Leveraging Knowledgein the Construction industry
2 1
Who We AreGiza Systems Electromechanical (GSEC), a subsidiary of Giza Systems, is an established EPC (Engineering, Procurement and Construction) contractor specialized in the field of potable Water/Wastewater treatment and Infrastructure projects.
GSEC was founded in 2011 as the contracting arm of Giza Systems to provide EPC services for Water and Infrastructure sectors in Egypt, the Middle East and Africa. In the last few years, GSEC has expanded its portfolio to include projects for the Infrastructure, Real Estate, and Hospitality sectors particularly in KSA.
VisionProvide international contracting and management services at reasonable cost
What We DoGSEC offers complete solutions for the Water Utilities, Water and Wastewater Treatment, Water Desalination, Infrastructure and Hospitality sectors.
Our scope of services extends from Project to Construction Management including operations and maintenance of plants. Our portfolio of solutions and the various projects implemented are executed according to the highest international standards and ultimate client satisfaction.
Our Project Management services encompass design, procurement, installation, commissioning and start-up, as well as operations and maintenance. In addition to our project and construction management, we are able to offer our clients turnkey solutions and services guaranteeing that international quality standards are met.
GSEC operates in the Middle East and Africa through our offices and group of companies amongst which are Giza Arabia, Giza Systems Gulf, Giza Systems JLT, and HF Giza Systems. We are focused on contributing to the local and regional development with our technology solutions, commitment and outstanding customer service. Our geographic footprint extending from Saudi Arabia, Emirates and Qatar to Egypt, Kenya, and Tanzania enables us to deliver diverse projects and connect us with our clients.
Our team of high caliber engineers employs integrated methodologies based on predefined standards and procedures of Quality Assurance and Control through an intricate system to validate all steps of project implementation; this is to ensure effectiveness of our services and added value to the operations of our clients.© 2014 Giza Systems. All rights reserved.
gizasystems.com and its companies own copyrights for the material contained in this brochure, including all text, graphics, and photos. The use and/or reproduction by any means of any of the material without the written consent of Giza Systems is strictly prohibited.
2 3
Giza Systems Group of Companies
Handles all integration business in Egypt
Established in 2011 as the contracting arm of the group. Focused on the water, wastewater
treatment, sanitation plants, desalination,
infrastructure, and hospitality
Established in 2006 to create a client base and
a revenue stream from the Kingdom of Saudi
Arabia in the telecoms, utilities, oil & gas, and
government sectors
Established in 2004 as the distribution
arm of Giza Systems encompasses all
distribution activity within the company
Established in 2012 to serve the Qatari market
Established in 2009 to serve the UAE & Gulf markets
Established in 2007 to eliminate custom tariffs on equipment required for Factory Acceptance Testing (FAT), which is to be re-exported to its final destination
Caters to clients exempt from sales tax & custom tariffs (ex, Oil & Gas sector) in free zone areas
Established in 2013 to serve Africa and Middle East, focus on smart solutions including fire, safety, security and smart buildings
The leading storage distributor and integrator in the Egyptian market operating in cloud enablement and virtualization space in Egypt and Libya
4 5
Services ProvidedOur services cover a wide range of activities and include:
Our technical capabilities, extensive experience and knowledge of the market enable us to develop integrated project methodologies that sustain the work effectiveness and build on the evolving technologies, as well as meet the dynamicity of our customers’ needs.
In our pursuit to constantly enhance existing resources, develop and the projects methodologies and create new capabilities, we drive forward the growth of our company, our customers, our people, and our communities.
QualityGiza Systems Electromechanical strives to integrate quality in all its processes to ensure adherence to the best standards and practices. Giza Systems has received the ISO 9001:2008, ISO 14001:2004, and OHSAS 18001:2007.
Certificates/ClassificationsEgyptian Federation for Construction and Building Contractors – EgyptClassified as 1st Grade – Electromechanical
Ministry of Municipality & Rural Affairs – KSA Classified in Water and Wastewater Contracting Classified in Electrical Contracting Classified in Telecom Technology and Electronics
Design
Sales &Sales
Support
Erection &Installation
Construction Management
O&M
Engineering
Project Management
6 7
Served Sectors GSEC is uniquely positioned to fulfill the needs of the local and regional markets due to our diversified technical and management experience that fulfill the various needs of the following sectors:
Water Treatment Reverse OsmosisDesalination
Water Wastewater
Pumping Industrial Wastewater Wastewater Treatment
Hospitality and Real Estate
10 11
Giza Systems Electromechanical OfferingsGiza Systems Electromechanical staff of engineers combines extensive experience and considerable knowledge in the design of conventional and advanced system solutions for modern Water/ Wastewater Treatment, Infrastructure and buildings projects. Through a multi-disciplinary approach and diverse technology-based systems integration, GSEC is able to effectively use advanced technologies and creative designs to drive constant process innovation.
Our highly trained team has hands on experience in the process design, procurement, supply, installation, testing and commissioning of water/wastewater, infrastructure and buildings projects. We also specialize in quality operation and maintenance of treatment plants.
Understanding the various needs of our clients and the diverse technology systems in place, we partner with our clients to tailor solutions and services that are optimal for them in order to achieve an increase in efficiencies by reducing operational costs and cutting on downtime, while ensuring safety standards are in place.
With the successful implementation of numerous projects, GSEC has gained industry leadership in electromechanical works by successfully completing projects in water and wastewater management, in addition to projects in the infrastructure and hospitality industries.
Our services cover a wide range of activities and include:
Design• Concept and preliminary designs• Detailed designs• Shop and as-built drawings• Process selection• Process calculations• Hydraulic calculations• Process and instrumentation diagram
• Civil-guide drawings• Layout drawing• Hydraulic gradient drawings• Equipment sizing• Equipment data sheets• Piping isometric
Project Management• Work Breakdown Structure (WBS)• Scheduling• Procurement planning• Cost controlling
• HSE• Inspection• Risk management
12 13
Construction Management• Installation and erection• Commissioning• Testing and handover
14 15
Operation and Maintenance• Operation instructions manuals• Preventive maintenance• O&M software• Periodical maintenance
• Standard and customized training courses• On-job training
Training and Support
16 17
SpecializationsGiza Systems Electromechanical offers specialized engineering services in the following disciplines related to Electromechanical works:• Protection and safety: earthing and lightning systems • Lighting: indoor, flood lighting and street lighting • Light Current Systems: fire alarms, CCTV, telecommunications, access control and audio/
visual systems.• Automation and Control: SCADA systems, PLC’s, RTU’s and instrumentation.• Heating, Ventilation and Air Conditioning (HVAC)
ContactsAhmed Reda Sales Manager [email protected]
Ihab AmerGeneral [email protected]
18 PB
© 2014 Giza Systems. All rights reserved.gizasystems.com and its companies own copyrights for the material contained in this brochure, including all text, graphics, and photos. The use and/or reproduction by any means of any of the material without the written consent of Giza Systems is strictly prohibited.
The logo of Giza Systems is a registered trademark.
Giza Systems www.gizasystems.com is the number one systems integrator in Egypt and the Middle East providing a wide range of industry specific technology solutions in the Telecom, Utilities, Oil & Gas, and Manufacturing industries. We have been shaping the IT industry and corporate agendas since 1974. Our consultancy practice provides industry focused services that enhance value for our clients by streamlining operational and business processes. Operating in the Middle East through Giza Arabia www.gizaarabia.com, our group of companies is focused on contributing to the local and regional development with our technology solutions, commitment and outstanding customer service. Our team of 600 professionals enables us to extend our geographic footprint delivering diverse projects and connecting us with clients in the Middle East, Africa, Europe, Latin America and Russia.
www.gizasystems.com | www.gizaarabia.com | www.gsst.com.eg
EgyptHead Office
Plot No. 176, Second Sector,City Center, P.O. Box 157New Cairo 11835,Egypt +202 26146000 / 6111 +202 26146001 [email protected] Center: 16492
TanzaniaArcade House, 1st Floor, Plot No. 72 Block DOld Bagamoyo Road P.O Box : 80366, Dar Es Salaam
& : +255-732998885: +255-786479185
NigeriaPlot 9 Port PlazaPort Harcourt Crescent off Gimbiya Street, Garki Area 11, Abuja, Nigeria : +234 8028479439
QatarGiza Systems Gulf
Majlis El Taawon St.,Palm Tower, Tower B,Area 60, Floor 40,Office no. 4005 Doha, Qatar +974 4482 0271 +974 4482 0264
Saudi Arabia Riyadh
Giza ArabiaRosayes Business Center,P.O. Box 67765,Riyadh 11517,KSA +966 1 460 2890 +966 1 460 2892
UAEDubai
Giza Systems JLTFortune Tower - OfficeNo. 1306 - 13th Floor,Jumeirah Lake TowersDubai,UAE
KenyaPO Box 73825 – 00200,308 Apple Wood Park, Kilimani.Nairobi, Kenya,: +254 386 273 7: +254 386 273 8: +254 705 321 211