24
R. E. Gibson Library & Information Center 1 Automating the Public Release Review Process at the Johns Hopkins Applied Physics Lab Peter LePoer & Judith Theodori Interlab 2004 10/27/2004

Interlab 2004_Revjgt

Embed Size (px)

Citation preview

Page 1: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 1/24

R. E. Gibson Library & Information Center 

1

Automating the Public Release

Review Process at the Johns

Hopkins Applied Physics Lab

Peter LePoer & Judith Theodori Interlab 2004 10/27/2004

Page 2: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 2/24

R. E. Gibson Library & Information Center 

2

Today¶s Presentation«.

Overview of APL and Existing Public

Review Process

Motivators for Change

Design Requirements

New automated process & UI

Design Process & Back End Modifications to Support PR

Results & Future Directions

Page 3: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 3/24

R. E. Gibson Library & Information Center 

3

JHU Applied Physics Laboratory

Page 4: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 4/24

R. E. Gibson Library & Information Center 

4

Overview of JHUAPL-The Facts

Not-for-profit division of Johns

Hopkins University

Major sponsors are Navy and NASA

Staff of 3,350. 66% engineers &

scientists

130 specialized research and test

facilities

Located on 360 acres in Laurel, MD

Page 5: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 5/24

R. E. Gibson Library & Information Center 

5

Overview of JHUAPL-Cool Stuff 

1942 ± VT Proximity Fuze

1948 ± First photo of Earth from Space

1957 ± Analyzed Doppler signals,developing first GPS

Ingestible temperature pill; disposable

syringe; bridge corrosion sensors

2001 ± NEAR satellite landed on asteroid

2004 ± MESSENGER successfully

launched

Page 6: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 6/24

R. E. Gibson Library & Information Center 

6

Manual Public Review Process

Staff 

Member 

Information to be

Reviewed, 5-511,

PR Form

Dept. Public

Release Reviewer 

Check for 

Proprietary,

Sponsor Sensitive

Information

Check for 

Contract Pre-Pub

Restrictions,

 NDA¶s

If DODK 

Visitor 

Control

Paper, 5-511(check # of copies

Required)

Sponsor 

Check for Export

Controlled,Military Critical

Technology

OPC, OTT, IP

Disclosure Form,

OTT website for 

 patent check 

Contracts,Grants Office

Legal (NDA¶s),

If Non

DoD K 

Export Office,

DFOISR,MCTL

Make Determination

And Sign FormArchive

5 Years

Form, Sponsor 

Approvals,

Changes

?

Paper, Cover 

Letter 

If Military

RelatedDFOISR 

Paper, DD1910,

Cover Letter 

(5 copies)

?

Page 7: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 7/24

R. E. Gibson Library & Information Center 

7

Motivators for Change

Complex system

Audit requirements

Desire for central repository

Revised APL internal policy

Page 8: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 8/24

R. E. Gibson Library & Information Center 

8

Why Utilize Existing DM System?

Archival function for document

retention

Security

Utilize existing resource

Because Bob said so

Page 9: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 9/24

R. E. Gibson Library & Information Center 

9

PRIST

Page 10: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 10/24

R. E. Gibson Library & Information Center 

10

Summary Page

Page 11: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 11/24

R. E. Gibson Library & Information Center 

11

Author Form

Page 12: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 12/24

R. E. Gibson Library & Information Center 

12

Confirmation Screen

Page 13: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 13/24

R. E. Gibson Library & Information Center 

13

Email Alert

Page 14: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 14/24

R. E. Gibson Library & Information Center 

14

Reviewer Form

Page 15: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 15/24

R. E. Gibson Library & Information Center 

15

Design Requirements

Make use of Existing DM system for storage of PR proposals

Store both In Process and Archival

Proposals Limit Access to In Process, while

providing general access for Archival

Simplified Front End for creation and

editing of metadata Support 1-1 workflow between Author and

Reviewer 

Single status page for Authors and

Reviewers

Page 16: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 16/24

R. E. Gibson Library & Information Center 

16

Hummingbird DM Architecture

Web Interface

(ASP)

Javascript Library

 API

DCOM API

DM Server 

Process

SQL Server 

Database

Page 17: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 17/24

R. E. Gibson Library & Information Center 

17

PRIST Architecture

I t rf c

( ) r r 

t s

Page 18: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 18/24

R. E. Gibson Library & Information Center 

18

Relevant DM Tables

Page 19: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 19/24

R. E. Gibson Library & Information Center 

19

Profile Table Additions

Field to track review status

PR_RevStat

Reviewer Info Fields

PR_Reviewer 

PR_RevEmail

Review Task Check Box fields

Sponsor Info Fields

Reviewer Comment Field

Page 20: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 20/24

R. E. Gibson Library & Information Center 

20

Proposal Creation Process

Author Inputs

Proposal using

Web Form

Document

Uploaded to

Repository

Profile Record

Created with

document

description

Security Table

updated

Document

location table

updated

Needs Indexing

Table updated

Email sent to

reviewer 

Unique # table

updated

Page 21: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 21/24

R. E. Gibson Library & Information Center 

21

Proposal Review Process

Summary Page

Retrieves

Proposal

Document

Updates

Reviewer Form Profile Table

Updated

Email to Author 

Generated

Security Table

updated if status

= approved

Page 22: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 22/24

R. E. Gibson Library & Information Center 

22

Results & Feedback

Mixed reviews

Slow to take hold

Departments independentlychanging process

Page 23: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 23/24

R. E. Gibson Library & Information Center 

23

Future Directions

Additional Work Flow capabilities

³Reviewer Proxy´ ± additional person

designated by reviewer who canperform reviewer function

³Task Reviewer´ ± ability for reviewer to

route proposal to 3rd party for a specific

review function.

Page 24: Interlab 2004_Revjgt

8/8/2019 Interlab 2004_Revjgt

http://slidepdf.com/reader/full/interlab-2004revjgt 24/24

R. E. Gibson Library & Information Center 

24

For More Information:

Peter LePoer, Systems Librarian

[email protected]

Judith Theodori, Project Manager 

[email protected]