37
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Embed Size (px)

Citation preview

Page 1: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L

JSIS Report for PCC

Donald Davies for Dmitry Kosterev, JSIS Chair

Page 2: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L

JSIS Activities• Oscillation Modes – embarking upon studies to

relate oscillatory modes, damping to system conditions including flow levels for various simulated systems

• Oscillation Analysis – review current system events. Review plots from PMU for interesting behavior

Page 3: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

3

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L

JSIS Activities• Improve Data Quality– Correct issues– Tools to detect and handle bad data including

Linear State Estimator• Operations and Engineering Analysis tools

Page 4: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

4

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L

JSIS Activities• Presentation from Peak, GE, WECC regarding

Simulations with Westwide System Model (WSM) Cases– WSM (West-wide System Model) – node-breaker model

used by Peak to run RTCA and next day studies;– WSM Cases including dynamics data are posted in at

PeakRC.org for operating entities to download. • Cases can be loaded into PSLF to provide for planner access

including dynamics studies

Page 5: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

5

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L

Simulations with WSM• Results– April 28th – PDCI loss– May 28th – Garrison-Taft line reclosing;– June 17th –Chief Jo brake test;

Page 6: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

At 6:06 PDCI tripped, RAS activated dropping 1708 MW in Pacific Northwest

System Frequency dropped to 59.784 Hz Sequence of events from BPA (not official):– 4.553 sec – PDCI pole 3 power change from 827 to 489 MW– 4.553 sec – PDCI pole 4 power change from 827 to 508 MW– 5.333 sec - PDCI pole 3 and 4 power change to 0 MW– 5.667 sec – insert Fort Rock series capacitors– 5.733 sec – RAS gen.drop

Additional comments: Poles 1 and 2 out; Olinda CB3096 closed (cap in), CB 5492 open

(reactor out) Tracy CB 1292 and 2292 opened (caps out) 3592

closed (reactor in), CB 1392 and 2392 closed (caps in)

April 28, 2015 Disturbance

Page 7: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

RAS gen. drop:–

April 28, 2015 Disturbance

RAS: GCL CKT2 254RAS: GCL CKT3 149RAS: CHJ PH4 146.7RAS: CHJ PH5 190.3RAS: CHJ PH6 498.2RAS: MCN LINE1 40RAS: MCN LINE2 45RAS: MCN LINE3&4 133.6RAS: MCN LINE5 144RAS: TDA PH3 52RAS: TDA PH6 56

Page 8: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU – Preliminary Results

Celilo

Page 9: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and UEL);

MALIN Voltage

Page 10: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (line Vincent Midway tripped);

Additional shunt switching needs to be modeled:• Olinda 500 kV CB3096 closed (capacitor in) and CB 5492 opened (reactor out)• Tracy 500 kV CB 1292 and 2292 opened (caps out) and 3592 closed (reactor in)• Tracy 500 kV CB 1392 and 2392 closed (capacitors in in)

Page 11: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Summerlake-Hemingway flow

Page 12: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

COI Flow

Page 13: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

GARRISON-TAFT Flow

Page 14: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

NAVAJO Voltage (5 kV difference between SCADA and PMU), HASSYYAMPA ( 8 kV difference between SCADA and PMU),

Page 15: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Page 16: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Page 17: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Page 18: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Page 19: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results using updated dynamic model (inclusion of BPA updates and adding UEL and removing line Vincent Midway);

Page 20: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Case will be posted at peakrc.org; We can start using WSM snapshots in

node breaker format (we have tool, PMUs, cases);

Results are reasonable, we need more simulations to gain more confidence and to improve models;

It is much faster to prepare case;

April 28, 2015 Disturbance

Page 21: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

May 28, 2015 Disturbance Here is what do we see from PMU data:

About 12:38:50.65 – Taft voltage jumps 25-kV, Garrison jumps only about 8-kV, no MW flow on Garrison – Taft #2, no MVAR flow on Garrison end, 500 MVAR flow from line to bus at Taft end – clearly line is energized at Taft

About 12:38:53.9 – looks like line is closed from Garrison About 12:38.54.45 – looks line opened at Garrison About 12:39:08.35 – line closed again at Garrison About 12:39:09.05 – line opened again at Garrison

Peak did not see action of PCBs on Garrison side since there was maintenance on this breakers so ICCP was probably disabled;

Page 22: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU

Page 23: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU

Page 24: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU

Page 25: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU

Page 26: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

PSLF simulation (WSM node-breaker) vs. PMU

Page 27: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

• Chief Joseph Brake Inerstion • Four insertion on June 17, 2015;• Cases will be posted on peakrc.org;

June 17 Chief Joseph Brake

Page 28: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 29: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 30: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 31: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 32: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 33: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 34: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 35: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 36: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results:

Page 37: JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results: