Upload
salman-ahmed
View
222
Download
0
Embed Size (px)
Citation preview
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 1/24
R. E. Gibson Library & Information Center
1
Automating the Public Release
Review Process at the Johns
Hopkins Applied Physics Lab
Peter LePoer & Judith Theodori Interlab 2004 10/27/2004
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 2/24
R. E. Gibson Library & Information Center
2
Today¶s Presentation«.
Overview of APL and Existing Public
Review Process
Motivators for Change
Design Requirements
New automated process & UI
Design Process & Back End Modifications to Support PR
Results & Future Directions
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 3/24
R. E. Gibson Library & Information Center
3
JHU Applied Physics Laboratory
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 4/24
R. E. Gibson Library & Information Center
4
Overview of JHUAPL-The Facts
Not-for-profit division of Johns
Hopkins University
Major sponsors are Navy and NASA
Staff of 3,350. 66% engineers &
scientists
130 specialized research and test
facilities
Located on 360 acres in Laurel, MD
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 5/24
R. E. Gibson Library & Information Center
5
Overview of JHUAPL-Cool Stuff
1942 ± VT Proximity Fuze
1948 ± First photo of Earth from Space
1957 ± Analyzed Doppler signals,developing first GPS
Ingestible temperature pill; disposable
syringe; bridge corrosion sensors
2001 ± NEAR satellite landed on asteroid
2004 ± MESSENGER successfully
launched
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 6/24
R. E. Gibson Library & Information Center
6
Manual Public Review Process
Staff
Member
Information to be
Reviewed, 5-511,
PR Form
Dept. Public
Release Reviewer
Check for
Proprietary,
Sponsor Sensitive
Information
Check for
Contract Pre-Pub
Restrictions,
NDA¶s
If DODK
Visitor
Control
Paper, 5-511(check # of copies
Required)
Sponsor
Check for Export
Controlled,Military Critical
Technology
OPC, OTT, IP
Disclosure Form,
OTT website for
patent check
Contracts,Grants Office
Legal (NDA¶s),
If Non
DoD K
Export Office,
DFOISR,MCTL
Make Determination
And Sign FormArchive
5 Years
Form, Sponsor
Approvals,
Changes
?
Paper, Cover
Letter
If Military
RelatedDFOISR
Paper, DD1910,
Cover Letter
(5 copies)
?
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 7/24
R. E. Gibson Library & Information Center
7
Motivators for Change
Complex system
Audit requirements
Desire for central repository
Revised APL internal policy
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 8/24
R. E. Gibson Library & Information Center
8
Why Utilize Existing DM System?
Archival function for document
retention
Security
Utilize existing resource
Because Bob said so
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 9/24
R. E. Gibson Library & Information Center
9
PRIST
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 10/24
R. E. Gibson Library & Information Center
10
Summary Page
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 11/24
R. E. Gibson Library & Information Center
11
Author Form
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 12/24
R. E. Gibson Library & Information Center
12
Confirmation Screen
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 13/24
R. E. Gibson Library & Information Center
13
Email Alert
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 14/24
R. E. Gibson Library & Information Center
14
Reviewer Form
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 15/24
R. E. Gibson Library & Information Center
15
Design Requirements
Make use of Existing DM system for storage of PR proposals
Store both In Process and Archival
Proposals Limit Access to In Process, while
providing general access for Archival
Simplified Front End for creation and
editing of metadata Support 1-1 workflow between Author and
Reviewer
Single status page for Authors and
Reviewers
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 16/24
R. E. Gibson Library & Information Center
16
Hummingbird DM Architecture
Web Interface
(ASP)
Javascript Library
API
DCOM API
DM Server
Process
SQL Server
Database
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 17/24
R. E. Gibson Library & Information Center
17
PRIST Architecture
I t rf c
( ) r r
t s
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 18/24
R. E. Gibson Library & Information Center
18
Relevant DM Tables
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 19/24
R. E. Gibson Library & Information Center
19
Profile Table Additions
Field to track review status
PR_RevStat
Reviewer Info Fields
PR_Reviewer
PR_RevEmail
Review Task Check Box fields
Sponsor Info Fields
Reviewer Comment Field
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 20/24
R. E. Gibson Library & Information Center
20
Proposal Creation Process
Author Inputs
Proposal using
Web Form
Document
Uploaded to
Repository
Profile Record
Created with
document
description
Security Table
updated
Document
location table
updated
Needs Indexing
Table updated
Email sent to
reviewer
Unique # table
updated
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 21/24
R. E. Gibson Library & Information Center
21
Proposal Review Process
Summary Page
Retrieves
Proposal
Document
Updates
Reviewer Form Profile Table
Updated
Email to Author
Generated
Security Table
updated if status
= approved
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 22/24
R. E. Gibson Library & Information Center
22
Results & Feedback
Mixed reviews
Slow to take hold
Departments independentlychanging process
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 23/24
R. E. Gibson Library & Information Center
23
Future Directions
Additional Work Flow capabilities
³Reviewer Proxy´ ± additional person
designated by reviewer who canperform reviewer function
³Task Reviewer´ ± ability for reviewer to
route proposal to 3rd party for a specific
review function.
8/8/2019 Interlab 2004_Revjgt
http://slidepdf.com/reader/full/interlab-2004revjgt 24/24
R. E. Gibson Library & Information Center
24
For More Information:
Peter LePoer, Systems Librarian
Judith Theodori, Project Manager