In order to maintain high-quality learning experiences, please

access the evaluation for this course by logging into CES Discovery

and clicking the Course Evaluation link.

Page 5: masonry job site troubleshooting

learning objectives

review

understand

discover

learn

basic masonry design concepts

masonry expectations

critical performance construction

details

how to diagnose masonry

problems

Page 6: masonry job site troubleshooting

seminar outline

1. masonry codes & resources

2. water-resistive barrier

3. air space

4. flashing

5. weep vents

6. mortar joints

7. veneer connectors

8. joint reinforcement

9. shelf angles

10. movement joints

Page 7: masonry job site troubleshooting

mason codes & resources

© International Masonry Institute 2013

Page 8: masonry job site troubleshooting

commercial masonry codes

"IBC”

and

“MSJC”

(“ACI 530”)

Page 9: masonry job site troubleshooting

residential masonry codes

2012

"IRC” "MSJC”

and

Page 10: masonry job site troubleshooting

ASTM Standards

Page 11: masonry job site troubleshooting

masonry resources (online)

Brick Industry Association (BIA)

National Concrete Masonry Association (NCMA)

International Masonry Institute (IMI)

The Masonry Society (TMS)

Page 12: masonry job site troubleshooting
Page 13: masonry job site troubleshooting

www.masonrydetails.org

IMI “Masonry Detailing Series”

Page 14: masonry job site troubleshooting

other masonry resources

Cast Stone Institute (CSI)

Indiana Limestone Institute (ILI)

Manufactured Veneer Masonry Association (MVMA)

manufacturer installation instructions

ICC Evaluation Services Reports (ICC-ESR)

Rocky Mountain Masonry Institute (RMMI)

Page 15: masonry job site troubleshooting

ICC Evaluation Services Report (1)

In the event of a conflict between the

manufacturer’s published installation instructions and this report, this report

governs.

Section 5.1 – Conditions of Use

(1) www.icc-es.org

Page 16: masonry job site troubleshooting

water-resistive barrier

(WRB)

© International Masonry Institute 2013

Page 17: masonry job site troubleshooting

masonry cavity wall

water-resistive barrier

Page 18: masonry job site troubleshooting

water-resistive barrier on CMU

Page 19: masonry job site troubleshooting

WRB requirement (1)

“Design and detail the

backing system of exterior

veneer to resist water

penetration.

Exterior sheathing shall be

covered with a water-resistant

membrane,

unless the sheathing is water

resistant and the joints are

sealed.”

(1) Building Code Requirements for Masonry Structures ( "MSJC“ )

MSJC-2011, Section 6.1.6.1

Page 20: masonry job site troubleshooting

no WRB !

Page 21: masonry job site troubleshooting

moisture sources

precipitation humidity

rising damp

precipitation

Page 22: masonry job site troubleshooting

Who plugs the hole ?

Page 23: masonry job site troubleshooting

water/air barrier & flashing coordination

Page 24: masonry job site troubleshooting

air space

© International Masonry Institute 2013

Page 25: masonry job site troubleshooting

masonry cavity wall

air space

Page 26: masonry job site troubleshooting

wall cavity vs. air space

wall cavity

air space

Page 27: masonry job site troubleshooting

inadequate air space

Page 28: masonry job site troubleshooting

water + pressure + wood = lawyer

Page 29: masonry job site troubleshooting

2 function of an air space

air out

air in

air control recommended on support wall when ventilating wall cavity,

1) drainage

2) drying

Page 30: masonry job site troubleshooting

air space width

(a) minimum, Masonry Standards Joint Committee Code (MSJC)

1” code (a)

2” recommended (b)

International Masonry Institute (IMI), Brick Industry Association (BIA), National Concrete Masonry Association (NCMA), The Masonry Society (TMS)

(b)

Page 31: masonry job site troubleshooting

flashing

© International Masonry Institute 2013

Page 32: masonry job site troubleshooting

masonry cavity wall

flashing system

Page 33: masonry job site troubleshooting

flashing locations

base of wall

under sills

lintels

shelf angle

top of wall

Page 34: masonry job site troubleshooting

what’s wrong?

Page 35: masonry job site troubleshooting

concealed flashing (not good)

Page 36: masonry job site troubleshooting

drip edge detail

1/2” – 3/4"

3” typical

1/2" to 3/4” min. if unstable rubberized asphalt flashing - to prevent drool

1” min. lap, sealed w/ mfr-approved adhesive

best practice to install mortar wash for “slope to drain” (1)

(1) must be detailed and/or specified in construction documents

Page 37: masonry job site troubleshooting

flashing drool

Page 38: masonry job site troubleshooting

exposed flashing membrane

Page 39: masonry job site troubleshooting

drip edge option

Page 40: masonry job site troubleshooting

membrane flashing system

Hohmann & Barnard’s TeXtroflash TM

Page 41: masonry job site troubleshooting

drip edge connection

"butt" look, leave gap for movement

lap

joint sealant

Page 42: masonry job site troubleshooting

drip edge – seal to substrate

Page 43: masonry job site troubleshooting

field-formed outside corner drip

6

Page 44: masonry job site troubleshooting

flashing functions

1 keep water out 1

2 drain water

2

2

3 break bond

3

4 prevent rising damp

4

5 protect structural steel Steel

5

Page 45: masonry job site troubleshooting

flashing protects structural steel

Page 46: masonry job site troubleshooting

flashing at beam

Page 47: masonry job site troubleshooting

protect the steel

Page 48: masonry job site troubleshooting

What’s wrong?

Page 49: masonry job site troubleshooting

International Building Code (1)

Section 1405.4.2

"Flashing and weepholes

shall be located in the

first course of masonry

above finished ground

level above the

foundation wall or slab,

and other points of support,

including structural floors,

shelf angles and lintels…"

(1) 2012

Page 50: masonry job site troubleshooting

below grade masonry veneer (1)

use durable veneer units

install site drainage material adjacent to veneer

grout solid behind below-

grade veneer units

insulation behind below-grade veneer units to break thermal

bridge

support flashing so it does not

sag

keep flashing & weep vents

above grade

(1) best-practice: recommended to keep veneer completely above grade

Page 51: masonry job site troubleshooting

what’s wrong ?

Page 52: masonry job site troubleshooting

what to do if the MDCD does not fit…

Page 53: masonry job site troubleshooting

common flashing materials

PVC

stainless steel

copper

EPDM

copper or stainless steel composite

self-adhering membranes

Page 54: masonry job site troubleshooting

materials that are NOT flashing

light-gauge PVC

– "Nervastral"

aluminum

polyethylene sheeting

asphalt-saturated felt

building paper

building wrap

Hefty garbage bags

Page 55: masonry job site troubleshooting

flashing lap detail

FLASHING LAP DIAGRAM 15.410.4101 REV. 02/10/11

6” LAP

DRIP EDGE SET IN SEALANT

PRIMER PER MANUF’R

SEAL FLASHING LAPS W/ MASTIC PER MANUF’R

RETURN FLASHING INTO BLOCK COURSE (SHOWN) OR SECURE TO BACKUP W/ TERMINATION BAR

Page 56: masonry job site troubleshooting

flashing laps

Page 57: masonry job site troubleshooting

seal laps

Page 58: masonry job site troubleshooting

secure top edge

BAD GOOD

Page 59: masonry job site troubleshooting

secure top edge - termination bar

bead of joint sealant

Page 60: masonry job site troubleshooting

secure top edge - termination bar

Page 61: masonry job site troubleshooting

secure top edge - embed

Page 62: masonry job site troubleshooting

good ad for term bar!!

Page 63: masonry job site troubleshooting

what’s wrong?

Page 64: masonry job site troubleshooting

what’s wrong?

Page 65: masonry job site troubleshooting

end dams

“Flashing shall be installed

in such a manner so as to

prevent moisture from

entering the wall or to

redirect it to the exterior.” (1)

(1) International Building Code (IBC), Section 1405.4

Page 66: masonry job site troubleshooting

end dam

EXTEND FLASHING FLUSH OR BEYOND FACE OF MASONRY

2” RECOMMENDED; 1” MIN.

CARRY FLASHING ½” MIN. BEYOND END OF LINTEL

CAVITY INSULATION NOT SHOWN FOR CLARITY OF DETAIL

SEALANT

NOTE: STRUCTURAL ELEMENTS MAY VARY, AND ARE SHOWN FOR ILLUSTRATION ONLY

END DAM UNDER THRU-WALL FLASHING IN HEAD JOINT AT OR BEYOND END OF LINTEL

2” RECOMMENDED

1 ½” MIN.

Page 67: masonry job site troubleshooting

what’s wrong?

Page 68: masonry job site troubleshooting

end dam above opening

Page 69: masonry job site troubleshooting

great drip edge/end dam detail

Page 70: masonry job site troubleshooting

prefabricated end dam

Page 71: masonry job site troubleshooting

sill flashing

Page 72: masonry job site troubleshooting

sill flashing & end dam

Page 73: masonry job site troubleshooting

roof-to-wall interface

Page 74: masonry job site troubleshooting

what’s wrong??

Page 75: masonry job site troubleshooting

roof-to-wall interface detail

Page 76: masonry job site troubleshooting

good flashing to roof connection

Page 77: masonry job site troubleshooting

low roof to tall wall interface

•First Brick Course unprotected

•“Low Roof to Vertical Wall Connection is What Lawsuits Are Made Of”

Page 78: masonry job site troubleshooting

flashing repair

Page 79: masonry job site troubleshooting

flashing repair

Page 80: masonry job site troubleshooting

ROOF DETAIL HIGH WALL – LOW ROOF DETAIL 01.704 REV. 11/6/07

© 2007 INTERNATIONAL MASONRY INSTITUTE

BR

ICK

& B

LOC

K C

AVIT

Y W

ALL

DETAILING MASONRY

SERIES www.imiweb.org 800-IMI-0988

International Masonry Institute

CUT BLOCK BELOW FLASHING

HORIZONTAL JOINT REINF. @ 16” O.C. W/ INTEGRAL WALL TIES

ROOF MEMBRANE

TERMINATION BAR W/ CONT. SEALANT

FACE BRICK

THRU-WALL FLASHING

ROOF STRUCTURE

SHEET METAL RECEIVER

COUNTER- FLASHING

WEEP VENT

THRU-WALL FLASHING

CMU BACKUP

CAVITY INSUL.

Page 81: masonry job site troubleshooting

flashing sag

Page 82: masonry job site troubleshooting

seal flashing penetration

Page 83: masonry job site troubleshooting

MASONRY WALL CAP DETAIL 01.751 REV. 11/04/08

© 2008 INTERNATIONAL MASONRY INSTITUTE

BR

ICK

& B

LOC

K C

AVIT

Y W

ALL

DETAILING MASONRY

SERIES www.imiweb.org 800-IMI-0988

International Masonry Institute

MASONRY COPING: LIMESTONE, CAST STONE, CALCIUM SILICATE, OR PRECAST CONCRETE; OVERHANG MASONRY WALL 1½” MIN.; SLOPED TOP

SEE DETAIL 01.759 FOR WALL CAP JOINT OPTIONS

CANTED S.S. THRU-WALL FLASHING W/ 1/2” EXPOSED DRIP EDGE

1/8” SAW-CUT DRIP, BOTH SIDES OF WALL CAP

OPEN DRAINAGE CAVITY, OPTIONAL ABOVE ROOF LINE; ALSO SEE DETAIL 01.752 GROUT & REINFORCING AS

REQ’D.

SEALANT BELOW DRIP, OPT. (NOT SHOWN)

HORIZONTAL JOINT REINFORCEMENT W/ WALL TIES

SLOPED MORTAR BED TO SUPPORT CANTED FLASHING, OPT.

S.S. DOWEL W/ SEALANT AROUND PENETRATIONS THROUGH FLASHING

RIGID INSULATION

OPEN CAVITY

FACE BRICK

SEALANT & BACKER ROD, BOTH SIDES OF WALL CAP

Page 84: masonry job site troubleshooting

flashing recommended under stone copings

Page 85: masonry job site troubleshooting

proper top-of-wall flashing

Page 86: masonry job site troubleshooting

parapet detail

Page 87: masonry job site troubleshooting

top-of-wall

Page 88: masonry job site troubleshooting

weep vents

© International Masonry Institute 2013

Page 89: masonry job site troubleshooting

weep vent options

Rope Wick

Plastic Tube

Metal Louver

PVC Louver

Plastic Cell

Synthetic Net

Page 90: masonry job site troubleshooting

masonry cavity wall

weep vent

Page 91: masonry job site troubleshooting

2 function of weep vents

air out

air in

air control recommended on support wall when ventilating wall cavity,

1) drainage

2) drying

Page 92: masonry job site troubleshooting

open head joints

Page 93: masonry job site troubleshooting

ventilated cavity wall

Page 94: masonry job site troubleshooting

what’s wrong?

Page 95: masonry job site troubleshooting

what’s wrong?

Page 96: masonry job site troubleshooting

mortar joints

© International Masonry Institute 2013

Page 97: masonry job site troubleshooting

masonry cavity wall

grout

grout

mortar

mortar

- head joint (vertical)

- bed joint (horizontal)

Page 98: masonry job site troubleshooting

mortar types in ASTM C270

compressive strength (cement content)

bond strength

CMU structural wall (1) non-structural walls (veneers) (1)

(low) (high)

(high) (low)

(1) typical applications

more important for structural masonry design

Page 99: masonry job site troubleshooting

head joints not full

Page 100: masonry job site troubleshooting

head joints not full

Page 101: masonry job site troubleshooting

head joints not full

Page 102: masonry job site troubleshooting

full head joint

Page 103: masonry job site troubleshooting

anchors & wall ties

© International Masonry Institute 2013

Page 104: masonry job site troubleshooting

masonry cavity wall

veneer anchor

Page 105: masonry job site troubleshooting

common horizontal joint reinforcement

© 2008 INTERNATIONAL MASONRY INSTITUTE

DETAILING MASONRY

SERIES www.imiweb.org 800-IMI-0988

International Masonry Institute

9 GA. HOT-DIPPED GALVANIZED WIRE EYES, WELDED TO LADDER-TYPE WIRE

9 GA. HOT-DIPPED GALVANIZED LADDER-TYPE HORIZONTAL JOINT REINFORCEMENT

REINFORCEMENT W/ INTEGRAL WALL TIES DETAIL 14.102 REV. 07/08/08

HORIZONTAL JOINT

PINTLE: 9 GA. HOT-DIPPED GALVANIZED HOOK-SHAPED WIRE, ENGAGED WITH EYES FOR WALL TIE

Page 106: masonry job site troubleshooting

typical masonry cavity wall veneer ties

Page 107: masonry job site troubleshooting

typical masonry cavity wall veneer ties

Page 108: masonry job site troubleshooting

eye & pintle veneer ties

16”

16”

veneer tie tributary area

16” (1.33) x 16” (1.33) = 1.77 SF

For adjustable two-

piece anchors, wire

anchors of wire size

W1.7, and 22 gage

corrugated sheet- metal

anchors, provide at least

one anchor for each

2.67 SF of wall area. (1)

(1) Masonry Standards Joint Committee code, Section 6.2.2.5.6.1

Page 109: masonry job site troubleshooting

veneer ties

masonry veneer shall

be anchored to the

supporting wall with

corrosion-resistant

metal ties. (1)

can only be used with wood stud support wall(1, 2)

(1) Masonry Standards Joint Committee code

(2) BIA recommends 20 ga., code 22 ga. Min., 28 ga. not permitted

Page 110: masonry job site troubleshooting

electro-galvanized corrugated wall tie

Page 111: masonry job site troubleshooting
Page 112: masonry job site troubleshooting

do we even have to ask?

Page 113: masonry job site troubleshooting

do we even have to ask?

Page 114: masonry job site troubleshooting

tie embedment/cover

embed anchors

in the mortar

joint and extend

into the veneer a

minimum of 1½”

5/8”

1 1/2”

with at least 5/8” mortar cover to the

outside face (1)

(1) Masonry Standards Joint Committee code

Page 115: masonry job site troubleshooting

joint reinforcement

© International Masonry Institute 2013

Page 116: masonry job site troubleshooting

the structural CMU system

block

mortar

rebar

horizontal joint

reinforcement

grout grout

Page 117: masonry job site troubleshooting

horizontal joint reinforcement

restrain with

joint

reinforcement

minimum lap

6”

Page 118: masonry job site troubleshooting

veneer reinforcement

6”

Page 119: masonry job site troubleshooting

classic shrinkage cracks

Page 120: masonry job site troubleshooting

veneer reinforcement

Page 121: masonry job site troubleshooting

shelf angles

© International Masonry Institute 2013

Page 122: masonry job site troubleshooting

horizontal movement joint

Page 123: masonry job site troubleshooting

up-lipped brick @ shelf angle

weep vent

backer rod &

sealant

compressible filler

flashing

drip edge

mortar dropping

collection device

insulation

shelf angle

(optional)

Page 124: masonry job site troubleshooting

vertical spacing

• check codes

• veneer type

• back-up system

• formula

• empirical

Page 125: masonry job site troubleshooting

mid-wall shelf angle

Page 126: masonry job site troubleshooting

mid-wall shelf angle – what’s wrong?

Page 127: masonry job site troubleshooting

energy efficient shelf angle

Page 128: masonry job site troubleshooting

energy efficient shelf angles

Page 129: masonry job site troubleshooting

movement joints

© International Masonry Institute 2013

Page 130: masonry job site troubleshooting

masonry cavity wall

control joint

expansion joint (1)

(1) if veneer material is expansive

Page 131: masonry job site troubleshooting

movement joint basics

all buildings move

CMU shrink

bricks expand

accommodate

restrain

both

Page 132: masonry job site troubleshooting

movement joint terminology

expansion joint (EJ)

control joint (CJ)

movement joint (MJ)

building expansion joint

isolation joint

?

Page 133: masonry job site troubleshooting

who is responsible for locating movement joints?

MSJC, Section 6.1.6.3

“Design and detail the veneer

to accommodate differential

movement.”

MSJC Mandatory

Requirements Checklist –

“Notes to Architect /

Engineer”, Part 3, 3.3 D.6,

page S-73

“Indicate type and location of

movement joints on the project

drawings.”

Page 134: masonry job site troubleshooting

expansion or shrinkage test

shrink

expand

expand

shrink

shrink

shrink

expand

expand

shrink autoclaved aerated concrete (AAC)

shrink or expand (1)

(1) depends if it is manufactured or natural stone

adhered veneer

architectural precast

brick (clay)

brick (fly ash)

calcium silicate

concrete masonry unit (CMU)

cast stone

EIFS

natural stone

tile (ceramic)

terra cotta

shrink

expand (2)

(2) natural stone may expand but is essentially inert, MJ's recommended because building structure will move

brick (CMU) shrink

Page 135: masonry job site troubleshooting

MJ’s at openings

1) end of lintel

2) aligned with jamb

3) between openings

3 options

Page 136: masonry job site troubleshooting

movement joint offsets

Page 137: masonry job site troubleshooting

movement joint width

3/8” to 1/2” wide

brick (ej)

3/8” wide

CMU (cj)

Page 138: masonry job site troubleshooting

improper MJ locations

20'

100'

20' 20' 20' 20'

20'

20'

20' 60'

crack

miscellaneous building plan

Page 139: masonry job site troubleshooting

corner crack (mother nature’s ej)

Page 140: masonry job site troubleshooting

corner MJ rule-of-thumb (1)

(1) source: Brick Industry Association (BIA) – Technical Note 18A (2006)

Note from International Masonry Institute (IMI) (2010). L1 or L2 4-feet

+/- when bricks are: new , dark colored, large sized, exposed to

abundant heat gain, used in facades multiple openings.

Page 141: masonry job site troubleshooting

corner MJ rule-of-thumb

L2

L1

Page 142: masonry job site troubleshooting

do not install mortar at lintel

Page 143: masonry job site troubleshooting

L-shaped movement joints

Page 144: masonry job site troubleshooting

improper joint sealant color

Page 145: masonry job site troubleshooting

proper sealant color

Page 146: masonry job site troubleshooting

proper sealant colors

Page 147: masonry job site troubleshooting

masonry geeks (& proud of it)

Page 148: masonry job site troubleshooting

thank you for your time

Q &A

this concludes the AIA CES program

Page 149: masonry job site troubleshooting

© International Masonry Institute 2013

masonry job site troubleshooting