LSC - K. Foraz 2
AD
• Done:– Renewal stoch. cooling power supply – Cryogenic pump maintenance– Pickup tank sUHM3107 & Tank UVM3207 back in
place
Circulation of demin water now stopped in AD-ring
• In progress:– Girder line 7000 : chamber specifications under
approval– BHN06: visit to Novosibirsk – Electrical reconnexion work - new junctions– Loop tests in parallel on all magnet interlocks
• Discussions in progress with EN/CV for water availibility
14/06/2013
Pickup tanks logistics
LSC - K. Foraz 3
LEIR
• Done– Buffer zone
• In progress– Organization of
future bake-out (sectors 1,2 & 5)
• Forecast– Access point installation
from next week
14/06/2013
LSC - K. Foraz 4
PSB & PS
PSB• In progress
– Cable continuity and Burndy connector tests for the Multipole power converters progressing well.
– On site preparations for the beam dump replacement project
– Replacement of the PSB lift AS-45.– Installation of the underground
cables – CV maintenance– Kicker consolidation and
maintenance Forecast
• Forecast– Vacuum and Beam instrumentation
maintenance & upgrade programs under preparation.
– Replacement of the BI.SMH under preparation.
14/06/2013
PS• In Progress
– Renewal of ventilation system progressing well
– Tuner of the PSC40-78MHz cavity removed - investigation on progress
– Refurbishment of the piping of the chilled water circuit just started
– Access System Installation
• Forecast– Dismantling of cranes PR06 & PR20 from
next week – ALARA done– Installation of shielding wall in front of
septa 16 & 42
LSC - K. Foraz 5
SPS
• Done– TT10 : CV pipes removal– 8 magnets exchanged
• In progress– EL cable campaigns…..
last minute: cable drums have been stolen in BA, BA4 and BA5…. Impact to be evaluated
– 7 magnets will be exchange next week– Preparation for LSS1+ decabling campaign
• Forecast– TT10 : civil engineering– Drain of the SPS primary water ring from next
week -> exchange of isolating valves
14/06/2013
SPS magnet exchange
TT10 – pipes removed
LSC - K. Foraz 6
LHC – sector readiness for consolidation
• Sector readiness:– Released: 45, 56, 67, 78, 81, 12, 23– To be released: 34 waiting for QRL leak test– S12 short circuits – investigation completed
• Diode – solved• Lyra – repair to be done
• Leak test of cryomagnets lines– 20 internal helium leaks identified
in arc subsectors after warm-up14 identified to component. for 6 leaks not identified to component, further tests to be performed in ɸ2.
– Triplet 5L – helium leak in FF (inside DFBX) stable since 2009 – propose ‘use-as-is’.
• RF ball tests
• *ball initially stopped, dummy PIMS in place , 2nd ball test successful• **ball stopped, no collapses PIM, 2nd test successful
14/06/2013
Status for LHC arcs S5-6 S4-5 S6-7 S7-8 S1-2 S8-1 S3-4 S2-3
RF ball test – PIM collapses 0 0 0** 0 1* 1* to do 0
LSC - K. Foraz 7
Status of leak tests
14/06/2013
• QRL internal leak test status– S56 - Leak tests in progress (in parallel with SMACC)– S34 - Leak localization tests on-going,– S67 - Coordinated with SMACC – scheduled next week– S78 - Line C leak confirmed – deformed compensator (H) confirmed,– S81 - Line C leak confirmed, deformed compensator at C29R8 – QRL opening
from end of next week– S45 - Opening and observation on going.
LSC - K. Foraz 8
LHC - SMACC
• W opening just finished in sector 67• Interconnection train in sectors 56 & 67
• DFBA consolidation in sectors 56, 67, 81
• DN200 in progress in sector 78 (not started in sector 81)
• Magnets:– s78 - connections in
progress – s12: magnets wil be
replaced from next week
14/06/2013
LSC - K. Foraz 9
• QRL opening in sector 45– Vacuum vessel sleeve cut, MLI and shield removed– Tests on line C compensator - leak concerned– Measurement in situ of the position of the lines– Cut and extract compensator for analysis
• QRL service module– Walkways installed on 1/8– Service modules upgraded 1/8
LHC “other” consolidation & upgrades
14/06/2013
QRL opening sec. 45
QRL opening sec. 45
Walkway
QRL service module
LSC - K. Foraz 10
LHC - R2E
• Point 1– Power converters removal in progress– Installation of canalys and AC cables in UL– Water cooled cables removal from next wk
• Point 5– Drilling will start next week– Displacement of cable trays in UL from next week– Piping installation almost finished– Water cooled cables removed
• Point 7– Power converters disconnection and cable
removal in progress– TZ76 – demolition wall in progress
14/06/2013
WCC removed @P5
UL55 doors removedWall demolition in TZ76
LSC - K. Foraz 11
LHC - LSS & service areas
• In (good) progress– Cabling campaigns (p1, p2, p4)– Maintenance of Kickers system– Maintenance of RF system– ACS exchanged canceled
spare is leaky (degradation during storage)– Maintenance and upgrade of access system– Survey– Vacuum and vacuum
• Meeting programmed next week
14/06/2013RF logisitcs RF module
Cabling at point 2
LSC - K. Foraz 12
LHC - Infrastructures
• Demineralised water production stopped
• Electrical maintenance and consolidation of 400kV inprogress
• UPS replacement– SR1 in progress– Point 6 underground
• CV maintenance at points 18, 2 6 and 8– In order to lower down temperature in REs ( 48kV systems are suffering from hot
temperature), it has been proposed to replace the door by grid door
• New cooling towers installation at Point 8 (pt 6 completed)
• Optical fibers @ point 1
• Removal of racks
14/06/2013
DYPBlogisitcs
LSC - K. Foraz 13
LHC overall progress
• Good overall progress in LHC• IC train ahead of schedule...but some issues being studied• Infrastructure progressing well
– Temperature in REs to be followed• Some potential issues to be followed
– LSS – components readiness to be followed– Lyra issue– QRL leaks and repair– Busbar insulation boxes
14/06/2013 SEPT37 37
38 38
39 39
SEPT
36 36
40 40
AUG
31 31
JULY
27 27
AUG
32 32
33 33
34 34
35 35
JUNE
23 23
MAY
JULY28 28
29 29
JUNE24 24
25 25
26 26
30 30
20 20
21 21
22 22
APR15 15
16 16
17 17
18 18
APR
14 14
MAY
19 19
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering testsELQA
Warm-up
Leak tests
ELQALeak tests
Powering tests
ELQA
Warm-upLeak tests
ELQALeak tests
Powering testsELQA
Warm-upLeak tests
ELQA
Leak tests
Powering testsELQA
Warm-upLeak tests
ELQALeak tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering tests
ELQA
Warm-up
ELQALeak tests
Leak testsCSCM
lockoutlockout
lockout
lockout lockoutlockout lockout
lockout
IC total
IC total
IC total
IC total
IC total
DFBA
J
DFBA
K
DFBA
L
DFBA
M
DFBA
N
DFBA
O
DFBA
P
DFBA
A
DFBA
B
DFBA
C
DFBA
D
DFBA
E
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EP
EP
EE
EE
EE
EE
Cryo
Cryo
DFBX
A
DFBX
B
Cryo
IT DN
300
IT DN
300
DFBX
C
DFBX
D
IT DN
300
IT DN
300
Cryo
QRL leak repair
Cryo
B30R
7
B21L
8Q5
L8
C15R
1A2
2R1
C30R
1C3
3R1
C33L
2A2
9L2
B25R
2
C15L
3 A23R
2Q2
3R3
A26R
3Q2
7R3
B32R
3
C17R
4B3
1R4
Prepa. Works
Disma
ntling
Piping
Cabli
ng
OF
Cryo
.Eth
.
Prepa. Works
Prepa. Works
Disma
ntling
Piping
Cabli
ng
Porte
Prepa. Works
Cabli
ngDis
mantl
ing
Civil eng.
Piping
and v
entil
ation
Safe
-room
(I)
Cable
tray
sUP
S
Move
racks
OF
Disma
ntling
Cabli
ng
Civil eng.
Cable
tray
s
RR
RR
Rack
sRa
cks
Alarm
s
R2E-Test Fire Detection
UPS
E
Table
autin
Disconnect
Eth.
Mo
UPS
Mo
CV ac
tiviti
es
Cryo
genic
sCa
bling
Shiel
ding
Shielding
beam
vacu
um
beam
vacu
um beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
Beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
A1L
A1R
A6L
I5L2
A5L
B4L2
A4L
B1L
A1L
A1R
A5R
A5L
A4L
IP3
A5R
IP4
B5R4
A5L5
A4L
A1L
A1R
A4R
A5R
A7R
E5L
A5L
A4L
IP6
A4R
A5R6
B5L7
A5L7
IP7
A4R
A5RB5R
A7R
A6L
A5L
A1L
A4R
B4R8
A5R
MKIs
I5RA6R
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
WCC
WCC
WCC
SC te
sts
UPS
UPS
SF M
ainten
ance
UPS
UPS
SF M
ainten
ance
UW M
ainten
ance
SU M
ainten
ance
New
SF
UW M
ainten
ance
UW Up
grade
SU
Main
tenan
ce
UPS
UPS
SF M
ainten
ance
New
SFUW
Main
tenan
ceUW
Upgra
deSU
Main
tenan
ce
New
SFUW
Main
tenan
ceUW
Upgra
de
Electrical Maintenance - No accessElectrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Acc.
PAD_MADPAD_MAD
PAD_MAD
PAD_MAD PAD_MADPAD_MAD PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
PAD_MAD
PAD_MADPAD_MAD
PAD_MADPAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
Acc.
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
Klystr
ons
Silico
noil
reco
nditio
nning
MKD
-MKB
gene
rator
s
MD-M
KB te
sts
MD-M
KB te
sts
MKD
-Entr
y box
es
MKD
-Entr
y box
es
UPS
17/05
07/06
RE18
RE22
RE28
UJ32
RE38
RE42
RE48
RE52
RE58
RE62
RE68
RE72
RE78
RE82
RE88
RE12
LSSR2E R2E R2E R2E
LSS Arc 67 LSSPt 7
LSS Arc 78LSSPt 5
LSS Arc 56 LSS Pt 6LSS Arc 34 LSS Pt 4 LSS Arc 45Pt 1
LSS Arc 12 LSS Pt 2 LSS Arc 23 LSS Pt 3 LSSPt 8
LSS Arc 81
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering testsELQA
Warm-up
Leak tests
ELQALeak tests
Powering tests
ELQA
Warm-upLeak tests
ELQALeak tests
Powering testsELQA
Warm-upLeak tests
ELQA
Leak tests
Powering testsELQA
Warm-upLeak tests
ELQALeak tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering tests
ELQA
Warm-upLeak tests
ELQA
Leak tests
Powering tests
ELQA
Warm-up
ELQALeak tests
Leak testsCSCM
lockoutlockout
lockout
lockout lockoutlockout lockout
lockout
IC total
IC total
IC total
IC total
IC total
DFBA
J
DFBA
K
DFBA
L
DFBA
M
DFBA
N
DFBA
O
DFBA
P
DFBA
A
DFBA
B
DFBA
C
DFBA
D
DFBA
E
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
DYPB
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EPC 60A
EP
EP
EE
EE
EE
EE
Cryo
Cryo
DFBX
A
DFBX
B
Cryo
IT DN
300
IT DN
300
DFBX
C
DFBX
D
IT DN
300
IT DN
300
Cryo
QRL leak repair
Cryo
B30R
7
B21L
8Q5
L8
C15R
1A2
2R1
C30R
1C3
3R1
C33L
2A2
9L2
B25R
2
C15L
3 A23R
2Q2
3R3
A26R
3Q2
7R3
B32R
3
C17R
4B3
1R4
Prepa. Works
Disma
ntling
Piping
Cabli
ng
OF
Cryo
.Eth
.
Prepa. Works
Prepa. Works
Disma
ntling
Piping
Cabli
ng
Porte
Prepa. Works
Cabli
ngDis
mantl
ing
Civil eng.
Piping
and v
entil
ation
Safe
-room
(I)
Cable
tray
sUP
S
Move
racks
OF
Disma
ntling
Cabli
ng
Civil eng.
Cable
tray
s
RR
RR
Rack
sRa
cks
Alarm
s
R2E-Test Fire Detection
UPS
E
Table
autin
Disconnect
Eth.
Mo
UPS
Mo
CV ac
tiviti
es
Cryo
genic
sCa
bling
Shiel
ding
Shielding
beam
vacu
um
beam
vacu
um beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
Beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
beam
vacu
um
A1L
A1R
A6L
I5L2
A5L
B4L2
A4L
B1L
A1L
A1R
A5R
A5L
A4L
IP3
A5R
IP4
B5R4
A5L5
A4L
A1L
A1R
A4R
A5R
A7R
E5L
A5L
A4L
IP6
A4R
A5R6
B5L7
A5L7
IP7
A4R
A5RB5R
A7R
A6L
A5L
A1L
A4R
B4R8
A5R
MKIs
I5RA6R
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Surve
y
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabling
Cabli
ng
Cabli
ng
Cabli
ng
Cabli
ng
WCC
WCC
WCC
SC te
sts
UPS
UPS
SF M
ainten
ance
UPS
UPS
SF M
ainten
ance
UW M
ainten
ance
SU M
ainten
ance
New
SF
UW M
ainten
ance
UW Up
grade
SU
Main
tenan
ce
UPS
UPS
SF M
ainten
ance
New
SFUW
Main
tenan
ceUW
Upgra
deSU
Main
tenan
ce
New
SFUW
Main
tenan
ceUW
Upgra
de
Electrical Maintenance - No accessElectrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Electrical Maintenance - No access
Acc.
PAD_MADPAD_MAD
PAD_MAD
PAD_MAD PAD_MADPAD_MAD PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
PAD_MAD
PAD_MADPAD_MAD
PAD_MADPAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD PAD_MAD
Acc.
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
PAD_MAD
Klystr
ons
Silico
noil
reco
nditio
nning
MKD
-MKB
gene
rator
s
MD-M
KB te
sts
MD-M
KB te
sts
MKD
-Entr
y box
es
MKD
-Entr
y box
es
UPS
17/05
07/06