Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
100
98
98
94
98
98
98
96
9898 98
98
98
96 9898
98
98 98
98
98
9898
98
96
98
100.5
97.5
97.5
97.597.5
97.5
97.597.5
97.5
97.5
97.5
97.5
97.5 97.5 97.5
97.597.5 97.5
97.5
97.5
97.5 97.5
97.5
97.597.5
97.5
97.5
97.5
97.5
97.597.5
97.597.5
95.5 97.5 97.5
97.5
97.5 97.5
97.597.5
97.5 97.597
.597.5
97.597.5 97.5 97.5
97.5
97.597.5
97.5
97.5
97.5
97.5 97
.5
97.597
.5 97.5 97.597.5 97.597.5
97.5 97.5
95.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
95.5
97.5 97
.5
96.5
97.5
97.5
97.5
97.597.5 97.597.5
97.597.5
97.5
97.5
97.5
95.5 97.5 97
.5
97.597.5 97.5
97.597.5 97.597.5 97.5 97.597.5 97.597.5
97.5 97.597.5
97.597.5 97.5
97.5 97.5
97.597.5
97.5 97.597
.5
97.5 97
.5
97.5 97.597.597.5
97.5
97.597.597.597.5
97.5
97.5 97.5
97.597.5
97.5
97.597.597.5
97.5 97.5
97.5
97.5 97.597.597.5 97.5
97.5
97.5
97.5
97.597.5
97.597.5
97.5 97.5 97.5
97.597.5
97.597.5 97.5
97.5
97.5
97.597.5 97.5
97.5 97.597.597.5 97.597.597.5
97.5
97.5
97.5
97.597.5
97.5
97.597.597
.5 97.597.5 97
.5
97.597.5 97.597.5
97.5 97.5
97.5
97.597.5
97.5
97.5
97.597.5
97.5
97.597.597.5 97
.597.5 97.597.5
97.5
97.597.5
96.5
97.5
96.5
97.5
98.5
97.597.5
98.5
97.597.5
97.5
97.596.5 97.5 97.597.5
97.597.5
97.597.597.5
96.5
97.5
95.5
97.597.597.597.5 97
.597.597.597.5 97.597.597.5
97.597.5
97.5
97.5
97.5
97.597.5
98.5
97.5
99.5
98.5 97.597.5 97
.5
97.599.597.5
97.599.599.597.5 97.5
99.5
97.5
97.5 97.597.5
97.5 97.5
95.5
97.597.5 97.5
97.597.5 97.5
97.5
97.5
97.5 95.5 97
.5
97.5
97.5
97.5
97.5
96.5
97.5
97.597.597.5 97
.5
97.5
96.5
97.5
95.5
97.5
97.5
97.597.5 99
.5
95.5
99.5
97.5 97.5
97.5
97.597.5
97.597.5
97.5
97.597.5 97
.597.5
97.5 97.597.5
97.5 97.5 99
.597.5
97.5 93.5
97.5
97.5
97.5
97.5
97.597.5
97.5
97.5
97.5
97.5
97.5
97.5 97.5
97.5
97.5
97.5
97.5
101
101101
101
100100
9797
9798 9797 97 98
97 97
98 98
97 97 97
97
98 97 9797 97
97
97 9798
98
97
97 97
97
97 97
98
9997
97
97
97 97
98
97 97 97
97 97 9798 97 97 959797 97
98
94
97
97
97 979596
97
97
98 97 97 9797
97
9797 97
97
97 9798 9797 9797 97 97 9797
9797
98
97 97
97
97
97
97
9797 97
9797 9897
979797 9797 97 9797 97 9797 97 9797 97
97 97 97 97 97 97 9797
9797 9797 97 97
99
97 97
9797 97 97 9697 979797
97
97 9797 97 979797
9797 97 97
97
9597
9797 97 97 979797 9797 97
9897
98
97 989797 97 979797 97 97
97
97
9799 97
979899
96
9799 97 97 979797 979797
97
9797 9797
97 97 9797 97 9797 97 979797 9797 97 9897
97
98
97 97 9797 9797 979797 97
97
97 9797 9797 97
9897 97 97 9895 98
9797
96
9797 98
97
98
97
97
9899
99
9898
98
9797
98
97
98
97
97 9797 97
9797
9797
97
9797 98
97
97 98
97
9797
98
96
9898
97
98
97
97
97
97
97
97
97
97
98 97
96
98
96
97
9797
97
98
97
BATTERY BATTERY BATTERY BCP
RESERVED
BATT
ERY
BATT
ERY
BATT
ERY
BCP
RES
ERVE
D
915m 509m
390m
389m
14m
81m
18m
1. THIS LAYOUT IS FOR PLANNING PURPOSE ONLY SUBJECT TO CHANGE.
NOTES
3. INVERTER STATION AND HV SWITCHGEAR LOCATION TO BE CONFIRMED DURING DETAIL DESIGN.
4. SVG TO BE CONFIRMED IF REQUIRED BY ESSENTIAL ENERGY.
5. 22kV GRID CONNECTION POINT TO BE CONFIRMED BY ESSENTIAL ENERGY.
6. OVERHEAD POWER LINE FROM HV SWITCHGEAR TO POC TO BE CONFIRMED DURING DETAIL DESIGN.
7. 10 METERS WIDE INTERNAL CLEARANCE AND APZ WITH EXTRA INTERNAL ROAD FOR FIRE BREAK.
2. PARTIAL LAND LOT TO BE USED FOR SOLAR FARM.
8. 4 METERS WIDE INTERNAL UNSEALED OR SEALED ROAD.
9. 5 METERS WIDE SCREENING BUFFER TO BE CONFIRMED DURING DETAIL LANSCAPING DESIGN.
10. SITE ENTRY GATES AND ACCESS ROAD TO BE CONFIRMED DURING CONSTRUCTION PERIOD.
SCALE BAR 1:1840
100 1 2 3 4 5
SYSTEM SPECIFICATION
GRID CONNECTION VOLTAGE 22kV
DC CAPACITY (25°C) 6.732 MWp
INVERTER CAPACITY (25°C) 4.998 MW
GRID DC/AC RATIO 1.349
INVERTER / MV STATION SMA SC2660UP MVPS2660-S2
No. INVERTER / MV STATION 2
PV MODULE RSM120-8-600BMDG
No. MODULES 11220
No. MODULES PER STRING 33
No. STRINGS 340
TRACKER PITCH 8 m
No. 66 MODULE TRACKERS 170
No. 33 MODULE TRACKERS 0
BESS POWER 1020 kW
BESS CAPACITY 2042.88 kWh
CHARGING/DISCHARGING HOURS 2 HOURS
DC-DC CONVERTER SMA DC-DC CONVERTER
DC-DC CONVERTER CAPACITY 600 kW MAX
No. DC-DC CONVERTER 2 (1 FOR EACH INVERTER)
BATTERY CABINET SU340U85K
No. BATTERY CABINET 6 (3 FOR EACH INVERTER)
BATTERY CABINET POWER 170 kW
BATTERY CABINET VOLTAGE 1216 V
BATTERY CABINET CAPACITY 340.48 kWh
LAND AREA 35.5 Ha
SITE AREA 19.7 Ha
LEGEND
INTERNAL CLEARANCE
APZ AND FIRE BREAK BUFFER
VEGETATION ZONE
SCREENING BUFFER
POWER LINE EASEMENT BUFFER
LAYDOWN AND SITE OFFICE AREA
HERITAGE PROTECTION ZONE
INVERTER STATION HV SWITCHGEAR SVG
METEOROLOGICAL (MET) STATION
CCTV SURVEILLANCE CAMERA
EXISTING MAJOR TREES
SITE BOUNDARY PERIMETER FENCE
EXISTING FENCE
INTERNAL SEALED OR UNSEALED ROAD
PUBLIC ROAD
OVERHEAD POWER LINE
TELSTRA COMMUNICATIONS LINE
RAILWAY
DRAIN AND WATERWAY
PROPOSED CONNECTION POINT22kV POLE CE5814
SOLAR FARM 22kV POLEFOR GRID CONNECTION
SITE ENTRY
LAYDOWN AREA
PV ARRAY MVPS-2 & BESS
MVPS-1 & BESS
SVG & SWITCHGEAR
10m PERIMETER CLEARANCE
UNUSED LAND
5m SCREENING BUFFER INDICATIVE BASIN
SITE OFFICE
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
GENERAL LAYOUTDRAWING NUMBER
MOA-GN-REA-DWG-001REVISION PAGE
2.0 1 / 2
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/21
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
1.1 CONNECTION POINT CHANGED 2021/03/25
DATE CHECKED BY APPROVED BY
--
-
1.2 LAND LOT HALVED TO EAST 2021/04/27 -1.3 PV CAPACITY REDESIGNED 2021/07/06 -2.0 LAYOUT ADJUSTED 2021/10/13 -- - - -- - - -
DRAINAGE ALONG INTERNAL ROAD
BATTERY BATTERY BATTERY BCP
RESERVED
BATT
ERY
BATT
ERY
BATT
ERY
BCP
RES
ERVE
D
915m 509m
390m
389m
14m
81m
18m
1. THIS LAYOUT IS FOR PLANNING PURPOSE ONLY SUBJECT TO CHANGE.
NOTES
3. INVERTER STATION AND HV SWITCHGEAR LOCATION TO BE CONFIRMED DURING DETAIL DESIGN.
4. SVG TO BE CONFIRMED IF REQUIRED BY ESSENTIAL ENERGY.
5. 22kV GRID CONNECTION POINT TO BE CONFIRMED BY ESSENTIAL ENERGY.
6. OVERHEAD POWER LINE FROM HV SWITCHGEAR TO POC TO BE CONFIRMED DURING DETAIL DESIGN.
7. 10 METERS WIDE INTERNAL CLEARANCE AND APZ WITH EXTRA INTERNAL ROAD FOR FIRE BREAK.
2. PARTIAL LAND LOT TO BE USED FOR SOLAR FARM.
8. 4 METERS WIDE INTERNAL UNSEALED OR SEALED ROAD.
9. 5 METERS WIDE SCREENING BUFFER TO BE CONFIRMED DURING DETAIL LANSCAPING DESIGN.
10. SITE ENTRY GATES AND ACCESS ROAD TO BE CONFIRMED DURING CONSTRUCTION PERIOD.
SCALE BAR 1:1840
100 1 2 3 4 5
LEGEND
INTERNAL CLEARANCE & APZ BUFFER
APZ AND FIRE BREAK BUFFER
VEGETATION ZONE
SCREENING BUFFER
POWER LINE EASEMENT BUFFER
LAYDOWN AND SITE OFFICE AREA
HERITAGE PROTECTION ZONE
INVERTER STATION HV SWITCHGEAR SVG
METEOROLOGICAL (MET) STATION
CCTV SURVEILLANCE CAMERA
EXISTING MAJOR TREES
SITE BOUNDARY PERIMETER FENCE
EXISTING FENCE
INTERNAL SEALED OR UNSEALED ROAD
PUBLIC ROAD
OVERHEAD POWER LINE
TELSTRA COMMUNICATIONS LINE
RAILWAY
DRAIN AND WATERWAY
PROPOSED CONNECTION POINT22kV POLE CE5814
SOLAR FARM 22kV POLEFOR GRID CONNECTION
SITE ENTRY
LAYDOWN AREA
PV ARRAY MVPS-2 & BESS
MVPS-1 & BESS
SVG & SWITCHGEAR
10m PERIMETER CLEARANCE
UNUSED LAND
5m SCREENING BUFFER INDICATIVE BASIN
SITE OFFICE
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
SITE OVERVIEW AND SETBACKDRAWING NUMBER
MOA-GN-REA-DWG-001REVISION PAGE
2.0 2 / 2
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/21
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
1.1 CONNECTION POINT CHANGED 2021/03/25
DATE CHECKED BY APPROVED BY
--
-
1.2 LAND LOT HALVED TO EAST 2021/04/27 -1.3 PV CAPACITY REDESIGNED 2021/07/06 -2.0 LAYOUT ADJUSTED 2021/10/13 -- - - -- - - -
DRAINAGE ALONG INTERNAL ROAD
NORTH BOUNDARY SETBACK - 81m FROM PV MODULE TO SITE BOUNDARY
SETBACK
EAST NEIGHBORHOOD SETBACK - 14m FROM PV MODULE
SOUTH NEIGHBORHOOD SETBACK - 18m FROM PV MODULE
TREES SCREENING BUFFER - 5m WIDE
INTERNAL ROAD - 4m WIDE
1
2
3
5
6
SETBACK DISTANCES TO BE CONFIRMED BASED ON CONSTRUCTION SURVEY.
1
2
3
4
5
INTERNAL CLEARANCE PERIMETER BUFFER AND APZ FIRE BREAK ZONE - 10m WIDE4
6
5 6
AVERAGE GROUND SLOPE
3.048m
STANDARD MOTOR PIER
GRADE
ANEMOMETER(RED DOT MUST FACE NORTH)
1.219mMIN
SELF POWERED CONTROLLER
ANEMOMETER(RED DOT MUST FACE NORTH)
SPC ANTENNA
MODULE
SELF POWERED CONTROLLER
GRADE
STANDARD MOTOR PIER
3.048m
1.219mMIN
SIDE VIEW FRONT VIEW
1.80
m
0.85
m
60°m
2.20m
2.78
mTY
P. 1
.5m
6 MODULEBAY
6 MODULEBAY
7 MODULEBAY
7 MODULEBAY
6 MODULEBAY
6 MODULEBAY
1 MODULEBAY
7 MODULEBAY
7 MODULEBAY
6 MODULEBAY
6 MODULEBAY
1 MODULEBAY
90.97m
LEGEND
SOLID GROUND (COMPACTED SOIL)
1. SINGLE-AXIS TRACKING SYSTEM CONFIGURATION AND DIMENSION SUBJECT TO CHANGE BASED ON FINAL DETAIL DESIGN.
NOTES
2. GROUND SLOPE TO BE CONFIRMED DURING CONSTRUCTION PERIOD.
3. TRACKER PLANE SHOULD MATCH THE AVERAGE GROUND SLOPE ACROSS THE TRACKER. THE MOTOR AND BHA BRACKETS SHOULD BE SET TO THIS SLOPE TO MOUNT THE SLEW GEAR AND BHAS PROPERLY.
4. WEATHER STATION IS FOR TRACKER USE TO BE CONFIRMED DURING DETAIL DESIGN PERIOD.
5. TRACKER PILING METHODOLOGY TO BE DETERMINED BASED ON DETAIL SITE GROUND SURVEY DURING CONSTRUCTION PERIOD.
1 TYPICAL ARRAY PLAN 66 MODULES
2 PLANE PARALLEL W/ AVERAGE GROUND SLOPE
3 TYPICAL ARRAY SECTION W/ MAXIMUM HEIGHT
4 WEATHER STATION DETAIL6. MAXIMUM TRACKER INSTALLATION HEIGHT AND PANEL MOUNT LEVEL TO BE CONFIRMED DURING DETAIL DESIGN AND CONSTRUCTION PERIOD.
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
TRACKING SYSTEM ELEVATIONDRAWING NUMBER
MOA-GN-REA-DWG-002REVISION PAGE
1.0 1 / 1
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/12
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
- - -
DATE CHECKED BY APPROVED BY
JOHN ZHONG-
JOHN ZHONG
1U1V
1W
1 RIGHT VIEW
4 TOP VIEW
3 FRONT VIEW2 REAR VIEW
6058
2896
24382438
2438
2900
INVERTER TRANSFORMER MV SWITCHGEAR
3328 2728300
FINISHED LEVEL
LEGEND
PEA GRAVEL GROUND
STRIP FOUNDATION
SOLID GROUND (COMPACTED SOIL)
1. MOUNTING OPTION WITH STRIP FOUNDATIONS (DIMENSIONS IN mm)
NOTES
2. STRIP FOUNDATIONS MUST BE SUITABLE FOR WEIGHT OF PRODUCT
3. STRIP FOUNDATIONS MUST BE PLACED ON SOLID GROUND
4. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS
5. ACTUAL ELEVATION AND FOUNDATIONS TO BE DETERMINED DURING DETAIL DESIGN PERIOD
SCALE BAR 1:1.936
100 1 2 3 4 5
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
INVERTER STATION ELEVATIONDRAWING NUMBER
MOA-GN-REA-DWG-003REVISION PAGE
1.0 1 / 1
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/12
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
- - -
DATE CHECKED BY APPROVED BY
JOHN ZHONG-
JOHN ZHONG
CONTAINER SVG UNIT STEP UP TRANSFORMER
DISCONNECTOR AND EARTHING SWITCH
1 RIGHT VIEW
2 TOP VIEW
HANDRAILS
STELL MESH STEPS
LEGEND
PEA GRAVEL GROUND
CONCRETE FOUNDATION
SOLID GROUND (COMPACTED SOIL)
1. ACTUAL ELEVATION AND FOUNDATION TO BE DETERMINED DURING DETAIL DESIGN PERIOD
NOTES
2. SVG MODEL TO BE DETERMINED AFTER CONNECTION STUDY AND APPROVAL FROM DNSP
3. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS
4. HANDRAILS DETAILS TO BE CONFIRMED DURING PROCUREMENT AND DETEIAL DESIGN PERIOD
SCALE BAR 1:3.8
100 1 2 3 4 5
STELL MESH FOOTSTEPS
5. DIMENSION UNIT IS mm
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
SVG ELEVATIONDRAWING NUMBER
MOA-GN-REA-DWG-004REVISION PAGE
1.0 1 / 1
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/12
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
- - -
DATE CHECKED BY APPROVED BY
JOHN ZHONG-
JOHN ZHONG
HANDRAILS
STELL MESH STEPS
LEGEND
PEA GRAVEL GROUND
CONCRETE FOUNDATION
SOLID GROUND (COMPACTED SOIL)
1. ACTUAL ELEVATION AND FOUNDATION TO BE DETERMINED DURING DETAIL DESIGN PERIOD
NOTES
2. ACTUAL SWITCHGEAR CONTAINER SIZE TO BE DETERMINED BY SUPPLIER DURING DETAIL DESIGN PERIOD
3. FOUNDATIONS SIZE TO BE DETERMINED BY GROUND CONDITIONS
4. HANDRAILS DETAILS TO BE CONFIRMED DURING PROCUREMENT AND DETEIAL DESIGN PERIOD
SCALE BAR 1:120
100 1 2 3 4 5
STELL MESH FOOTSTEPS
5. DIMENSION UNIT IS mm
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
SWITCHGEAR CABINET ELEVATIONDRAWING NUMBER
MOA-GN-REA-DWG-005REVISION PAGE
1.0 1 / 1
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/12
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
- - -
DATE CHECKED BY APPROVED BY
JOHN ZHONG-
JOHN ZHONG
SMOKE HEAT SENSOR
BATTERY SWITCH PANEL
BATTERY MODULE HVAC UNIT
148014801402
1 FRONT VIEWWITH AND WITHOUT DOOR AND FRONT COVER
2 TOP VIEW
10
2330
10 1480 10 1825
AEROSOL FIRE SUPPRESSION
3 LEFT SIDE VIEW 4 RIGHT SIDE VIEW
FIN
ISH
ED L
EVEL
ABO
VE G
RO
UN
D >
= 10
0 D
EPEN
DIN
G O
N S
ITE
FLO
OD
ING
ASS
ESSM
ENT
1300
CO
NC
RET
E D
EPTH
>=
100
TO B
E C
ON
FIR
MED
DU
RIN
G D
ETAI
L C
IVIL
STR
UC
TUR
AL D
EISG
N
BATTERYCABINET
BATTERYCABINET
BATTERYCABINET
BCPSWITCHGEAR& CONTROL
CABINET
5 BATTERY CABINET3D VIEW
DEPTH OF BURIED GRAVEL AND COMPACT EARTHTO BE CONFIRMED DURING DETAIL CIVIL DESIGN
RESERVED SPACE FOR BATTERYSYSTEM EXTENSION
RESERVED SPACE FOR BATTERYSYSTEM EXTENSION
1480148010 10 1480 10 1824
1386
2020
1300
20 20
20
20
BATTERY CABINET WITHOUT DOOR
LEGEND
GRAVEL GROUND
CONCRETE FOUNDATION
SOLID GROUND (COMPACTED SOIL)
1. MOUNTING OPTION WITH CONCRETE FOUNDATIONS
NOTES
2. FOUNDATIONS MUST BE SUITABLE FOR WEIGHT OF PRODUCT
3. FOUNDATIONS MUST BE PLACED ON SOLID GROUND
4. FOUNDATIONS SIZE TO BE DETERMINED BY FLOODING ASSESSMENT AND GROUND CONDITIONS
5. ACTUAL ELEVATION AND FOUNDATIONS TO BE DETERMINED DURING DETAIL DESIGN PERIOD
SCALE BAR 1:147
100 1 2 3 4 5
MOAMA SOLAR FARMPROJECT CLIENT
LOT 590 HILL SIDE ROADMOAMA NSW 2630
RISEN ENERGY AUSTRALIATITLE
BATTERY CABINET ELEVATIONDRAWING NUMBER
MOA-GN-REA-DWG-006REVISION PAGE
1.0 1 / 1
DESIGNERDRAFTERPROJECT MANAGERPROJECT DIRECTOR
WILSON JINWILSON JINSABINA SCHARFELENA LI
1.0 INITIAL DRAFT
REVISION
2021/10/12
CONCEPT DESIGNCHECK
A1 841 x 594
1
M
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A
CAD
CO
PYR
IGH
T Th
is d
raw
ing
mus
t not
be
repr
oduc
ed in
par
t or w
hole
with
out w
ritte
n pe
rmis
sion
from
RIS
EN E
NER
GY
(AU
STR
ALIA
) PTY
LTD
ABN
97
168
750
374
©
- - -
DATE CHECKED BY APPROVED BY
--
-
6. EACH BATTERY CABINET ESTIMATED WEIGHT 3500 KG
7. DIMENSIONS IN MILLIMETERS (mm)