7
100 98 98 94 98 98 98 96 98 98 98 98 98 96 98 98 98 98 98 98 98 98 98 98 96 98 100.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 96.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 9 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 96.5 97.5 96.5 97.5 98.5 97.5 97.5 98.5 97.5 97.5 97.5 97.5 96.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 96.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 98.5 97.5 99.5 98.5 97.5 97.5 97.5 97.5 99.5 97.5 97.5 99.5 99.5 97.5 97.5 99.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 95.5 97.5 97.5 97.5 97.5 97.5 96.5 97.5 97.5 97.5 97.5 97.5 97.5 96.5 97.5 95.5 97.5 97.5 97.5 97.5 99.5 95.5 99.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 99 97.5 9 5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 97.5 101 10 101 101 100 100 97 9 97 97 98 97 97 98 98 97 97 97 97 98 97 97 97 97 97 97 97 98 98 97 97 97 97 97 97 98 99 97 97 97 97 97 98 97 97 97 97 97 97 98 97 97 95 97 97 97 98 94 97 97 97 97 95 96 97 97 98 97 97 97 7 97 97 97 97 97 97 97 98 97 97 97 97 97 97 97 97 97 97 98 97 97 97 97 97 97 97 97 97 97 97 98 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 99 97 97 97 97 97 97 96 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 95 97 97 97 97 97 97 97 97 97 97 97 98 97 98 97 98 97 97 97 97 97 97 97 97 97 97 97 99 97 97 98 99 96 97 99 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 98 97 97 98 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 97 98 97 97 97 98 95 98 97 97 96 97 97 98 97 98 97 97 98 99 99 98 98 98 97 97 98 97 98 97 97 97 97 97 97 97 97 97 97 97 97 98 97 97 98 97 97 97 98 96 98 98 97 98 97 97 97 97 97 97 97 97 98 97 96 98 96 97 97 97 97 98 97 915m 509m 390m 389m 14m 81m 18m 1. THIS LAYOUT IS FOR PLANNING PURPOSE ONLY SUBJECT TO CHANGE. NOTES 3. INVERTER STATION AND HV SWITCHGEAR LOCATION TO BE CONFIRMED DURING DETAIL DESIGN. 4. SVG TO BE CONFIRMED IF REQUIRED BY ESSENTIAL ENERGY. 5. 22kV GRID CONNECTION POINT TO BE CONFIRMED BY ESSENTIAL ENERGY. 6. OVERHEAD POWER LINE FROM HV SWITCHGEAR TO POC TO BE CONFIRMED DURING DETAIL DESIGN. 7. 10 METERS WIDE INTERNAL CLEARANCE AND APZ WITH EXTRA INTERNAL ROAD FOR FIRE BREAK. 2. PARTIAL LAND LOT TO BE USED FOR SOLAR FARM. 8. 4 METERS WIDE INTERNAL UNSEALED OR SEALED ROAD. 9. 5 METERS WIDE SCREENING BUFFER TO BE CONFIRMED DURING DETAIL LANSCAPING DESIGN. 10. SITE ENTRY GATES AND ACCESS ROAD TO BE CONFIRMED DURING CONSTRUCTION PERIOD. SCALE BAR 1:1840 10 0 1 2 3 4 5 SYSTEM SPECIFICATION GRID CONNECTION VOLTAGE 22kV DC CAPACITY (25°C) 6.732 MWp INVERTER CAPACITY (25°C) 4.998 MW GRID DC/AC RATIO 1.349 INVERTER / MV STATION SMA SC2660UP MVPS2660-S2 No. INVERTER / MV STATION 2 PV MODULE RSM120-8-600BMDG No. MODULES 11220 No. MODULES PER STRING 33 No. STRINGS 340 TRACKER PITCH 8 m No. 66 MODULE TRACKERS 170 No. 33 MODULE TRACKERS 0 BESS POWER 1020 kW BESS CAPACITY 2042.88 kWh CHARGING/DISCHARGING HOURS 2 HOURS DC-DC CONVERTER SMA DC-DC CONVERTER DC-DC CONVERTER CAPACITY 600 kW MAX No. DC-DC CONVERTER 2 (1 FOR EACH INVERTER) BATTERY CABINET SU340U85K No. BATTERY CABINET 6 (3 FOR EACH INVERTER) BATTERY CABINET POWER 170 kW BATTERY CABINET VOLTAGE 1216 V BATTERY CABINET CAPACITY 340.48 kWh LAND AREA 35.5 Ha SITE AREA 19.7 Ha LEGEND INTERNAL CLEARANCE APZ AND FIRE BREAK BUFFER VEGETATION ZONE SCREENING BUFFER POWER LINE EASEMENT BUFFER LAYDOWN AND SITE OFFICE AREA HERITAGE PROTECTION ZONE INVERTER STATION HV SWITCHGEAR SVG METEOROLOGICAL (MET) STATION CCTV SURVEILLANCE CAMERA EXISTING MAJOR TREES SITE BOUNDARY PERIMETER FENCE EXISTING FENCE INTERNAL SEALED OR UNSEALED ROAD PUBLIC ROAD OVERHEAD POWER LINE TELSTRA COMMUNICATIONS LINE RAILWAY DRAIN AND WATERWAY PROPOSED CONNECTION POINT 22kV POLE CE5814 SOLAR FARM 22kV POLE FOR GRID CONNECTION SITE ENTRY LAYDOWN AREA PV ARRAY MVPS-2 & BESS MVPS-1 & BESS SVG & SWITCHGEAR 10m PERIMETER CLEARANCE UNUSED LAND 5m SCREENING BUFFER INDICATIVE BASIN SITE OFFICE MOAMA SOLAR FARM PROJECT CLIENT LOT 590 HILL SIDE ROAD MOAMA NSW 2630 RISEN ENERGY AUSTRALIA TITLE GENERAL LAYOUT DRAWING NUMBER MOA-GN-REA-DWG-001 REVISION PAGE 2.0 1 / 2 DESIGNER DRAFTER PROJECT MANAGER PROJECT DIRECTOR WILSON JIN WILSON JIN SABINA SCHARFE LENA LI 1.0 INITIAL DRAFT REVISION 2021/10/21 CONCEPT DESIGN CHECK A1 841 x 594 1 M 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 L K J H G F E D C B A M L K J H G F E D C B A CAD COPYRIGHT This drawing must not be reproduced in part or whole without written permission from RISEN ENERGY (AUSTRALIA) PTY LTD ABN 97 168 750 374 © 1.1 CONNECTION POINT CHANGED 2021/03/25 DATE CHECKED BY APPROVED BY - - - 1.2 LAND LOT HALVED TO EAST 2021/04/27 - 1.3 PV CAPACITY REDESIGNED 2021/07/06 - 2.0 LAYOUT ADJUSTED 2021/10/13 - - - - - - - - - DRAINAGE ALONG INTERNAL ROAD

LAYDOWN AREA - murrayriver.nsw.gov.au

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LAYDOWN AREA - murrayriver.nsw.gov.au

100

98

98

94

98

98

98

96

9898 98

98

98

96 9898

98

98 98

98

98

9898

98

96

98

100.5

97.5

97.5

97.597.5

97.5

97.597.5

97.5

97.5

97.5

97.5

97.5 97.5 97.5

97.597.5 97.5

97.5

97.5

97.5 97.5

97.5

97.597.5

97.5

97.5

97.5

97.5

97.597.5

97.597.5

95.5 97.5 97.5

97.5

97.5 97.5

97.597.5

97.5 97.597

.597.5

97.597.5 97.5 97.5

97.5

97.597.5

97.5

97.5

97.5

97.5 97

.5

97.597

.5 97.5 97.597.5 97.597.5

97.5 97.5

95.5

97.5

97.5

97.5

97.5

97.5

97.5

97.5

97.5

95.5

97.5 97

.5

96.5

97.5

97.5

97.5

97.597.5 97.597.5

97.597.5

97.5

97.5

97.5

95.5 97.5 97

.5

97.597.5 97.5

97.597.5 97.597.5 97.5 97.597.5 97.597.5

97.5 97.597.5

97.597.5 97.5

97.5 97.5

97.597.5

97.5 97.597

.5

97.5 97

.5

97.5 97.597.597.5

97.5

97.597.597.597.5

97.5

97.5 97.5

97.597.5

97.5

97.597.597.5

97.5 97.5

97.5

97.5 97.597.597.5 97.5

97.5

97.5

97.5

97.597.5

97.597.5

97.5 97.5 97.5

97.597.5

97.597.5 97.5

97.5

97.5

97.597.5 97.5

97.5 97.597.597.5 97.597.597.5

97.5

97.5

97.5

97.597.5

97.5

97.597.597

.5 97.597.5 97

.5

97.597.5 97.597.5

97.5 97.5

97.5

97.597.5

97.5

97.5

97.597.5

97.5

97.597.597.5 97

.597.5 97.597.5

97.5

97.597.5

96.5

97.5

96.5

97.5

98.5

97.597.5

98.5

97.597.5

97.5

97.596.5 97.5 97.597.5

97.597.5

97.597.597.5

96.5

97.5

95.5

97.597.597.597.5 97

.597.597.597.5 97.597.597.5

97.597.5

97.5

97.5

97.5

97.597.5

98.5

97.5

99.5

98.5 97.597.5 97

.5

97.599.597.5

97.599.599.597.5 97.5

99.5

97.5

97.5 97.597.5

97.5 97.5

95.5

97.597.5 97.5

97.597.5 97.5

97.5

97.5

97.5 95.5 97

.5

97.5

97.5

97.5

97.5

96.5

97.5

97.597.597.5 97

.5

97.5

96.5

97.5

95.5

97.5

97.5

97.597.5 99

.5

95.5

99.5

97.5 97.5

97.5

97.597.5

97.597.5

97.5

97.597.5 97

.597.5

97.5 97.597.5

97.5 97.5 99

.597.5

97.5 93.5

97.5

97.5

97.5

97.5

97.597.5

97.5

97.5

97.5

97.5

97.5

97.5 97.5

97.5

97.5

97.5

97.5

101

101101

101

100100

9797

9798 9797 97 98

97 97

98 98

97 97 97

97

98 97 9797 97

97

97 9798

98

97

97 97

97

97 97

98

9997

97

97

97 97

98

97 97 97

97 97 9798 97 97 959797 97

98

94

97

97

97 979596

97

97

98 97 97 9797

97

9797 97

97

97 9798 9797 9797 97 97 9797

9797

98

97 97

97

97

97

97

9797 97

9797 9897

979797 9797 97 9797 97 9797 97 9797 97

97 97 97 97 97 97 9797

9797 9797 97 97

99

97 97

9797 97 97 9697 979797

97

97 9797 97 979797

9797 97 97

97

9597

9797 97 97 979797 9797 97

9897

98

97 989797 97 979797 97 97

97

97

9799 97

979899

96

9799 97 97 979797 979797

97

9797 9797

97 97 9797 97 9797 97 979797 9797 97 9897

97

98

97 97 9797 9797 979797 97

97

97 9797 9797 97

9897 97 97 9895 98

9797

96

9797 98

97

98

97

97

9899

99

9898

98

9797

98

97

98

97

97 9797 97

9797

9797

97

9797 98

97

97 98

97

9797

98

96

9898

97

98

97

97

97

97

97

97

97

97

98 97

96

98

96

97

9797

97

98

97

BATTERY BATTERY BATTERY BCP

RESERVED

BATT

ERY

BATT

ERY

BATT

ERY

BCP

RES

ERVE

D

915m 509m

390m

389m

14m

81m

18m

1. THIS LAYOUT IS FOR PLANNING PURPOSE ONLY SUBJECT TO CHANGE.

NOTES

3. INVERTER STATION AND HV SWITCHGEAR LOCATION TO BE CONFIRMED DURING DETAIL DESIGN.

4. SVG TO BE CONFIRMED IF REQUIRED BY ESSENTIAL ENERGY.

5. 22kV GRID CONNECTION POINT TO BE CONFIRMED BY ESSENTIAL ENERGY.

6. OVERHEAD POWER LINE FROM HV SWITCHGEAR TO POC TO BE CONFIRMED DURING DETAIL DESIGN.

7. 10 METERS WIDE INTERNAL CLEARANCE AND APZ WITH EXTRA INTERNAL ROAD FOR FIRE BREAK.

2. PARTIAL LAND LOT TO BE USED FOR SOLAR FARM.

8. 4 METERS WIDE INTERNAL UNSEALED OR SEALED ROAD.

9. 5 METERS WIDE SCREENING BUFFER TO BE CONFIRMED DURING DETAIL LANSCAPING DESIGN.

10. SITE ENTRY GATES AND ACCESS ROAD TO BE CONFIRMED DURING CONSTRUCTION PERIOD.

SCALE BAR 1:1840

100 1 2 3 4 5

SYSTEM SPECIFICATION

GRID CONNECTION VOLTAGE 22kV

DC CAPACITY (25°C) 6.732 MWp

INVERTER CAPACITY (25°C) 4.998 MW

GRID DC/AC RATIO 1.349

INVERTER / MV STATION SMA SC2660UP MVPS2660-S2

No. INVERTER / MV STATION 2

PV MODULE RSM120-8-600BMDG

No. MODULES 11220

No. MODULES PER STRING 33

No. STRINGS 340

TRACKER PITCH 8 m

No. 66 MODULE TRACKERS 170

No. 33 MODULE TRACKERS 0

BESS POWER 1020 kW

BESS CAPACITY 2042.88 kWh

CHARGING/DISCHARGING HOURS 2 HOURS

DC-DC CONVERTER SMA DC-DC CONVERTER

DC-DC CONVERTER CAPACITY 600 kW MAX

No. DC-DC CONVERTER 2 (1 FOR EACH INVERTER)

BATTERY CABINET SU340U85K

No. BATTERY CABINET 6 (3 FOR EACH INVERTER)

BATTERY CABINET POWER 170 kW

BATTERY CABINET VOLTAGE 1216 V

BATTERY CABINET CAPACITY 340.48 kWh

LAND AREA 35.5 Ha

SITE AREA 19.7 Ha

LEGEND

INTERNAL CLEARANCE

APZ AND FIRE BREAK BUFFER

VEGETATION ZONE

SCREENING BUFFER

POWER LINE EASEMENT BUFFER

LAYDOWN AND SITE OFFICE AREA

HERITAGE PROTECTION ZONE

INVERTER STATION HV SWITCHGEAR SVG

METEOROLOGICAL (MET) STATION

CCTV SURVEILLANCE CAMERA

EXISTING MAJOR TREES

SITE BOUNDARY PERIMETER FENCE

EXISTING FENCE

INTERNAL SEALED OR UNSEALED ROAD

PUBLIC ROAD

OVERHEAD POWER LINE

TELSTRA COMMUNICATIONS LINE

RAILWAY

DRAIN AND WATERWAY

PROPOSED CONNECTION POINT22kV POLE CE5814

SOLAR FARM 22kV POLEFOR GRID CONNECTION

SITE ENTRY

LAYDOWN AREA

PV ARRAY MVPS-2 & BESS

MVPS-1 & BESS

SVG & SWITCHGEAR

10m PERIMETER CLEARANCE

UNUSED LAND

5m SCREENING BUFFER INDICATIVE BASIN

SITE OFFICE

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

GENERAL LAYOUTDRAWING NUMBER

MOA-GN-REA-DWG-001REVISION PAGE

2.0 1 / 2

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/21

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

1.1 CONNECTION POINT CHANGED 2021/03/25

DATE CHECKED BY APPROVED BY

--

-

1.2 LAND LOT HALVED TO EAST 2021/04/27 -1.3 PV CAPACITY REDESIGNED 2021/07/06 -2.0 LAYOUT ADJUSTED 2021/10/13 -- - - -- - - -

DRAINAGE ALONG INTERNAL ROAD

Page 2: LAYDOWN AREA - murrayriver.nsw.gov.au

BATTERY BATTERY BATTERY BCP

RESERVED

BATT

ERY

BATT

ERY

BATT

ERY

BCP

RES

ERVE

D

915m 509m

390m

389m

14m

81m

18m

1. THIS LAYOUT IS FOR PLANNING PURPOSE ONLY SUBJECT TO CHANGE.

NOTES

3. INVERTER STATION AND HV SWITCHGEAR LOCATION TO BE CONFIRMED DURING DETAIL DESIGN.

4. SVG TO BE CONFIRMED IF REQUIRED BY ESSENTIAL ENERGY.

5. 22kV GRID CONNECTION POINT TO BE CONFIRMED BY ESSENTIAL ENERGY.

6. OVERHEAD POWER LINE FROM HV SWITCHGEAR TO POC TO BE CONFIRMED DURING DETAIL DESIGN.

7. 10 METERS WIDE INTERNAL CLEARANCE AND APZ WITH EXTRA INTERNAL ROAD FOR FIRE BREAK.

2. PARTIAL LAND LOT TO BE USED FOR SOLAR FARM.

8. 4 METERS WIDE INTERNAL UNSEALED OR SEALED ROAD.

9. 5 METERS WIDE SCREENING BUFFER TO BE CONFIRMED DURING DETAIL LANSCAPING DESIGN.

10. SITE ENTRY GATES AND ACCESS ROAD TO BE CONFIRMED DURING CONSTRUCTION PERIOD.

SCALE BAR 1:1840

100 1 2 3 4 5

LEGEND

INTERNAL CLEARANCE & APZ BUFFER

APZ AND FIRE BREAK BUFFER

VEGETATION ZONE

SCREENING BUFFER

POWER LINE EASEMENT BUFFER

LAYDOWN AND SITE OFFICE AREA

HERITAGE PROTECTION ZONE

INVERTER STATION HV SWITCHGEAR SVG

METEOROLOGICAL (MET) STATION

CCTV SURVEILLANCE CAMERA

EXISTING MAJOR TREES

SITE BOUNDARY PERIMETER FENCE

EXISTING FENCE

INTERNAL SEALED OR UNSEALED ROAD

PUBLIC ROAD

OVERHEAD POWER LINE

TELSTRA COMMUNICATIONS LINE

RAILWAY

DRAIN AND WATERWAY

PROPOSED CONNECTION POINT22kV POLE CE5814

SOLAR FARM 22kV POLEFOR GRID CONNECTION

SITE ENTRY

LAYDOWN AREA

PV ARRAY MVPS-2 & BESS

MVPS-1 & BESS

SVG & SWITCHGEAR

10m PERIMETER CLEARANCE

UNUSED LAND

5m SCREENING BUFFER INDICATIVE BASIN

SITE OFFICE

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

SITE OVERVIEW AND SETBACKDRAWING NUMBER

MOA-GN-REA-DWG-001REVISION PAGE

2.0 2 / 2

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/21

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

1.1 CONNECTION POINT CHANGED 2021/03/25

DATE CHECKED BY APPROVED BY

--

-

1.2 LAND LOT HALVED TO EAST 2021/04/27 -1.3 PV CAPACITY REDESIGNED 2021/07/06 -2.0 LAYOUT ADJUSTED 2021/10/13 -- - - -- - - -

DRAINAGE ALONG INTERNAL ROAD

NORTH BOUNDARY SETBACK - 81m FROM PV MODULE TO SITE BOUNDARY

SETBACK

EAST NEIGHBORHOOD SETBACK - 14m FROM PV MODULE

SOUTH NEIGHBORHOOD SETBACK - 18m FROM PV MODULE

TREES SCREENING BUFFER - 5m WIDE

INTERNAL ROAD - 4m WIDE

1

2

3

5

6

SETBACK DISTANCES TO BE CONFIRMED BASED ON CONSTRUCTION SURVEY.

1

2

3

4

5

INTERNAL CLEARANCE PERIMETER BUFFER AND APZ FIRE BREAK ZONE - 10m WIDE4

6

5 6

Page 3: LAYDOWN AREA - murrayriver.nsw.gov.au

AVERAGE GROUND SLOPE

3.048m

STANDARD MOTOR PIER

GRADE

ANEMOMETER(RED DOT MUST FACE NORTH)

1.219mMIN

SELF POWERED CONTROLLER

ANEMOMETER(RED DOT MUST FACE NORTH)

SPC ANTENNA

MODULE

SELF POWERED CONTROLLER

GRADE

STANDARD MOTOR PIER

3.048m

1.219mMIN

SIDE VIEW FRONT VIEW

1.80

m

0.85

m

60°m

2.20m

2.78

mTY

P. 1

.5m

6 MODULEBAY

6 MODULEBAY

7 MODULEBAY

7 MODULEBAY

6 MODULEBAY

6 MODULEBAY

1 MODULEBAY

7 MODULEBAY

7 MODULEBAY

6 MODULEBAY

6 MODULEBAY

1 MODULEBAY

90.97m

LEGEND

SOLID GROUND (COMPACTED SOIL)

1. SINGLE-AXIS TRACKING SYSTEM CONFIGURATION AND DIMENSION SUBJECT TO CHANGE BASED ON FINAL DETAIL DESIGN.

NOTES

2. GROUND SLOPE TO BE CONFIRMED DURING CONSTRUCTION PERIOD.

3. TRACKER PLANE SHOULD MATCH THE AVERAGE GROUND SLOPE ACROSS THE TRACKER. THE MOTOR AND BHA BRACKETS SHOULD BE SET TO THIS SLOPE TO MOUNT THE SLEW GEAR AND BHAS PROPERLY.

4. WEATHER STATION IS FOR TRACKER USE TO BE CONFIRMED DURING DETAIL DESIGN PERIOD.

5. TRACKER PILING METHODOLOGY TO BE DETERMINED BASED ON DETAIL SITE GROUND SURVEY DURING CONSTRUCTION PERIOD.

1 TYPICAL ARRAY PLAN 66 MODULES

2 PLANE PARALLEL W/ AVERAGE GROUND SLOPE

3 TYPICAL ARRAY SECTION W/ MAXIMUM HEIGHT

4 WEATHER STATION DETAIL6. MAXIMUM TRACKER INSTALLATION HEIGHT AND PANEL MOUNT LEVEL TO BE CONFIRMED DURING DETAIL DESIGN AND CONSTRUCTION PERIOD.

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

TRACKING SYSTEM ELEVATIONDRAWING NUMBER

MOA-GN-REA-DWG-002REVISION PAGE

1.0 1 / 1

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/12

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

- - -

DATE CHECKED BY APPROVED BY

JOHN ZHONG-

JOHN ZHONG

Page 4: LAYDOWN AREA - murrayriver.nsw.gov.au

1U1V

1W

1 RIGHT VIEW

4 TOP VIEW

3 FRONT VIEW2 REAR VIEW

6058

2896

24382438

2438

2900

INVERTER TRANSFORMER MV SWITCHGEAR

3328 2728300

FINISHED LEVEL

LEGEND

PEA GRAVEL GROUND

STRIP FOUNDATION

SOLID GROUND (COMPACTED SOIL)

1. MOUNTING OPTION WITH STRIP FOUNDATIONS (DIMENSIONS IN mm)

NOTES

2. STRIP FOUNDATIONS MUST BE SUITABLE FOR WEIGHT OF PRODUCT

3. STRIP FOUNDATIONS MUST BE PLACED ON SOLID GROUND

4. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS

5. ACTUAL ELEVATION AND FOUNDATIONS TO BE DETERMINED DURING DETAIL DESIGN PERIOD

SCALE BAR 1:1.936

100 1 2 3 4 5

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

INVERTER STATION ELEVATIONDRAWING NUMBER

MOA-GN-REA-DWG-003REVISION PAGE

1.0 1 / 1

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/12

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

- - -

DATE CHECKED BY APPROVED BY

JOHN ZHONG-

JOHN ZHONG

Page 5: LAYDOWN AREA - murrayriver.nsw.gov.au

CONTAINER SVG UNIT STEP UP TRANSFORMER

DISCONNECTOR AND EARTHING SWITCH

1 RIGHT VIEW

2 TOP VIEW

HANDRAILS

STELL MESH STEPS

LEGEND

PEA GRAVEL GROUND

CONCRETE FOUNDATION

SOLID GROUND (COMPACTED SOIL)

1. ACTUAL ELEVATION AND FOUNDATION TO BE DETERMINED DURING DETAIL DESIGN PERIOD

NOTES

2. SVG MODEL TO BE DETERMINED AFTER CONNECTION STUDY AND APPROVAL FROM DNSP

3. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS

4. HANDRAILS DETAILS TO BE CONFIRMED DURING PROCUREMENT AND DETEIAL DESIGN PERIOD

SCALE BAR 1:3.8

100 1 2 3 4 5

STELL MESH FOOTSTEPS

5. DIMENSION UNIT IS mm

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

SVG ELEVATIONDRAWING NUMBER

MOA-GN-REA-DWG-004REVISION PAGE

1.0 1 / 1

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/12

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

- - -

DATE CHECKED BY APPROVED BY

JOHN ZHONG-

JOHN ZHONG

Page 6: LAYDOWN AREA - murrayriver.nsw.gov.au

HANDRAILS

STELL MESH STEPS

LEGEND

PEA GRAVEL GROUND

CONCRETE FOUNDATION

SOLID GROUND (COMPACTED SOIL)

1. ACTUAL ELEVATION AND FOUNDATION TO BE DETERMINED DURING DETAIL DESIGN PERIOD

NOTES

2. ACTUAL SWITCHGEAR CONTAINER SIZE TO BE DETERMINED BY SUPPLIER DURING DETAIL DESIGN PERIOD

3. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS

4. HANDRAILS DETAILS TO BE CONFIRMED DURING PROCUREMENT AND DETEIAL DESIGN PERIOD

SCALE BAR 1:120

100 1 2 3 4 5

STELL MESH FOOTSTEPS

5. DIMENSION UNIT IS mm

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

SWITCHGEAR CABINET ELEVATIONDRAWING NUMBER

MOA-GN-REA-DWG-005REVISION PAGE

1.0 1 / 1

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/12

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

- - -

DATE CHECKED BY APPROVED BY

JOHN ZHONG-

JOHN ZHONG

Page 7: LAYDOWN AREA - murrayriver.nsw.gov.au

SMOKE HEAT SENSOR

BATTERY SWITCH PANEL

BATTERY MODULE HVAC UNIT

148014801402

1 FRONT VIEWWITH AND WITHOUT DOOR AND FRONT COVER

2 TOP VIEW

10

2330

10 1480 10 1825

AEROSOL FIRE SUPPRESSION

3 LEFT SIDE VIEW 4 RIGHT SIDE VIEW

FIN

ISH

ED L

EVEL

ABO

VE G

RO

UN

D >

= 10

0 D

EPEN

DIN

G O

N S

ITE

FLO

OD

ING

ASS

ESSM

ENT

1300

CO

NC

RET

E D

EPTH

>=

100

TO B

E C

ON

FIR

MED

DU

RIN

G D

ETAI

L C

IVIL

STR

UC

TUR

AL D

EISG

N

BATTERYCABINET

BATTERYCABINET

BATTERYCABINET

BCPSWITCHGEAR& CONTROL

CABINET

5 BATTERY CABINET3D VIEW

DEPTH OF BURIED GRAVEL AND COMPACT EARTHTO BE CONFIRMED DURING DETAIL CIVIL DESIGN

RESERVED SPACE FOR BATTERYSYSTEM EXTENSION

RESERVED SPACE FOR BATTERYSYSTEM EXTENSION

1480148010 10 1480 10 1824

1386

2020

1300

20 20

20

20

BATTERY CABINET WITHOUT DOOR

LEGEND

GRAVEL GROUND

CONCRETE FOUNDATION

SOLID GROUND (COMPACTED SOIL)

1. MOUNTING OPTION WITH CONCRETE FOUNDATIONS

NOTES

2. FOUNDATIONS MUST BE SUITABLE FOR WEIGHT OF PRODUCT

3. FOUNDATIONS MUST BE PLACED ON SOLID GROUND

4. FOUNDATIONS SIZE TO BE DETERMINED BY FLOODING ASSESSMENT AND GROUND CONDITIONS

5. ACTUAL ELEVATION AND FOUNDATIONS TO BE DETERMINED DURING DETAIL DESIGN PERIOD

SCALE BAR 1:147

100 1 2 3 4 5

MOAMA SOLAR FARMPROJECT CLIENT

LOT 590 HILL SIDE ROADMOAMA NSW 2630

RISEN ENERGY AUSTRALIATITLE

BATTERY CABINET ELEVATIONDRAWING NUMBER

MOA-GN-REA-DWG-006REVISION PAGE

1.0 1 / 1

DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR

WILSON JINWILSON JINSABINA SCHARFELENA LI

1.0 INITIAL DRAFT

REVISION

2021/10/12

CONCEPT DESIGNCHECK

A1 841 x 594

1

M

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

L

K

J

H

G

F

E

D

C

B

A

M

L

K

J

H

G

F

E

D

C

B

A

CAD

CO

PYR

IGH

T Th

is d

raw

ing

mus

t not

be

repr

oduc

ed in

par

t or w

hole

with

out w

ritte

n pe

rmis

sion

from

RIS

EN E

NER

GY

(AU

STR

ALIA

) PTY

LTD

ABN

97

168

750

374

©

- - -

DATE CHECKED BY APPROVED BY

--

-

6. EACH BATTERY CABINET ESTIMATED WEIGHT 3500 KG