9
African Water Summit, 2014 Implementation of Project Boloka Metsi Takalani Mamphitha Session 5.4 Page1 Presented by: Takalani Mamphitha Presented by: Takalani Mamphitha Presented by: Takalani Mamphitha Presented by: Takalani Mamphitha PARTNERSHIP AND FUNDING MODEL PARTNERSHIP AND FUNDING MODEL Integrated Vaal River System Integrated Vaal River System Supply water to 60% of economy 45% of population Mines and industry on Eastern Mpumalanga Highveld Gauteng NW and FS goldfields Kimberley Irrigation Supply water to 60% of economy 45% of population Mines and industry on Eastern Mpumalanga Highveld Gauteng NW and FS goldfields Kimberley Irrigation 2400 2600 2800 3000 3200 3400 3600 3800 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 Yield / Water Requirements (million m 3 / annum) Years Vaal Reconciliation Scenario Vaal Reconciliation Scenario 4 Yield reduction due to dilution wastages High Water Requirement Scenario with Water Conservation and Demand Management Polihali Dam Yield Deficit Deficit First transfer from LHWP Phase II High with target WC/WDM Neutralisation and discharge Unlawful removed Short-term excess yield System Yield Sasol Sasol International integrated energy and chemical company. One of world’s largest producers of synthetic fuels. Uses 4% of water in the Vaal River System Water security a major concern Limited potential to reduce internal consumption and at very high cost International integrated energy and chemical company. One of world’s largest producers of synthetic fuels. Uses 4% of water in the Vaal River System Water security a major concern Limited potential to reduce internal consumption and at very high cost SADC Transboundary Water Management SADC Transboundary Water Management GIZ is implementing agent on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ). Australian Agency for International Development (AusAID) UK Department for International Development (DFID) Multi-dimensional approach, operating at three levels of intervention: the entire SADC region; transboundary river basins and their organisations (e.g. ORASECOM); local municipalities and water utilities. GIZ is implementing agent on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ). Australian Agency for International Development (AusAID) UK Department for International Development (DFID) Multi-dimensional approach, operating at three levels of intervention: the entire SADC region; transboundary river basins and their organisations (e.g. ORASECOM); local municipalities and water utilities.

Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page1

Presented by: Takalani MamphithaPresented by: Takalani MamphithaPresented by: Takalani MamphithaPresented by: Takalani Mamphitha

PARTNERSHIP AND FUNDING MODELPARTNERSHIP AND FUNDING MODEL

Integrated Vaal River SystemIntegrated Vaal River System

Supply water to 60% of economy

45% of population

Mines and industry on Eastern Mpumalanga Highveld

Gauteng

NW and FS goldfields

Kimberley

Irrigation

Supply water to 60% of economy

45% of population

Mines and industry on Eastern Mpumalanga Highveld

Gauteng

NW and FS goldfields

Kimberley

Irrigation

2400

2600

2800

3000

3200

3400

3600

3800

2005 2010 2015 2020 2025 2030 2035 2040 2045 2050

Yie

ld /

Wa

ter

Re

qu

ire

me

nts

(m

illi

on

m3

/ a

nn

um

)

Years

Vaal Reconciliation ScenarioVaal Reconciliation Scenario

4

Yield reduction due to

dilution wastages

High Water Requirement Scenario with

Water Conservation and Demand Management

Polihali Dam Yield

Deficit

Deficit

First transfer from LHWP Phase II

High with target

WC/WDM

Neutralisation and

discharge Unlawful removed

Short-term

excess yield

System

Yield

SasolSasol

International integrated energy and chemical company.

One of world’s largest producers of synthetic fuels.

Uses 4% of water in the Vaal River System

Water security a major concern

Limited potential to reduce internal consumption and at very high cost

International integrated energy and chemical company.

One of world’s largest producers of synthetic fuels.

Uses 4% of water in the Vaal River System

Water security a major concern

Limited potential to reduce internal consumption and at very high cost

SADC Transboundary Water ManagementSADC Transboundary Water Management

GIZ is implementing agent on behalf of the

- German Federal Ministry for Economic Cooperation and Development (BMZ).

- Australian Agency for International Development (AusAID)

- UK Department for International Development (DFID)

Multi-dimensional approach, operating at

three levels of intervention:

- the entire SADC region;

- transboundary river basins and their organisations (e.g. ORASECOM);

- local municipalities and water utilities.

GIZ is implementing agent on behalf of the

- German Federal Ministry for Economic Cooperation and Development (BMZ).

- Australian Agency for International Development (AusAID)

- UK Department for International Development (DFID)

Multi-dimensional approach, operating at

three levels of intervention:

- the entire SADC region;

- transboundary river basins and their organisations (e.g. ORASECOM);

- local municipalities and water utilities.

Page 2: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page2

Emfuleni Local MunicipalityEmfuleni Local Municipality

• Largest local municipality in SA with a population of 721 000 (Census 2011)

• Unemployment rate = 34.7%

• Water purchases = 93million m3/ annum @ cost of R 536million

• NRW / Water losses = 48%

• Cost recovery <5% in certain areas

• Average consumption = 350 ℓ / c / day

• Should be major contributor to Project 15% in Integrated Vaal River System

Internal Plumbing LeakageInternal Plumbing Leakage

Leak = 720 litres / hour = 518 m3 / month = 6 221m3 / annumPayment to Rand Water = R 2800 / month = R 33 600 / annum

Cost to fix = ± R 100 (flexible hose plus labour)

Partnership ModelPartnership Model PROJECT AREA

Funding ModelFunding Model

Annual Rand Water bill for project area = 41.4 million m3 @ a cost of R 238 million

Target 10% water savings or R 24 million

Sasol and GiZ seed funding contribution = R 10 million

Municipality reinvest savings

Main objective is for project to become self sustaining

Annual Rand Water bill for project area = 41.4 million m3 @ a cost of R 238 million

Target 10% water savings or R 24 million

Sasol and GiZ seed funding contribution = R 10 million

Municipality reinvest savings

Main objective is for project to become self sustaining

No savings = No project!!!

Team StructureTeam Structure

Metsi-a-

LekoaSasol GiZ

3 x Main Local

Contractors

26 x Water

Warriors

(1 per Ward)

52 x Local Plumbers

(2 per Ward)

UK Aid

Australian Aid

ORASECOM

MOU MOU

Tender Contract Tender Contract

Tender Contract Employment Contract

Employment Contract

German

Cooperation

4 x Student technicians

(Engineering & quality

control)

Employment Contract

Management Consultant

Page 3: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page3

COMMUNITY AWARENESSCOMMUNITY AWARENESS

TasksTasks

� Selection and appointment of Water Conservation Warriors

� Development of awareness and Material

� Coordinate community awareness with leak repair initiatives

Water WarriorsWater Warriors Councillors TrainingCouncillors Training

Community WorkshopsCommunity Workshops Outreach ActivitiesOutreach Activities

Page 4: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page4

Road ShowsRoad Shows

Learner WorkshopsLearner Workshops

School Caretaker WorkshopsSchool Caretaker Workshops24 698 Water and Sanitation

problems reported

Key Awareness HighlightsKey Awareness Highlights

Reached 103 088 households in Sebokeng and Evaton

Reached 39 260 consumers through workshops and out reach activities

Reached 98 schools

Educated 12 475 learners

Fully utilised local resources

Employment creation and skills development

Distributed 495 068 pamphlets, stickers,

fridge magnets, buckets, shirts, bath plugs, etc.

Page 5: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page5

TECHNICAL ASPECTTECHNICAL ASPECT

TasksTasks

Baseline assessment

Retrofitting

Results

Baseline assessment

Retrofitting

Results

Sebokeng / Evaton BaselineSebokeng / Evaton Baseline New Magflow metersNew Magflow meters

Bulk Meter Replacement

Refurbishment of PRV’s

Valve audits, maintenance and repairs

Page 6: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page6

Sectorisation and Logging Domestic Meter Leaks – Before

After

Stolen Tap – Leak Directed to Drain Toilet Leaks - Before

After

Before

After

Leaking School Urinals Replaced with Push-Button SystemBulk pipeline leak repairs Bulk pipeline leak repairs

Page 7: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page7

ChallengesChallenges ChallengesChallenges

Removed Bolts

ChallengesChallenges Total Jobs CreatedTotal Jobs Created

Local Labour Male Female Total

Engineering Technicians 6 1 7

Admin Support 0 1 1

Water Warrior Coordinator 1 1 2

Water Warriors 9 16 25

Local Ward Plumbers 37 21 58

Local Contractors’ Team 33 7 40

Management Consultant 8 4 12

Total 94 51 145

Summary of Plumbing MaterialSummary of Plumbing Material

Scheduled Material Additional Work

242 928 washers replaced!!!

Total Unit CostTotal Unit Cost

TaskHouseholds

/ StandsPhase 1

(R million)Phase 2

(R million)Total

(R million)Unit Cost

Social

(32% of budget)

106 092Households

R 5.153 R 3.294 R 8.447R 80 /

household

Technical

(68% of budget)

73 766 stands

R 7.012 R 11.230 R 18.242R 247 /

stand

Total106 092

householdsR 12.165 R 14.524 R 26.689

R 252 / household

Include professional and performance fees,

disbursements and construction costs

Page 8: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page8

Sebokeng / Evaton Actual vs Projected Demand

Sebokeng / Evaton Actual vs Projected Demand

Saving: 6 840 373m³R36 975 061

Six Month Rolling Actual vs Baseline

Demand

Six Month Rolling Actual vs Baseline

Demand

Saving

Date from Date to Saving m3 Value (R)

% Reduction

againstbaseline

Jul-12 Jun-13 2 076 793 R 10 513 490 5.2%

Jul-13 Jun-14 4 763 580 R 26 461 570 11.4%

Total 6 840 373 R 36 975 061 8.4%

Annual Project SavingsAnnual Project Savings Project Cost vs SavingsProject Cost vs Savings

Technical HighlightsTechnical Highlights

145 jobs created

6.8 million m3 water saving

Improved level of service

Improved customer relations

Optimised pressure management

Deferred infrastructure upgrades

145 jobs created

6.8 million m3 water saving

Improved level of service

Improved customer relations

Optimised pressure management

Deferred infrastructure upgrades

Lessons learntLessons learnt

Model can be replicated in other areas with necessary political & institutional support

Performance must be measured against a baseline

Savings not always realised in “cash-

strapped” municipal environment

Difficult to plan without a defined budget

Short term solution – municipality has long

term solution with Smart Metering

Model can be replicated in other areas with necessary political & institutional support

Performance must be measured against a baseline

Savings not always realised in “cash-

strapped” municipal environment

Difficult to plan without a defined budget

Short term solution – municipality has long

term solution with Smart Metering

Page 9: Integrated Vaal River System Vaal Reconciliation Scenario · Partnership Model PROJECT AREA Funding Model Annual Rand Water bill for project area = 41.4 million m 3 @ a cost of R

African Water Summit, 2014 Implementation of Project Boloka Metsi

Takalani Mamphitha Session 5.4 Page9

Thank youThank you