Longitudinal de la Sierra Road- Section 4: Huancayo Izcuchaca
Mayocc - Ayacucho/Ayacucho Andahuaylas Pte. Sahuinto/Dv. Pisco
Huaytar Ayacucho
Slide 2
Huancayo Ayacucho Pte Sahuinto Dv. Kishuara Huanta Izcuchaca
Mayocc Km 50+000 Km 154+000 Km 210+000 Dv. Pisco Andahuaylas Km
98+800
Slide 3
Structure Concession comprising road sections:
Huancayo-Izcuchaca-Mayocc- Ayacucho/Ayacucho-Puente Sahuinto/Dv.
Pisco Huaytar Ayacucho (Approx. 971 km).Concession comprising road
sections: Huancayo-Izcuchaca-Mayocc- Ayacucho/Ayacucho-Puente
Sahuinto/Dv. Pisco Huaytar Ayacucho (Approx. 971 km). Mode
Comprehensive projects, the Concession Holder will conduct studies
according to the terms of reference included in the
basesComprehensive projects, the Concession Holder will conduct
studies according to the terms of reference included in the bases
Term 25 years25 years Competition factor Lower amount charged for
Restoring and Improvement(PRM) Lower amount charged for initial
periodic maintenance payments (PAMPI) Lower amount charged for
maintenance and operation (PAMO) Financing In char ge of the Con
cessi on hold er for the Rest oring and Impr ove ment work s, the
Initia l Peri odic Main tena nce, Oper ation and Con serv ation.
Rec over y throu gh PRM, PAM PI and PAM POIn char ge of the Con
cessi on hold er for the Rest oring and Impr ove ment work s, the
Initia l Peri odic Main tena nce, Oper ation and Con serv ation.
Rec over y throu gh PRM, PAM PI and PAM PO PROMOTION PROCESS
CHARACTERISTICS
Slide 4
STRATEGIC PARTNER Will be the operator and must possess and
maintain a minimum share of 35% of the capital subscribed by the
Concession holder.Will be the operator and must possess and
maintain a minimum share of 35% of the capital subscribed by the
Concession holder. WARRANTIES W. of Validity, Effectiveness and
Reliability of the Offer: US$ 10MMW. of Validity, Effectiveness and
Reliability of the Offer: US$ 10MM W. of Certain Fulfillment of the
Contract: To be determinedW. of Certain Fulfillment of the
Contract: To be determined W. of Certain Fulfillment of the
Restoring and Improvement Works Execution: US$ 16MM.W. of Certain
Fulfillment of the Restoring and Improvement Works Execution: US$
16MM. W. of Certain Fulfillment of the Initial Periodic Maintenance
Execution: US$ 18MM.W. of Certain Fulfillment of the Initial
Periodic Maintenance Execution: US$ 18MM. 04 TOLL UNITS Will be
given to the Concession holder once the operation begins.Will be
given to the Concession holder once the operation begins. AWARD
Will be awarded given a minimum of two valid economic proposals are
receivedWill be awarded given a minimum of two valid economic
proposals are received
Slide 5
BIDDER CHARACTERISTICS OPERATION In the last 10 years has been
operating or has operated 01 or more asphalted road concessions
totaling at least 100 km or in the last 05 years has been operating
or has operated 01 or more asphalted road concessions that add at
least 50 km ; in both cases, for a cumulative minimum period of 02
years. It is not necessary to prove the experience of the builder
to be declared as a prequalified bidder. Accreditation will be
presented by the winner of the contest within 30 calendar days from
the date of the Award.
Slide 6
Construction The builder must prove that he has executed at
least 100 km in the last 15 years, among "New Roads,
"rehabilitation" and / or "improvement. The extension can be
accumulated in both directions of the road, only in case of
separate roads (highway). Financial criteria Minimum net worth:
TBD, audited financial statements of the last three years
available, or similar documents. Reference letter issued by a
Banking Entity or an International Financial Institution according
to the Bases. Minimum social capital To be determined BIDDER
CHARACTERISTICS
Slide 7
SUB SECTIONS TO BE DELIVERED BY THE GRANTOR* 574.589 km 1.Dv
Huancayo Pnte Chanchas: 3.834 km. 2.Pte. Chanchas - Huayucachi:
2.820 km. 3.Huayucachi Imperial: 26.567 km. 4.Imperial Izcuchaca:
31.219 km. 5.Mayocc Huanta: 32.756 km. 6.Ayacucho (Emp PE-28A) Km.
00+000: 7.628 km. 7.Abra Tocto Ocros: 48.80 km 8.Ocros Chincheros:
55.200 km. 9.Chincheros Sta Mara Chicmo: 66.022 km. 10.Andahuaylas
Dv. Quishuar: 54.307 km. 11.Dv. Quishuar Dv. Sahuinto: 62.711 km.
12.Dv. Sahuinto Pte Sahuinto: 13.739 km. 13.San Clemente Pnte
Choclococha: 163.810 km. 14.Pte. Choclococha Ayacucho: 5.176 km. *
With the Service Indices indicated on the Bases
Slide 8
INTERVENTIONS IN CHARGE OF THE CONCESSION HOLDER RESTORING AND
IMPROVEMENT Izcuchaca y Mayocc : 116.8 km (Reference amount: US$
162 millions) INITIAL PERIODIC MAINTENANCE (279.5 KM) Huanta
Ayacucho: 42.25 km Ayacucho (Km 0+000)-Abra Tocto: 50.00 km Snta
Mara de Chicmo-Andahuaylas: 20.34 km Pnte Choclococha - Ayacucho:
166.89 km (Reference amount : US$ 178 millions) Concession
operation, scheduled and periodic maintenance throughout the 971
km, during the term of the concession. Note: The amounts for the
operation and the scheduled and periodic maintenance are not
included in the indicated amounts.
Slide 9
Ayacucho Pte Sahuinto Huancayo Andahuaylas Huanta Mayocc
Izcuchaca Huacrapuquio La Esmeralda Huanta Ocros Chicmo Auquibamba
Pisco Socos) Rumichaca) Pacra) TOLL UNITS: Existing and provided
Existing 1.UP Huacrapuquio 2.UP Pacra 3.UP Rumichaca 4.UP Socos
Provided 1.UP La Esmeralda 2.UP Huanta 3.UP Ocros 4.UP Chicmo 5.UP
Auquibamba One month after the Contract Subscription: Actual toll +
VAT Actual toll + VAT On the reception date or the intervention
completion in sub sections: US$ 1.5 + VAT
Slide 10
Publishing of the CD agreement approving the Promotion Plan
January 30th 2015 Call February 22nd and 23rd 2015 Consultation on
Bidding Documents Up until September 2015 Answers to the
Consultation on Bidding Documents Up until October 2015
Presentation of Envelope N 1 (prequalifying credentials) Up until
October 2015 Partnership term, to changes in conformation or
withdrawal of a prequalified bidder member Up until October 2015
TENTATIVE SCHEDULE
Slide 11
Delivery of the Final Version of the Contract approved by the
Directive Council of Pro Inversion Within the next 320 calendar
days after publication of the CD agreement approving the Promotion
Plan Submitting of Envelopes N 2 y N 3 (technical and economic
proposals) November 2015 November 2015 Opening of Envelope N 3 and
Award date December 2015 Contract Subscription Date Will be given
via Notice Will be given via Notice TENTATIVE SCHEDULE
Slide 12
Important: This presentation has been elaborated by
PROINVERSION and provided only for informative purposes to assist
potential investors define their interest on participating in the
Comprehensive Projects Contest related to the Concession of the
Longitudinal of the Sierra Section 4. Accessing this document
constitutes acceptance by potential investors, that the Peruvian
Government, PROINVERSION and its Consultants, are not subject to
any present or future responsibility nor a legal liability
originated from this document. QUESTIONS AND SUGGESTIONS Tel.:
2001200 (direct) Fax [511] 2212935 tramo4longitudinaldelasierra
@proinversion.gob.pe