Upload
asia-clean-energy-forum
View
227
Download
0
Embed Size (px)
Citation preview
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
1/14
22 June 2011Ir. Rana Yusuf Nasir
Director of Rating & Technology Green Building Council Indonesia
Greenship Rating Tools :The Challenge & Barriers for Building
Energy Efficiency in Indonesia
1
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
2/14
POLICY DIRECTION
NRE
Gas
Coal
Oil
21 %
30,7 %
43,9%
4,4 %
NRE
Gas
Coal
Oil
2010* 2015 2020
2025
ENERGY
CONSERVATION
(33,85%)
ENERGY
DIVERSIFICATION
Source: *Projection 2010, DEN 2010-2025, **BAU Ditjen EBTKE
25 %
22 %
30 %
23 %
41.7%
20,6%
34.6%
3,1%
2852Mil.BOE
1131,3Mil.BOE
3200Mil.BOE
20%
30%
33%
17%
4300BOE
Fossil energy(subsidized)
RE as alternative energy
Unefficient sectoral
energy demand :House holdTransportationIndustry
Commercial
Fossil energy assecondary energy
sources
ENERGY SUPPLY SIDE MANAGEMENT ENERGY DEMAND SIDE MANAGEMENT
Efficient sectoralenergy demand :House hold
TransportationIndustry
Commercial
SUPPLY SUPPLY DEMAND DEMAND
(DIVERSIFICATION)
2
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
3/14
Energy Efficiency Movement
- IncentiveScheme- Banking
Regulation
FinancialSupport
- MEMR- Jakarta Local Gov
- GBCI
- Gov Reg 70/2009- SNI- Product Labeling- Gov Decree GB- Greenship Rating
Regulation/Standard
- MEMR- DANIDA
- GBCI
- Energy Manager- Energy Auditor- ESCO- GreenshipProfessional
CapacityBuilding
- MOF
- Central Bank
- MEMR
- DANIDA
- Portal EnergyEfficiency- EE&C
Database
InstitutionalStrengthening
3
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
4/14
NB & EB Greenship RatingTools
4
Appropriate Site Development
Energy Efficiency & Conservation
Water Conservation
Material Resource and Cycle
Indoor Health and Comfort
Building Environment Management
TOTAL POINT
Kategori Criteria Points %
8 17 16.8%
7 26 25.7%
7 21 20.8%
7 14 13.9%
8 10 9.9%
8 13 12.9%
45 101 100%
New Building (NB)
Criteria Points %
10 16 13.7%
9 36 30.8%
9 20 17.1%
8 12 10.3%
9 20 17.1%
6 13 11.1%
51 117 100%
Existing Buildin (EB)
3
2 2
3
11
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
5/14
Related Greenship Criteria to Energy Efficiency Measures
SiteEnergy Effi&
Conservation
Indoor Health &
Comfort
Bld EnvironmentManagement
ProperCommissioning
Thermal ComfortHeat Island
Visual ComfortMicro Climate
PASSIVE DESIGN- OTTV
- Building Envelope
- Natural Lighting
- Natural Ventilation
ACTIVE DESIGN-Plant Efficiency
-Artificial Lighting
- Bldg Transportation
5
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
6/14
Green Building Council Indonesia
PROJECT TO BE CERTIFIED
New Building :
1. Public Works Ministry Office
2. Jakarta City Hall
3. Jakarta Parliament Bldg4. Lemigas Bldg
5. Austrian Embassy
6. ITSB
7. Jakarta Eye Center
8. Ciputra World Jakarta
9. Royal Springhill Apartment
Existing Building :
1. Environment MinistryOffice
2. German Center
3. Central Park Mall
4. Grand Indonesia Office
5. Sampurna Strategic
6. Surya Toto
7. Bakrie Tower
Pilot project
As per end of May 2011 - 42 project : Registration & Exercised
Target 2011 : 4 building certified 6
CVVCVV
C
VVCVV
CVV
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
7/14
DEPARTEMEN PEKERJAAN UMUMSEKRETARIAT JENDERALSNVT PENGEMBANGAN, PENGENDALIANDAN PELAKSANAAN PEKERJAAN STRATEGIS BIDANG PU LAINNYA
PEMBERI TUGAS
Public Works MinistryOffice
Saving 38%
250
155
0
50
100
150
200
250
300
Average Office Public WorksBldg
EEI (KWH/m2.yr)
7
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
8/14
PHOTOVOLTAIC PANEL DOUBLE SIDE TYPE
GRASS AT ROOF TOP
MIRROR REFLECTOR
INSULATION WALL
LOUVRE GRILL
ALUMINIUM METAL CLADDING
GEDUNG TEKNOLOGI GAS
PPPTMGB LEMIGASSaving 30%
250
175
0
100
200
300
Average Office This building
EEI (KWH/m2.yr)
8
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
9/14
Photovoltaic
Sun shading
Day lighting
Radiant Cooling
Air tight and high thermal insulation
building envelopes
250
145
050
100
150
200
250300
AverageOffice
AEJ
EEI (KWH/m2.yr)
Saving 42%
Austrian Embassy Jakarta
9
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
10/14
2
250
210
173
0
50
100
150
200
250
300
AverageOffice
Before After
EEI (KWH/m2.yr)
Saving vs Ave : 30%
Saving vs Previ : 18,6%
Existing Building
10
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
11/14
Saving 41%
170
95
0
50
100
150
200
Before Retrofit After Retrofit
EEI (KWH/m2.yr)
EE renovation of office in MEMR
AC-VRF multi split system
Double glass panelling
Sustainable materials
On-line monitoringSpace organization
Eco friendly sanitary
Airtighness & high ceiling
T5 lighting
11
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
12/14
Barriers & Challenge to Green Building Adoption
Lack of Confidence & ExperienceLimited supply of accredited professionals
Psychological resistance of change,
Lack of public awareness / demandLack of knowledge about the environment, social, and
economic risk of inefficient conventional building
Lack of Financial Issue
Financial support
Green products seen as expensive and unreliable
12
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
13/14
Opportunity for EE & Green Building Adoption
Opportunity :
Most building is still inefficient
Increasing demand from market throughout countryGovernment initiative in supporting regulations
&standards, capacity building, institutionalstrengthening and financial support
Green building movement
13
8/6/2019 Ir. Rana Yusuf Nasir - Greenship Rating Tools
14/14
Thank you . . .
Green Building Council Indonesia