Upload
others
View
37
Download
1
Embed Size (px)
Citation preview
Ainscough Training Services Ltd
Excel House, Leyland Business Park, Centurion Way, Leyland, Lancashire, PR25 3GR Tel: 0844 225 0240 Web: www.ainscoughtraining.co.uk
Level 4 NVQ Diploma in Controlling Lifting Operations Supervising Lifts Example of Evidence
To achieve the Level 4 NVQ Diploma in Controlling Lifting Operations- Supervising Lifts you will be required to gather evidence of at least two
lifts that you have supervised from start to finish.
This evidence example should give you an idea of the types of evidence that you need to produce to complete your portfolio. It has been
designed to help you prepare so you have the correct information to hand when you meet with the assessor.
Your assessor will explain all you need to know about the qualification
and the evidence during your initial induction.
Should you have any queries in the meantime please do not hesitate to contact us on 0844 225 0240.
Lift Supervisor Evidence Chart
***IF YOU ARE NEW TO THE ROLE THEN YOU WILL NEED 2 SETS OF THIS EVIDENCE THAT ARE
AT LEAST 6 MONTHS APART***
10.0 Copy of valid CPCS cards (FRONT &
BACK) from all involved in the
lift
10.3 M Copy of ORIGINAL
Method Statement/ Lifting
Plan
10.3R Risk
Assessment
10.3T Toolbox Talk
10.4 Lifting
Certifications
10.5 Plant
Inspection Reports
10.6 Permits to Work/ Lift
10.7 Proof of Hire
Signed off
10.8 Personal
Statements/ Reflection
THE LIFT
START FINISH
10.1 Copy of valid CPCS card &
Proof of CSCS H&S test pass
WT Witness
testimony by your line
manager either written or
verbally recorded
Lift Supervisor Evidence Checklist.
Set 1 of Evidence
Items/Documents Needed Done ?
Copy of valid Lift Supervisor CPCS/Other card. Copy of valid CPCS/Other cards from all involved in the lift. Copy of valid H&S test pass certificate. Copy of the original Method Statement/Risk Assess/Toolbox Talk. Lifting Certification - 6 monthly accessories/12monthly plant cert. Plant Inspection – Daily weekly report. Permit to work/lift. Proof of hire sheet/Invoice for the plant used. Personal Statement/Reflection of lift. Witness Testimony.
Set 2 of Evidence
Items/Documents Needed Done ?
Copy of valid CPCS/Other cards from all involved in the lift. Copy of the original Method Statement/Risk Assess/Toolbox Talk. Lifting Certification - 6 monthly accessories/12monthly plant cert. Plant Inspection – Daily weekly report. Permit to work/lift. Proof of hire sheet/Invoice for the plant used. Personal Statement/Reflection of lift. Video or Audio recorded Toolbox Talk - (If NVQ assessor not present)
EXAM
PLE