2
Capital Projects Division Recovery and Resilience tinyurl.com/SANDYRECOVERY (212) 306-8532 — [email protected] LAGUARDIA HOUSES Development Information Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights: 16 stories Total Buildings: 10 6 Property Size: Congressional (D-7): Tenant Association President: NYS Assembly (D-65): NYS Senate (D-26): NYC Council (D-1): • Nydia Velazquez • Felicia Cruickshank • Yuh-Line Niou • Brian Kavanagh • Margaret Chin 11.36 acres Existing Funded Buildings

LAGUARDIA HOUSES Development InformationLAGUARDIA HOUSES Development Information Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding:

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LAGUARDIA HOUSES Development InformationLAGUARDIA HOUSES Development Information Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding:

Capital Projects Division Recovery and Resilience

tinyurl.com/SANDYRECOVERY(212) 306-8532 — [email protected]

LAGUARDIA HOUSES Development Information

Development Statistics

Elected Representative:

Tenant Association:

Buildings benefiting from FEMA funding:

Building heights:16 stories

TotalBuildings: 10

6

Property Size:

Congressional (D-7):

Tenant Association President:

NYS Assembly (D-65):

NYS Senate (D-26):

NYC Council (D-1):

• Nydia Velazquez

• Felicia Cruickshank

• Yuh-Line Niou

• Brian Kavanagh

• Margaret Chin

11.36 acres

Electrical Service Building # 12 - Axon

Existing Funded Buildings

Page 2: LAGUARDIA HOUSES Development InformationLAGUARDIA HOUSES Development Information Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding:

Project Scope

NYCHA’s Recovery & Resilience Department Questions/Problems, 疑 问/家 里 的 问 题,

Вопросы / проблемы, Preguntas/Problemas (212) 306-8532 — [email protected]

Resiliency• Install manual dry flood proof in areas below the FEMA flood level at Buildings 2, 3, 4, 6, 7, and 8• Elevate and protect electrical service above the FEMA flood level to serve Buildings 2, 3, and 4

Safety• Install new security cameras per funding availability• Install upgraded door security access systems per funding availability• Replace exterior site lighting fixtures and bulbs• Replace lobby, corridor, and stairwell interior lighting fixtures in buildings 2, 3, 4, 6, 7, and 8

Development Improvements• Resurface site pavement affected by construction• Replace underground electrical wiring system at affected damaged areas (Partial)

Building Improvements• Construct new electrical service for buildings 2, 3 and 4 protected up to FEMA flood level• Install new current transformer cabinet and automatic transfer switches to serve buildings 2, 3 and 4• New hot water heater tank in buildings 3 and 4 and backflow preventer in buildings 2, 3, 4, 6, 7 and 8• Construct new sump pump in buildings 2, 3, 4, 6, 7 and 8• Replace and/or repair doors, door frames, hardware damaged by water• Replace electrical conduits located at cellar level in buildings 2, 3, 4, 6, 7 and 8• Replace steam piping located at cellar level in buildings 2, 3, 4, 6, 7 and 8• Replace vacuum and condensate pumps in buildings 2, 3, 4, 6, 7 and 8• Remove hazardous materials and clean building crawl spaces

Energy• Install full backup power generator to serve buildings 2, 3 and 4• Implement sitewide energy and sustainability measures