JP ELEKTROPRIVREDA BiH
d.d. - Sarajevo
1. Results and Trends
2. Planning new capacities
June 2010
JP Elektroprivreda BiH d.d.
2
Single company
JP EP BiH d.d. (90% state / 10% private)
Distribution
and Supply
HQ
TPP TUZLA
ED ZENICATPP KAKANJ
HPP on Neretvi
ED SARAJEVO
ED TUZLA
ED BIHAĆ
ED MOSTAR
Generation
Trading
JP Elektroprivreda BiH d.d.
3
Concern
Concern EP BiH d.d.
EP BiH
TPP TUZLA
ED Zenica
TPP KAKANJ
HPP on Neretva
ED Sarajevo
ED Tuzla
ED Bihać
ED Mostar
EP Generation EP Distribution EP Supply EP Coal mines(7)
Iskraemeco
SarajevoEti Sarajevo
Eldis tehnika
ELBiH Hotel
Other activities
JP Elektroprivreda BiH d.d.
4
Stanje EES u BiH
TPP Tuzla
715 MW
3,326 GWh
TPP Kakanj
450 MW
1,908 GWh
HYDRO
517 MW
1,693 GWh
110 kV: 367 GWh 6%
Annual : 1,956 GWh 29%
Total
1,682 MW
6,927 GWh
Total Sales: 6,661 GWh
688,514 customers
Distribution: 3,728 GWh 56%
Tariff Sales 2009
Gen.
capacity
Total trading: 2,566 GWh 39%
Total Tariff Sales: 4,095 GWh 61%
Short-term: 610 GWh 9%
Market Sales 2009
JP Elektroprivreda BiH d.d.
5
El.en. Balance (GWh)
2007 2008 2009 %
Generation 6,544 7,295 6,927 -5,0
Thermal (76%) 5,365 5,750 5,234 -9,0
Hydro ( 24%) 1,179 1,545 1,693 +9.6
Consumption (Gross)
4,514 4,827 4,618 -4.3
Saldo 2,030 2,468 2,309 -6,4
JP Elektroprivreda BiH d.d.
6
Unaudited Income statement
(mil.KM)
2008 2009
Electricity sales 835 856 2.5%
Other revenues 35 41 17%
Operating revenue 870 897 3.1%
Operating expenses 696 711 2.2%
EBITDA 174 186 6.9%
Depreciation 140 143 2.1%
Other income (net) 12 19 58%
Profit 46.2 61.9 34%
JP Elektroprivreda BiH d.d.
7
Trend - Generation
GWh
1990 6,680
1996 2,298
2001 5,115
2002 5,540
2003 5,362
2004 6,112
2005 5,767
2006 6,363
2007 6,544
2008 7,295 11.3%
2009 6,927 -5%0
1000
2000
3000
4000
5000
6000
7000
8000
90 93 96 99 '02 '05 '08
GWh
JP Elektroprivreda BiH d.d.
8
Trend – Total electricity sales
GWh
1990 6,795
1996 1,715
2001 4,655
2002 5,100
2003 4,832
2004 5,655
2005 5,380
2006 5,775
2007 6,096
2008 6,795
2009 6,661 -2%
0
1000
2000
3000
4000
5000
6000
7000
8000
96 98'00 '02 '04 '06 '08
GWh
TotalTariffOther
JP Elektroprivreda BiH d.d.
9
Trend – Income from el. sales
mill. KM
1996 165
2001 449
2002 483
2003 475
2005 559
2005 548
2006 611
2007 692
2008 835 21%
2009 856 2,5%0
100
200
300
400
500
600
700
800
900
96 97 98 99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09
mil. KMTotal
Tariff
Other
JP Elektroprivreda BiH d.d.
10
Trend – Loss/Profit
mil. KM
2001 -77.8
2002 -74.8
2003 -145.2
2004 -55.4
2005 2.7
2006 5.4
2007 11.5
2008 46.2
2009 61.9-200
-150
-100
-50
0
50
100
'01 '02 '03 '04 '05 '06 '07 '08 '09
JP Elektroprivreda BiH d.d.
11
F/kWh
1999 11.93
2000 11.80
2001 12.02
2002 12.40
2003 12.33
2004 12.28
2005 12.12
2006 12.40
2007 12.40
2008 12.81
2009 13.12
Trend – Average tariffs (F/kWh)
0
2
4
6
8
10
12
14
'99 '01 '03 '05 '07 '09
JP Elektroprivreda BiH d.d.
12
Average tariffs (F/kWh)
5
7
9
11
13
15
17
19
21
99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09
110 kV
35 kV
10 kV
households
Commercial
on 0,4 kV
Public
lightning
Average
JP Elektroprivreda BiH d.d.
13
1999 6,735
2000 6,403
2001 6,286
2002 6,095
2003 5,890
2004 5,750
2005*(T) 5,675
2005* 5,048
2006 5,034
2007 5,013
2008 4,966
2009 4,975*(T) Including TransCo
Trend – Employees
0
1000
2000
3000
4000
5000
6000
7000
8000
'99 '01 '03 '05 '07 '09
JP Elektroprivreda BiH d.d.
14
103 KM
1999 64.4
2000 71.1
2001 75.9
2002 84.5
2003 86.2
2004 102.2
2005 102.9
2006 127.4
2007 143.8
2008 175.2
2009 181.7 +3.7%
Trend – Income per employee
0
20
40
60
80
100
120
140
160
180
200
'99 '01 '03 '05 '07 '09
JP Elektroprivreda BiH d.d.
15
103 tons
1999 2,940
2000 3,488
2001 3,409
2002 4,087
2003 4,306
2004 4,606
2005 4,622
2006 4,985
2007 5,139
2008 5,730
2009 5,657 -1%
Trend – Coal purchase
0
1000
2000
3000
4000
5000
6000
7000
'99 '01 '03 '05 '07 '09
JP Elektroprivreda BiH d.d.
16
KM/GJ
1999 3.374
2000 3.365
2001 3.380
2002 3.471
2003 3.451
2004 3.754
2005 3.763
2006 3.989
2007 4.360
2008 4.406
2009 4.740
Trend – average coal price
3
3,2
3,4
3,6
3,8
4
4,2
4,4
'99 '01 '03 '05 '07 '09
JP Elektroprivreda BiH d.d.
17
2009 / 2008
2007 2008 2009 %
Generation (GWh) 6,544 7,295 6,929 -5,0
Electricity Sales (GWh) 6,096 6,781 6,661 -2,0
Income from sales (mill.
KM)724 835 856 +2,5
Total income (mill. KM) 765 908 944 +4,0
EBITDA (mill. KM) 119.5 174 186 +6.9
Profit (mill. KM) 11.54 46.2 61.9 +34
Employees (31.12.) 5,013 4,966 4,975
Coal purchase 5,139 5,730 5,657 -1
JP Elektroprivreda BiH d.d.
18
2. New projects
JP Elektroprivreda BiH d.d.
19
Existing capacities
THERMAL CAPACITIES
Possible Total TotalInstalled In Age in Reconstr. Life shut years of hours of
capacity operation 2010 extension down operation operation
at the end till 2009
MW since
Tuzla G3 100 1966 44 1997 18 2015 49 332.306
Tuzla G4 200 1971 39 2002 15 2017 46 223.786
Tuzla G5 200 1974 36 2008 15 2023 49 258.288
Tuzla G6 215 1978 32 2012 15 2027 49 277.761
TUZLA 715
Kakanj G5 110 1969 41 2004 15 2019 50 279.207
Kakanj G6 110 1977 33 2011 15 2026 49 278.371
Kakanj G7 230 1988 22 2005 20 2025 37 178.264
KAKANJ 450
JP Elektroprivreda BiH d.d.
20
New projects
TPP TuzlaTPP KakanjTPP Bugojno
HPP Unac
HPP Vranduk
HPP
Ustikolina
Small HPP
Konjic
JP Elektroprivreda BiH d.d.
21
New projects
Priorities
MW mil.€
1. HPP Ustikolina 63 92
2. HPP Vranduk 20 48
3. HPP Unac 74 87
4. Small HPP-s 26 35
Hydro total 183 262
1. New unit in TPP Tuzla 450 842
2. New unit in TPP Kakanj 300 681
3. TPP and coal mine Bugojno 300 584
Thermal Total 1050 2107
JP Elektroprivreda BiH d.d.
22
USTIKOLINA
HPP Ustikolina
Drina River
Pinst. = 3 x 21.2 MW
(63.6 MW)
Gann.= 255 GWh
Inv = 92,2 mil. €
Status:
Preliminary water approval
Preliminary environmental impact
assessment
Preliminary design in August
In operation : 2016
JP Elektroprivreda BiH d.d.
23
USTIKOLINA
JP Elektroprivreda BiH d.d.
24
VRANDUK
HPP Vranduk
Bosnia River
Pinst. = 2 x 9.12 +1.32 MW
Pmax.= 19.56 MW
Gann. = 96.4 GWh
Inv = 47.6 mil. €
Status:
Preliminary water approval Concession approval from municipality
Preliminary design
Environmental impact assessment
In operation: 2015
JP Elektroprivreda BiH d.d.
25
VRANDUK
JP Elektroprivreda BiH d.d.
26
UNAC
HPP UNAC
Unac River
Pinst. = 2 x 36,8 MW
(73,6 MW)
Gann.= 259 GWh
Inv = 87 mil. €
Status:
Feasibility study
Geological investigation
In operation: 2018
JP Elektroprivreda BiH d.d.
27
UNAC
JP Elektroprivreda BiH d.d.
28
SHPPs
Konjic
15 small hydro plants on
the Neretvica River:
26 MW
102 GWh
In operation:
2011: 11 MW (4 plants)
2012: 7,8 MW (5 plants)
2013: 7,2 MW (6 plants)
JP Elektroprivreda BiH d.d.
29
Tuzla
TPP TUZLA
G1-2 2x32 MW out
G3 100 MW 1966 / reconstr. 1997
G4 200 MW 1971 / reconstr. 2002
G5 200 MW 1974 / reconstr. 2008
G6 215 MW 1978 / reconstr. plan: 2012
Total: 715 MW (3500 GWh)
Tuzla - New Unit 7
Pinst. = 450 MW
Gann. = 2756 GWh
Inv: 842 mill.€
In operation: 2017
JP Elektroprivreda BiH d.d.
30
Tuzla1 Object name Unit 7, 450 MW –TPP Tuzla
2 Basic Parameters
Location Existing location of Thermal Power
Plant Tuzla
Type
TPP- Cogeneration Unit with pulverized coal burning and ultra
critical parameters 275/56 bar; 600/610
0C
Fuel Coal- lignite Hd= 9500 KJ/kg; consumption approx. 2.3 mill t/year
Installed electric power (netto) 450 MWe
Installed Thermal power 320MWth
Efficiency in condensing mode 42.75 %
Emission Limit values
NOx <200 mg/Nm3
SO2 <200 mg/Nm3
Dust <30 mg/Nm3
3 Goals and expected effects of
object construction
- Securing continuity of production of electrical and heat energy - Reduction of emission and fulfilling obligations concerning the
establishment of the power market of South-East Europe - Increasing of energy efficiency.
4 Estimated costs Total investment cost (milion of €) (which relates to TPP and mine)
841.60
5 Actual status of preparing
activities
Obtaining approvals of
authorities
The decision of the Government of the Federation BiH of 15.02.2010 on defining the public interest and preliminary activities for construction of electric energy plants in FBiH R equest for Environment approval submitted to authorities. Request for Preliminary water approval submitted to authorities.
Preparing of investment-
technical documentation
Preliminary design completed. Environmental impact assessment completed.
6 Plan of realisation with
investment plan According to long term energy supply plan till 2030. of JP EP B&H, it is estimated for Unit 7 to be in operation in 2017.
Start of construction in mid 2012. year and ending in 2017.
JP Elektroprivreda BiH d.d.
31
Kakanj
TPP KAKANJ
G1-4 4x32 MW out
G5 110 MW 1969 / reconstr. 2004
G6 110 MW 1977 / reconst. plan 2011
G7 230 MW 1988 / reconstr. 2005
total 450 MW (2000 GWh)
Kakanj - New Unit 8
Pinst. = 300 MW
Gann. = 1755 GWh
Inv: 681 mill. €In operation: 2018
JP Elektroprivreda BiH d.d.
32
Kakanj
1 Object name Unit 8, 300 MW –TPP Kakanj
2
Basic Parameters
Location At the existing location of Thermal power plant Kakanj
Type TPP-Cogeneration unit with CFB or pulverised coal burning and sub ctitical parameters 167 bar;566 C
Fuel Brown coal Hd= 12.874 KJ/kg; Consumption cca 1,4 mil. t/year.
Installed electric power (netto) 300 MWe
Installed Thermal power 300 MWth
Efficiency in condensing mode 39 %
Emission Limit values
NOx <200 mg/Nm3
SO2 <400 mg/Nm3
Dust <30 mg/Nm3
3 Goals and expected effects of
object construction
- Securing continuity of production of electrical and heat energy - Reduction of emission and fulfilling obligations concerning the
establishment of the power market of South-East Europe - Increasing of energy efficiency - Achieving higher share of combined production of electrical and
heat energy
4 Estimated costs Total investment cost (milion of €) (which relates to TPP and mine)
681.00
5 Actual status of preparing
activities
Obtaining approvals of
authorities
The decision of the Government of the Federation BiH of 15.02.2010 on defining the public interest and preliminary activities for construction of electric energy plants in FBiH
Preparing of investment-
technical documentation
Preliminary design completed. Environmental impact assessment completed.
6 Plan of realisation with
investment plan According to long term energy supply plan till 2030. of JP EP B&H, it is estimated for Unit 7 to be in operation in 2018.
Start of construction in mid 2013. and ending in 2017.
JP Elektroprivreda BiH d.d.
33
New TPP Bugojno
TPP Bugojno
Pinst. = 300 MW
Gann. = 1755 GWh
Inv: 584 mill. €
Coal: 2 mill.t./ann.
Reserve: 140 mill. t.
JP Elektroprivreda BiH d.d.
34
Bugojno
Start of construction in 2017. and ending in 2022.
1 Object name Unit 1, 300 MW –TPP Bugojno
2
Basic Parameters
Location Municipality of Bugojno, near coal mine Kotezi
Type TPP-Cogeneration unit with coal burning
Fuel Coal-lignite Hd= 10.600 KJ/kg
Installed electric power (netto) cca 300 MWe
Installed Thermal power cca 300 MWth
Efficiency in condensing mode 40 %
Emission Limit values
NOx <200 mg/Nm3
SO2 <200 mg/Nm3
Dust <30 mg/Nm3
3 Goals and expected effects of
object construction
- Secure of long term energy supply for market - Achieving of higher efficiency and higher share of combined
production of heat and electric energy - Increased security of supply and adaptation to conditions of
liberised power market - District heating of Bugojno, Donji Vakuf and Gornji Vakuf-Uskoplje
4 Estimated costs Total investment cost (milion of €) (which relates to TPP and mine)
584.00
5 Actual status of preparing
activities
Obtaining approvals of
authorities
The decision of the Government of the Federation BiH of 15.02.2010 on defining the public interest and preliminary activities for construction of electric energy plants in FBiH
Preparing of investment-
technical documentation
Feasibility study for Mine and TPP completed.
6 Plan of realisation with
investment plan According to long term energy supply plan till 2030. of JP EP B&H, it is estimated for Unit 1 to be in operation in 2022.
JP Elektroprivreda BiH d.d.
35
Other projects - Wind
Other projects – Wind power
Podveležje: Mali grad and Sveta Gora
2 x 2 + 14 x 3 = 46 MW 92,5 GWh 54 mill.€
Podveležje: Merdžan glava and Poljice
12 x 2 = 24 MW 48 GWh 36 mill.€
Total:
28 units, 70 MW, 140 GWh 90 mill. €
JP Elektroprivreda BiH d.d.
36
Other projects - Hydro
Other projects – Hydro
MW GWh mill.€
1. HE Vrhpolje (Sana) 79 157 152
2. HE Čaplje (Sana) 12 57 23
3. HE Kruševo (Bioštica) 12 30 46
4. HE Babino selo (Vrbas) 11 60 22
5. HE Vinac (Vrbas) 11 61 25
Total 125 365 268
JP Elektroprivreda BiH d.d.
37
Other projects - Thermal
Other projects – Thermal
MW mill.€
1. TE Tuzla (G8) 450 900
2. TE Kakanj (G9) 300 600
3. TE Bugojno (G2) 300 600
4. TE Banovići (G1) 300 600
5. TE Kakanj (combi) 100 100
6. TE Kamengrad (G1) 215 430
Total 1665 3230
JP Elektroprivreda BiH d.d.
38
Total
MW bil.€
1. Hydro 183 0.26
2. Thermal 1050 2.10
3. Wind 70 0.09
Total (till 2018 / 2022*) 1303 2.45
1. Other projects Hydro 125 0.27
2. Other projects Thermal 1665 3.23
Total (after 2020) 1790 3.50
* Bugojno