CLIENT REV M8 M73 M74 Motorway Improvements PROJECT TITLE DATE: DATE: DRAWN BY: DESIGN BY: DATE BY CHKD REVISIONS APP'D AMENDMENTS DATE: APPROVED BY: DATE: CHECKED BY: ENGINEER SCALE AT A1 DRAWING NO DRAWING TITLE REV IN ASSOCIATION WITH This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Scottish Executive 100046668 2011 DRAWING STATUS CONTRACT SL MB March 2012 March 2012 March 2012 March 2012 SL GG 02 1:2500 M8/C/LOR/001 Reference Drawings Sheet 1 of 25 Lane Occupation M8 Easterhouse M8 Junction 10 M8 Eastbound Merge Slip Road from Junction 10 (Easterhouse) Auchinlea Way Wellhouse Road Westerhouse Road Wardie Road Springhill M8 Junction 9 M8 Westbound Merge Slip Road from Junction 9 (Springhill) Easterhouse Road Easterhouse Road 01 Notes and Road extents added RH GG MB Sept 12 02 Drawing border updated - Road Name Update SL GG MB Feb 13 Notes: 1). For the purposes of calculation of Lane Occupation charges, the extent of a diverge Slip Road is defined as: The slip road from the start of the diverge taper (as defined in TD22/06, Fig 1/1) to the junction with the downstream road network. 2). For the purposes of calculation of Lane Occupation charges, the extent of a merge Slip Road is defined as: The slip road from the junction with the upstream road network, to the end of the merge taper (as defined in TD22/06, Fig 1/1). 3). For lane drop/lane gain Slip Roads, the mainline extent of the slip road shall be taken from the tip of the nosing (as defined in TD22/06,Figure 1/1). INSET A M8 Eastbound Diverge Slip Road to Junction 10 (Easterhouse) M8 Westbound Merge Slip Road from Junction 10 (Easterhouse) Easterhouse M8 Junction 10 M8 Westbound Diverge Slip Road to Junction 10 (Easterhouse) CLIENT REV M8 M73 M74 Motorway Improvements PROJECT TITLE DATE: DATE: DRAWN BY: DESIGN BY: DATE BY CHKD REVISIONS APP'D AMENDMENTS DATE: APPROVED BY: DATE: CHECKED BY: ENGINEER SCALE AT A1 DRAWING NO DRAWING TITLE REV IN ASSOCIATION WITH This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office Crown Copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Scottish Executive 100046668 2011 DRAWING STATUS M8 Eastbound Diverge Slip Road to Junction 9 (Springhill)

M8 M73 M74 Motorway Improvements - Transport Scotland CLIENT REV M8 M73 M74 Motorway Improvements PROJECT TITLE DATE: DATE: DRAWN BY: DESIGN BY: REVISIONS BYCHKDAPP'DDATE AMENDMENTS

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M8 M73 M74 Motorway Improvements - Transport Scotland CLIENT REV M8 M73 M74 Motorway Improvements PROJECT TITLE DATE: DATE: DRAWN BY: DESIGN BY: REVISIONS BYCHKDAPP'DDATE AMENDMENTS

CLIENT

REV

M8 M73 M74Motorway Improvements

PROJECT TITLE

DATE:

DATE:

DRAWN BY:

DESIGN BY:

DATEBY CHKDREVISIONS APP'D

AMENDMENTS

DATE:

APPROVED BY:

DATE:

CHECKED BY:

ENGINEER

SCALE AT A1 DRAWING NO

DRAWING TITLE

REV

IN ASSOCIATION WITH

This map is based on Ordnance Survey material with the permission of Ordnance

Survey on behalf of the Controller of Her Majesty's Stationery Office Crown

Copyright. Unauthorised reproduction infringes Crown copyright and may lead to

prosecution or civil proceedings. Scottish Executive 100046668 2011

DRAWING STATUS CONTRACT

SL MB

March 2012March 2012

March 2012March 2012

SL GG

021:2500 M8/C/LOR/001

Reference DrawingsSheet 1 of 25

Lane Occupation

M8

EasterhouseM8 Junction 10

M8 Eastbound Merge Slip Roadfrom Junction 10 (Easterhouse)

Auchinlea Way

Wellhouse Road

Westerhouse Road

Wardie Road

SpringhillM8 Junction 9

M8 Westbound Merge Slip Roadfrom Junction 9 (Springhill)

Easterhouse Road

Easterhouse Road

01 Notes and Road extents added RH GG MB Sept 12

02 Drawing border updated - Road Name Update SL GG MB Feb 13

Notes:

1). For the purposes of calculation of Lane Occupation charges,the extent of a diverge Slip Road is defined as: The slip road fromthe start of the diverge taper (as defined in TD22/06, Fig 1/1) tothe junction with the downstream road network.

2). For the purposes of calculation of Lane Occupation charges,the extent of a merge Slip Road is defined as: The slip road fromthe junction with the upstream road network, to the end of themerge taper (as defined in TD22/06, Fig 1/1).

3). For lane drop/lane gain Slip Roads, the mainline extent of theslip road shall be taken from the tip of the nosing (as defined inTD22/06,Figure 1/1).

INSET A

M8 Eastbound Diverge Slip Roadto Junction 10 (Easterhouse)

M8 Westbound Merge Slip Roadfrom Junction 10 (Easterhouse)

EasterhouseM8 Junction 10

M8 Westbound Diverge Slip Roadto Junction 10 (Easterhouse)

CLIENT

REV

M8 M73 M74Motorway Improvements

PROJECT TITLE

DATE:

DATE:

DRAWN BY:

DESIGN BY:

DATEBY CHKDREVISIONS APP'D

AMENDMENTS

DATE:

APPROVED BY:

DATE:

CHECKED BY:

ENGINEER

SCALE AT A1 DRAWING NO

DRAWING TITLE

REV

IN ASSOCIATION WITH

This map is based on Ordnance Survey material with the permission of Ordnance

Survey on behalf of the Controller of Her Majesty's Stationery Office Crown

Copyright. Unauthorised reproduction infringes Crown copyright and may lead to

prosecution or civil proceedings. Scottish Executive 100046668 2011

DRAWING STATUS

M8 Eastbound Diverge Slip Roadto Junction 9 (Springhill)