O ver the past year, Pakistan’s business community has ac- knowledged LCPL’s exceptional corporate standards with the presentation of three separate awards. The National Fo- rum for Environment & Health (NFEH), the Employers’ Feder- ation of Pakistan and ICAP/ICMAP recognized and rewarded LCPL’s culture of transparency, safety and excellence for 2013. COVER STORY IN THIS ISSUE COVER STORY INITIATIVES RECRUITMENT & TRAINING ENGAGEMENT An Award-winning Year Completion Of 5S Activities On 3rd BlockB TPM Model Activities On-Site Weather Station Implementation of Safety Induction System in City Office Plant Shutdown Averted Presentation Skills Training LCPL Participation at Apprenticeship Directorate Event Breakfast with Trainee Engineers Eid Milan Party 2014 Iftaar Party Chairman & BoD’s Plant Visit Completion of 45 Million Man-hours without Lost Time Case (LTC) for LCPL Employee & All Contractors 01 05 06 07 08 09 10 11 11 12 12 03 03 Life @ Lotte Chemical is a corporate newsletter intended for employees and partners of Lotte Chemical Pakistan Q3 2014 An Award-winning Year Continued on page 4 VISITS HSE&S

Life@Lotte Q3 2014

Embed Size (px)

DESCRIPTION

Q3 2014 issue of Life @ Lotte; Lotte Chemical Pakistan's in-house newsletter

Citation preview

Page 1: Life@Lotte Q3 2014

Over the past year, Pakistan’s business community has ac-knowledged LCPL’s exceptional corporate standards with

the presentation of three separate awards. The National Fo-

rum for Environment & Health (NFEH), the Employers’ Feder-ation of Pakistan and ICAP/ICMAP recognized and rewarded LCPL’s culture of transparency, safety and excellence for 2013.

C o v e r S t o r y

In thIs Issue

COver stOry InItIatIves reCruItment & traInIng

engagement

an award-winning year Completion Of 5s activities On 3rd BlockB

tPm model activities

On-site Weather station

Implementation of safety Induction system in City Office

Plant shutdown averted

Presentation skills training

LCPL Participation at apprenticeship Directorate event

Breakfast with trainee engineers

eid milan Party 2014

Iftaar Party

Chairman & BoD’s Plant visit

Completion of 45 million man-hours without Lost time Case (LtC) for LCPL employee & all Contractors

01 05

06

07

08

09

10

11

11

12

12

03

03

Life @ Lotte Chemical is a corporate newsletter intended for employees and partners of Lotte Chemical PakistanQ3 2014

An Award-winning Year

Continued on page 4

vIsIts

Hse&s

Page 2: Life@Lotte Q3 2014

2

r e S u l t Se d i t o r i a l

unaudited Financial results for the third Quarter ended 30 september 2014Welcome to our Q3 Newsletter for

2014. Thanks to those of you who contributed to it as these contributions are essential to the newsletter’s success.

The editorial team would like to take this opportunity to congratulate all the functions who have received awards since the last edition of the newsletter. As team members of LCPL we all share in and benefit from your achievements, and we hope to hear more good news in the future.

We would also like to thank all those who participated in the joyous occasions of the Iftaar Dinner hosted by the Shift Staff at the Plant and the subsequent Eid Milan Party elaborately arranged by the LCPL staff. Promoting such activities has resulted in a positive impact as concerns employee engagement and the overall in-teraction of all functions with each other.

The LCPL team deserves to be com-mended for their exceptional efforts and display of skill in the completion of 45 mil-lion man hours without Lost Time Case. Such events highlight the highly-skilled competency of the Plant’s maintenance staff towards health, safety and environ-ment as well as the high standards main-tained at the Plant site.

In the end, the editorial team would like to thank you for your continuous support and participation which is the main source of encouragement for our contributors. If you have any suggestions regarding the newsletter, please feel free to contact me.

– Fatima A. KaziEditor

by Faisal Abid

Q3

20

14

– e

dit

or

ial

Editor Fatima a. Kazi

Contributors ahmed ali abedi arif raza asadullah Chughtai ayesha moin Faisal abid Instrument team moonam Bilal mufaddal abid marvi

muhammad Waqas muhammad Zain siddiqui nizar Ismail s. Hameed H. shah shazia siddiqui shuaib Iqbal syed sajjad ahmed tariq usmani

Design & Layout imedia

Life @ Lotte is compiled and edited by staff at Lotte Chemical. If you would like to contribute to the articles and events covered here, please contact the editorial board.

www.lottechem.pk

(Rupees'000)

lotte Chemical Pakistan limited

Quarter ended 30 SeptemberNine months ended

30 September

2014 2013 2014 2013

Revenue 12,874,478 16,327,789 37,678,825 42,220,700

Cost of sales (13,183,716) (16,028,857) (38,931,952) (42,489,277)

Gross (loss) / profit (309,238) 298,932 (1,253,127) (268,577)

Distribution and selling expenses

(36,771) (44,128) (145,260) (98,330)

Administration expenses (86,884) (79,931) (311,248) (231,455)

Other expenses (1,264) (3,667) (8,026) (7,732)

Other income 43,424 403,266 612,636 711,502

Finance costs (57,242) (69,052) (127,800) (176,552)

(Loss)/profit before taxation (447,975) 505,420 (1,232,825) (71,144)

Taxation 33,459 30,350 158,064 183,994

(Loss)/profit after taxation (414,516) 535,770 (1,074,761) 112,850

(Loss)/earnings per share – basic and diluted (in Rupees)

(0.27) 0.35 (0.71) 0.07

(Rupees’000)

Consolidated

Quarter ended 30 SeptemberNine months ended

30 September

2014 2013 2014 2013

Revenue 12,874,478 16,327,789 37,678,825 42,220,700

Cost of sales (13,020,243) (15,794,731) (38,299,103) (41,843,443)

Gross (loss) / profit (145,765) 533,058 (620,278) 377,257

Distribution and selling expenses

(36,771) (44,128) (145,260) (98,330)

Administration expenses (90,405) (80,479) (317,269) (232,009)

Other expenses (14,931) (19,012) (57,869) (52,540)

Other income 51,630 23,908 190,453 118,657

Finance costs (27,353) (56,944) (61,018) (145,625)

(Loss)/profit before taxa-tion

(263,595) 356,403 (1,011,241) (32,590)

Taxation 33,459 22,172 158,064 163,317

(Loss)/profit after taxation (230,136) 378,575 (853,177) 130,727

(Loss)/earnings per share – basic and diluted (in Rupees)

(0.15) 0.25 (0.56) 0.09

Twenty years from now you will be more disappointed by the things that you didn’t do than by the ones you did do, so throw off the bowlines, sail away from safe harbor, catch the trade winds in your sails. Explore, Dream, Discover.

– Mark Twain

Page 3: Life@Lotte Q3 2014

3

v i S i t S

Q3

20

14

– v

iSit

S

On 26 August 2014, Mr Changgyou Kim, Chairman BOD, Lotte Chemical Pakistan Ltd, visited the plant site at

Port Qasim. He was accompanied by Mr Hyun Chul Park, Member BOD’S LCPL / Executive Managing Di-rector, Lotte Group HQ Korea, Mr Hun Ki Lee, Mem-ber BOD’s LCPL / Head (Dir) of Corporate Planning Div, Lotte Chemical HQ Korea, Mr Nak Seon Sung, General Manager, Lotte Chemical HQ Korea and Mr Chul Soo Kim, Manager Strategic Planning & Coordination, Lotte Group HQ Korea.

The delegates were received by Mr Mohammad Wasim, Director Manufacturing LCPL and his team. After the briefing session on plant operations, the guests were taken around for

a plant visit. They were impressed by the professionalism of staff, housekeeping and HSE standards being maintained

at plant. The chief guest remarked in the visitor’s book “So impressed seeing the plant which is well arranged, clean and neat. I’d like to convey my congratulations on safe running of plant for last 15 years. I hope you

contribute more towards the company and LOTTE group’s future needs”.

a

Chairman & BOD’s Plant Visit

H S e S

Completion of 45 Million Man-hours without Lost Time Case (LTC) for LCPL Employee & All Contractors

Lotte Chemical Pakistan Ltd. has achieved another milestone in HSE&S performance by completing

45 Million Man-hours without Lost Time Case (LTC) for its employees & all Contractors on August 04, 2014.

Mr. Jung Neon Kim (Chief Executive) and Mr. Mo-hammad Wasim (Director Manufacturing), congratulated the LCPL team and appreciated the efforts of all employees & contractors staff in achieving this world-class benchmark

due to their continued commitment, positive attitude, adherence to safety rules and responsible approach towards HSE&S .

The strong focus of the Management on Health, Safety and Environment has proven to be a success.

This remarkable achievement is a confirmation of the ef-fectiveness of our Responsible Care Management System (RCMS) and our team’s commitment towards safety.

a

By Shuaib Iqbal

by Asad Ullah Chughtai

another milestone towards continuous journey of success in Hse&s Performance

Page 4: Life@Lotte Q3 2014

4

C o v e r S t o r y

Q3

20

14

Co

ve

r S

tor

y

An Award-winning Yearemployer of the year award 2013

the Employers’ Federation of Pakistan organized the 2nd Employer of the Year Award 2013 to honor corporate

commitment towards human resource and workplace safety. The ceremony was held at the Movenpick hotel, Karachi, on 16 October 2014 under the auspices of Abdul Rauf Siddiqui, Min-ister for Commerce & Industries Sindh.

Lotte Chemical Pakistan Ltd won three awards at the event: The Best Enterprise for Human Resource Development Award, the most coveted trophy of the event, The Best Enter-prise for Work Place Environment Award and The Best Chief Executive Officer Award.

LCPL won all these awards last year as well, beating 57 companies including K Electric, PEPSICO, Shell, P&G, KAPCO, PTCL, Telenor, PPL, PARCO and Engro Polymer, to name a few.

The event was sponsored by the Technical and Vocational Education and Training (TVET) Reform Support Programme, which is co-funded by The European Union (EU), the Embassy of the Kingdom of the Netherlands, the Royal Norwegian Em-

bassy and the Federal Republic of Germany and being imple-mented by GIZ in close coordination with the National

Vocational and Training Commission (NAVTTC).a

11th annual environment excellence award 2014 for LCPL

Lotte Chemical Pakistan Ltd. (LCPL) was awarded the 11th Annual Environment Excellence Award 2014 On September 27, 2014 at an award ceremony organized by the National Fo-rum for Environment & Health (NFEH). Out of 120 participat-ing companies, only 76 qualified for the award. It was a great achievement for LCPL to be amongst the top 10 award-win-

ning companies. The evaluation was carried out by an indepen-dent panel of NFEH governing body.

Mr. Shabbir K. Hussain (HSE & Business Development Manager) received this prestigious award on behalf of LCPL in a ceremony held at the Pearl Continental in Lahore.

Mr. Chaudhry Muhammad Sarwar (Governor of Punjab) was the Chief Guest while Mr. Ahsan Iqbal (Federal Minister for Planning and Development) was the guest of honor. Before the award ceremony, both the chief guest and the guest of honor expressed their views on environment and the impor-tance of its conservation.

As an ISO 14001 organization, LCPL understands growth and sustainability as “meeting the needs of the present with-out compromising the ability of future generations to meet their own needs.” The company has invested USD 45 Million in its plant and equipment to comply with National Environmen-tal Quality Standards.

Protecting the environment and preserving natural re-sources has always remained a top priority under HS&E chal-lenge programs. Lowering environmental burdens, reducing gaseous emissions, recycling the solid wastes, conservation of natural resources, conservation of flora and fauna and ECO system management are LCPL ongoing objectives.

a

Best Corporate and sustainability award

the aim of the Best Cor-porate Report (BCR)

Awards is to encourage and give recognition to excel-lence in annual corporate reporting. Instituted and presented for the first time in 2000, BCR Awards seek to promote corporate ac-countability and transpar-ency through the publica-tion of timely, informative, factual and reader friendly annual reports.

The Institute of Char-tered Accountants of Paki-stan (ICAP) and Institute of Cost and Management Ac-countants of Pakistan (IC-MAP) jointly organized the 13th Best Corporate and Sustainability Report (BCSR) Awards ceremony to give recognition to excellence in corporate and sustainability reporting. It is indeed a moment of great pride to announce that our Company for the first time won the ‘Cer-tificate of Merit’ award for the Best Corporate Report 2013 in the Chemical sector (fourth position).

Every year almost 200 companies compete for this pres-tigious award and only 10% are selected after a detailed and comprehensive evaluation. The Annual Report is the compa-ny’s most important strategic communications document and this Certificate of Merit is a symbol of pride and honor for the corporate sector.

a

By Shuaib Iqbal

Continued from page 1

Page 5: Life@Lotte Q3 2014

5

Q3

20

14

– iN

itia

tiv

eS

i N i t i a t i v e S

16000-Hour Maintenance of Gas Turbine Generatorthe Gas Turbine Generator is critical to the production pro-

cess at Lotte Chemical. It has saved the company millions of rupees in terms of power costs. The maintenance team at Co-Gen is always available to resolve to perform skilled repair and maintenance operations. Extensive opera-tions were carried out on the gas turbine during its 16000 hour maintenance starting 8th September 2014.

The activities included boroscope inspection of HP

and LP compressors, HP and LP turbines, fuel gas system and combustion chambers. It also included external inspection of the turbine body and hosing systems, intensive cleaning of the

GTG air filter house, replacement of all 448 air filters as well as oil filters and gas duplex filters, water wash of

the turbine compressor, gear box tooth pattern check and alignment checks. After successful completion of all jobs, turbine start up was initiated.

a

By Mufaddal Abid Marvi

5S activities on third block com-menced on 26th May 2014 and con-

cluded on 15th August 2014. Each week, eleven Small Group Teams (SGTs) spent

two hours on organizing and cleaning activities. Areas covered in the third block include: M1-1603 (+TO+ 643), DH column (+F1-605 + E1-608), CG drier (+F1-150+HPCCU), ETP-3, instrument air compressor (+ DW Tank), raw water tank

(+Dosing + fire water), ETP-2 (Neut/feed tanks+ mechanical chillers), the vent scrubber (+F1-1601), the workshop, the

cylinder room and the equipment/sample store.

5S implementation was beneficial for team members as

well as the company. SGTs participated in field activities with great enthusi-asm and team spirit, sustaining activities done in each block.The idea of an or-ganized, comfort-able and efficient workplace moti-vated employees to make changes. The changes included better floor space utilization as many unnecessary things were repurposed or removed from the area.

a

Completion of 5s activities on 3rd BlockBy:

By Ayesha Moin

Page 6: Life@Lotte Q3 2014

6

Q3

20

14

iNit

iat

ive

S

i N i t i a t i v e S

after the successful completion of Total Production Environ-

ment (TPM) model activity for se-niors, the TPM department took the initiative to start a TPM model activity for Senior Shift Managers (SSMs), Engineering and technical staff on the same pattern as TPM model activity for seniors. By in-volved them in the TPM activities so that they can understand and guide their Small Group Team (SGT) members for effective TPM implemen-tation. TPM model activities are based on three steps of autonomous mainte-nance, which are: identification of prob-lem by intensive cleaning, root cause

analysis and standardization of clean-ing/lubrication procedures.

Two teams have been formed, SGT-PURE and SGT-UTY comprising of 9 members each. A detailed training ses-

sion was conducted on 4th Sep-tember 2014 with both the teams in order to guide Small Group Team about performing TPM model ac-tivities. SGT-PURE started TPM model activity on G1-1209 D on 17th September 2014. SGT-UTY started TPM model activity on G1-2317 C on 19th September 2014. It is expected that after completion of TPM model activities on G1-1209 D and G1-2317 C most of their

chronic issues will be addressed. TPM model activities for SSMs, Engineering and Technical staff are scheduled to be completed by end of December 2014.

a

maintenance Engineering often demands innovative and original solutions to complex problems. During

the short shutdown in September, replacement activity of G1-403 (Third Crystallizer Agitator) Gearbox was scheduled. In the past, whenever such a gearbox was removed and the drive shaft of these agitators were disengaged, it was disconnected from the mechani-cal seal as well. This was done to prevent the load of

shaft being transferred on to the mechanical seal faces. This time, the Oxidation maintenance team developed a clamp for

holding the shaft in position with the trestle as the gear-box is decoupled from the drive shaft. This innovative

method eliminated the need for the tedious activity of disengagement of the mechanical seal and saved precious time on a critical job.

a

the primary objective of plant maintenance is to sustain good operating conditions for each equipment so as to

ensure health and reliability of the plant and minimize inef-ficiencies and losses. A major step in this direction was taken by rectification of Acetic Acid leakage from TA Drier feed end seal. Acetic Acid fumes leakage had suddenly increased which posed an imminent threat to the environmental conditions of the plant. The fumes were also a health risk for operators and maintenance staff working in the area. Moreover, Acetic Acid material losses were also being incurred at a calculated esti-mate of 5 tons/day which was a huge hit on variable costs.

Keeping in mind the criticality of this issue, an emergency

maintenance activity was planned and executed on Drier feed end seal. Alignment of seal faces was carried out and all 12 ram seal cylinders were replaced in co-ordination with instrumen-tation and workshop teams. Focused efforts and great team-work was shown by all personnel involved as a result of which the task was completed in short duration keeping plant outage to minimum. As a result of the activity, the leakage was mini-mized substantially resulting in a more congenial environment around the Drier and also improving Acetic Acid consumption efficiency. Overall, this action was another success story for Mechanical Maintenance team.

a

TPM Model Activities

By Ayesha Moin

By Muhammad Zain Siddiqui

Complex Problem; Intelligent solution

timely maintenance reduces hazards and costs

Page 7: Life@Lotte Q3 2014

7

ambient conditions are impor-tant parameters for correlating

weather affects on process changes. Therefore, on-site Weather Moni-toring Station is an important instru-ment. Recently, high humidity and low temperature greatly affected GTG performance but there was no accurate real-time data available.

An industrial grade, state-of-the-art weather station was procured from Columbia Weather Systems, USA. It measures eight weather pa-rameters every second including

temperature, humidity, rain-fall, wind speed & direc-

tion. The whole station was installed and con-figured by Instrumenta-

tion Section without any vendor support. Real-time

data along with historic trends are now available on Aspen with help from IT Department. Now we can accurately correlate process param-eters with weather conditions and make timely decisions. This system will also play a vital role during an HSE Emergency; monitoring wind speed and direction will help the Op-erations Team make safer decisions during a toxic gas emergency.

aQ

3 2

01

4 –

iN

itia

tiv

eS

i N i t i a t i v e S

a Behavior-Based Safety ap-proach is based on assisting,

reinforcing and sustaining safe be-haviors. Behavior-based safety fo-cuses on what people do, analyzes why they do it, and then applies a research-supported intervention strategy to improve what people do.

To improve HSE culture within the company, Technical Training department organized two aware-ness sessions on basic level of Be-havior Based Safety (BBS) for LCPL employees on 07th August & 16th September 2014, at LCPL Site.

Mr. Tariq Mehdi conducted both BBS sessions. Employees from the Engineering, Production, Technical, Commercial and Ad-min departments partici-pated in the training. Over all 30 employees partici-pated in first session and 22 employees partici-pated in second session. All participants showed interest in the sessions and it is hoped that these sessions will pave the way for further improvement on the HSE front.

a

On-Site Weather Station

major firms in the chemical industry are moving towards practicing sustainable

management. Integrated Management Systems are viewed as a step in this direction. On 26th

August 2014, the Technical Training Centre organized a full day awareness session on Integrated Management System (IMS) in collaboration with United Registrar of

System (URS). This session was specially organized for the employees who are re-

sponsible for the effective implementation of our QHSE system. 14 employees participated in this session. They will continue to monitor improvement in the company’s economics and QHSE performance.

a

By Ahmed Ali

Abedi

Behavior Based safety (BBs) – Basic Level

awareness of Integrated management system (Ims)

By Instrument Team

Page 8: Life@Lotte Q3 2014

8

the natural gas booster com-pressor at Co-Gen com-

presses natural gas at its supply pressure of 2.6 bar to a final pres-sure of 46.6 bar to be fed into the gas turbine. Upon comple-tion of 16000 hours of service in September, the compressor was overhauled as per recommenda-tion by the manufacturer.

Activities began on 8th September and comprised of refurbishment of all suction, discharge and unloader valves, replacement of all piston rod packings, inspection of bearing clearances, piston end clearances and crosshead guide clearances, coupling alignment checks, pres-sure testing of force feed lubri-cation system, replacement of the first stage lube oil distribu-

tor block, replacement of piston rings and wear

bands, adjustment of chain drives and sprocket alignment,

and replacement of coalescer and lube oil

duplex filters.The maintenance team did

an excellent job and had the compressor back online by 12th September 2014. Special thanks goes to Asim ur Rehman, Gohar Rehman and the rest of the team members for exemplary coordi-nation and effort.

a

i N i t i a t i v e S

Q3

20

14

InIt

Iat

Ive

s

the Safety Orientation Program is required for all new employees,

contractors and visitors at LCPL with an objective to provide awareness on HSE&S procedures & associated precau-tions before execution of any activity at plant site and offices. HSE department conducts this awareness session on daily basis at LCPL plant site.

HSE assessed that the hazards of working in the City Office do not entire-ly match the ones at the plant site. This

resulted in creation of a separate safety induction program for City Office.Mr. Jamal Haider (Administration Officer) & Syed Sibtain Haider (Administration Officer) were nominated for con-ducting induction at City Of-fice. A formal training session was conducted by HSE and the system has been launched w.e.f Oct 01, 2014.

Our special thanks to Mr. Mo-hammad Wasim (Director Manufactur-

ing), Mr. Adnan Wasey Samdani (Chief Financial Officer & Company Secretary). Mr. Shabbir K Hussain (HSE & Business

Development Manager), Mr. Raja Waheed Ullah Khan (Corporate

Human Resource Manager) & Mr. Col. (R) Asadullah Chughtai (General Affairs & Security

Manager) for their valuable support and encouragement in

implementation of the task.a

there are about three hun-dred split air condition-

ing units installed at plant site. Sometimes their maintenance re-quires carrying out functionality check of components such as compressors, blower and condenser motors, control wiring and other electronic circuits.

Previously, these activities were car-ried out through different instruments and power supplies in workshop. How-ever, with increase in the amount of work, it was getting difficult to arrange all the instruments and separate power supplies for testing the air conditioning units. Also, it was not possible to keep the spare parts and spare units separately in workshop.

The electrical team came up with the idea of developing a separate test bench for testing split air conditioning units. The testing panel has been designed in such a way that all the required sockets, switch-es and instruments are installed in it.The test bench has been designed in house and all the equipments and instruments are utilized from the available inventory. Some of the material has been taken from usable scrap as well. No additional cost has been incurred on the development of this test bench. This idea was material-ized and implemented successfully by the efforts of Mr. Muhammad Hassan Kazmi and his team who put in their best efforts to complete the designing and installation of this test bench in the area near the fab-rication shop. a

Implementation of safety Induction system in City Officean initiative by the Hse team

By Shuaib Iqbal

By Mufaddal Abid Marvi

By Muhammad

Waqas

Refurbishment of Natural Gas Booster Compressor

test Field development in Workshop for split aCs

Page 9: Life@Lotte Q3 2014

9

Q3

20

14

– i

niT

iaT

ive

s

i N i t i a t i v e S

One of the top priorities of any business is to find cost-effec-

tive solutions to any problem.The maintenance team plays

a significant role in ensuring that quality work is performed while keeping the cost at a minimum. This is possible through cost-saving ini-tiatives, spares and local development. One such initiative was the local de-velopment of the ‘Feed Pipe’ of the sludge centrifuge at the effluent treatment plant. In the past, the

feed pipe was procured from its OEM. The workshop team played a key role in providing support for the fabrication of the feed pipe. As a result, two feed pipes were fab-

ricated and the results were satisfactory.

This successful en-deavor reduced the lead time and also rendered

a substantial reduction in cost. The lead time was re-

duced by 7 weeks and the cost by over 0.5 million PKR.

a

an absorption chiller was installed at the efflu-ent treatment plant. This chiller was installed

to cool down the temperature of waste, which is an integral part of the treatment process before drain-ing into the open sea. However, the chiller was not performing efficiently; decreased efficiency, low MTBF and frequent tube leakages were the main concerns that neede to be addressed. Installation of an alternative chiller was also considered.

The Maintenance Utilities team chose to over-

haul the chiller with the support of a local vendor. Each component of the machine was evaluated and a modified repair methodology was developed. All possible leakage points were carefully identi-fied, repaired and tested. This was followed by pressure testing, vacuum testing and gas charging. Chemistry balancing was later performed in col-laboration with the Technical department.

The availability of an efficient absorption chiller has enhanced the reliability of the effluent treat-ment plant. One of the two centrifugal chillers has now been taken offline, yielding a substantial sav-ing in electricity costs. a

During the summer, two chillers are kept in continuous operation at Effluent Treatment Plant to cater for increased effluent load. One of

these two chillers tripped on a heavy power dip resulting in damage to its Thrust and Radial bearings. This required a complete machine overhaul which includes dismantling, inspection, repair, impeller balancing, assem-bly, pressure testing, vacuuming and Gas charging.

Average Mean Time To Repair (MTTR) the Centrifugal chiller is around 4-5 weeks. The main challenge faced by the Maintenance team was to complete the entire overhauling activity in 2 weeks to allow continuous plant operation.

Upon inspection, a few critical parts were found damaged which were not available in inventory due to their high cost. These were reclaimed, serviced and fitted back. A high speed gear shaft was also recovered from Usable yard and installed after its refurbishment. During overhauling pe-riod, the maintenance team worked round the clock and demonstrated

very high level of skill and dedication. Machine was assembled well within and taken back online due to which there was no reduc-

tion in plant load. a

By Moonam Bilal

In-House Spares Development

Chiller Performance Enhancement

Plant Shutdown Averted

By Syed Sajjad Ahmed

By Moonam Bilal

Page 10: Life@Lotte Q3 2014

10

HR Session with Staff on Car Loan Process and Rules

a session on car loan processes and rules was or-ganized for LCPL employees by the HR team on

Thursday, 28 August 2014 at the Recreation Hall at the plant. The session aimed to explain the process and rules pertaining to car loans. Employees dis-

cussed car loan rules in detail and asked questions for their better understanding.

a

r e C r u i t m e N t & t r a i N i N g

Q3

20

14

re

Cr

uit

me

Nt

& t

ra

iNiN

g

Presentation Skills Training

4-Day advance excel training for the Finance & It team

the HR department organized a workshop on effec-tive communication and presentation on 21-22

August 2014 at the LCPL Plant site. The training was conducted by Mr. Tahir Hussain, an international ex-pert on the subject.

The workshop provided a mixture of theoretical and practical training. The participants learned about the

importance of having a strong introduction, maintaining eye contact and effective time management, amongst other important things. By the end of the program, every participant had given six presentations and re-cieved feedback from colleagues and the trainer after

their presentations.a

By Shazia Siddiqui

a management training program for potential execu-tives was held between September 22 and 24 Sep-

tember 2014 at the LCPL Recreation Hall. The trainer, Mr. Nasser Aziz, helped develop the participant’s man-agement skills, focusing mainly on self awareness and understanding, personal initiative and problem solving skills necessary to excel at a higher career level.

a

strong communication skills are a must for managers who generally devote approximately five hours per

day in communication. A two-day training program was organized from September 25 to September 26, 2014 at the LCPL Plant. The trainer, Ms. Meena Wali Muhammad, helped participants strengthen email, report writing & business communication skills.

a

By Nizar Ismail

microsoft Excel is used for recording and organizing im-portant business data. Based on the strong need for

Excel in a corporate environment, a four-day program on “Ad-vanced Excel” was organized in August and again in September

for the Finance & IT team. The facilitator, Mr. Aasim Alee taught participants valuable

tools to master Excel.a

training Program on Introduction to management

training Program on email, Letter & report Writing

Page 11: Life@Lotte Q3 2014

11

Q3

20

14

re

Cr

uit

me

Nt

& t

ra

iNiN

g

r e C r u i t m e N t & t r a i N i N g

HR & Administration Function or-ganized a breakfast with Trainee

Engineers (TE’s) at Plant on 25th

September 2014.Halwa Puri was served with

Chana, Aloo ki Tarkari and Lassi. At breakfast, the trainee’s shared

their feedback with HR & Admin-istration team. The trainee’s expressed

an interest in having such gatherings more often as it gives them a platform to express themselves.

a

the Apprenticeship Directorate invited LCPL to give a presentation on our Apprenticeship process. The

event was organized at Movenpick Hotel, Karachi on 17th September 2018. Syed Asad Zafar, Acting Joint Director of Apprenticeship Sindh shared the Appren-ticeship Directorate role of responsibility in the over-all process of Apprenticeships.

On behalf of Lotte Chemical, the HR Department gave the presentation; they shared the disciplines in which we

hire Apprentices, advantages to students from this program, etc. There were many other multinational and national companies that participated in the event

and shared their Apprenticeship process.a

LCPL Participation at Apprenticeship Directorate Event

By Arif Raza

solutions to the puzzles on page 13

ACROSS: 3 roost. 8 Assisi. 9 allies. 10 Mimi. 11 stockstill. 12 Somali. 13 overturn. 16 Annie Get Your Gun. 18 elongate. 21 the Met. 23 Persephone. 25 lees. 26 donate. 27 lentil. 28 today.

DOWN: 1 Eskimo. 2 litigation. 3 Riesling. 4 on top of the world. 5 tackle. 6 clot. 7 seller. 12 slave. 14 tortellini. 15 nonet. 17 on the sly. 19 lie low. 20 applet. 22 emetic. 24 scab.

CRYPTOGRAMS:

“Cushion the painful effects of hard blows by keeping the enthusiasm going strong, even if doing so requires struggle.”— Norman Vincent Peale

“I firmly believe that if the whole material medical could be sunk to the bottom of the sea, it would be all the better for mankind, and all the worse for the sea.”— Oliver Wendell Holmes Sr.

Cardiopulmonary Resuscitation is an emergency procedure performed on

people experiencing cardiac arrest. Per-forming CPR provides oxygen to the brain and other organs, increasing the chances of survival. Training sessions on CPR are reg-ularly organized by the Technical Training Cen-tre to ensure CPR certified employees are always present at the plant site. The most recent training session was held on 28 August 2014 and it was conducted by Dr. Feroz R. Patel.

a

Long Service Awards

Welcome aboardBreakfast with Trainee Engineers

We would like to congratulate this quarter’s recipient of the Long Service Awards. LCPL wishes you many more years with the com-

pany, and a long and successful career. a

LCPL welcomes new inductees into the Lotte Chemical Pakistan employ-ee roster.

a

Faisal AbidPlanning & Reporting Manager, completed 15 years of service on 23 August-2014.

Nisar Ahmed Khan, BE (Electronic Engineering), NED University of Engineering and Technology, Karachi, joined as Trainee Engineer with effect from 11 August 2014

Umair Siddiqui, B.Sc. (Chemical Engineering), University of Engineering and Technology, Lahore, joined as Trainee Engineer with effect from 1 September 2014

Fawad Ur Rehman, BS (Mechanical Engineering), Ghulam Ishaq Khan Institute of Engineering and Technology, Topi, joined as Trainee Engineer with effect from 1 September 2014

Usman Shaukat, B.Sc. (Polymer Engineering), University of Engineering and Technology, Lahore, joined as Trainee Engineer with effect from 3 September 2014

H e a l t H

Cardiopulmonary Resuscitation (CPR)

By Ahmed Ali Abedi

By Tariq Usmani

Page 12: Life@Lotte Q3 2014

12

surveys conducted by Hr & admin Function

e N g a g e m e N t

the HR & Admin Function conducts various types of surveys related to services being provided to LCPL employees. The surveys provide

honest responses that are critical in improving the services.During the year, surveys have been conducted in the following areas :

» Transport system. » Meals facility. » Employees Training.

a

On the occasion of the Eid-Ul-Fitr, LCPL organized an Eid milan party at the plant site. The party was held in the main mess; The premises were

decorated by colorful bunting and balloons. At the entrance, the administra-tion staff welcomed everyone to the event. Chief guest Mr. Neon wished Eid Mubarak to everyone as well. All staff members embraced each other and looked jubilant in the spirit of Eid, their joyous faces lit with excitement.

a

a traditional iftaar dinner was organized on July

18, 2014 during the holy month of Ramadan for Shift

Staff at the plant. The dinner was also attended by Mr.Jung

Neon Kim and Mr. Eun Pyo Hong along with HR & Admin staff. This event provided an opportunity for management to interact with the shift workforce.

An Islamic question and answer quiz competition was organized in which staff participated; the winners received gifts from the senior man-agement.

aQ3

20

14

eN

ga

ge

me

Nt

By S. Hameed H. Shah

By S. Hameed H. Shah

Iftaar Dinner

Eid Milan Party 2014

H r & a d m i N

Page 13: Life@Lotte Q3 2014

13

Q3

20

14

– l

eiS

ur

e

l e i S u r e

aCROss

3 Old East German follows river to

find perch (5)

8 Fool is one from Italian city (6)

9 Everyone is accommodating

English friends (6)

10 Two notes from operatic

heroine (4)

11 Not moving goods yet (5-5)

12 Thus African country produces

African (6)

13 Capsize open vessel (8)

16 Gaunt young Irene performs in

musical (5,3,4,3)

18 Teen reformed with gaol stretch

(8)

21 Police force has those people on

film (3,3)

23 New peer’s given ring portray-

ing Zeus’s daughter (10)

25 US general’s the dregs (4)

26 Give daughter a note perhaps

(6)

27 The Italian is after fast food (6)

28 Play about District Attorney in

the present time (5)

DOWn

1 American who inhabits the White

House? (6)

2 One toiling at unravelling lawsuit

(10)

3 Wine gets Sir Nigel drunk (8)

4 Over the moon, having climbed

Everest? (2,3,2,3,5)

5 Deal with equipment (6)

6 Idiot wants 150 books (4)

7 Retailer of wine collection, say (6)

12 Very hard worker is left inside

bar (5)

14 Back home, I’ll follow cake with

pasta (10)

15 Group of musicians not touring

Tyneside (5)

17 Working honestly or dishon-

estly? (2,3,3)

19 Ollie upset wife so keep out of

sight (3,3)

20 Computer manufacturer needs

time to produce program (6)

22 Quote me retrospectively? It’ll

make you sick (6)

24 Openers for Sussex caught and

bowled but this chap’s not out (4)

Challenging sudoku!

Symbols to use: 123456789ABCCryptic Crossword

Quotable Quotes

The best and most beautiful things in the world can-not be seen or even touched - they must be felt with the heart.

— Helen Keller

Don’t limit yourself. Many people limit themselves to what they think they can do. You can go as far as your mind lets you. What you believe, remember, you can achieve.

– Mary Kay ash

For the past 33 years, I have looked in the mirror every morning and asked myself: ‘If today were the last day of my life, would I want to do what I am about to do today?’ And whenever the answer has been ‘No’ for too many days in a row, I know I need to change something.

– steve Jobs

Someone is sitting in the shade today because someone planted a tree a long time ago.

– Warren Buffett

Answers on page 11

CryptogramsCryptograms are simple-substitution ciphers where every letter of the alphabet has been switched. Your task is to use pattern recognition and your grammar and vocabulary abilities to decipher the hidden quotes. Hint: start with the 1, 2 and 3 letter words, and remember that the most com-mon letters in the English language are E-T-A-I-O-N, in roughly that order.

J KQ L S B Y R LG T V S Y W K N G W W G J RQ

B W LVC H O N B I Q O F P G G T S YA R LG

G Y R L KQ S VQ E A B S YA Q RC B YA , G U G Y S W

H B S YA Q B C G M K S C G Q Q RC K A A N G .— norman vincent Peale

N E N L U B F K X B N X R X DAY D N E DA X

Z AQ B X U Y DX L N Y B U X S N V Y B VQ M B S

K X T M G P D Q DA X KQ D D Q U Q E DA X

T X Y, N D ZQ M B S K X Y B B DA X K X D DX L

E Q L U YG P N G S , YG S Y B B DA X ZQ LT X

E Q L DA X T X Y.— Oliver Wendell Holmes sr.

Page 14: Life@Lotte Q3 2014

14

مئی 26 آغاز کا رسگرمیوں 5S پر بالک تیرسے ہر ہ��وا۔ کو 2014 اگست 15 اختتام اور 2014

up Teams( ٹیموں گروپ چھوٹی گیارہ -ففتے، کی صفائی اور اہتامم نے )SGTs - Small Gro

رسگرمیوں پر دو گھنٹے رصف کیے۔ تیرسے گیا کیا احاطہ کا میں جن جگہوں بالک ڈی ،)+TO+643( M1-1603 میں: ان سی ،)+F1-605+Eq-608( کامل ایچ ،)+F1-150+HPCCU( ڈرائیر جی

عید الفطر کے موقع پر، LCPL نے پالنٹ سائٹ پر عید ملن پارٹی کا انعقاد کیا۔ پارٹی مرکزی میس میں منعقد کی گئی تھی؛ اور اس جگہ کو رنگ برنگی جھنڈیوں اور غباروں سے سجایا گیا تھا۔ داخلی دروازے پر، انتظامی عملے نے متام رشکاء سے مصافحہ کر کے ان کا استقبال کیا۔ مہامن خصوصی جناب نیون نے بھی متام رشکاء کو عید کی مبارک باد پیش کی۔ عملے کے متام ارکان ایک دورسے سے گلے ملے اور عید کے پرمرست موقعے پر بے حد خوش نظر آئے، ان کے چہرے خوشی

سے دمک رہے تھے۔

ایپرنٹس شپ عید ملن پارٹی 2014ڈائریکٹوریٹ

LCPL ایونٹ میںکی رشکت

زیر تربیت انجینرئز کے ساتھ ناشتہ

a

a

a

،)+DW Tank( انسٹرومنٹ ائیر کمپریرس ،ETP-3 chillers ( ETP-2 ،)+Dosing + fire water(اسکربر وینٹ ،)Neut/feed tanks+mechanicalسامان/ اور روپ سیلنڈر ورکشاپ، ،)+F1-1601 (

منونوں کا اسٹور شامل ہیں۔

اور ارک��ان کے ٹیم سے تکمیل کی 5Sکمپنی دونوں مسستفید ہوئے۔ SGT کے ارکان نے فیلڈ رسگرمیوں میں بڑے جوش

تیرسے بالک پر 5S رسگرمیوں کی تکمیلو خروش اور مل کر کام کرنے کے جذبے کے ساتھ رشکت کی، اور ہر بالک میں ان تھک رسگرمیاں انجام کی کام موثر اور دہ آرام منظم، ایک گئیں۔ دی جگہ کے تصور نے مالزمین کو متحرک کر دیا کہ وہ تبدیلی کا پیش خیمہ بنیں۔ تبدیلی میں زمینی رقبے کا بہرت استعامل بھی شامل تھا جس کی وجہ سے کئی غیر رضوری اشیاء کو یا تو ان کی جگہ سے ہٹا

دیا گیا یا ان کا مرصف تبدیل کر دیا گیا۔a

از: ایس۔ حمید ایچ۔ شاہ

نے ڈائریکٹوریٹ شپ ایپرنٹس طریقہ تربیتی ہامرے کو LCPL

لیے کے دینے پریزینٹیشن پر کار 17 انعقاد کا تقریب اس دی۔ دع��وت

ہوٹل، کراچی میں ستمرب، 2014 کو موون پک ہوا۔ ایپرنٹس شپ سندھ کے قائم مقام جوائنٹ تربیتی مجموعی نے ظفر اسد سید ڈائریکٹر، طریقہ کار میں ایپرنٹس شپ ڈائریکٹوریٹ کے

ذمہ دارانہ کردار کی وضاحت کی۔

لوٹ کیمیکل کی جانب سے، ایچ آر کے شعبے نے پریزینٹیشن پیش کی؛ انہوں نے ان شعبوں کی وضاحت کی جن میں ایپرنٹس بھرتی کیے جاتے ہیں، اور اس پروگرام سے طلباء کو پہنچنے فراہم آگاہی میں بارے فوائد وغیرہ کے والے االقوامی بین کئی دیگر میں تقریب اس کی۔ اور قومی کمپنیوں نے رشکت کی اور اپنے اپنے

تربیتی طریقہ کار کے بارے میں بتایا۔

از: عارف رضا

ایچ پر، 25 ستمرب 2014 کو پالنٹ زیر نے فنکشن انتظامی اور آر

کا ناشتے انجینرئز کے ساتھ تربیت اہتامم کیا۔

کے لسی اور ترکاری کی آلو چنا، میں ناشتے ساتھ حلوہ پوری سے تواضع کی گئی۔ ناشتے کے دوران، زیر تربیت انجینئیروں نے اپنی آراء انتظامی ٹیم کو آگاہ کیا۔ زیر ایچ آر اور سے تربیت افراد نے اس قسم کی مزید دعوتوں کے اہتامم کی تائید کی کیونکہ اس طرح انہیں اپنی فارم پلیٹ ایک لیے کے کرنے اظہار کا رائے

میرس ہوتا ہے۔

از: طارق عثامنی

از: عائشہ معین

Page 15: Life@Lotte Q3 2014

15

ایمپالئر آف دی ائیر ایوارڈ 2013

اور ریسورسز( )ہیومن وسائل انسانی نے پاکستان آف فیڈریشن ایمپالئرز کام کی جگہ پر تحفظ کے فروغ کے کاروباری عزم کا اعرتاف کرنے کے لیے دورسے ایمپالئر آفی دی ائیر ایوارڈ 2013 کی تقریب کا اہتامم کیا۔ یہ تقریب الرؤف صدیقی کے زیر سایہ، 16 سندھ کے تجارت و صنعت کے وزیر عبد

اکتوبر 2014 کو کراچی کے موون پک ہوٹل میں منعقد ہوئی۔

کیے: دی ایوارڈ حاصل تین میں تقریب اس نے ملیٹڈ پاکستان کیمیکل لوٹ اہم کا تقریب ایوارڈ، جو کہ ہیومن ریسورس ڈویلپمنٹ فار انٹرپرائز بیسٹ ترین اعزاز تھا، دی بیسٹ انٹرپرائز فار ورک پلیس انوائرینمنٹ ایوارڈ اور دی

بیسٹ چیف ایگزیکٹو آفیرس ایوارڈ۔

LCPL نے گزشتہ سال بھی 75 کمپنیوں کو شکست دیتے ہوئے یہ متام ایوارڈز ،KAPCO ،P&G ،Shell ،PEPSICO ،K-Electric حاصل کیے تھے جن میں

PARCO ،PPL ،Telenor ،PTCL اور Engro Polymer شامل تھیں۔

ریفارم )TVET( ٹریننگ اینڈ ایجوکیشن ووکیشنل اینڈ ٹیکنیکل تقریب یہ ،)EU( سپورٹ پروگرام کے تعاون سے منعقد کی گئی، جس میں یورپین یونینسلطنت نیدرلینڈز کے سفارت خانے، شاہی ناروجین سفارت خانے اور وفاقی جمہوریہ جرمنی نے رسمایہ کاری کی ہوئی ہے اور GIZ کی جانب سے اس کا )NA VTTC( نفاذ کیا گیا ہے جس میں نیشنل ووکیشنل اینڈ ٹریننگ کمیشن

کا قریبی تعاون بھی شامل ہے۔

LCPL کے لیے گیارہواں ساالنہ انوائرینمنٹ ایکسیلنس ایوارڈ 2014

کو 2014 ستمرب 27 نے )LCPL( ملیٹڈ پاکستان کیمیکل لوٹ ہیلتھ )NFEH( کی جانب سے اینڈ انوائرینمنٹ نیشنل فورم فار

پہلے صفحہ سےجاری

ایوارڈ کے حصول کا سالکور سٹوری

منعقد کی جانے والی ایک تقریب میں گیارہواں ساالنہ انوائرینمنٹ ایکسیلنس ایوارڈ 2014 حاصل کیا۔ رشیک ہونے والی 210 کمپنیوں میں سے رصف 76 ایوارڈ جیتنے والی پائیں۔ LCPL کے لیے اہل قرار ایوارڈ کو جیتنے کی اس رسفہرست 10 کمپنیوں میں شامل ہونا ایک بہت بڑی کامیابی تھی۔ ایوارڈ کے حق دارہونے کا تعین، NFEH کی انتظامیہ کے ایک غیر جانبدار پینل نے کیا۔

جناب شبیر کے۔ حسین )HSE اور بزنس ڈویلپمنٹ مینیجر( مہامن خصوصی تھے جبکہ جناب احسن اقبال )وفاقی وزیر برائے ترقی و منصوبہ بندی( کو بھی بطور مہامن خصوصی مدعو کیا گیا تھا۔ ایوارڈ کی تقریب سے قبل، دونوں مہامنان خصوصی نے ماحول اور اس کے تحفظ کے حوالے سے اپنے خیاالت

کا اظہار کیا۔

بطور ISO 14001 آرگنائزیشن، LCPL ترقی اور sustainability کو سمجھتی کی کرنے پوری رضوریات اپنی کو نسلوں والی آنے میں “مستقبل کہ ہے صالحیت کو متاثر کیے بغیر آج اپنی رضوریات پوری کرنا۔” کمپنی نے نیشنل انوائیرمنٹل کوالٹی اسٹینڈرڈز پر عمل در آمد کرنے کے لیے اپنی پالنٹ اینڈ

اکویپمنٹ میں 54 ملین ڈالر کی رسمایہ کاری کی۔

HS&E چینج پروگراموں کے تحت ماحول کا تحفظ اور قدرتی وسائل کا موثر میں بوجھ ماحولیاتی ہیں۔ رہے میں ترجیحات رسفہرست ہمیشہ استعامل کمی، گیسوں کے اخراج میں کمی، ٹھوس فاضل مادے کے دوبارہ استعامل، قدرتی وسائل کا تحفظ، فلورا اور فونا اور ECO سسٹم مینیجمنٹ، LCPL کے

موجودہ مقاصد میں شامل ہیں۔

بیسٹ کارپوریٹ اینڈ سسٹین ایبلٹی ایوارڈ

بیسٹ کارپوریٹ رپورٹ )BCR( ایوارڈز کا مقصد ساالنہ کاروباری رپورٹنگ ایوارڈز، BCR ہے۔ کو رساہنا اس اور کرنا افزائی کی حوصلہ مسابقت میں جو سب سے پہلے 2000 میں تشکیل اور پیش کیے گئے، کا مقصد بروقت،

اور مبنی پر حقائق معلوماتی، ساالنہ سہل لیے ک��ے قارئین ذریعے کے اشاعت کی رپورٹوں کاروباری احتساب اور شفافیت کا

فروغ ہے۔

انسٹیٹیوٹ آف چارٹرڈ اکاؤنٹنٹس اور )ICAP( پ��اک��س��ت��ان آف اینڈ ک��اس��ٹ آف انسٹیٹیوٹ آف اکاؤنٹنٹس مینیجمنٹ مشرتکہ نے )ICMAP( پاکستان طور پر تیرہویں بیسٹ کارپوریٹ رپ��ورٹ ایبلٹی سسٹین ای��ن��ڈ تقریب کی ای���وارڈز )BCSR(اور کاروباری تاکہ کیا انعقاد کا میں رپورٹنگ ایبلٹی سسٹین کی افزائی کی حوصلہ مسابقت جا سکے۔ یہ یقینی طور پر ایک ہامری کہ ہے ملحہ فخر قابل کیمیائی مرتبہ پہلی نے کمپنی

شعبے میں بیسٹ کارپوریٹ رپورٹ 2013 کے لیے “رسٹیفیکیٹ آف میرٹ” )چوتھی پوزیشن( ایوارڈ حاصل کیا۔

اور ہیں کرتی مقابلہ لیے کے اعزاز منفرد اس کمپنیاں 200 تقریباً سال ہر تفصیلی اور جامع تجزیے کے بعد رصف 10 فیصد ہی منتخب ہو پاتی ہیں۔ ساالنہ رپورٹ کمپنی کی اہم ترین معلوماتی دستاویزات میں شامل ہے اور یہ

رسٹیفیکیٹ آف میرٹ کارباری حلقے کے لیے فخر اور اعزاز کی عالمت ہے۔ از: شعیب اقبال

a

Page 16: Life@Lotte Q3 2014

اِس اِشو میں...

گزشتہ سال کے دوران، پاکستان کے کاروباری حلقوں نے تین مختلف اعزازات ہے۔ کیا اعرتاف کا معیارات کاروباری معمولی غیر کے LCPL کر نواز سے ایمپالئرز ،)NFEH( ہیلتھ اینڈ انوائرینمنٹ فار فورم نیشنل میں، 2013 سال

فیڈریشن آف پاکستان اور ICAP/ICMAP نے LCPL کے شفاف، محفوظ اور مسابقتی طریقہ کار کو تسلیم کیا اور ایوارڈ پیش کیے۔

ایوارڈ کے حصول کا سال

تیرسے بالک پر S5 رسگرمیوں کی تکمیل

16

14

زیر تربیت انجینرئز کے ساتھ ناشتہ

میں ایونٹ ڈائریکٹوریٹ شپ ایپرنٹس LCPL کی رشکت

14

14

Life @ Lotte Chemical is a corporate newsletter intended for employees and partners of Lotte Chemical PakistanQ3 2014

ایوارڈ کے حصول کا سالکور سٹوری

14عید ملن پارٹی 2014

اگلے صفحہ پرجاری