For cost effective housingthe Mascon Aluminum Formwork System

is THE ONLY SYSTEMon the world market that...

forms any architectural design,with loadbearing walls,

with a 15% cost saving, usingunskilled labour, without cranes,without timber or plywood...

Page 2: Mascon Construction System - Brochure

Why Cast-in-Place Concrete?Cement, sand and stone are readily available in

most countries. Concrete is strong, durable, fire-resistant, rot and termite free. Concrete has low noisetransmission, good thermal capacity, low maintenance,long life and is environmentally friendly.

Cast-in-place concrete, unlike pre-cast, does nothave the construction joints that can cause problems ofstructural weakness and water penetration. Cast-in-placeconcrete also eliminates the high capital, handling andtransportation costs associated with pre-cast concrete.

Why Loadbearing Wall Design?Ove Arup, internationally recognized structural

engineers, in a comparative study on typical five-storeybuildings erected in Cairo, Egypt, concluded:

“The loadbearing wall design has structural andeconomic advantages over the column and beam solution,due both to the relative costs of the different elements andto the more efficient way the structure works.”

Their analysis showed a 15.7% saving in structuralcosts by using loadbearing walls rather than theconventional column and beam with block infill.

Why a Hand-Held Formwork System?Hand-held forms are ideally suited to loadbearing

wall designs of any configuration because they can formthe complex connections other systems can’t. Andbecause they are small, they can be easily transportedthrough small openings from floor to floor, and building tobuilding.

Massive steel formwork systems require cranes tohandle the forms. However, moving cranes amongnumerous low-rise buildings is not practical.

The hydraulic pressure of fresh concrete placed inloadbearing walls is very high. While timber and plywoodforms can form columns and beams easily, they needexpensive walers, bracing and ties when used to formloadbearing walls.

Page 3: Mascon Construction System - Brochure

Why the MasconConstruction System?• Mascon forms ALL the concrete in a building -including walls, floor slabs, balconies, windowhoods, curved and decorative features as well ascolumns and beams.

• Mascon enables all concrete to be castmonolithically, thereby eliminating joints.

• Mascon completes the entire structure of a buildingat a rate of 4 days per floor.

• All Mascon formwork is erected and dismantledwithout cranes, using unskilled labour equippedonly with hammers.

• Mascon includes systematic constructionscheduling and coordination of all trades.

• Mascon’s all-aluminum components produceaccurate, high-quality surfaces that save costs onthe finishings and the fitting of doors and windows.

• The Mascon formwork equipment isenvironmentally friendly and fully recyclable.

• The Mascon formwork equipment is not damagedby concrete vibrators and mechanical operations.The equipment can be reused many hundredsof times.

• Mascon has a proven track record of constructinghundreds of buildings designed with loadbearingwalls.

... At a rate of4 days per floor!

And Mascon’s free design and consultation services,as well as complete site training, accompany every setof its formwork.

Page 4: Mascon Construction System - Brochure

ENGINEERING LIMITED67 Balmoral Heights,

Queensville, Ontario, L0G 1R0CANADA

Tel: +1-905-478-1010 • Fax: +1-905-478-1260

CONSTRUCTION SYSTEMPRIVATE LIMITED

F-12, Niharika, Gladys Alwares Road,Thane (W) 400 601, INDIA

Tel: +91-22-21715018 • Fax: +91-22-21715020

www.masconsystem.com • [email protected]