Project Eng: Checking Eng: Drawing No. Project Design Eng: Drawn by: Drawing Title Rev. Copyright c Dorman Long Technology DO NOT SCALE NOTES Scales (At A3) This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use. Dorman Long Technology shall not be liable for the use of any information contained on this drawing for any purpose other than that for which it was specifically prepared and provided. Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works. Drawing Status Original Drawing size: A3 Dorman Long Technology The Charles Parker Building Midland Road, Higham Ferrers Northamptonshire, NN10 8DN United Kingdom Tel: +44 (0) 1933 319133 Fax: +44 (0) 1933 319135 www.dormanlongtechnology.com DL-TLG400 TELESCOPIC LIFTING GANTRY JM SG PD SAB INFORMATION NTS 4-POINT TELESCOPIC LIFTING GANTRY GENERAL ARRANGEMENT AND SPECIFICATION DL-TLG400-001 F C:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-001.idw MAIN FEATURES 400 TONNES LIFTING CAPACITY ON FOUR LIFTING UNITS 100 TONNES LIFTING CAPACITY PER LIFTING UNIT HIGH HORIZONTAL LOAD CAPACITY ADJUSTABLE TRACK WIDTH FOR INCREASED STABILITY TRACKS CAN BE AT DIFFERENT LEVELS CENTRAL WIRELESS CONTROL OF ALL FUNCTIONS ACCURATE ADJUSTMENT OF THE LOAD POSITION TO +/-1mm IN ALL DIRECTIONS ALL COMPONENTS SUBJECT TO STATIC TEST AT 125% OF SWL AND DYNAMIC TESTS OF ALL FUNCTIONS AT 110% OF SWL IN ACCORDANCE WITH APPROPRIATE EUROPEAN DIRECTIVES ALL COMPONENTS AND COMPLETE DL-TLG400 SYSTEM CE MARKED IN ACCORDANCE WITH APPROPRIATE EUROPEAN DIRECTIVES ALL COMPONENTS SUITABLE FOR TRANSPORT IN STANDARD SHIPPING CONTAINERS 2 No. DL-TLG400 POWERED TROLLEYS PER HEAD BEAM WITH CHAIN DRIVE FOR SECURE LATERAL MOVEMENT. SAFE WORKING LOAD 100 TONNES PER UNIT SEE DRG DL-TLG400-003-01 DL-TLG400 HEAD BEAM TO SUIT TRACK CENTRES UP TO 11.3m SEE DRGS DL-TLG400-003-01 & 02 4 No. DL-TLG400 LIFTING UNITS EACH WITH 3 STAGE TELESCOPIC CYLINDER. SAFE WORKING LOAD 100, 100 AND 70 TONNES PER UNIT FOR TELESCOPIC CYLINDER STAGES 1, 2 AND 3 SEE DRG DL-TLG400-002 DL-TLG400 STANDARD TRACK SECTIONS AVAILABLE IN 2.8m AND 5.6m LENGTHS SEE DRG DL-TLG40-004 SPECIFICATION FOR DL-TLG400, 4-POINT LIFT SYSTEM MAXIMUM SAFE WORKING LOAD (SWL) AT TOP OF TELESCOPIC CYLINDERS STAGE 1 = 400 TONNES @ 83 BAR WORKING PRESSURE STAGE 2 = 400 TONNES @ 120 BAR WORKING PRESSURE STAGE 3 = 280 TONNES @ 120 BAR WORKING PRESSURE SEE DRAWINGS DL-TLG400-005-01 AND 02 FOR LIFTING ARRANGEMENTS AND DUTY CHARTS STATIC TEST LOAD = 1.25 x SWL + MAXIMUM HORIZONTAL LOAD (TESTS CARRIED OUT AT FULL EXTENSION FOR EACH TELESCOPIC CYLINDER STAGE) DYNAMIC TEST LOAD = 1.10 x SWL (TESTS CARRIED OUT FOR EACH TELESCOPIC CYLINDER STAGE AND FOR ALL FUNCTIONS) MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION (SEE OPERATION AND MAINTENANCE MANUAL FOR DETAILS) MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL) MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1% MAXIMUM WHEEL LOAD = 53 TONNES LIFTING AND LOWERING SPEED OF TELESCOPIC CYLINDER = 0.5 m/minute (FAST) AND 0.1 m/minute (SLOW) - CONSTANT FOR ALL TELESCOPIC CYLINDER STAGES LONGITUDINAL MOVEMENT SPEED OF DL-TLG400 LIFTING UNITS = 3.0 m/minute (FAST) AND 1.0 m/minute (SLOW) TRANSVERSE MOVEMENT SPEED OF DL-TLG400 POWERED TROLLEYS = 0.5 m/minute POWER SUPPLY = 380-420 VOLTS AT 50 Hz OR 440-480 VOLTS AT 60 Hz, 3 PHASE + EARTH MAXIMUM POWER CONSUMPTION = 10 kW RUNNING PER DL-TLG400 LIFTING UNIT CONTROL FOR ALL FUNCTIONS = CENTRAL WIRELESS CONTROL CONSOLE OR CONTROL PANEL AT THE CENTRAL CONTROL UNIT OR LOCAL CONTROL PANEL AT EACH DL-TLG400 LIFTING UNIT OPERATING TEMPERATURE = -20 TO +45 °C SUBJECT TO HYDRAULIC OIL GRADE USED ALL COMPONENTS OF DL-TLG400 SYSTEM SUITABLE FOR TRANSPORT IN STANDARD SHIPPING CONTAINERS LONGITUDINAL TRANSVERSE POWER AND CONTROL CABLES TO DL-TLG400 LIFTING UNITS (BY DLT) WIRELESS CONTROL CONSOLE LINKED TO CENTRAL CONTROL UNIT POWER IN (BY OTHERS) 40 kW MAX RUNNING CENTRAL CONTROL UNIT (BY DLT) COMPRISING POWER DISTRIBUTION CABINET AND PLC CABINET NOTE: HEAD BEAMS WITH POWERED TROLLIES SHOWN. HEAD BEAMS WITH STATIC HANGERS AVAILABLE. SEE DRG DL-TLG400-003-02

· PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

  • Upload
    leduong

  • View
    216

  • Download
    3

Embed Size (px)

Citation preview

Page 1: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

JM

SG

PD

SAB

INFORMATION NTS

4-POINT TELESCOPIC LIFTING GANTRYGENERAL ARRANGEMENT AND SPECIFICATION

DL-TLG400-001 FC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-001.idw

MAIN FEATURES

400 TONNES LIFTING CAPACITY ON FOUR LIFTING UNITS 100 TONNES LIFTING CAPACITY PER LIFTING UNITHIGH HORIZONTAL LOAD CAPACITYADJUSTABLE TRACK WIDTH FOR INCREASED STABILITYTRACKS CAN BE AT DIFFERENT LEVELSCENTRAL WIRELESS CONTROL OF ALL FUNCTIONSACCURATE ADJUSTMENT OF THE LOAD POSITION TO +/-1mm IN ALL DIRECTIONSALL COMPONENTS SUBJECT TO STATIC TEST AT 125% OF SWL AND DYNAMIC TESTS OF ALL

FUNCTIONS AT 110% OF SWL IN ACCORDANCE WITH APPROPRIATE EUROPEAN DIRECTIVESALL COMPONENTS AND COMPLETE DL-TLG400 SYSTEM CE MARKED IN ACCORDANCE WITH

APPROPRIATE EUROPEAN DIRECTIVESALL COMPONENTS SUITABLE FOR TRANSPORT IN STANDARD SHIPPING CONTAINERS

2 No. DL-TLG400 POWERED TROLLEYS PER HEAD BEAMWITH CHAIN DRIVE FOR SECURE LATERAL MOVEMENT.SAFE WORKING LOAD 100 TONNES PER UNITSEE DRG DL-TLG400-003-01

DL-TLG400HEAD BEAM TO SUIT TRACKCENTRES UP TO 11.3mSEE DRGS DL-TLG400-003-01 & 02

4 No. DL-TLG400 LIFTING UNITS EACH WITH 3 STAGE TELESCOPIC CYLINDER.SAFE WORKING LOAD100, 100 AND 70 TONNES PER UNIT FORTELESCOPIC CYLINDER STAGES 1, 2 AND 3SEE DRG DL-TLG400-002

DL-TLG400 STANDARD TRACK SECTIONSAVAILABLE IN 2.8m AND 5.6m LENGTHSSEE DRG DL-TLG40-004

SPECIFICATION FOR DL-TLG400, 4-POINT LIFT SYSTEM

MAXIMUM SAFE WORKING LOAD (SWL) AT TOP OF

TELESCOPIC CYLINDERSSTAGE 1 = 400 TONNES @ 83 BAR WORKING PRESSURESTAGE 2 = 400 TONNES @ 120 BAR WORKING PRESSURESTAGE 3 = 280 TONNES @ 120 BAR WORKING PRESSURESEE DRAWINGS DL-TLG400-005-01 AND 02 FOR LIFTING ARRANGEMENTS AND DUTY CHARTS

STATIC TEST LOAD = 1.25 x SWL + MAXIMUM HORIZONTAL LOAD (TESTS CARRIED OUT AT FULL EXTENSION FOR EACH TELESCOPIC CYLINDER STAGE)

DYNAMIC TEST LOAD = 1.10 x SWL (TESTS CARRIED OUT FOR EACH TELESCOPIC CYLINDER STAGE AND FOR ALL FUNCTIONS)

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION (SEE OPERATION AND MAINTENANCE MANUAL FOR DETAILS)

MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL)

MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1%

MAXIMUM WHEEL LOAD = 53 TONNES

LIFTING AND LOWERING SPEED OF TELESCOPIC CYLINDER = 0.5 m/minute (FAST) AND 0.1 m/minute (SLOW) - CONSTANT FOR ALL TELESCOPIC CYLINDER STAGES

LONGITUDINAL MOVEMENT SPEED OF DL-TLG400 LIFTING UNITS = 3.0 m/minute (FAST) AND 1.0 m/minute (SLOW)

TRANSVERSE MOVEMENT SPEED OF DL-TLG400 POWERED TROLLEYS = 0.5 m/minute

POWER SUPPLY = 380-420 VOLTS AT 50 Hz OR 440-480 VOLTS AT 60 Hz, 3 PHASE + EARTH

MAXIMUM POWER CONSUMPTION = 10 kW RUNNING PER DL-TLG400 LIFTING UNIT

CONTROL FOR ALL FUNCTIONS = CENTRAL WIRELESS CONTROL CONSOLE OR CONTROL PANEL AT THE CENTRAL CONTROL UNIT OR LOCAL CONTROL PANEL AT EACH DL-TLG400 LIFTING UNIT

OPERATING TEMPERATURE = -20 TO +45 °CSUBJECT TO HYDRAULIC OIL GRADE USED

ALL COMPONENTS OF DL-TLG400 SYSTEM SUITABLE FOR TRANSPORT IN STANDARD SHIPPING CONTAINERS

LONGITUDINAL

TRANSVERSE

POWER AND CONTROL CABLESTO DL-TLG400 LIFTING UNITS (BY DLT)

WIRELESS CONTROL CONSOLELINKED TO CENTRAL CONTROL UNIT

POWER IN (BY OTHERS)40 kW MAX RUNNING

CENTRAL CONTROL UNIT (BY DLT)COMPRISING POWER DISTRIBUTIONCABINET AND PLC CABINET

NOTE:HEAD BEAMS WITH POWERED TROLLIES SHOWN.HEAD BEAMS WITH STATIC HANGERS AVAILABLE.SEE DRG DL-TLG400-003-02

Page 2: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

DIMENSIONS FOR TRANSPORT

UNIT FOLDED FOR TRANSPORT

DIMENSIONS FOR OPERATION

STAGE 3CAPACITY: 70 Tonnes (EACH UNIT)

MAX % TIPPING = 61%

STAGE 2CAPACITY: 100 Tonnes (EACH UNIT)

MAX % TIPPING = 50%

STAGE 1CAPACITY: 100 Tonnes (EACH UNIT)

MAX % TIPPING = 61%

STAGE 0

DETAIL 01WHEEL DETAIL

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

PD

AW

JM

SAB

INFORMATION NTS

DL-TLG400 TELESCOPIC LIFTING UNITGENERAL ARRANGEMENTAND SPECIFICATION

DL-TLG400-002 EC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-002.idw

01

3637

3205 TELESCOPIC CYLINDER

2135

1270 OVERALL

1050 FORK LIFT SLOTS

1900 WHEEL CENTRES2895 OVERALL

400WHEELS1000 WHEEL CENTRES

1270 OVERALL

9287

(M

AX

IMU

M)

7787

(M

AX

IMU

M)

5787

(M

AX

IMU

M)

3787

(M

INIM

UM

)

1700 EXTENDED WHEEL CENTRES

1970 OVERALL (EXTENDED WHEEL CENTRES)

1700 1700 1000 1000

ROCKER JOINT

3 STAGE TELESCOPIC CYLINDER DESIGNEDFOR 5% HORIZONTAL LOAD AT FULL EXTENSION ANDFOR THE STAGES TO EXTEND AND RETRACTIN THE CORRECT SEQUENCE UNDER LOAD

2 No HYDRAULICOIL TANKS

ELECTRIC MOTOR ANDHYDRAULIC PUMP

2 No DRIVEN WHEELS2 No UN-DRIVEN WHEELSPER UNIT

3787

MIN

IMU

M

TURNING RAM TO CHANGE BETWEEN TRANSPORT AND OPERATING CONFIGURATIONS

ELECTRIC CABINET WITH LOCAL CONTROL PANEL

400

50

485

60°

23R13

42

190WHEEL

1970 OVERALL(EXTENDED WHEEL CENTRES)

1500

ST

RO

KE

2000

ST

RO

KE

2000

ST

RO

KE

UNDERSIDEOF HEAD BEAM

275

SPECIFICATION FOR DL-TLG400 TELESCOPIC LIFTING UNIT

MAXIMUM SAFE WORKING LOAD (SWL) AT TOP OF TELESCOPIC

CYLINDERSTAGE 1 = 100 TONNES @ 83 BAR WORKING PRESSURESTAGE 2 = 100 TONNES @ 120 BAR WORKING PRESSURESTAGE 3 = 70 TONNES @ 120 BAR WORKING PRESSURESEE DRAWINGS DL-TLG400-005-01 AND 02 FOR DETAILS OF LIFTING ARRANGEMENTS AND DUTY CHARTS

TELESCOPIC CYLINDER WORKING PRESSURE ON RETRACT = 70 BAR

STATIC TEST LOAD = 1.25 x SWL + MAXIMUM LATERAL LOAD (TESTS CARRIED OUT AT FULL EXTENSION FOR EACH TELESCOPIC CYLINDERSTAGE)

DYNAMIC TEST LOAD = 1.10 x SWL (TESTS CARRIED OUT FOR EACH TELESCOPIC CYLINDER STAGE AND FOR ALL FUNCTIONS)

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION (SEE OPERATION AND MAINTENANCE MANUAL FOR DETAILS).

MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL)

THE MAXIMUM % TIPPING FIGURES GIVEN FOR STAGES 1, 2 AND 3 ASSUME 5% LATERAL LOAD AT THE ROCKER JOINT PLUS 1% TRANSVERSE SLOPE OF THE TRACK

MAXIMUM WHEEL LOAD = 53 TONNES

LIFTING AND LOWERING SPEED OF TELESCOPIC CYLINDER = 0.5 m/minute (FAST) AND 0.1 m/minute (SLOW) - CONSTANT FOR ALL TELESCOPIC CYLINDER STAGES

LONGITUDINAL MOVEMENT SPEED OF DL-TLG400 LIFTING UNITS = 3.0 m/minute (FAST) AND 1.0 m/minute (SLOW)

POWER SUPPLY = 380-420 VOLTS AT 50 Hz OR 440-480 VOLTS AT 60 Hz, 3 PHASE + EARTH

MAXIMUM POWER CONSUMPTION = 10 kW RUNNING PER DL-TLG400 LIFTING UNIT

CONTROL FOR ALL FUNCTIONS = CENTRAL WIRELESS CONTROL CONSOLE OR CONTROL PANEL AT THE CENTRAL CONTROL UNIT OR LOCAL CONTROL PANEL AT EACH DL-TLG400 LIFTING UNIT

OPERATING TEMPERATURE = -20 TO +45 °CSUBJECT TO HYDRAULIC OIL GRADE USED

TELESCOPIC CYLINDER FOLDS AS SHOWN SO THAT COMPLETE DL-TLG400 LIFTING UNIT (WITH BOGIE EXTENSION PIECES) IS SUITABLE FOR TRANSPORT IN A STANDARD SHIPPING CONTAINER

WEIGHTSBASE UNIT - STEEL FRAME AND PINS = 2,645 kgBASE UNIT - DRIVEN BOGIES (2 x 425 kg) = 850 kgBASE UNIT - UN-DRIVEN BOGIES (2 x 265 kg) = 530 kgBASE UNIT - OTHER EQUIPMENT = 800 kgTELESCOPIC CYLINDER = 2,670 kgROCKER JOINT ASSEMBLY = 205 kgHYDRAULIC OIL = 650 kg

TOTAL = 8,350 kg

HYDRAULIC OIL TANK SIZE = 2 x 350 litres = 700 litres

305

Page 3: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

HEAD BEAM ASSEMBLY IN LIFTING CONFIGURATIONOPERATIONAL WEIGHT 9.98 TONNES

HEAD BEAM ASSEMBLY IN LIFTING CONFIGURATION

HEAD BEAM ASSEMBLY IN TRANSPORT CONFIGURATIONTRANSPORT WEIGHT 10.40 TONNES

A-A ( 1 : 50 )

END ELEVATION ( 1 : 50 )

POWERED TROLLEY(HEAD BEAM OMITTED FOR CLARITY)

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

JM

SG

PD

SAB

INFORMATION NTS

DL-TLG400 HEAD BEAM ANDDL-TLG400 POWERED TROLLEYSGENERAL ARRANGEMENT AND SPECIFICATION

DL-TLG400-003-01 AC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-003.idw

LIFT POINT LIFT POINT

A

A

PIN

CHAIN ANCHORAGE

DL-TLG400HEAD BEAM

11750

DL-TLG400HEAD BEAM

2 No. DL-TLG400 POWERED TROLLEYS PER HEAD BEAMWITH CHAIN DRIVE FOR SECURE LATERAL MOVEMENT

TRANSPORTSUPPORT STOOL

TRANSPORTSUPPORT STOOL

2300

MA

XIM

UM

HE

IGH

T16

2080

047

0

522

CLCL

595 10482 No. DL-TLG400 POWERED TROLLEYSPER HEAD BEAM WITH CHAINDRIVE FOR SECURELATERAL MOVEMENT

SUPPORT SPAN UP TO 11.3m WITH STANDARD 11.75m HEAD BEAM

POWEREDTROLLEY

HEAD BEAM

CHAINANCHORAGE

CHAINANCHORAGE

11750

700

POWEREDTROLLEY

HEAD BEAM

TRANSPORTSUPPORT STOOL

TELESCOPICCYLINDERTELESCOPIC

CYLINDER

ROCKER JOINTASSEMBLYROCKER JOINT

ASSEMBLY

ELECTRICGEAR MOTOR

120 TONNESSWL SHACKLE(OPTIONAL)

SHACKLE BEAM(WITH SHACKLE REMOVED)SUITABLE FORALTERNATIVE RIGGING

560 560

TELESCOPICCYLINDER

715

LIFT POINT SPACING - 1250 MINIMUM

556

178

448

297

CL

R65

SPECIFICATIONDL-TLG400 HEAD BEAM ANDDL-TLG400 POWERED TROLLEYS

MAXIMUM SAFE WORKING LOAD (SWL)

= 100 TONNES PER LIFT POINT= 190 TONNES PER HEAD BEAMSEE DRAWINGS DL-TLG400-005-01 AND 02 FOR LIFTING ARRANGEMENTS AND DUTY CHARTS

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION

MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1%

TRANSVERSE MOVEMENT SPEED OF DL-TLG400 POWEREDTROLLEYS = 0.5 m/minute

POWER SUPPLY = 380-420 VOLTS AT 50 Hz OR 440-480 VOLTS AT 60 Hz, 3 PHASE+EARTH

MAXIMUM POWER CONSUMPTION = 0.5 kW RUNNING PER DL-TLG400 POWERED TROLLEY

CONTROL FOR ALL FUNCTIONS = CENTRAL WIRELESS CONTROL CONSOLE OR CONTROL PANEL AT THE CENTRAL CONTROL UNIT OR LOCAL CONTROL PANEL AT EACH DL-TLG400 LIFTING UNIT

OPERATING TEMPERATURE = -20 to +45°C

DL-TLG400 HEAD BEAM SUPPORTED ON 2 No. SUPPORT STOOL ASSEMBLIES AND COMPLETE WITH ALL EQUIPMENT IS SUITABLE FOR TRANSPORT IN A STANDARD 40' SHIPPING CONTAINER

WEIGHTSDL-TLG400 HEAD BEAM = 6,270 kgPOWERED TROLLEY = 2x1,635 kgCHAIN AND CHAIN ANCHORAGES = 440 kgTRANSPORT SUPPORT STOOLS = 2 x 210 kg

TOTAL OPERATING WEIGHT = 9,980 kgTOTAL TRANSPORT WEIGHT = 10,400 kg

525 525 FORK LIFT SLOTS

CL HEAD BEAM3840 3840

525 525

Page 4: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

HEAD BEAM ASSEMBLY IN LIFTING CONFIGURATIONOPERATIONAL WEIGHT 7.570 TONNES

HEAD BEAM ASSEMBLY IN LIFTING CONFIGURATION

HEAD BEAM ASSEMBLY IN TRANSPORT CONFIGURATIONTRANSPORT WEIGHT 7.990 TONNES

A-A ( 1 : 50 )

END ELEVATION ( 1 : 50 )

STATIC HANGER(HEAD BEAM OMITTED FOR CLARITY)

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

JM

SG

PD

SAB

INFORMATION NTS

DL-TLG400 HEAD BEAM ANDDL-TLG400 STATIC HANGERSGENERAL ARRANGEMENT AND SPECIFICATION

DL-TLG400-003-02 BC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-003-02.idw

LIFT POINT LIFT POINTA

APIN DL-TLG400

HEAD BEAM

11750

DL-TLG400HEAD BEAM

TRANSPORTSUPPORT STOOL

TRANSPORTSUPPORT STOOL

1130

800

SUPPORT SPAN UP TO 11.3m WITH STANDARD 11.75m HEAD BEAM

HEAD BEAM

11750

700

HEAD BEAM

TRANSPORTSUPPORT STOOL

TELESCOPICCYLINDERTELESCOPIC

CYLINDER

ROCKER JOINTASSEMBLYROCKER JOINT

ASSEMBLY

TELESCOPICCYLINDER

71517

6

448

SPECIFICATIONDL-TLG400 HEAD BEAM ANDDL-TLG400 STATIC HANGERS

MAXIMUM SAFE WORKING LOAD (SWL)

= 100 TONNES PER LIFT POINT= 192 TONNES PER HEAD BEAMSEE DRAWINGS DL-TLG400-005-01 AND 02 FOR LIFTING ARRANGEMENTS AND DUTY CHARTS

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION

MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1%

OPERATING TEMPERATURE = -20 to +45°C

DL-TLG400 HEAD BEAM SUPPORTED ON 2 No. SUPPORT STOOL ASSEMBLIES AND COMPLETE WITH ALL EQUIPMENT IS SUITABLE FOR TRANSPORT IN A STANDARD 40' SHIPPING CONTAINER

WEIGHTSDL-TLG400 HEAD BEAM = 6,270 kgSTATIC HANGER ASSEMBLY = 2x 650 kgTRANSPORT SUPPORT STOOLS = 2 x 210 kg

TOTAL OPERATING WEIGHT = 7,570 kgTOTAL TRANSPORT WEIGHT = 7,990 kg

525 525 FORK LIFT SLOTS

CL HEAD BEAM3840 3840

525 525

395395

CL

CL CL

300300

LIFT POINT SPACING - 650 MINIMUM

1830

MA

XIM

UM

HE

IGH

T

2 No. DL-TLG400 STATICHANGERS PER HEAD BEAM

120 TONNESSWL SHACKLE(OPTIONAL)

R65

SHACKLE BEAM(WITH SHACKLE REMOVED)SUITABLE FORALTERNATIVE RIGGING

2 No. DL-TLG400 STATICHANGERS PER HEAD BEAM

LOWER SECTIONOF STATIC HANGERIS IDENTICAL TOPOWERED TROLLEYTO ALLOW FOR FUTUREUPGRADE IF REQUIRED

297

Page 5: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

2.8m STANDARD TRACK SECTION1.0m RAIL CENTRES

2.8m STANDARD TRACK SECTION1.7m RAIL CENTRES

5.6m STANDARD TRACK SECTION1.0m RAIL CENTRES

5.6m STANDARD TRACK SECTION1.7m RAIL CENTRES

2.8m STANDARD TRACK SECTION1.0m AND 1.7m RAIL CENTRES

5.6m STANDARD TRACK SECTION - 1.0m AND 1.7m RAIL CENTRES

TYPICAL END VIEW1.0m RAIL CENTRES

TYPICAL END VIEW1.7m RAIL CENTRES

CONNECTION DETAILSBETWEEN RAIL SECTIONS

CONNECTION DETAILSBETWEEN RAIL SECTIONS

SIDE ELEVATION

CONNECTION DETAILSBETWEEN RAIL SECTIONS

AND INSERT PIECES

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

PD

AW

JM

SAB

INFORMATION NTS

DL-TLG400 STANDARD TRACK SECTIONSGENERAL ARRANGEMENTAND SPECIFICATION

DL-TLG400-004 EC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-004.idw

1000

5598

2 NOMINAL GAP17

0019

0

20

DL-TLG400 Standard Track - Maximum Loads

Maximum Wheel Load on Track 53.1 Tonnes 52.7 Tonnes 40.1 TonnesMaximum Load on each Bearing Pad 53.5 Tonnes 53.1 Tonnes 40.3 TonnesMaximum Average Bearing Pressure under each Bearing Pad

6.7 MPa 6.7 MPa 5.1 MPa

Maximum Peak Bearing Pressure under each Bearing Pad

9.1 MPa 9.0 MPa 6.4 MPa

Telescopic Cylinder Stage 1 1.0m Rail Centres

1000

1700

2798

190

20

TOP OF RAIL

TOP OF RAIL

SPECIFICATION FOR DL-TLG400 STANDARD TRACK SECTIONS

STANDARD TRACK SECTIONS SUPPLIED IN

LENGTHS GIVING EFFECTIVE TRACK LENGTHS OF 5.6m AND 2.8m (OVERALL LENGTHS OF 5,803mm AND 3,003mm)

STANDARD TRACK SECTIONS SUPPLIED WITH RAILS AT 1.0m CENTRES AND WITH INSERT PIECES TO INCREASE RAILS TO 1.7mCENTRES

MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL)

SEE TABLE FOR MAXIMUM WHEEL LOADS AND BEARING PAD LOADS AND PRESSURES

OPERATING TEMPERATURE = -20 TO +45°C

FULLY ASSEMBLED STANDARD TRACK SECTIONS ARE SUITABLE FOR TRANSPORT IN STANDARD SHIPPING CONTAINERS

WEIGHTS5.6m LONG x 1.0m RAIL CENTRES = 1,400 kg5.6m LONG x 1.7m RAIL CENTRES = 1,470 kg2.8m LONG x 1.0m RAIL CENTRES = 760 kg2.8m LONG x 1.7m RAIL CENTRES = 810 kg

Telescopic Cylinder Stage 2 1.7m Rail Centres

Telescopic Cylinder Stage 3 1.7m Rail Centres

THE MAXIMUM WHEEL LOADS AND BEARING PAD LOADS AND PRESSURES TABULATED BELOW ASSUME 5% HORIZONTAL LOAD PLUS 1% SLOPE OF THE TRACK, BOTH AT 45 DEGREES ORIENTATION.THE PROJECT SPECIFIC VALUES WILL DEPEND ON THE ACTUAL LOADS TO BE APPLIED TO THE SYSTEM.SEE OPERATION AND MAINTENCE MANUAL FOR FURTHER INFORMATION.

190

20

TOP OF RAIL

1000

1700

190

20

TOP OF RAIL

2 No M16 THREADEDBARS PER RAIL

2 No M16 THREADEDBARS PER RAIL

2 NOMINAL GAP

M12 BOLTASSEMBLIES

2 NOMINAL GAP

5803 MAXIMUM

260

300TYPICAL BEARINGPAD DIMENSIONS

500

500

500

700

500

500

500

500

700

500

300260

TYPICAL BEARINGPAD DIMENSIONS

Ø20 GUIDE BAR

190

20 300

10 NOMINAL GAP

390

Ø20 GUIDE BAR

3003 MAXIMUM

INSERT PIECE

INSERT PIECE

INSERT PIECE

BEARING PAD.FOR MAX. LOADINGSEE TABLE BELOW.

1100 1100 800 1100 1100149

800 800 800149

Page 6: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

STAGE 1 : HEAD BEAM IN OPERATIONAL RANGEFROM LEVEL 3787 TO LEVEL 5787

STAGE 2 : HEAD BEAM IN OPERATIONAL RANGE TO LEVEL 7787STAGE 3 : HEAD BEAM IN OPERATIONAL RANGE TO LEVEL 9287

0.00 1.00 2.00 3.00 4.001 62.5 63.4 69.7 61.5 55.02 62.5 63.4 69.7 61.5 55.03 62.5 55.0 47.6 41.9 37.41 68.0 68.0 69.8 61.52 68.0 68.0 69.8 61.53 65.1 55.0 47.6 41.91 76.7 75.0 69.8 61.52 76.7 75.0 69.8 61.53 65.1 55.0 47.6 41.91 87.9 80.5 69.82 87.9 80.5 69.83 65.1 55.0 47.61 95.1 80.5 69.82 95.1 80.5 69.83 65.1 55.0 47.61 95.1 80.52 95.1 80.53 65.1 55.01 95.1 80.52 95.1 80.53 65.1 55.01 95.12 95.13 65.11 95.12 95.13 65.1

6.00

7.00

8.00

9.00

2.00

3.00

4.00

5.00

STAGE

1.25

SPAN 11.30mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

LOAD CENTRE OFFSET E [m] FROM SPAN CENTRE

LIFT POINTS

SPACING LPS [m] 0.00 1.00 2.00 3.00

1 72.5 73.9 67.4 58.823 65.1 53.9 46.0 40.11 79.8 78.9 67.4 58.82 79.8 78.9 67.4 58.83 65.1 53.9 46.0 40.11 91.9 78.9 67.4 58.82 91.9 78.9 67.4 58.83 65.1 53.9 46.0 40.11 95.1 78.9 67.42 95.1 78.9 67.43 65.1 53.9 46.01 95.1 78.9 67.42 95.1 78.9 67.43 65.1 53.9 46.01 95.1 78.92 95.1 78.93 65.1 53.91 95.1 78.92 95.1 78.93 65.1 53.91 95.12 95.13 65.11 95.12 95.13 65.1

LIFT POINTS

SPACING LPS [m]

1.25

2.00

3.00

LOAD CENTRE OFFSET E [m] FROM SPAN CENTRE

8.00

9.00

SPAN 10.00mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

4.00

5.00

6.00

7.00

STAGE 0.00 1.00 2.00 3.001 82.5 77.5 65.3 56.42 82.5 77.5 65.3 56.43 65.1 52.9 44.5 38.41 91.9 77.5 65.3 56.42 91.9 77.5 65.3 56.43 65.1 52.9 44.5 38.41 95.1 77.5 65.32 95.1 77.5 65.33 65.1 52.9 44.51 95.1 77.5 65.32 95.1 77.5 65.33 65.1 52.9 44.51 95.1 77.52 95.1 77.53 65.1 52.91 95.1 77.52 95.1 77.53 65.1 52.91 95.12 95.13 65.11 95.12 95.13 65.1

7.00

8.00

3.00

4.00

5.00

6.00

1.25

2.00

STAGE

SPAN 9.00mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

LIFT POINTS

SPACING LPS [m]

LOAD CENTRE OFFSET E [m] FROM SPAN CENTRE

0.00 1.00 2.001 95.1 75.7 62.82 95.1 75.7 62.83 65.1 51.7 42.81 95.1 75.7 62.82 95.1 75.7 62.83 65.1 51.7 42.81 95.1 75.7 62.82 95.1 75.7 62.83 65.1 51.7 42.81 95.1 75.72 95.1 75.73 65.1 51.71 95.1 75.72 95.1 75.73 65.1 51.71 95.12 95.13 65.11 95.12 95.13 65.1

6.00

7.00

2.00

3.00

4.00

5.00

1.25

LIFT POINTS

SPACING LPS [m]

LOAD CENTRE OFFSET E [m] FROM SPAN CENTRE

SPAN 8.00mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

STAGE 0.00 1.00 2.001 95.1 73.6 59.92 95.1 73.6 59.93 65.1 50.2 40.81 95.1 73.6 59.92 95.1 73.6 59.93 65.1 50.2 40.81 95.1 73.62 95.1 73.63 65.1 50.21 95.1 73.62 95.1 73.63 65.1 50.21 95.12 95.13 65.11 95.12 95.13 65.1

SPAN 7.00mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

1.25

STAGE

LIFT POINTS

SPACING LPS [m]

LOAD CENTRE OFFSET E [m] FROM

SPAN CENTRE

5.00

6.00

2.00

3.00

4.00

0.00 1.001 95.1 70.92 95.1 70.93 65.1 48.41 95.1 70.92 95.1 70.93 65.1 48.41 95.1 70.92 95.1 70.93 65.1 48.41 95.12 95.13 65.11 95.12 95.13 65.1

5.00

2.00

3.00

4.00

SPAN 6.00mSAFE WORKING LOAD (SWL)

PER LIFT POINT [TONNES]

1.25

STAGE

LIFT POINTS

SPACING LPS [m]

LOAD CENTRE OFFSET E [m] FROM

SPAN CENTRE

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

JM

SG

PD

SAB

INFORMATION NTS

LIFTING ARRANGEMENT AND DUTY CHARTS2 No. LIFT POINTS LOADED PER HEAD BEAM

DL-TLG400-005-01 EC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-005-01.idw

LOAD

SPAN

LOADSPAN

DUTY CHARTS ASSUME THE FOLLOWING:-

STANDARD DL-TLG400 COMPONENTS WITH DL-TLG400 HEAD BEAM

2 No. LIFT POINTS EQUALLY LOADED PER HEAD BEAM

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION

MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL)

MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1%

DL-TLG400 STANDARD TRACK SECTIONS USED WITH 1.0m RAIL CENTRES FOR TELESCOPIC CYLINDER STAGE 1 AND 1.7m RAIL CENTRES FOR TELESCOPIC CYLINDERSTAGES 2 AND 3

TABULATED LOADS APPLIED TO SHACKLE OR, IF SHACKLE NOT USED, TO SHACKLE BEAM

IF THE DL-TLG400 TELESCOPIC LIFTING GANTRY IS TO BE USED IN A CONFIGURATION NOT SHOWN ON THIS DRAWING, CONTACT DORMAN LONG TECHNOLOGY FOR SPECIFIC SAFE WORKING LOADS AND ANY SPECIAL CONDITIONS THAT MAY APPLY

5072

MA

XIM

UM

ST

AG

E 174

07

5787

MA

XIM

UM

ST

AG

E 1

1620

3787

MIN

IMU

MS

TA

GE

0

SPAN - 11300 MAXIMUMSPAN - 6000 MINIMUM

= =

CL

SAFE WORKINGLOAD (SWL)PER LIFT POINTTABULATED BELOW.MAXIMUM LIFTLOAD PER HEAD BEAM= 2xTABULATED LOAD.

CLE LOAD CENTRE OFFSET

FROM SPAN CENTRE

2200 SHOWN

LIFT POINTSSPACING (LPS)

1250 MINIMUM

= =

TOP OF RAIL

CL

= =

E (LOAD CENTRE OFFSET FROM SPAN CENTRE)

CL

= =

SPAN - 11300 MAXIMUMSPAN - 6000 MINIMUM

8572

MA

XIM

UM

ST

AG

E 3

9287

MA

XIM

UM

ST

AG

E 3

1620

8572

MA

XIM

UM

ST

AG

E 3

SAFE WORKINGLOAD (SWL)PER LIFT POINTTABULATED BELOW.MAXIMUM LIFTLOAD PER HEAD BEAM= 2xTABULATED LOAD.

9287

MA

XIM

UM

ST

AG

E 3

1620

7787

MA

XIM

UM

ST

AG

E 2

LIFT POINTS SPACING (LPS)2200 SHOWN

1250 MINIMUM

INTERPOLATION BETWEEN TABULATED VALUES PERMISSIBLESEE ALSO OPERATION AND MAINTENANCE MANUAL

1000 OR 1700 WHEEL CENTRES

1700WHEEL CENTRES

Page 7: · PDF filerocker joint 3 sta gelcop iy ndr ... dl-tlg400 lifting unit (with bogie extension pieces) is ... trolley head beam transport support stool

STAGE 2 : HEAD BEAM IN OPERATIONAL RANGE TO LEVEL 7787STAGE 3 : HEAD BEAM IN OPERATIONAL RANGE TO LEVEL 9287

STAGE 1 : HEAD BEAM IN OPERATIONAL RANGEFROM LEVEL 3787 TO LEVEL 5787

0.00 1.00 2.00 3.00 4.00 1 AND 2 100.0 100.0 100.0 100.0 100.0

3 100.0 100.0 94.7 83.6 76.3

SPAN 11.30m

STAGELIFT POINT OFFSET E [m] FROM SPAN CENTRE

SINGLE LIFT POINT LOADED

SAFE WORKING LOAD (SWL)PER LIFT POINT [TONNES]

0.00 1.00 2.00 3.00 4.00 1 AND 2 100.0 100.0 100.0 100.0 100.0

3 100.0 100.0 91.4 79.8 72.4

SPAN 10.00m

STAGELIFT POINT OFFSET E [m] FROM SPAN CENTRE

SINGLE LIFT POINT LOADED

SAFE WORKING LOAD (SWL)PER LIFT POINT [TONNES]

0.00 1.00 2.00 3.00 4.00 1 AND 2 100.0 100.0 100.0 100.0 100.0

3 100.0 100.0 88.6 78.3 68.9

SPAN 9.00m

STAGELIFT POINT OFFSET E [m] FROM SPAN CENTRE

SINGLE LIFT POINT LOADED

SAFE WORKING LOAD (SWL)PER LIFT POINT [TONNES]

0.00 1.00 2.00 3.00 1 AND 2 100.0 100.0 100.0 100.0

3 100.0 100.0 85.3 74.5

SPAN 8.00m

STAGE

SAFE WORKING LOAD (SWL)

SINGLE LIFT POINT LOADED

LIFT POINT OFFSET E [m] FROM SPAN CENTRE

PER LIFT POINT [TONNES]

0.00 1.00 2.00 3.00 1 AND 2 100.0 100.0 100.0 100.0

3 100.0 99.8 83.1 70.1

SPAN 7.00m

STAGE

LIFT POINT OFFSET E [m] FROM SPAN CENTRE

SAFE WORKING LOAD (SWL)PER LIFT POINT [TONNES]

SINGLE LIFT POINT LOADED

0.00 1.00 2.00 1 AND 2 100.0 100.0 100.0

3 100.0 96.2 78.2

SPAN 6.00m

STAGE

LIFT POINT OFFSET E [m] FROM SPAN CENTRE

SAFE WORKING LOAD (SWL)PER LIFT POINT [TONNES]

SINGLE LIFT POINT LOADED

Project Eng:

Checking Eng:

Drawing No.

Project

Design Eng:

Drawn by:

Drawing Title

Rev.

Copyright c Dorman Long Technology

DO NOT SCALE

NOTES

Scales(At A3)

This drawing has been produced by Dorman Long Technology in accordance with the instructions of the client for their sole and specific use.

Dorman Long Technology shall not be liable for the use of any informationcontained on this drawing for any purpose other than that for which it was specifically prepared and provided.

Should there be any doubt regarding the interpretation of any information given on this drawing, enquiries should be directed to Dorman Long Technology at the address given below before executing such part of the works.

Drawing Status

Original Drawing size: A3

Dorman Long TechnologyThe Charles Parker Building

Midland Road, Higham FerrersNorthamptonshire, NN10 8DN

United KingdomTel: +44 (0) 1933 319133Fax: +44 (0) 1933 319135

www.dormanlongtechnology.com

DL-TLG400TELESCOPIC LIFTING GANTRY

JM

SG

PD

SAB

INFORMATION NTS

LIFTING ARRANGEMENT AND DUTY CHARTSSINGLE LIFT POINT LOADED PER HEAD BEAM

DL-TLG400-005-02 EC:\VaultWorkspace\Designs\_R00\_R021 DL-TLG400 Telescopic Gantry\DL-TLG400-005-02.idw

LIFT POINTSPAN

SPAN LIFT POINTDUTY CHARTS ASSUME THE FOLLOWING:-

STANDARD DL-TLG400 COMPONENTS WITH DL-TLG400 HEAD BEAM

1 No. LIFT POINT LOADED PER HEAD BEAM

MAXIMUM HORIZONTAL LOAD = 5% OF VERTICAL LOAD IN ANY DIRECTION

MAXIMUM SLOPE OF TRACK = 1% IN ANY DIRECTION (BOTH TRACKS AT SAME SLOPE WITHIN TOLERANCES SPECIFIED IN OPERATION AND MAINTENANCE MANUAL)

MAXIMUM TRANSVERSE SLOPE OF HEAD BEAM = +/- 1%

DL-TLG400 STANDARD TRACK SECTIONS USED WITH 1.0m RAIL CENTRES FOR TELESCOPIC CYLINDER STAGE 1 AND 1.7m RAIL CENTRES FOR TELESCOPIC CYLINDERSTAGES 2 AND 3

TABULATED LOADS APPLIED TO SHACKLE OR, IF SHACKLE NOT USED, TO SHACKLE BEAM

IF THE DL-TLG400 TELESCOPIC LIFTING GANTRY IS TO BE USED IN A CONFIGURATION NOT SHOWN ON THIS DRAWING, CONTACT DORMAN LONG TECHNOLOGY FOR SPECIFIC SAFE WORKING LOADS AND ANY SPECIAL CONDITIONS THAT MAY APPLY

9287

MA

XIM

UM

ST

AG

E 3

1620

SPAN - 11300 MAXIMUMSPAN - 6000 MINIMUM

= =

CLE LIFT POINT OFFSET

FROM SPAN CENTRE

SAFE WORKING LOAD(SWL) FOR SINGLELIFT POINTTABULATED BELOW

8572

MA

XIM

UM

ST

AG

E 3

SAFE WORKING LOAD(SWL) FOR SINGLELIFT POINTTABULATED BELOW

E LIFT POINT OFFSET FROM SPAN CENTRE

CL

= =

SPAN - 11300 MAXIMUMSPAN - 6000 MINIMUM

5072

MA

XIM

UM

ST

AG

E 1

5787

MA

XIM

UM

ST

AG

E 1

1620

7407

TOP OF RAIL

5072

MA

XIM

UM

ST

AG

E 1

5787

MA

XIM

UM

ST

AG

E 1

1620

7407

3787

MIN

IMU

MS

TA

GE

0

TOP OF RAIL

CL

CL

INTERPOLATION BETWEEN TABULATED VALUES PERMISSIBLESEE ALSO OPERATION AND MAINTENANCE MANUAL

1000 OR 1700WHEEL CENTRES

1700WHEEL CENTRES